international construction engineering...

38
INTERNATIONAL CONSTRUCTION ENGINEERING COMPANY Your reliable partner

Upload: others

Post on 27-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

INTERNATIONAL CONSTRUCTION ENGINEERING COMPANY

Your reliable partner

Page 2: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

OUR MISSION IS TO INVIGORATE PROGRESS

Introduce innovative products and technologies to themarket, more sophisticated, efficient, reliable and eco-friendly than those existent in these directions. Andother times — even completely new and unique inindustry.

Owing to this mission we play a special part on theconstruction scene world-wide. By promulgating andintroducing new technologies we improve quality of lifeof each member of a society throughout the globe whilesaving natural and economic resources, optimizing andcreating the best of all possible

Page 3: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

OUR GOAL

Uncompromisingly complete and high-qualitativeend result. We achieve this owing to strictadherence to the established principles.

Our solutions involve various directions of theconstruction industry, but they are constantlycharacterized with absolute quality standards andprogressive developments of the superior globalmanufacturers. We place exacting demands on theproducts presented in our name and the projectswe implement as well. We always remember thatyour benefit and high level of satisfaction meansnot only a long-term cooperation, but our imageand continuous development alike.

Page 4: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

All our staff members are professionals who combine open

mindedness and depth of experience. They justifiably hold their

positions. Because we aim to provide our customers with superiorsolutions only

Such approach ensures better execution on tasks due to the exhaustive elaboration of

solution, its feasibility and seamless building of the existing system, as well as owing to

fast commissioning of implemented projects due to consideration of interproject links. It propels our customer’s business to new heights and boosts our value

Nothing describes company’s level such favorably as consistency.

This means for us that notwithstanding which project we take on, itwill be executed equally well regardless external circumstances

We distinguish two type of responsibility — responsibility before a customer and

social responsibility. We fully understand our role in the life of society and customer’sactivity and we are committed to execute x obligations that we assumed

PROFESSIONAL INTEGRITY COMPREHENSIVE APPROACH

CONSISTENCY RESPONSIBILITY

ADVANTAGES OF DEALING WITH US:

Page 5: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Company assets reside in implementation of large-scale projects by the following areas of activity

OUR DIRECTIONS

TES ENGINEERING TES COATINGS TES SCANProcessing complexity and resource intensity of the process

of low-depth laying of service lines results in that there are

precious little contractors executing works of that kind.

Our expert teams have a considerable experience and

proper equipment for successful completion of all types of

works — microtunneling, horizontal directional drilling,

underwater laying of service lines, sanitation (repair) of

communication routes. We execute works at the highest

level only compliant to our own high standards.

Under conditions of high loads, it is highly important for

industrial facilities to preserve continuity of operation. And

thus, rigid requirements for reliability and endurance are

placed on the protective insulating systems used.

Our products completely meet these requirements. High

environmental resistance factor and maximum service life

are unique certified and field-proven parameters of their

quality.

Hundreds of thousands of gas pipelines, oil pipelines and

other analogous systems which pass through the whole

continents require for regular maintenance.

For solving such tasks we have complicated high-technology

equipment with a wide range of capacities for inline

inspection, clearing and repair. These are the best

achievements of science employed by production sector.

Page 6: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES ENGINEERING

Our company TES Engineering was founded in

2012. Principal direction and priority of TES

Engineering was microtunneling where we

made great progress in a relatively short time

for which speak our implemented projects.

With our branches and subsidiaries in many

countries, we offer you a well-established

international network of services of superior

quality.

Page 7: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES ENGINEERING

Our company TES Engineering wasfounded in 2012. Principal direction andpriority of TES Engineering wasmicrotunneling where we made greatprogress in a relatively short time forwhich speak our implemented projects.

With our branches and subsidiaries inmany countries, we offer you a well-established international network ofservices of superior quality.

Page 8: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

To date TES Engineering is amongthe few companies offering andimplementing a full range of servicesin such domains as:

• Civil engineering.

• Building of underground pipelines and sewerage systems of all nominal inside diameters, pressure levels and materials.

• Trenchless sanitation of pipeline and sewerage systems, inspection, damage assessment, demands analysis, sanitation planning and its following implementation.

