integrated sea information system : public-private partnership option

24
Integrated Sea Information System : Public-Private Partnership Option Eur Ing John P. Shaw BE MBA CEng MIEI SMIEEE MISA [email protected] CIO Mainstream Renewable Power 15 November 2011 MRI – 14 – 15 November 2011

Upload: lilah

Post on 25-Feb-2016

26 views

Category:

Documents


3 download

DESCRIPTION

MRI – 14 – 15 November 2011. Integrated Sea Information System : Public-Private Partnership Option. Eur Ing John P. Shaw BE MBA CEng MIEI SMIEEE MISA [email protected] CIO Mainstream Renewable Power 15 November 2011. Introduction. ISIS. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Integrated Sea Information  System : Public-Private Partnership Option

Integrated Sea Information System : Public-Private Partnership Option

Eur Ing John P. Shaw BE MBA CEng MIEI SMIEEE [email protected] Renewable Power15 November 2011

MRI – 14 – 15 November 2011

Page 2: Integrated Sea Information  System : Public-Private Partnership Option

By 2050 there will be a transition to large-scale Offshore Wind Farms in the North

Sea.

The Supergrid will enable efficient distribution of this new energy

resource

An Integrated Sea information System is needed to accelerate this transition:

ISIS.

To create ISIS, new policies, new standards, greater cooperation and

innovative Information and Communication Technologies are

needed.

IntroductionISIS

Page 3: Integrated Sea Information  System : Public-Private Partnership Option

1. ISIS Workshop on 14 September 2011 – key outputs

2. ISIS – Next steps

IntroductionISIS

Page 4: Integrated Sea Information  System : Public-Private Partnership Option

1. ISIS Workshop on 14 September 2011 – key outputs

2. ISIS – Next steps

IntroductionISIS

Page 5: Integrated Sea Information  System : Public-Private Partnership Option

5

Agenda

Purpose of WorkshopCreate ISIS Consortium and agree a Memorandum of Understanding to build the

technical ISIS solution.

Agenda08:30               Start and introductions09.00               Microsoft Vision and strategy : Smart Energy Reference Architecture SERA 09:30               ISIS : recap on the scope and objectives of ISIS Consortium

10:00 – 10:15   coffee break

10:15               Question 1 on Roles: Capture the thoughts from each attendee on Consortium Roles11:30               Summarise key points on Role

12:00 – 12: 30 lunch

12:30               Spotlight on Microsoft Approach to Visualization  13:00               Spotlight on OSIsoft Visualization Demonstration13.30               European Commission Perspective on Marine Data Management

14:00 – 14:15 coffee break

14:15               Question 2 on Criteria: Capture the thoughts from each attendee on Consortium Criteria15:30               Summarise key points on Criteria16.00               Confirm Actions & Next Steps16.30               Close

ISIS

Page 6: Integrated Sea Information  System : Public-Private Partnership Option

6

Attendees

Name Position Organisation City Website emailDr Angela Schaefer Helmholtz Projejkt Alfred Wegener Institute Bremerhaven http://www.awi.de/en/home/ [email protected]

Pierce Martin Director Antaris Dublin http://antarisconsulting.com/ [email protected]

Till Luhmann Head of Energy Research BTC Bremen http://www.btc-ag.com/en/index.htm [email protected]

Johannes Brinkmann Energy Research BTC Bremen http://www.btc-ag.com/en/index.htm [email protected]

Alexander Loffler Researcher - German Research Centre for Artificial Intelligence DFKI Saarbrucken http://graphics.cs.uni-sb.de/ [email protected]

Iain Shepherd European Commission EC Fisheries & Maritime Affairs Brussels https://webgate.ec.europa.eu/maritimeforum/node/130

[email protected]

Waddah Saab European Commission EC Fisheries & Maritime Affairs Brussels https://webgate.ec.europa.eu/maritimeforum/node/130

[email protected]

Stephane Otjacques R&D Manager ELIA Brussels http://www.elia.be/default.aspx [email protected]

Bart Goethals International Business Development ELIA Brussels http://www.elia.be/default.aspx [email protected]

Eamonn Doyle CTO ESRI Dublin http://www.esri.com/ [email protected]

Chrystelle Ourzik Energy & Utilities Business Development Manager ESRI Dublin http://www.esri.com/ [email protected]

Anne-Bénédicte Genachte Regulatory Affairs EWEA Brussels [email protected] http://www.ewea.org/

