InterMoor Services
MOORINGSMOORINGSRig Moves
Permanent MooringsEquipmentInspection,
Maintenance & RepairMarine Assurance
FOUNDATIONSFOUNDATIONSWell Conductors
Suction PilesDriven Piles
SEPLAsAnchorsMudmats
SUBSEASUBSEARiserless Well Intervention
Heave CompensationAbrasive Cutting
Decommissioning
5
Personnel
Diverse Capable Staff
• Safety Staff • Ocean Engineers• Civil / Structural Engineers • CAD Designers • Procurements Specialists • Contract Supervisors • Master Mariners • Anchor Handling Superintendents • Anchor Handling Crew Members• Equipment Technicians• Management & Support Staff
6
Operational Capability
- InterMoor is a leader in innovative mooring and installationtechnology.
- The company designs, supplies and deploys technically advancedmooring systems.
- InterMoor also provides rig moves and back of the boat installationservices worldwide and survey and positioning services.
- InterMoor is the only mooring service company worldwide thatoffers FULL service for both temporary and permanent moorings.The services include:
- mooring system design and installationengineering;
- expertise and experience with ALL oil field anchortypes (drag, SEA, SEPLA, VLA, torpedo);
- provisions of mooring systems and equipment forlease or sale;
- mooring installation teams including crews andsupervision;
- inspection, maintenance and repair of mooring.- and ring recovery
7
Operational Capability
- InterMoor provides subsea services with cost-effective solutions forunderwater projects using unconventional installation andintervention vessels (in-line subsea heave compensation fordeployment and recovery subsea hardware, manifold, conductor, treeinstallation and etc.)
InterMoor Firsts:- Current world record holder of conventional
drilling rig mooring installation, 2.570m WD – 2008- Current record for Shell in Brazil for conventional
drilling rig mooring installation, 2.015m WD – 2012- First permanent production facility polyester
mooring (outside of Brazil) – 2003- First full drilling rig polyester and suction
embedded plate anchor (SEPLA) mooring system –2001
- First test drilling rig polyester and SEPLA mooringinstallation – 1999
- First test drilling rig suction anchor installation –1996
- First drag VLA installation (outside of Brazil) - 1994
InterMoor Support Services
ENGINEERINGENGINEERINGDesign / Analysis
Mooring/HydrodynamicStructural/Installation
Foundation DesignField Development
& Planning
Cost & Feasibility
FABRICATIONFABRICATIONSEPLAs
Suction PilesDriven Piles/ Conductors
MudmatsSpecialty
Fabrication
SURVEY & POSITIONING
SURVEY & POSITIONING
Rig KitsVessel Kits
Heading ControlMetrology
USBL
SHORE BASESHORE BASEHeavy LiftStorageProject
MobilizationCargo Handling
Test Bed
InterMoor Overview
RESOURCES EXPERIENCE TECHNOLOGYRESOURCES EXPERIENCE TECHNOLOGYFacilities
Shore Base & Offshore Crews
Technical & Operations Personnel
Extensive Inventory
Equipment
Rig Moves
Temporary & Permanent Moorings
Foundation Design, Supply & Install
Subsea Install/Retrieve
Abrasive Cutting
Back-of-boat Services
Development of Deepwater Moorings
Development of Synthetic Moorings Applications
Suction Piles
Award-Winning SEPLA
Heave Compensation
Riserless Well Intervention
Novel Installations & Operations
10
Engineering & Design• Hydrodynamic Analysis (Vessel Motions & Coefficients)
• Mooring System Design & Analysis (Frequency & Time Domain)
• Dynamic Lowering Analysis (CASIM)(Compensated Anchor-handler Subsea Installation Method)
A complete package for installation of (trees, manifolds, anchors, hammers, etc.) that includes:
• Detailed engineering• Dynamic lowering analysis• Operational procedures• Tools and equipment• Offshore personnel
Mooring Design & Installation
11
Engineering & Design• 3D Finite Element Structural Analysis
• CAD & Drafting Services
• Suction Pile Design & Analysis
• SEPLA Anchor Design & Analysis
• Foundations Engineering
• Mooring Operations & Planning Studies
• Installation Engineering & Procedures
• Cost & Feasibility Studies
Nonlinear Buckling Analysis
SEPLA FEA
12
Services in BrazilBC-10 Conductors Installation(Phase 1 – Parque das Conchas)
Mooring analysis for drilling units rig moves, Positioning and Offshore Supervision
FPSO mooring lines recovery and hook up
Polvo FPSO Installation
Mooring analysis for drilling unit rig moves, Positioning and Offshore Supervision
Mooring analysis for drilling unit rig moves, Positioning and Offshore Supervision
Mooring hook up and Riser pull-in campaigns
Papa Terra Conductors design, construction and installation
Peregrino FPSO Installation(Client Rep)
FPSO OSX-1 Installation(Client Rep)
13
– Shell BC-10 (Phase 1):• 3 Year Program to Manage the Arctic 1 Drilling Program (Polyester
and Drag VLAs)• Turnkey Installation of Driven Drilling Conductors
– Provision of Conductors and All Installation Equipment– Provision of Purpose Built Barge– Provision of All Installation Management and Supervision
Project Highlights – Brazil
14
– Shell MODUs Installation (2 drilling units)• Mooring analysis (deepwater moorings – 1600 to 2000m):
– Pre-Sets:» VLA anchor» wire rope / polyester rope
– Conventional moorings:» drag anchor» chain / wire rope
• Operational procedures for the installation• Positioning services• Offshore Supervision
– Perenco MODU Installation (1 drilling unit)• Mooring analysis (deepwater moorings – 700 to 1200m):
– Conventional moorings:» drag anchor» chain / wire rope
• Operational procedures for the installation• Positioning services• Offshore Supervision
Project Highlights – Brazil
15
– Sonangol MODU Installation (1 drilling unit)• Mooring analysis (shallow waters, 140m up to deepwater moorings,
850m):– Conventional moorings:
» drag anchor» chain / wire rope
• Operational procedures for the installation• Positioning services• Offshore Supervision
– Anadarko MODU Installation (1 drilling unit)• Mooring analysis (deepwater mooring – 1500m):
– Pre-Set:» VLA anchor» wire rope / polyester rope
• Operational procedures for the installation• Positioning services• Offshore Supervision
Project Highlights – Brazil
16
– OGX MODUs Installation (6 drilling units)• Mooring analysis (shallow waters, 100–150m up to 300m moorings):
– Conventional moorings:» drag anchor» all chain or chain / wire rope
• Operational procedures for the installation• Positioning services• Offshore Supervision
Project Highlights – Brazil
17
Innovation• Long history of involvement with Mooring R&D and has led the industry in
innovative thinking that has resulted in many technological advancementsfor the oil and gas industry.