• Buildings and installations: implementation in the capacity of a principal contractor for design and construction up to commissioning of comprehensive plants including manufacturing technique, machine and technical equipment, measurement equipment, as well as automatic control engineering equipment.

• Microtunneling.

• Tunneling.

• Emergency maintenance of existing installations, as well as twenty-four-hour repair service.

• Assembling of the entire technical equipment.

Page 9: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES ENGINEERING PARTNERS:

OUR CLIENTS:

Page 10: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES COATINGS

TES Coatings – an expert in the field of coating materials

In the segment of protective and restoration coatings we propose a wide range ofmaterials capable to reliably protect the surface against any external influences —corrosion, mechanical impacts, wearing-out and destructions, water and moistureinvasion, low and high temperatures, influence of other environmental factors with thewidest range of aggressiveness levels.

TES Coatings has strong views on the quality of the products which complies with themost stringent global standards, obtains all certificates and authorizations of therelevant bodies.

Leading-edge technology and present-day solutions, continuous improvement ofproducts, product lines development, laboratory investigations and multilevelexaminations form the basis of our success. We are a fast-growth company workingtowards leadership in the global market.

Our protective coatings for industrial purposes reflect the latest scientificdevelopments, possess the best operational characteristics — they are reliable and timeproof, as well as efficient and simple in application.

Our decorative coatings will be suitable both for household and industrial use. Wealth oftextures, color palette and processing characteristics can satisfy the needs of the mostdemanding designers and architects having displayed their boldest ideas.

Page 11: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES Coatings offers to its clients multiple present-day variants for comprehensive solution of many tasks among which are:

✓ external protection of pipelines

✓ internal protection of steel tanks for oil

✓ internal protection of reinforced concrete or steel tanks for drinking water

✓ internal waterproofing of metro

✓ waterproofing of roofs over old bitumen

✓ waterproofing of parking lots

✓ continuous floors for warehouses and shopping malls

✓ general anticorrosion protection for metal structures

✓ internal protection of reinforced concrete collectors for waste waters

✓ firefighting and anticorrosion protection of any metal and reinforced concrete structures

Page 12: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES Scan

TES Scan provides pipeline inspection and integrity support services for oil andgas Industry globally.

The pipeline inspection services include metal loss, geometry, crack detection andXYZ mapping surveys using advanced modern technologies. The pipeline integritymanagement support services include installation of pipeline data managementsystems, provision of fitness-for-purpose assessments, development of pipelinemaintenance programs, quick pipeline repairs and pigging equipment suppliesalong with variety of training and professional consulting services.

TES Scan is an independent technology owner, developer and manufacturer of allthe equipment and software used for provision of the services. The companypossesses a huge fleet of inspection equipment designed to suit any pipeline sizein the industry. Organizationally TES Scan is now large size corporation with anumber of branches established all over the world including operating companiesin India as well as R&D center in Germany.

We have been recognized by internationally as a company with quality, HSE andenvironmental management system complying with ISO 9001, 14001, 29001 andOHSAS 18001 regulations. We also comply with many other international andnational industry specific standards and practices hence we are ready for the moststringent market requirements.

Page 13: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Products & ServicesTES Scan’s product & services include:

• In-line inspection services (metal loss, stress corrosion, geometryand crack surveys) using MFL, TFI, ultrasound and calipertechnologies as well as any combination of them.

• Integrity management support services such as fitness-for-purpose assessments, repair plan recommendations, supply andmaintenance of pipeline database management systems, etc.

• Pipeline cleaning services including chemical cleaning and blackpowder removal.

• Supply of pigging equipment such as temporary (light weight) andpermanent pig traps, transmitter/receiver set, pipeline pigs etc.

• Quick pipeline repair services using carbon fiber technology.

• Professional training and expert consultancy services

All the equipment we sell is ATEX certified and al theservices we provide are carried out in strict conformitywith the regulations of our quality management system.

Page 14: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

TES SCAN Clients

Page 15: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

OUR PROJECTS

Page 16: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Salman El Trais El Light Dam tunnel construction works

Page 17: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Meric river crossing - Edirne, Turkey

Page 18: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Nurwani Dam Derivation Tunnel Excavation and Concrete Coating Construction works. Saudi Arabia.

