Intro to BPC Logic Filter for Microsoft ProjectEnhanced Schedule Logic Tracing
By Thomas Boyle, PE, PSP, PMP
BPC Logic Filter for Microsoft Project –Abstract and Introduction
• Complex sequencing logic can be difficult to extract and display in Microsoft Project, especially when deadlines or variable calendars complicate Project’s Slack (Float) calculations. So we wrote our own Add-In to make Project sing like a rock star. BPC Logic Filter is a lightweight tool that shows only logically-connected tasks and includes advanced features to focus on Driving Relationships, Project Longest Path, Multiple Float Paths, Driving Path Drag, and other key parameters.
• Presented by Thomas Boyle, PE, PMP, PSP, principal consultant of a firm which he founded in 2004 after 19 years in engineering and construction management. Based in Charlotte, NC, USA, he provides outcome-driven consulting and management-support services to clients worldwide.
Agenda - Outline
• Background / Motivation• Program Development• User Interface• Limitations / Calculation Notes• Some Real-World Examples• Questions
BPC Logic Filter for Microsoft Project
- Background / Motivation• History
• MSP (DOS version) – 1984• MSP (Windows version) – 1990• Then
• Focus on IT/Software Development• Multiple Smaller Projects – Competing for manpower• Low cost – limited functionality• Not taken seriously in other sectors
• Now (MSP 2013)• General-Purpose Project focus• All project sizes, client/server, master/sub-projects• Appears generally compliant with requirements for PDM/CPM• Improved functionality• Extremely large user base• Widely used in government and business, growing use in Construction.• Logic Output remains difficult (manual, click-intensive)
BPC Logic Filter for Microsoft Project
- Background / Motivation
• History (to MSP2010)
BPC Logic Filter for Microsoft Project
- Background / Motivation
• History (to MSP2010)• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Predecessors / Successors fields (R/W)
• History (to MSP2010)• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Dependency (Predecessors) Object Form (R/W)
• History (to MSP2010)• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Dependency (Predecessors / Successors) Object Forms (R/W)
• History (to MSP2010)• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Logic Links (R/W)
• History (to MSP2010)• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Task Inspector (RO)
• History (to MSP2010)• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Free Slack Field (RO)• History (to MSP2010)
• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
Total Slack Field (RO)• History (to MSP2010)
• MSP Logic Input/Output
BPC Logic Filter for Microsoft Project
- Background / Motivation
• History (to MSP2010)• MSP Logic Input/Output
• Input = Multiple Options• Output = ??
• Task Inspector• Local Driving Predecessor• Unreliable for non-FS drivers
• Free Slack• Distance from nearest local successor • No ID of driven successors
• Total Slack• Basis of “Critical” Flag• CPM Forward/Backward Pass + mods. (Sparse docs.)• Loses significance w/ variable calendars and mult. Deadlines
BPC Logic Filter for Microsoft Project
- Background / Motivation
• NeedsFor Complex Industrial / Construction Projects:• Communication of the schedule plan:
• Sequential logical relationships• Cascading consequences of delay/acceleration• Key milestones – ID and tracking
• Perform What-If Analyses• Evaluate Schedule Disruptions• Total Slack is not enough
BPC Logic Filter for Microsoft Project
- Background / MotivationNeeds – Why Total Slack is not enough• Simplest Case (1980):
• TS ~ “The amount of (working) time a task may slip without delaying the project.”• TS = Late Finish – Early Finish; TS = Late Start – Early Start• TS=0 Critical Path; TS=1 Near-Critical Path; etc.
• Complex Project (2015)• Working Time – i.e. Calendar – variations TS changes along a single logical path.
i.e. Critical Path ≠ (TS=0)• NLT Constraints and Deadlines affect Late dates ~ sometimes TS<0.
i.e. Critical Path ≠ (TS=0)• (Multiple) NLT Constraints and Deadlines TS~ “The amount of time a task may
slip without delaying ????? (a constrained task somewhere, or the project finish.)”i.e. Critical Path = ????