Charlie Sheridan Research Manager Intel Leixlip http://www.intel.com/content/www/us/en/homepage.html

[email protected]

Graham Quinn CTO Cloud IT Alliance Dublin http://www.italliance.com/ [email protected]

William Lacey Managing Director Lumus Dublin http://www.lumus.ie/ [email protected]

Joe Corbett Head of Technical Services Mainstream Renewable Power Dublin http://www.mainstreamrp.com/ [email protected]

John Shaw CIO Mainstream Renewable Power Dublin http://www.mainstreamrp.com/ [email protected]

Vernon Fox Head of Offshore IS Mainstream Renewable Power Dublin http://www.mainstreamrp.com/ [email protected]

Dr Barbara Fogarty SeaChange Manager Marine Institute Galway http://www.marine.ie/Home/ [email protected]

Peter Thijsse Project Manager MARIS The Hague http://www.maris.nl/ [email protected]

David Cotton Director MEDIN Liverpool http://www.oceannet.org/ [email protected] Berthold Van Der

Molen EMEA Head of Power & Utilities Microsoft Berlin http://www.microsoft.com/enterprise/industry/power-utilities/default.aspx

[email protected]

Prof Brian Donnellan Co-Director Innovation Value Institute NUI Maynooth http://ivi.nuim.ie/ [email protected]

Dr Tim McCarthy Research Manager at NUI NUI Maynooth http://research.nuim.ie/ [email protected]

Michael van der Veeken Engineer OSIsoft San Francisco http://www.osisoft.com/ [email protected]

Renato Grampa HV & Submarine Projects Director Prysmian Powerlink Milan http://www.prysmian.com/ [email protected]

Dr Aoife Foley Lecturer Sustainable Energy QUB Belfast http://www.qub.ac.uk/home/Research/ [email protected]

Prof Roy Douglas Director of Energy Group QUB Belfast http://www.qub.ac.uk/home/Research/ [email protected]

Gavin Duffy Managing Director Realsim Galway http://www.realsim.ie/ [email protected]

ISIS

Page 7: Integrated Sea Information  System : Public-Private Partnership Option

Why ISIS ?

Develop Construct Operate

Information needed :SurveyingModellingTurbine Control SystemsWireless CommunicationPower Distribution ManagementProject & Document ManagementRisk Management

Business needs to...Identify & Mitigate RisksAccelerate SurveyingAccelerate ConstructionConnect & Distribute Power

• The emerging € 6.4 Trillion investment in Offshore Wind needs to be delivered efficiently and effectively over the next 30 years.

• ISIS will reduce the Risk of Cost Overrun.

ISIS

Page 8: Integrated Sea Information  System : Public-Private Partnership Option

• Mainstream’s fundamental belief is that marine data is a Public Good.

• It should be collected once and used many times.

• Key needs ;

• Accessibility and Management: • Clear policy of ownership, licensing & access for all publicly funded data collection• Single point of access to marine data and information• Discourage cost-recovery pricing from public bodies

• Data Standards and Quality control: • Common standards across jurisdictions and disciplines• Ensure the above is addressed in publicly funded data collection contracts

• International Coordination:• Harmonised approach across the EU in relation to all of the above:• Links provided and maintained to EU/global databases and initiatives

• Benefits of improved data management ;• Measurable reductions in costs to find, access and retrieve data• Wider and more reliable data and information upon which to base assessments• Mechanisms to share results and data with stakeholders

What Offshore Developers Need from ICT

Developers want to reduce Project Risk

Page 9: Integrated Sea Information  System : Public-Private Partnership Option

• 4 EU Directives in particular impact industry:

• Marine Strategy Framework Directive – ‘establish and implement coordinated monitoring programmes for ongoing assessment of the environmental status of [member state] marine waters’

• INSPIRE Directive – ‘adopt measures for the sharing of data sets and services between public authorities for the purpose of public tasks and the Environmental Information Directive’

• Birds and Habitats Directive – ‘establish a network known as Natura 2000 (SPA, SACs)

• Data Collection Framework for Fisheries – ‘collect, manage and provide high quality fisheries data for the purpose of scientific advice, mainly for appropriate fisheries management decisions’Shading = initiatives to manage data to satisfy EC

Legislation

EU Marine Data Management

There are many initiatives underway

Page 10: Integrated Sea Information  System : Public-Private Partnership Option

Marine Knowledge 2020 : Marine Data and Observation for Smart and Sustainable GrowthLaunched 13 September 2010Led by Iain Shephard