• Pioneer in the use of Deepwater Pre-Set Moorings to increase efficiencyand water depth capabilities of floating vessels with the development ofsuction anchors, the patented SEPLA (Suction Embedded PLate Anchor),and polyester rope and taut-leg moorings.
• Currently involved in multiple joint industry projects, industry committeesand forums – contribution to the development and improvement of theoffshore industry's practices and technologies.
18
Innovation – SEPLA Anchor• Combines advantages of suction embedment and proven plate anchor
technology• Uses suction embedment follower with plate anchor slotted into base to
install plate anchor• Follower is then removed by reversing pump action, leaving plate at
depth• Plate is then rotated to orientation close to perpendicular to direction of
load• Geotechnically efficient shape
19
Innovation – SEPLA AnchorCOMPARISON:
MODU Example:Suction Anchor SEPLA
2,90m diameter x 21,30m 2,45m x 6,10mWeight 68 tons Weight 24 tons (solid fluke)
Permanent Mooring Example (Red Hawk Spar) Suction Anchor SEPLA
5,50m diameter x 23,80m 4,60m x 9,15mWeight 180 tons Weight 37 tons (hollow fluke)
20
Mooring Design• MODU MOORING DESIGN AND RISK ASSESSMENT:
– MODUs have gotten bigger and staying at one site for longer periods of time.– There are more permanent deepwater production systems with higher
production rates.– There is much more subsea infrastructure.– Governments, regulatory agencies, companies and the general public have put
more emphasis on protecting the environment and offshore assets.– Hurricane and typhoon design criteria and regulatory requirements have become
more stringent.
InterMoor's extensive understanding of mooring components,installation methods, and analytical simulations means we can evaluatethe probability of failure, consequence of damage and the associated riskto deliver robust, reliable, and cost effective mooring systems.
21
Forecast– Shell Moorings & Conductors – BC-10 Phase 2
– Permanent Mooring Design and Installations
– Moorings & Positioning MODU Spot Market: OGX, Statoil, Maersk Oil, Karoon, Vanco, ONGC, etc.
– LLX – Porto do Açu: Shore Base support area for Oil & Gas Industry with heavy lift, inspection, logistic, spooling services and etc. – Start operations in 2013
22
Forecast– Mooring Maintenance: Mooring Integrity Management (MIM)
• Maritime history shows that permanent mooring fails in a widerange of WD and environmental conditions
• Records show that failures are caused by a variety of mechanisms(wear, fatigue, abrasion, corrosion, damages from installationoperations, inspection operations, and dropped objects, flawedmaterials, excessive tension, etc.);
• Statistics at North Sea show that the probability of failure peroperating year is relatively high;
• Statistics also shows that most part of units cannot monitor linetension or offsets, do not have line failure alarms or adjust linelengths or have spare parts available;
• Mooring integrity is gaining interest: it is not acceptable for apermanent production unit to be with a damaged mooring system;
23
Forecast– Mooring Maintenance: Mooring Integrity Management (MIM)
• Interest in MIM becomes more prevalent;• MIM programs tailored to encompass:
– regular inspection and evaluation of mooring system in-placecondition
– Identification and execution of routine maintenance operationsto reduce potential of failures
– Analytical prediction of a mooring line’s probability of failurebased on mooring system condition, line measurements,previous real world operating and survival conditions and
– Mooring repair plan (MRP) to identify market installationvessels, mooring suppliers, installation suppliers, developoperations procedures to repair line components before orafter failure occurs with little or no production loss down time
– Procurement, fabrication, storage and maintenance of sparemooring components and installation aids;
• The majority of existing Units assets are installed and operatingWITHOUT mooring system monitoring and load measurement. Theintegrity is based only on inspection and maintenance;
24
Forecast– Mooring Maintenance: Mooring Integrity Management (MIM)
• MIM for New Units should not only include a inspection,maintenance and MRP. There is the opportunity to augment thesystem in a real time line measurement equipment to realize acomprehensive MIM program.
• InterMoor has developed the Inter-M-Pulse direct in line tensionmonitoring system. The system send the real time measurement tocontrol room, detailing line inclination, orientation and curvature ofmooring line;
• For new Units, a comprehensive MIMcould be developed before the failureoccurs, offering the opportunity tomonitoring systems for more accurateand predictive probability of failureestimates (using real time mooringline measurement and monitoringsystem).