• All Projects• TS ~ Task A “project finish”.• TS says nothing re. Task A Task B
BPC Logic Filter for Microsoft Project
- Background / Motivation• NeedsFor a given task:• Which tasks are its predecessors? (The whole
chain, not just the immediate dependencies.)• Which tasks are its successors?• Which predecessors are driving – i.e. effectively
limiting the early start of – the task? • Which successor tasks are being driven by the
task?• If a predecessor is NOT driving, how much may it
slip before it becomes driving.• If a successor is NOT being driven, how much
may the given task slip before it has an impact on the successor?
BPC Logic Filter for Microsoft Project
- Background / Motivation• NeedsFor the Project as a whole:• What is the real “Critical Path” and how
is this related to Project’s “Critical” task flag? (Is it related at all?)
• What is the Longest Path – i.e. that group of logically connected activities that drive the overall project completion date?
• What is the Critical/Longest Path for a project whose key milestone(s) don’t coincide with the end of the project schedule?
• Identify and differentiate parallel critical paths and near critical paths?
• Available Tools• Non-MSP Scheduling
Tools (P6, Asta PP, Spider, Safran, Deltek, Acumen Fuse, etc.)
• MSP 2013 – Task Path
BPC Logic Filter for Microsoft Project
- Background / Motivation
• Available Tools• Non-MSP Scheduling
Tools (P6, Asta PP, Spider, Safran, Deltek, Acumen Fuse, etc.)
• MSP 2013 – Task Path• PathsPro
(http://www.projectprocorp.com/)
BPC Logic Filter for Microsoft Project
- Background / Motivation
• Available Tools• Non-MSP Scheduling
Tools (P6, Asta PP, Spider, Safran, Deltek, Acumen Fuse, etc.)
• MSP 2013 – Task Path• PathsPro
(http://www.projectprocorp.com/)
• Driving Path Widget (http://www.projectwidgets.com/)
BPC Logic Filter for Microsoft Project
- Background / Motivation
• Available Tools• Non-MSP Scheduling
Tools (P6, Asta PP, Spider, Safran, Deltek, Acumen Fuse, etc.)
• MSP 2013 – Task Path• PathsPro
(http://www.projectprocorp.com/)
• Driving Path Widget (http://www.projectwidgets.com/)
• BPC Logic Filter (http://www.boyleprojectconsulting.com )
BPC Logic Filter for Microsoft Project
- Background / Motivation
BPC Logic Filter for Microsoft Project
- Program Development
• Initiation• Client: “My people can’t see why they need to finish
these tasks so soon. Isn’t there a report or something to show what other tasks (in other departments) are depending on them?”
• VBA – “Macros”• Rod Gill’s book – VBA Programming – For Microsoft
Project ’98 through 2010 with an Introduction to VSTO
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)
Filter: Select Task Links
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls
Filter: Select Task Links
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls
Filter: Select Task Links
Only within 1 logical step of selected task.
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls
Filter: Select Task Links(<1stp)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0) Relationship Float
Rel. Float
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)
Filter:Select Task Links: Drvrs+0dFF
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
Task9 Driving PathRelFlt=0
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
Task9 Driving PathRelFlt=0
Task9 PathRelFlt=5
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
Task9 Driving PathRelFlt=0
Task9 PathRelFlt=5
Task9 PathRelFlt=7
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
Task9 Driving PathRelFlt=0
Task9 PathRelFlt=5
Task9 PathRelFlt=7
Task9 PathRelFlt=12
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)4. Path Relative Float
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)5. Longest Path Filter
• Automatically Find Last Task(s)• Driving Predecessors
6. Local Network Filter• Dedicated Button• Limited steps from Selected Task
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
Task9 Driving PathRelFlt=0
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
Task9 Driving PathRelFlt=0
Task9 PathRelFlt=7
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
Task9 Driving PathRelFlt=0
Task9 PathRelFlt=7
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)7. Target Task (Bounded Network)
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
Project 3a
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)8. Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