Page 19: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Shuqaiq - Abha, 2nd phase tunnel construction works in Saudi Arabia

Page 20: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Water treatment / Water recycling (ACACIA BUILD LTD.)

Page 21: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Wastewater Treatment Plant (INCESU OSB)

Page 22: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

ISKI Bosphorus Crossing Freeway Project

Page 23: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Kabul - Kandahar Road / Afghanistan

Page 24: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Misuratha - Emsaed Highway / Libya

Page 25: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Mugan - Yevlakh Road (M4) / Azerbaijan

Page 26: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Crossing of the Oka River

Page 27: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Sanitation of Shollar water pipeline

Azersu, OJSC — State Water Administration of Azerbaijan

Sanitation of water pipeline section in the area of Khachmaz(3100 m length). The works were carried out by tunnelingmethod by way of KAWEX

Page 28: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Laying of sewage as part of primary roads and in remote regions byconventional methods in the area of Goychay district (Azerbaijan)

Azersu, OJSC — State Water Administration of Azerbaijan

Laying of sewage as part of primary roads and in remote regions by conventionalmethods in the area of Goychay district of 78 m length and 600 mm internaldiameter. The works were carried out by tunneling method by way of HDD(horizontal directional drilling)

Page 29: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Laying of sewage as part of primary roads and in remote regions byconventional methods in the area of Mingachevir (Azerbaijan)

Azersu, OJSC — State Water Administration of Azerbaijan

Laying of sewage as part of primary roads and in remoteregions by conventional methods in the area of Mingachevirof 587 m length and 200 mm – 800 mm internal diameter. Theworks were carried out by tunneling method by way of HDD(horizontal directional drilling)

Page 30: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Laying of water pipeline along the road in Zykh village (Azerbaijan)

Azersu, OJSC — State Water Administration of Azerbaijan

Laying of water pipeline in Zykh village of 85 m length with 475 mm internaldiameter. The works were carried out by tunneling method by way of HDD(horizontal directional drilling)

Page 31: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Laying of water pipeline under railroad in Pirshagi village (Azerbaijan)

Azersu, OJSC — State Water Administration of Azerbaijan

Laying of water pipeline in Pirshagi village of 80 m length with725 mm internal diameter. The works were carried out bytunneling method by way of HDD (horizontal directionaldrilling)

Page 32: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Construction of rainwater collector in Serdivan citySASKİ Sapanca Water Department

The project took place in Sakarya city in Turkey. It consisted inconstruction of pipelines of various diameters of 5955 m totallength.

Page 33: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Gas pipeline construction under Kura riverState Owned Oil Company of Azerbaijan (SOCAR)

Gas pipeline construction was carried out by HDD method(horizontal directional drilling). Section length — 330 m,carrier pipe diameter — 1020 m

Page 34: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Imishli microtunnelAzersu, OJSC — State Water Administration of Azerbaijan

The project includes construction of waste sewage collector of16 km length by the method of microtunneling with 800 mminternal diameter.

Page 35: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Darnagiul microtunnelAzersu, OJSC — State Water Administration of Azerbaijan

Collector was built by the method of microtunneling of 2936 mtotal length and Ø2000 mm internal diameter. A record formicrotunneling penetration of 1130 m length with 5 radiuses ofimmense complexity was completed in the scope of thisproject.

Page 36: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Microtunneling on Geidar Aliev avenueAzersu, OJSC — State Water Administration of Azerbaijan

∅1400 mm steel water pipes, method of microtunneling with2000 mm internal diameter was employed in order to passunder highroad

Page 37: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Sumqayit sewage collector

Azersu, OJSC — State Water Administrationof Azerbaijan

Collector passes along the coastfor collections of sewage. It is3000 m long and of 1400 mmHDPE diameter. Flanges aremanufactured by the method ofelectro-socket welding.

Page 38: INTERNATIONAL CONSTRUCTION ENGINEERING COMPANYny770.group/wp-content/uploads/2019/01/TES_profile_Eng.pdfworks —microtunneling, horizontal directional drilling, underwater laying

Contact us

• EMAIL

[email protected]

• PHONE

+971 4 450 4377+971 56 664 2999

• FAX

+971 4 450 4375

• ADDRESS

Suite # 28-A, Almas Tower,Jumeirah Lakes Towers,Dubai, United Arab Emirates