international coal conference presentation by mr bradley green managing director australasian...
TRANSCRIPT
International Coal Conference Presentationby
Mr Bradley GreenManaging Director
Australasian Continental Energy
October 2011version 1.0
AACE Board and Advisors
Australasian Continental Energy Board MembersDomenic Martino ChairmanBradley Green Managing DirectorShane Doherty DirectorLuke Martino DirectorDr Martin Chapman Director
Harry Spindler Company Secretary
Advisors to the BoardColin Roberts AdvisorAhmad Sohail Pakistan Representative / Advisor
Domenic Martino
Chairman Resourcehouse LimitedChina First Coal ProjectPartners in this project Metallurgical Corporation of China Limited China Power International Holding Sino-coal International
Cokal LimitedPan Asia Corporation LimitedBlue Energy LimitedSydney Gas Limited
Bradley Green
Managing Director of Australasian Continental Energy
Mining Economist
20 years experience in the mining industry
Advisor to several large international mining companies
Advisors
Professor Colin Roberts Chartered Mining Engineer Resource Law & Policy Foreign Investment Consul for Australia
Ahmad Sohail Chemical Engineer Multi discipline experience AACE’s representative in Pakistan
Why the Thar Coalfields
Largest untapped energy resource in the Asian regionThe value of the Thar coal reserves is estimated to be equivalent to the oil reserves of both Saudi Arabia and Iran and could generate 100,000 MW of power for 300 years.
Export of coal based fuels potentialCoal seam gasCoal to oil
Substantial feasibility and pre development work already undertaken
Power requirements for Pakistan Investment incentives Low sovereign and security risk Technology transfer
AACE’s project
Coal Mining on Block IVHas a measured and indicated reserve of 2.4 billion tonnes.Area covered 82.5km2
Initial production rate 6 million tonnes per annum increasing to 18 mtpa in 15 years
Power Station1,100 MW increasing to 3,000 MW in 15 years
Estimated total project cost $US 3 billion
AACE’s project
6 million tonne per annum coal mining operation
AACE’s project
1,100 MW Power Station
Mining equipment
Main mining equipment Bucket wheel excavators. 3 BWE’s are required for the removal of overburden and 1
for the mining operation. Total capital cost of the mining operation - $US1 billion est.
Power generating equipment
Main power generating equipment Steam turbines, configuration 3 x 370MW or 2 x 650MW Boilers Water towers Total capital cost for the power station - $US 2 billion est.
Project Timeframe