• Feature Development 2013-2015 (VBA)9. Driving Path Drag
• DRAG = Devaux’s Removed Activity Gauge• Total Project Acceleration to be achieved by removing a particular
schedule component:• ~Task Remaining Duration (e.g. resource limitations)• ~Early Constraints• ~Predecessor Lags• ~Leveling Delays, Suspend/Resume of In-progress tasks
• In Logic Analysis, • Only the Driving Path (e.g. Critical Path) has Drag.• Drag <= Task Remaining Duration• Drag is limited by parallel paths• i.e. Drag <= Path Relative Float of Parallel paths
BPC Logic Filter for Microsoft Project
Program Development
BPC Logic Filter for Microsoft Project
- Program Development
• Feature Development 2013-2015 (VBA)1. Simple Logic Tracer (Ancestors/Descendants)2. Counters/Limits/Controls3. Driving-Only (Relative Float=0)4. Path Relative Float5. Longest Path Filter6. Local Network Filter7. Target Task (Bounded Network)8. Cross-Project Links9. Driving Path Drag
BPC Logic Filter for Microsoft Project
- Program Development
• Sharing the Tools• Client Needs• Macros + MS Security <> Easy sharing/deployment• VBA VB.Net VSTO (Office Add-In)• First Beta May 2015
BPC Logic Filter for Microsoft Project
- User Interface
• Installation• Receive link to .vsto file on deployment server(by email)• Execute link using MS Internet Explorer
• If MSIE is default browser, then just click the link• Else, copy link and paste into URL of MSIE
• MSIE automatically downloads and installs the Add-In in user’s account using “ClickOnce”
• Subject to User Access Control permissions• (Uninstall using Control Panel if desired)• New menu group added to MS Project Ribbon
BPC Logic Filter for Microsoft Project
- User Interface
• Trial Operation• Limited Period (7-21d)• Full Analysis Functions Available• Selectable Edition
• No Data Persistence
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button• Click thru initial messages.
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button• Click thru initial messages.
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button• Click thru initial messages.
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button• Click thru initial messages.
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button• Click thru initial messages.
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Select Task (or Tasks)• Select Application Button• Click thru initial messages.
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Confirm Parameters
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• View Results
Filter=“Select Task Links: Drvrs+100dFF”Group=“BPC Relative Float - All Links”
BPC Logic Filter for Microsoft Project
- User Interface
• Basic Operation• Restore Previous (Non-BPC) View if desired
BPC Logic Filter for Microsoft Project
- User Interface
• User Applications• (General) Task Logic Tracer• Longest Path Filter• Local Network Filter
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Simple Project
Logic Tracing• Path Relative
Float• Cross-Project
Links• Bounded
Network (Target Task) Analysis
• Drag Analysis• Re-Sorting to
Show Logical Branches
• Rounding-Off Clock-Time Errors
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Simple Project Logic Tracing
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Simple Project Logic Tracing
• Display Output Form
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Simple Project Logic Tracing
• Predecessors Only
• Display Output Form
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Simple Project Logic Tracing
• Predecessors Only• Hide Completed Tasks• Display Output Form
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Simple Project Logic Tracing
• Predecessors Only• Hide Completed Tasks• Display Output Form• Filter = “Select Task Preds”
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float
Relationship Float = “Number of Days away from Driving”
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float
Relationship Float = “Number of Days away from Driving”
Driving Path: RelFlt=0
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float
Relationship Float = “Number of Days away from Driving”
Driving Path: RelFlt=0
Multiple Float Paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float
• Show Path Rel. Flt.• Re-Sort• Filter Name = “Select
Task Preds: Drvrs+100dFF”
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
