Integrating Geospatial with BIM to Resolve the Most Complex Construction Challenges:
The tipping point
Dr Anne Kemp, Director and Fellow, Atkins Chair of UK BIM Alliance
GeoBIM, 25th November 2016
Our evolving landscape….
PAS 1192:3 Asset
PAS 1192:2 Project
“BIM-enabled” Through to Operations and Maintenance
Crossrail, Farringdon Station Overall Site coordinated with existing London Underground lines
5
Digital Plan of Works
BIM: A9 Dualling BIM Common
Data Environment
Discipline Access (Read Only)
Geotech Landscape
Ecology Transport Planning
Incoming WIP
PostGIS
PostGIS
A9 Project Team WebGIS
Client WebGIS
Archived
PostGIS
Legacy Data
200+
National Constraint Data
35+
Reference Data (OS, Aerial)
75GB+
Local Data
25+
Project Spatial Data Standards
Metadata Standards (INSPIRE)
Figure Standards
Standards/Procedures
Metadata
Metadata
Metadata Metadata
Metadata Website
Metadata Website
Metadata Website
G. Waite – Geospatial Analysis
Published
Shared
01 December 2016 9
Offering Rail Better Information Services (ORBIS)
Delivering the specification, design, development, and implementation of an enterprise web mapping application to 35,000 end users.
The web mapping solution handles over 150 layers of data across a range of business themes and asset types.
Insert image caption and copyright text
Faro X130 3D laser scanner
Faro Freestyle 3D Scanner
13 13
M25 Journey Time Analysis Atkins & EE Collaboration We’re working in partnership to keep the traffic moving around London. Delivering to Connect Plus Services we are working with EE to use mobile phone data to determine average journey times around the M25.
The speed of trust – and the
role of reliable data
The need for better learning and development, under-pinned by on-going support ‘on-the-job’, which is where 70% of embedded learning occurs.
15
3D Route Finding
Never ever take anything
for granted,
…….no matter how many
times you have done it
before !
The Moral
http://roadworks.org/
Road Works
Utilities Process Maps and Procedures
Well Briefing
Employee Questionnaire
Very important – RED
Important – AMBER
Not important - GREEN
Visual observation
Poor condition – RED
Average condition – AMBER
Good condition - GREEN
Areas of highest importance
Matrix process
Standards
Gold
Silver
Bronze
Option based on physical parameters
indicators of: Light, Temp, Air,
Noise
Basic of Design
Client
Basis of Design
Disruptive technology changes the face of industries. We are also in an age of disruptive data. … you have to have your people work through, understand, and tailor themselves to a new world.
Autodesk BIM Business Briefs 02
The future of building engineering
Contributions of digital transformation CLARITY Clarity of delivery
TECHNICAL JUDGEMENT AND ASSURANCE
Converging information production with sound engineering judgement and design
ACCESS Wider, faster access to comprehensible and integrated information
LATERAL THINKING
Enabling reflective, adaptive thinking to incorporate whole life and integrated systems approach within the wider geographic context.
INNOVATION Harnessing innovative technologies and harvesting intelligence from big data
DECISIONS Fostering instinctive but rigorous collaboration and better decision making