Key ObjectivesThis Initiative from the Commission will ensure the following are achieved ;• Data from the EU-supported research programmes are more available for re-

use• Common standards and policies• Contribute towards an interoperable global marine knowledge system Cost

• €1,400.0 Million spent per year by all stakeholders on Marine data collection in Europe• € 110.0 Million spent per year by EU on marine data collection• € 18.5 Million additional allocation per year for EU’s Marine Knowledge 2020 initiative

Marine Knowledge 2020

Offshore Developers will contribute to Marine Knowledge 2020

Page 11: Integrated Sea Information  System : Public-Private Partnership Option

DepthBathymetry

SeabedSidescan Sonar

Sub-StrataBoomer

WrecksMagnetometer

FoundationsGeotechnics

Waves & CurrentsOceanography

Flora & FaunaEcology

Regulatory ReportsConsultancy

What is ISIS ?

ISIS

Offshore Data Types

RiskPredictio

n & Mitigatio

n

WindMetMast,Lidar

Collect DataStore Data

Visualise DataIdentify Patterns

Run Scenarios

MappingESA Satellites

• ISIS delivers a Standard approach to collect and analyse data in an innovative way : Transparent, Auditable, Compliant with Regulation, Enforceable.

• ISIS reduces Project Risk by converting Data into Wisdom

ISIS

Page 12: Integrated Sea Information  System : Public-Private Partnership Option

 ISIS Layer

5. Risk Scenario

4. Visualisation

3. Database

2. Communications

1. Instruments

What are the components of ISIS ?

• ISIS delivers value for all of the Stakeholders

• ISIS has 5 layers

• ISIS requires a Consortium to deliver Standards, Adaption of existing Technology, Innovative Creation of New Technology

• ISIS is a Programme of Projects

ISIS

Page 13: Integrated Sea Information  System : Public-Private Partnership Option

• Innovation is inhibited by data licence issues: • Data licence issue throughout European waters• Over 400 legal entities have licensed ownership of data in Britain• Need EU Data Ownership Policy

• Innovation is inhibited by regional data strategy variation:• National data archives are at different levels of maturity• Low Interoperability of data and metadata across EU• Need EU standard for data archives

• Role for EU Commission:• Build on existing progress made by data communities• Provide sustainable funding for Innovation• Provide framework for licensing and re-use of data

• Role for ICT Standards:• Build on existing ISA standards in other Sectors ( eg Manufacturing )• Align relevant IEEE / IEC / ISA standards for computer & electrical devices• Provide framework for developing integrated standards across supply chain

ISIS :Barriers to address

Intel are already helping to set standards for Supergrid & Offshore Wind

Page 14: Integrated Sea Information  System : Public-Private Partnership Option

When is ISIS needed ?

• ISIS is needed before large-scale Wind Farms are deployed in the North Sea

• The delivery of the components of ISIS is dictated by Policy, Consortium, Funding

• ISIS will deliver payback as

ISIS

Page 15: Integrated Sea Information  System : Public-Private Partnership Option

Who will create ISIS ?

• ISIS will be delivered by those organisations with a stake in the successful future of the North Sea

• ISIS will be delivered via a Consortium of Public, Private and Academic Organisations

• ISIS will be delivered by Experts in Standards, Innovation, Technology and Project Execution

ISIS

Page 16: Integrated Sea Information  System : Public-Private Partnership Option

How will ISIS be created?

• An ISIS Consortium will be formed representing Public, Academic and Commercial organisations

• The Consortium will be initiated via a Memorandum of Understanding

• A Schedule of Deliverables will be agreed over the next 7 years

ISIS

Page 17: Integrated Sea Information  System : Public-Private Partnership Option

ISIS will help to

Internalise the Regenerative Capacity of the Biosphere

Aligned with the productive application of the Earth’s Resources

In a Business Model built on Sustainable Standards in line with

Transparency, Auditability, Regulatory commitments, Enforceability

So...ISIS

Page 18: Integrated Sea Information  System : Public-Private Partnership Option

1. ISIS Workshop on 14 September 2011 – key outputs

2. ISIS – Next steps

IntroductionISIS

Page 19: Integrated Sea Information  System : Public-Private Partnership Option

ISIS - Business CaseISIS

ISIS Business Case :•Move to change current economic thinking of offshore environmental resources permitting/ consenting  as an expense item to new economic thinking where it is treated as a capital item and viewed as an investment  to maintain or regenerate the environment over a life cycle of sustainable use

•The vital role ICT and integrated data management will play in shifting economic thinking to view maintaining/regenerating environmental resources as a capital investment for sustainable productive use and for a sustainable societal quality of life, today and for future generations.

