INTERNATIONAL STANDARD ISOTC67/SC4M
1 st edition 2010 5 - 8 Petroleum and natural gas industries —
Well integrity for the operational phase.
Participating Work groups Well integrity management & handover – Gary Limb (ConocoPhillips) Lead – Simon Spark ( Tullow Oil )– Nina Ringoen( Centrica )– Joe Anders ( BP ) / Mike Payne BP > replaces Joe
Define well types & risk based monitoring– Paul Hopmans ( Shell ) ( Iso standard Convener ) – Andre Luiz Rocha Alves Petrobras – Gavin Mundie ( Centrica )– Crawford Hair ( Chevron- Grant Lintern (Woodside) added
Well barriers & annular pressure management– Hilde Brandanger ( Statoil ) – Alex Crabtree ( Hess ) lead – Pier Alberto Magarini (Eni )
Well review & test criteria– Nigel Snow ( Maersk )Lead– Mike Murrey ( ExxonMobil )– Remco Donders (Total)
Other participantsISO contacts
'[email protected]'; '[email protected]‘; Reeve, Neil TN GSNL-PTE/DTST;
OGP focal point'[email protected]'; Participating companies to review.
Petro ChinaAdco / Zadco Abu Dahbi; Petronas Malaysia Billiton Petroleum Development OmanGazprom Qatar Petroleum
Referenced standards (So far )API 14 A / B / D/ H API 6 AAPI 90 Norsok D 10Iso 17776 Hazard identificationIso 14224 reliability and maintenance data for
equipmentISO 31000 risk management
ISO standard content Scope / Definitions /References Well Integrity Management
System Organizational Structure Competence Data Management Handover Assessment Well Integrity Assurance Process Performance indicators KpI’s Management of Change
Barrier Principle Barrier Principle/Philosophy Barrier Definition (WBE/SCE) Barrier Schematics Barrier Performance Matrix Barrier Reliability/survivability (safety
case) ESD/Related Safety Systems
Risk management Risk factors and assessment Matrix Corrosion\ Erosion Management Conductor\Structural\Reservoir
Compaction Risk Based Maintenance Process
Annulus Pressure Management
Annuli Pressure Monitoring Process Definition/Calculation of MAASP/
MAWOP Sustained Pressure Management
Integrity assurance Closed in/temporary suspended wells Acceptance criteria / Leak Rates Integrity Fault Mitigation Integrity Deviation/Waver Process Incident/ response planning
Lifecycle management.
Well Review/ Health Check Process Life Cycle Extension Abandonment criteria for end of well
life
Definition of Well integrity Well integrity process is:Application of technical , operational and
organizational solutions to reduce risk of uncontrolled release of well bore fluids through out the life cycle of a well, to avoid harm to people , environment and assets and the required barriers and assurance task in place to prevent this .
This well integrity standard addresses the operate phase of the well from well construct hand over to abandonment only.
Team 1 topics ( Gary )1. Organisation R&R2. Information management3. Well hand over
1. Well design basis2. Traceability of SCE materials
4. People & competence5. Procedures 6. Management of change7. KPI’s metric’s8. Assessment health check ( system)
Team 2 topics (Paul )1. Risk matrix2. Performance standards 3. Mitigation of faults4. Emergency response plan5. Deviation process6. Reliability process7. Condition monitoring all wells that are not
abandoned1. Corrosion proposal Nigel
8. Risk based monitoring , inspection & maintenance,
1. flow wetted and non flow wetted components9. Reservoir compaction assurance task and risk
Team 3 topics (Alex)1. Barriers 2. Barrier schematic’s matrix3. Safety systems / ESD ‘s4. Annular pressure management5. Methods of monitoring of annular pressure6. Risk acceptance criteria definition7. Acceptance criteria table8. Mitigating measures
Team 4 topics ( Nigel )Well review processWell review scopeTriggers for Well reviewWell review documentation process Technical health checkEnd of well life reviewValve testing & barrier verification
Leak ratesBlock and bleedBarrier verification testTesting methodsFunction testingInterface seal testingWell head maintenance ( OEM spares definition )Annular pressure test SCV testing
Timeline plan for development of ISOTC67/SC4M standard 1 st edition 2010 5 – 8 Well integrity for the operational phase I
Note: 15 th afternoon after SPE start and continue in Grand Palace Noordwijk hotel, continue on Monday Tuesday in Rijswijk, details to follow.
2010 2011 2012 2013Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Draft ballotballot1 st f2fScope initiationWork group reviews other operators
2nd f2f 12 / 13 /14 th April Houston3rd f2f Netherlands , following SPE work shop in Noordwijk 15 th / 16 th Sept and 19 th / 20 th Sept in Rijswijk 4 th f2f 5 th f2f6 th f2f Celebration
Committee draftCommentsNational committee endorsement
30 % progress on content
60 % progress on content
100 % progress on content
Technical autor ediiting 100 %Committee draft