Southern California Edison Integrated Grid Project (IGP) EPIC Winter Symposium Bob Yinger – Chief Engineer February 7, 2018

Upload: lyduong

Post on 12-Mar-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Integrated Grid Project (IGP) EPIC Winter Symposium

Bob Yinger – Chief Engineer February 7, 2018

Page 2: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Southern California Edison in 2018 • 15 million residents in a 50,000 square mile area • 40% energy from carbon-free sources • Joined open letter to support Paris Climate Accord • Utility Dive “2017 Utility of the Year” for our 2017

Clean Power and Electrification Pathway

Supporting California’s 2030 greenhouse gas reduction goals

Page 3: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

• Demonstrate the next generation grid infrastructure (field and back office) to manage, operate, and optimize the grid with high penetrations of DER

• Provide a demonstration test bed for systems, equipment, and concepts for future modernization efforts

• Verify technology readiness and potential architectures

This testing of emerging technology components and back office systems will enable effective technology choices, reduce capital deployment risk, and accelerate SCE’s ability to modernize the grid

3

Objectives

Page 4: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Scope and Timeline • IGP focuses on optimizing all DER assets, 3rd

party- or utility-owned

• The project is organized into three major areas ‒ DER control systems (voltage and power flow

optimization) ‒ Cross cutting functions (i.e. communications, cyber &

integration) ‒ DER resource contracting for tests (3rd party &

aggregators)

4

Phase 1: Planning 2015 - 2016

Phase 2: Lab Test 2017-2018

Phase 3: M&V 2018—2019

Page 5: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Scope

As controls interact with back-office applications, field devices, and aggregators over the Internet, cybersecurity measures become more important

5

Page 6: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Technical Highlights • DER Controls

‒ Provides increased DER integration capacity by optimizing power flow and voltage control

• Operational Service Bus ‒ Provides easier integration of multiple applications

through standard data and services

• Field Area Network ‒ Provides low latency communications for advanced

field automation and DER controls

• IEEE 2030.5 Standard ‒ Provides standard method to communicate with

smart inverters and aggregators

6

Page 7: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Site Selection

7

•Mix of overhead and underground circuits

•Both residential and commercial customers

•Several large PV installations already in place

•Located in the Preferred Resource Pilot (PRP) area

Camden and Johanna Jr substations

Johanna Jr

Camden

Page 8: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Use Case: Power Flow & Voltage Optimization

Camden Substation

482 kW PV

1 MW Storage

187 kW PV

1.4 MW Storage

1.2 MW Customer

Load

Optimization Controller

Monitoring Point

Optimization controller monitors all DER and sends commands to maintain the correct voltage levels and operate within grid power flow constraints

Page 9: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Use Case: Virtual Microgrid

482 kW PV

1 MW Storage

187 kW PV

1.4 MW Storage

1.2 MW Customer

Load

Monitoring Point

Monitoring point samples power flow and directs DER to reduce the power flow at the monitoring point to zero

Camden Substation

Page 10: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

High Level Logical Architecture

10

Edge Domain

Distributed DomainCentral Domain

Operational Service Bus

IGP Control Application

IGP Control Application

IGP Control Application

Distributed Control

Application

Distributed Control

Application

DER DER

Field Area Network

Operational Service Bus Wide Area Network

Page 11: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Logical Architecture

11

DER Control Functionality

Foundational Functionality

Support Projects

Production Environment

Network Management

3rd PartyField

DERMonitoring Point

Automation Devices

2030.5StorageMarketMicro grid

Power Flow

Volt/ VAR

Operational Service Bus

2030.5 Interface

Camden Substation

Substation Automation

Common Substation Platform

Cybersecurity SuiteShared Apps

DMS

Visualization Other Key Mgmt Security Active

Directory Logging

Distributed Applications Customer

Metering

Weather

Aggregators

3rd Party DER

SCE Intranet Internet

FAN Headend

Pricing

Page 12: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison 12

Closed-Loop Testing Approach

Benefits to the approach • Test multiple applications, hardware configurations and

communications infrastructure • Testing both centralized and distributed controls as well as

optimization routines • Simulating hypothetical DER adoption or load growth

scenarios

Control

Optimization

Distribution Management System

External Input Data(Weather, LMP, etc.)

Smart Meter Data Oper

atio

nal S

ervi

ce B

us Real-Time Network Model

Substation Telemetry

Large DER

Non-DER Devices

Aggregated DER

Page 13: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Example Test Results

• Battery is used to offset change in PV output as well as reduce the higher frequency PV output variations

13

PV Output Battery Output

Page 14: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Connecting to 3rd Party DER • Most new DER resources connected to the utility

grid are owned by customers or third-party developers

• For DERs to provide grid support, the utility may want to reduce output or produce reactive power limiting the DER’s real power output ‒ How do utilities compensate owners of DERs for the

services they provide? ‒ Will the incentives being considered lead to higher

levels of penetration?

14

Page 15: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Key Accomplishments • Identified site for utility-owned storage system • Developed system requirements and completed system

design for high penetration DER control systems • Developed a high-level integration path for aggregators of

DERs using IEEE 2030.5 • Integrated the distributed control systems with the

production DMS through the operational service bus • Assembled laboratory test environment based on the

DigSILENT PowerFactory simulation system • Completed first series of factory acceptance testing (FAT) of

the control systems and the operational service bus • Tested and evaluated four FAN communications systems

and down-selected to two systems 15

Page 16: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Key Lessons Learned • IEEE 2030.5 standard is in early stages of

deployment and few aggregators have it • Lab testing with a real-time simulation

approach allows examination of a broad range of conditions before field deployment

• Edge computing capability in the FAN field device is vital to allowing network adaptability

• When integrating cybersecurity measures, examine all systems for continued proper operation

• Recruiting customers for the demo requires establishing value for their efforts/equipment use

16

Page 17: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Value for Future Modernization Efforts • Design and demo IEEE 2030.5 architecture

acceptable to SCE cybersecurity group • Demo volt/VAR and power flow optimization

techniques using DERs • Show integration of multiple applications

through operational service bus • Develop detailed interface service definitions

that can be reused • Assess field message bus technologies • Host first test of FAN technologies in the field

17

Page 18: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

IGP Status • EPIC I Activities Completed

‒ Completed requirements, design and architecture ‒ Completed control system RFP and vendor selection ‒ Demonstrated core functionality and system

integration in the lab

• EPIC II 2018 Activities ‒ Begin field demonstration of the IGP controls with

distribution circuit resources (e.g. capacitor controllers, remote control switches with monitoring, DER resources)

18

Page 19: Integrated Grid Project (IGP) - energy.ca.gov · 7/2/2018 · Intranet Internet FAN Headend Pricing. 12 Southern California Edison Closed-Loop Testing Approach . ... ‒Begin field

Southern California Edison

Bob Yinger Consulting Engineer Grid Technology & Modernization Southern California Edison [email protected]