Data Center Design/Build Solutions and Infrastructure
Equipment Specialists
Manufacturers Representative
Zions Bank Data Services
Building Owner: Zions First National Bank
Size of Installation: 12,000 sq. ft. Data Center
32,000 sq. ft. eBuilding
Products: Full Turnkey, Design Build, Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC, Fire Suppression Systems and Technical Furniture.
Goldman Sachs
Building Owner: California Avenue L.L.C.
Size of Installation: 60,000 square feet
Products: Raised Access Flooring, Critical Power Equipment and Sub Floor Cabling.
Pacific Landing
Building Owner: California Avenue Inc.
Size of Installation: (2) 50,000 square foot buildings
Product: Raised Access Flooring
Social Hall Avenue
Building Owner: Internal Revenue Service
Size of Installation: 68,000 square feet
Product: Raised Access Flooring and Plug & Play Electrical
Ninigret Buildings
Building Owner: Ninigret Park Development
Size of Installation: 97,000 square feet
Two buildings equaling 194,000 square feet
Products: Raised Access Flooring, Sub Floor Plug & Play Power, Voice and Data Distribution, Cable Tray, and Critical Power Equipment.
Talk2 Technology
Scope of Work: Turnkey Computer Room
Size of Installation: 1,600 square feet
Products: Full Turnkey, Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC and Fire Suppression Systems.
Switch & Data
Building Owner: Switch & Data
Size of Installation: 20,000 square feet
Product: Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling and Computer Room HVAC.
Ovid Technologies
Building Owner: Larry H. Miller
Size of Installation: 5,700 square feet
Products: Full Turnkey, Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC and Fire Suppression Systems.
Church of Jesus Christ of Latter Day Saints Assembly Hall
Building Owner: LDS Church
Size of Installation: 14,000 square feet Products: Raised Access Flooring, Critical Power
Equipment, Computer Room HVAC, Under Floor Cabling, Cable Tray and Carpet Finishes.
Consonus
Building Owner: Questar MetroNet Services, Inc.
Size of Installation: 20,000 square feet
Product: Raised Access Flooring and Electrical Consulting
Wells Fargo Loan Operation Center
Building Owner: Wells Fargo Bank Northwest
Size of Installation: 145,000 square feet
Products: Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC and Fire Suppression Systems.
Inovex Data Services
Building Owner: C3 Investments L.L.C.
Size of Installation: 12,000 square feet
Product: Full Turnkey, Design Build, Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC and Fire Suppression Systems.
C3 Investments
Building Owner: C3 Investments, LLC
Size of Installation: 36,000 square feet
Product: Full Turnkey, Design Build, Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC and Fire Suppression Systems.
222 South MainBuilding Owner: Goldman Sachs
Size of Installation: 150,000 square feet
Product: Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling and Internal Air Quality Management.
Adobe Corporate Campus
Building Owner: Adobe Systems, Inc.
Size of Installation: 16,000 square feet
Product: Raised Access Floor System and Seismic Evaluation
eBay Customer Service Center
Building Owner: eBay
Size of Installation: 160,000 square feet
Product: Raised Access Floor System, Cable Tray, Sub Floor Cabling and Subfloor Air Quality Management
Missionary Training CenterBuilding Owner: Brigham Young University
Size of Installation: 3,000 square feet
Product: Full Turnkey, Design Build, Raised Access Flooring, Critical Power Equipment, Cable Tray, Sub Floor Cabling, Computer Room HVAC, Fire Suppression Systems and Seismic Isolation.
C7 Data Centers
Building Owner: C7
Size of Installation: 12,000 square feet
Product: Design Build, Seismic Equipment and Access Floor Platform for Critical Power Equipment Furnished
City Creek ReserveBuilding Owner: City Creek Reserves
Size of Installation: 16,000 square feet
Product: Design Build, Raised Access Flooring and Critical Power Equipment.
Topaz Data Center
Building Owner: eBay
Size of Installation: 60,000 square feet
Product: Engineer and Supply 101 Computer Room HVAC units and Ultra Sonic Humidification Water Treatment System
University of Utah Data Center
Building Owner: University of Utah
Size of Installation: 76,000 square feet
Product: Design Build, Critical Power Equipment, PDU’s, Isle Containment, Data Cabinets, Data Cabling Management Systems and Seismic Isolation.
Stampin’ Up Office and Distribution Building
Building Owner: Stampin’ Up
Size of Installation: 160,000 square feet
Product: Design, Raised Access Floor System, Sub floor Mechanical Distribution, Subfloor Plug Play Electrical, Subfloor Plug Play Voice Data, Critical Power Equipment and Data Cabling Management Systems.