•Harnessing offshore wind potential for Europe’s sustainable future is both a huge economic opportunity and a huge economic and environmental challenge

•Creating an integrated view of marine data gathering, structure and standards, management and accessibility [archived and real time] will allow sustainable productive use projects to be assessed with more economic and social rigour, monitored in real time, and promote early prediction of and, intervention on, trends impacting negatively on environmental resources ‘capital’.  Offshore wind developers adopting these new standards will benefit from more streamlined, cost effective and predictable environmental permits/consents and ongoing demonstration of regulatory compliance. 

•Additionally integrated data management infrastructures will capture economic benefits for the operation of renewable offshore wind energy by better climate forecasting, fast tracking research into more efficient operating and maintenance regimes and by incentivizing plant designs that are neutral, regenerative or enhancing to the environment’s resource capital. 

•Identifying opportunities for the creation of new SMEs and enhancing business development and commercialization opportunities for existing SMEs and MNCs around the new common data architectures, protocols,  security standards, communications systems, technologies, data warehousing,  products and services

Page 20: Integrated Sea Information  System : Public-Private Partnership Option

ISIS - Consortium ObjectivesISIS

ISIS Consortium Objectives :

•To harness stakeholder expertise and competences at national and European level to develop and promote new marine data management standards, policies , best practices and best-in-class technologies , protocols, etc

•To identify the user needs and expectations along with use cases for the new integrated marine data management solutions and to initiate projects to build out the new infrastructure, business models and disciplines to achieve early wins for the consortium’s effort and investments.

•To develop a roadmap, in wide consultation with stakeholders, to both build from scratch, where appropriate, to meet the needs of the new industries while at same time building on ‘value add’ brought from existing systems, programmes, networks and collaborations.

•To draft specifications for RDI actions for innovative applications of the integrated marine data management infrastructure which motivate best practice commercialization strategies

•To promote action for further involvement of stakeholders, including SME’s and multi-nationals, at local and regional level to facilitate the cross-fertilisation of ideas and create best practice business development and commercialization approaches.

Page 21: Integrated Sea Information  System : Public-Private Partnership Option

Consortium Model

ISIS High Level Vision

Long term programmeEarly Quick Wins

Steering Committee Strongdisciplines

Governance Delivery

Communication

Topics of Interest

User Reqts. (broad)What output user wants?

Policy/Regulation

Stakeholders-developers- Surveyors

etc

Technical/Academia

Innovative programming of critical inter-dependencies/topic drivers

ISIS

Page 22: Integrated Sea Information  System : Public-Private Partnership Option

First Steps Steering Committee

Nominees from:

1. Mainstream [John Shaw]2. BTC [Till Luhmann to forward nominee from WAB]3. Elia Group4. IVI [Prof Brian Donellan] 5. QUB [Dr Aoife Foley]6. MARIS [PeterThijsse] – valuable inputs to definitions/position paper7. ESRI [Technical]8. EWEA [need to consult/come back]9. Lumus [William Lacey] - user cases

ISIS

Page 23: Integrated Sea Information  System : Public-Private Partnership Option

Next Steps

Target Actions

At workshop session - Appoint first steps Steering Committee

End-October 2011 - Hold user case (reqts.) workshop- Prepare/issue position paper (wider objectives/programme) covering 4 topics & steering committee operation

End-November 2011 - Prepare/issue MOU (Consortium)- Link with broader policy context- Include view of PPP & value/cost analysis- Include view of JR Committee

Mid-End January 2012 - Consortium participants approval/start implementation- Prepare research project submission for funding

ISIS

Page 24: Integrated Sea Information  System : Public-Private Partnership Option

By 2050 there will be a transition to large-scale Offshore Wind Farms in the North

Sea.

The Supergrid will enable efficient distribution of this new energy

resource

An Integrated Sea information System is needed to accelerate this transition:

ISIS.

To create ISIS, new policies, new standards, greater cooperation and

innovative Information and Communication Technologies are

needed.

IntroductionISIS