Multiple Float Paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
• Selected Task21 (Task9 PathRelFlt=12)
Multiple Float Paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
• Selected Task21 (Task9 PathRelFlt=12)• Show Both Directions
Multiple Float Paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
• Selected Task21
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
• Selected Task21• Filter Name = “Select Task Links: Drvrs+100dFF”
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Path Relative Float for Intermediate Task
• Selected Task21• Filter Name = “Select Task Links: Drvrs+100dFF”
• PathRelFlt (re. Task21) <> PathRelFlt (re. Task9)
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
Project 2a
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
Project 2a
Project 3a
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
Project 2a
Project 3a
Project 4aSub
Project 4a
Project 4aSubSub
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links• Multi-Project (Master-Subproject) allows consolidated
view and calculationFS FS
FS
FS FS
FS
FS
FS
FS
FS
SS
FS FS FS FS
FS
FS FS FS
FS
FS
FS FS FS FSFS
FS
FS FS FS FS FS FS
FS FS FS FS FS
FS
T a s k 2 1
E S : 3 0 - 0 4 - 1 5 I D : 4
D u r : 3 d a y s F S : 7 d a y s
T a s k 3
E S : 3 0 - 0 4 - 1 5 I D : 5
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 4
E S : 1 4 - 0 5 - 1 5 I D : 6
D u r : 1 0 d a y s F S : 0 d a y s
S t a r t : 0 1 - 0 1 - 8 4 I D : 1 8
P r o j e c t : F : \ T h o m a s \ M y D o c u m e n t s \ B P C \ R e f e r e n c
S t a r t : 0 1 - 0 1 - 8 4 I D : 1 9
F in is h : 0 1 - 0 1 - 8 4 D u r : 2 1 0 d a y s
T a s k 1 1
E S : 2 8 - 0 5 - 1 5 I D : 2
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 2
E S : 1 1 - 0 6 - 1 5 I D : 3
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 3
E S : 2 5 - 0 6 - 1 5 I D : 4
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 4
E S : 0 9 - 0 7 - 1 5 I D : 5
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 5
E S : 2 3 - 0 7 - 1 5 I D : 6
D u r : 1 0 d a y s F S : 0 d a y s
M a n u a l T e s t T a s k
E F : 3 0 - 0 5 - 1 5 T S : 0 d a y s
T a s k 1 6
E S : 0 6 - 0 8 - 1 5 I D : 8
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 7
E S : 2 0 - 0 8 - 1 5 I D : 9
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 8
E S : 0 3 - 0 9 - 1 5 I D : 1 0
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 1 9
E S : 1 7 - 0 9 - 1 5 I D : 1 1
D u r : 1 0 d a y s F S : 1 3 d a y s
T a s k 4 1
E S : 2 0 - 1 0 - 1 5 I D : 3
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 4 2
E S : 0 3 - 1 1 - 1 5 I D : 4
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 4 3
E S : 1 7 - 1 1 - 1 5 I D : 5
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 4 4
E S : 0 1 - 1 2 - 1 5 I D : 6
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 4 5
T a s k 4 7 1
E S : 2 4 - 0 3 - 1 5 I D : 1
D u r : 2 0 d a y s F S : 0 d a y s
T a s k 4 7 2
E S : 2 1 - 0 4 - 1 5 I D : 3
D u r : 2 0 d a y s F S : 0 d a y s
T a s k 4 7 3
E S : 1 9 - 0 5 - 1 5 I D : 4
D u r : 2 0 d a y s F S : 0 d a y s
T a s k 4 7 4
E S : 1 6 - 0 6 - 1 5 I D : 5
D u r : 2 0 d a y s F S : 0 d a y s
T a s k 4 7 5
E S : 1 4 - 0 7 - 1 5 I D : 6
D u r : 2 0 d a y s F S : 1 0 d a y s
T a s k 4 7 6
E S : 2 5 - 0 8 - 1 5 I D : 8
D u r : 2 0 d a y s F S : 0 d a y s
T a s k 4 7 7
E S : 2 2 - 0 9 - 1 5 I D : 9
D u r : 2 0 d a y s F S : 0 d a y s
T a s k 4 7 1 1
E F : 1 1 - 0 5 - 1 5 T S : 0 d a y s
T a s k 4 7 1 2
E F : 0 1 - 0 6 - 1 5 T S : 0 d a y s
T a s k 4 7 1 3
E F : 2 2 - 0 6 - 1 5 T S : 0 d a y s
T a s k 4 7 1 4
E F : 1 3 - 0 7 - 1 5 T S : 0 d a y s
T a s k 4 7 1 5
E F : 0 3 - 0 8 - 1 5 T S : 0 d a y s
T a s k 4 7 1 6
E F : 2 4 - 0 8 - 1 5 T S : 0 d a y s
T a s k 0
E S : 0 1 - 0 4 - 1 5 I D : 1
D u r : 1 d a y F S : 0 d a y s
S t a r t : 0 1 - 0 1 - 8 4 I D : 1 0
F in is h : 0 1 - 0 1 - 8 4 D u r : 1 5 0 d a y s
S t a r t : 0 1 - 0 1 - 8 4 I D : 0
C o m p : 0 %
T a s k 1
E S : 0 2 - 0 4 - 1 5 I D : 2
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2
E S : 1 6 - 0 4 - 1 5 I D : 3
D u r : 1 0 d a y s F S : 0 d a y s
S t a r t : 0 1 - 0 1 - 8 4 I D : 1 1
P r o j e c t : F : \ T h o m a s \ M y D o c u m e n t s \ B P C \ R e f e r e n c
FS+ 5 0 %
FS
FS
FS
FS
FS
FS
FS
FS
FS FS FS FS FS FS FS FS FS
FS FS FS FS FS FS FS FS FS
FS FS
FS
T a s k 5
E F : 2 2 - 0 1 - 1 6 T S : 0 d a y s
D u r : 9 d a y s F S : 0 d a y s
