Report on mechanical tests and possible operation scheme of the liquid recirculation for ARGONTUBE. Internal meeting 31/01/2007. Mechanical test with rings at LHEP. Contacts with HBB Biegetechnik able to make the rings Order placed (receive rings in 2 weeks) - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Internal meeting 31/01/2007](https://reader036.vdocument.in/reader036/viewer/2022072013/56812af4550346895d8edb7a/html5/thumbnails/1.jpg)
Report on mechanical testsand possible operation scheme
of the liquid recirculation for ARGONTUBE
Internal meeting 31/01/2007
![Page 2: Internal meeting 31/01/2007](https://reader036.vdocument.in/reader036/viewer/2022072013/56812af4550346895d8edb7a/html5/thumbnails/2.jpg)
Mechanical test with rings at LHEP
Contacts with HBB Biegetechnikable to make the rings
Order placed (receive rings in 2 weeks)
Soon after realize the prototype
![Page 3: Internal meeting 31/01/2007](https://reader036.vdocument.in/reader036/viewer/2022072013/56812af4550346895d8edb7a/html5/thumbnails/3.jpg)
LN
Vacuumpump
Artank
Artank
Oxysorb
Hydrosorb
Oxysorb
Hydrosorb
Possible operation scheme