integrated lot sizing and safety stock placement in a ... · kunal kumar faculty of economics and...

3
Accepted Manuscript Integrated lot sizing and safety stock placement in a network of production facilities Kunal Kumar, Tarik Aouam PII: S0925-5273(17)30309-2 DOI: 10.1016/j.ijpe.2017.10.006 Reference: PROECO 6838 To appear in: International Journal of Production Economics Received Date: 2 August 2016 Revised Date: 29 September 2017 Accepted Date: 4 October 2017 Please cite this article as: Kumar, K., Aouam, T., Integrated lot sizing and safety stock placement in a network of production facilities, International Journal of Production Economics (2017), doi: 10.1016/ j.ijpe.2017.10.006. This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrated lot sizing and safety stock placement in a ... · Kunal Kumar Faculty of Economics and Business Administration Ghent University Tweekerkenstraat 2, 9000 Gent, Belgium kunal.kumar@ugent.be

Accepted Manuscript

Integrated lot sizing and safety stock placement in a network of production facilities

Kunal Kumar, Tarik Aouam

PII: S0925-5273(17)30309-2

DOI: 10.1016/j.ijpe.2017.10.006

Reference: PROECO 6838

To appear in: International Journal of Production Economics

Received Date: 2 August 2016

Revised Date: 29 September 2017

Accepted Date: 4 October 2017

Please cite this article as: Kumar, K., Aouam, T., Integrated lot sizing and safety stock placement in anetwork of production facilities, International Journal of Production Economics (2017), doi: 10.1016/j.ijpe.2017.10.006.

This is a PDF file of an unedited manuscript that has been accepted for publication. As a service toour customers we are providing this early version of the manuscript. The manuscript will undergocopyediting, typesetting, and review of the resulting proof before it is published in its final form. Pleasenote that during the production process errors may be discovered which could affect the content, and alllegal disclaimers that apply to the journal pertain.

Page 2: Integrated lot sizing and safety stock placement in a ... · Kunal Kumar Faculty of Economics and Business Administration Ghent University Tweekerkenstraat 2, 9000 Gent, Belgium kunal.kumar@ugent.be

MANUSCRIP

T

ACCEPTED

ACCEPTED MANUSCRIPT

Integrated lot sizing and safety stock placement in a network of

production facilities

Kunal KumarFaculty of Economics and Business Administration

Ghent UniversityTweekerkenstraat 2, 9000 Gent, Belgium

[email protected]

Tarik Aouam ∗

Faculty of Economics and Business AdministrationGhent University

Tweekerkenstraat 2, 9000 Gent, [email protected]

September 29, 2017

∗Corresponding author

1