T a s k 6
E F : 1 2 - 0 2 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 6 1
E F : 1 7 - 0 2 - 1 6 T S : 7 d a y s
T a s k 7
E F : 2 6 - 0 2 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 8
E F : 1 1 - 0 3 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 9
E F : 1 4 - 0 3 - 1 6 T S : 8 9 d a y s
T a s k 2 0
E F : 2 5 - 0 3 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 1
E F : 0 8 - 0 4 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 2
E F : 2 2 - 0 4 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 5
E F : 0 3 - 0 6 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 6
E F : 1 7 - 0 6 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 7
E F : 0 1 - 0 7 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 8
E F : 1 5 - 0 7 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 9
E F : 2 9 - 0 7 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 0
E F : 0 5 - 0 2 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 1
E F : 1 9 - 0 2 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 2
E F : 0 4 - 0 3 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 3
E F : 1 8 - 0 3 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 4
E F : 0 1 - 0 4 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 5
E F : 1 5 - 0 4 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 6
E F : 2 9 - 0 4 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 7
E F : 1 3 - 0 5 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 8
E F : 2 7 - 0 5 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 3 9
E F : 1 0 - 0 6 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 3 4 . 5 d a y s
T a s k 4 0
E F : 2 8 - 0 3 - 1 6 T S : 0 d a y s
T a s k 4 4
T a s k 4 5
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 4 6
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 4
E F : 2 0 - 0 5 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
T a s k 2 3
E F : 0 6 - 0 5 - 1 6 T S : 0 d a y s
D u r : 1 0 d a y s F S : 0 d a y s
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links• Multi-Project (Master-Subproject) allows consolidated
view and calculation
Note: Task9 no longer Critical Path
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
What About Task9?
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
What About Task9?
Task21: 20d away from driving Task9
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Cross-Project Links
What About Task21?
Drives Nothing.
7d from driving <<this path
20d from driving <<this path
20d from driving <<this path
<<And This one.
<<Driven by these.
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis
Multiple Float Paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis
Task35: 20d from being driven by Task21
Task2: Driving Task21
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis• Selected: Task35
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis• Selected: Task35• Target: Task2
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis• Selected: Task35• Target: Task2
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Bounded Network (Target Task) Analysis• Selected: Task35• Target: Task2
Task2: 13d (not 20d) from Driving Task35
• Task Logic Tracer• Drag Analysis
• DRAG = Devaux’s Removed Activity Gauge• Total Project Acceleration to be achieved by removing a
particular schedule component:• ~Task Remaining Duration (e.g. resource limitations)• ~Early Constraints• ~Predecessor Lags• ~Leveling Delays, Suspend/Resume of In-progress tasks
• In Logic Analysis, • Only the Driving Path (e.g. Critical Path) has Drag.• Drag <= Task Remaining Duration• Drag is limited by parallel paths• i.e. Drag <= Path Relative Float of Parallel paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Drag Analysis
• DRAG = Devaux’s Removed Activity Gauge• Total Project Acceleration to be achieved by removing a
particular schedule component:• ~Task Remaining Duration (e.g. resource limitations)• ~Early Constraints• ~Predecessor Lags• ~Leveling Delays, Suspend/Resume of In-progress tasks
• In Logic Analysis, • Only the Driving Path (e.g. Critical Path) has Drag.• Drag <= Task Remaining Duration• Drag is limited by parallel paths• i.e. Drag <= Path Relative Float of Parallel paths
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Drag Analysis
• BPC Logic Filter Displays Duration Drag Only. Drag from other components is logged for referral.
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Re-Sorting to Show Logical Branches
Analysis Parameters Displayed Results
Re-S
ort t
o Sh
ow
Logi
cal B
ranc
hes Relationships
to Check
Chec
k Dr
ivin
g/
Driv
en O
nly
View Applied Group-By Applied Sort Criteria (within groups if
applicable)
Pred
s
Succ
s
Both
No Change No Change No Change
No Change No Change No Change
No Change Name: BPC Relative Float - All LinksGroup By: Relationship Type
No Change
BPC_MultipleFloatPaths Name: BPC Relative FloatGroup By: Relative FloatThen By: Driving Path Drag (descending, if applicable)
Task check order -descending
BPC_MultipleFloatPaths Name: BPC Relative FloatGroup By: Relative FloatThen By: Driving Path Drag (descending, if applicable)
Task check order -ascending
BPC_MultipleFloatPaths Name: BPC Relative Float - All LinksGroup By: Relationship TypeThen By: Relative FloatThen By: Driving Path Drag (descending, if applicable)
Task check order -ascending
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors
Default catches errors from sloppy updating:
What about Hourly Projects?
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors Hourly Project Example
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors Hourly Project Example
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors Hourly Project Example
Default: Relative Float<1/2 d ignored. All tasks are shown driving.
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors Hourly Project Example
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors Hourly Project Example
Uncheck Rounding:
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Task Logic Tracer• Rounding-Off Clock-Time Errors Hourly Project Example
Uncheck Rounding:
Hour-scale relative float is correctly caught.
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Longest Path Filter• Last-Task Selector• Driving-Path Task Logic Tracer
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Longest Path Filter• Last-Task Selector
• (Ignores User’s Initial Task Selection)• Finds and selects the task (or tasks) that has
• The latest finish date of all tasks in the project that meet the following conditions:
• At least one predecessor• No successors (except external tasks)
• Driving-Path Task Logic Tracer – Limited Options
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Longest Path Filter• Driving-Path Task Logic Tracer – Limited Options
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Longest Path Filter• Default Result
Filter=“Project Longest Path”View=Group=Sort=[No Change]
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Local Network Filter• Limited Options• Change default steps in settings
BPC Logic Filter for Microsoft Project- User Interface
- User Applications
• Local Network Filter• Default Re-sorted Output
View=[No Change]Filter=“Local Logic at Selected Task”Group=“BPC Relative Float - All Links”
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings• General Settings• Analysis Preferences• About/Upgrade
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings• General Settings
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings• General Settings
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings• General Settings
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings• Analysis Preferences
BPC Logic Filter for Microsoft Project
- User Interface
• User Settings• About/Upgrade
BPC Logic Filter for Microsoft Project
- User Interface• Data Output and Retention
• Output• Print to pdf (preferred)• Print to Printer• Recommended Data to Include in All Legend/Hdr/Ftr
• Project Title• Project Filename• Status Date/Time• Print Date/Time• View Name applied• Group-By Name applied• Filter Name applied
• Image Copy/Paste (No Legend/Hdr/Ftr) • Table/Bar Chart (Task Menu|Copy|Copy Picture Paste)• Output Form (<Alt>PrntScrn Paste)
BPC Logic Filter for Microsoft Project
- User Interface
• Data Output and Retention• Retention
• Filters/Groups/Views created by BPC Logic Filter are saved with the project file.
• Logs:• Run Log of each analysis is prepared and included in a
consolidated daily log stored in the default folder. e.g. user\My Documents\BPCLogicFilter\BPC_Logic_Filter-DayLogYYYYMMDD.txt
• Run Log of each analysis is included on the output form if selected.
• Drag Log will be created for each analysis and stored in the default folder if selected. Drag comments may also be added to task notes if selected.
BPC Logic Filter for Microsoft Project
- User Interface• Data Output and Retention
• Retention• Data:
• Program identifies and uses up to eight custom fields for generating the required filters and views.
• Fields unavailable run is aborted.• Default: After generating the filter/group/view, program clears and releases all
the underlying data fields• Filter/group/view can only be regenerated by BPC Logic Filter.• Saving and re-opening the file immediately after running BPC Logic Filter
may cause a null-filter – i.e. all tasks are hidden. Need to Clear Filters.• User may manually tag/flag any/all tasks included in the filter and
manually re-create the view• “Mark the filtered tasks” selected (registered Std Edition required):
task.marked field is used to save underlying basis of filter. Other parts of the view are not saved.
• “Permanently save the data…” selected (registered Pro Edition required): Eight fields needed to prepare all views are permanently retained in the file. Same fields are re-used for every run – so any user edits will be overwritten.
BPC Logic Filter for Microsoft Project
- Limitations/ Calculation Notes
• Dates• Summary Tasks• Inactive Tasks• Manually-Scheduled Tasks• Resource Leveling
BPC Logic Filter for Microsoft Project
- Limitations/ Calculation Notes
• Dates• BPC Logic Filter does not change the dates.
• Running BPC Logic Filter after editing and before re-calculating the schedule will yield incorrect results.
• Program mimics parts of forward and backward pass to compute path relative float, consistent w/ MSP behavior for task calendars, leads, lags.
• Exception: use of task calendars for path relative float vs. total slack.
BPC Logic Filter for Microsoft Project
- Limitations/ Calculation Notes
• Summary Tasks• Program accounts for sequential logic through summary
tasks.• Program ignores all parent/child inheritance logic.
Schedules with the following characteristics may yield incorrect results:
• Constraints on summary tasks• Manually Scheduled summary tasks• Actual-start entries on summary tasks• Predecessors or successors on summary tasks.
• Exception: if all generations of subtasks (including sub-summaries) below the summary have no logic at all, then results may be correct. This condition seems rare in practice.
BPC Logic Filter for Microsoft Project
- Limitations/ Calculation Notes
• Inactive Tasks• MSP 2010
• Program ignores all inactive tasks.• Consistent with MSP 2010 behavior – inactive tasks are
removed from logic.• MSP 2013
• Program ignores all inactive tasks.• NOT-consistent with MSP 2013 behavior – inactive tasks are
substituted with FS relationships (between all predecessors and all successors of the task) at run-time.
• Future program upgrade is planned to address this condition.
BPC Logic Filter for Microsoft Project
- Limitations/ Calculation Notes
• Manual-Scheduling• Program ignores “Task Mode”• Program assumes all tasks are automatically scheduled• Logical conflicts due to manually scheduled tasks are
ignored – presumed unreal.
BPC Logic Filter for Microsoft Project
- Limitations/ Calculation Notes
• Resource Leveling• Program allows resource leveling• Leveling delays are noted/logged and deducted from
relative float• Resource-constrained driving path is NOT tracked• Therefore all leveling should be cleared before running
BPC Logic Filter.
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical PathsAlternate Calendar
on Start MilestonesStd Project Calendar is 4d (M-Th)
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical PathsAlternate Calendar
on Start Milestones
Possible External Constraint on Fence
Std Project Calendar is 4d (M-Th)
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Traditional Approach – Use TS to Identify Critical/Near-Critical Paths
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Start Milestones Excluded from CP
Traditional Approach – Use TS to Identify Critical/Near-Critical Paths
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Start Milestones Excluded from CP
Fence is NCP (4d) based on
TS alone
Traditional Approach – Use TS to Identify Critical/Near-Critical Paths
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Using Logic Filter to Identify Critical/Near-Critical Paths
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Using Logic Filter to Identify Critical/Near-Critical Paths
Start Milestones are on Driving Path to Project
Completion
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Using Logic Filter to Identify Critical/Near-Critical Paths
Start Milestones are on Driving Path to Project
Completion
Fence is 24d (not 4d) from Driving Path to Project Completion
BPC Logic Filter for Microsoft Project- TenSix Example-Critical/Near Critical Paths Std Project Calendar is
4d (M-Th)
Using Logic Filter to Identify Critical/Near-Critical Paths
Start Milestones are on Driving Path to Project
Completion
Fence is 24d (not 4d) from Driving Path to Project Completion
Grading is 12d (not 4d) from Driving Path to Project Completion
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Std Project Calendar is 5d (M-F).
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Alternate Calendar on Construction
Std Project Calendar is 5d (M-F).
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Std Project Calendar is 5d (M-F).
Traditional Approach – “Critical” Filter (TS<=0)
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Std Project Calendar is 5d (M-F).
Traditional Approach – “Critical” Filter (TS<=0)
Critical Path??
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Std Project Calendar is 5d (M-F).
Critical Path??
Traditional – “Critical” Filter + Group by TS
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Std Project Calendar is 5d (M-F).
Traditional – “Critical” Filter + Group by TS
Critical Path??
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Deadlines: Key Milestones <>
Project End
Std Project Calendar is 5d (M-F).
Traditional – “Critical” Filter + Group by TS
Critical Path??
Near-Critical Paths??
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Longest Path Filter = Driving Path to Project Completion
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Longest Path Filter = Driving Path to Project Completion
TS= -4 >>Constraint on other path
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Longest Path Filter = Driving Path to Project Completion
TS= -4 >>Constraint on other path
No Slack Jumps at Calendar Changes => Mixed-Calendar
links are on weekdays.
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Longest Path Filter = Driving Path to Project Completion
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Longest Path Filter = Driving Path to Project Completion
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Longest Path Filter = Driving Path to Project Completion
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Longest Path Filter = Driving Path to Project Completion
Task Logic Tracer -> Driving Path & Near Driving Paths to Project End
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Longest Path Filter = Driving Path to Project Completion
Task Logic Tracer -> Driving Path & Near Driving Paths to Project End
Critical Path has “Drag”
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Longest Path Filter = Driving Path to Project Completion
Task Logic Tracer -> Driving Path & Near Driving Paths to Project End
Critical Path has “Drag”
Near Critical ~ No “Drag”
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer -> Drag on Driving Path to Project End
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer -> Drag on Driving Path to Project End
“Drag” is limited by first Near Critical Path (17d)
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer -> Drag on Driving Path to Project End
“Drag” is limited by first Near Critical Path (17d)
Task Durations not on CP: “Drag” = 0
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Constrained Milestone
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Constrained Milestone
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Constrained Milestone
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Task Logic Tracer -> Driving Path & Near Driving Paths to Key Milestone
Constrained Milestone
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths Std Project Calendar is
5d (M-F).
Task Logic Tracer -> Driving Path & Near Driving Paths to Key Milestone
Constrained Milestone
What about Drag?
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer Driving Path Drag ~ Potential Acceleration
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer Driving Path Drag ~ Potential Acceleration
“Drag” Limited by Parallel Logic Path (2d)
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer Driving Path Drag ~ Potential Acceleration
“Drag” Limited by Parallel Logic Path (2d)
Driven Finish + Driving Start: “Negative Drag”
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Critical/Near Critical Paths
Task Logic Tracer Driving Path Drag ~ Potential Acceleration
What About Crane Deliveries?
“Drag” Limited by Parallel Logic Path (2d)
Driven Finish + Driving Start: “Negative Drag”
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Bounded Analysis – Major Equipment
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Bounded Analysis – Major Equipment
Target: Crane Fabrication Task
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Bounded Analysis – Major Equipment
All Logical Connections Between STS Crane Fabrication and Terminal First Commercial Lift.
BPC Logic Filter for Microsoft Project- Real World Example – Container Terminal- Bounded Analysis – Major Equipment
All Logical Connections Between STS Crane Fabrication and Terminal First Commercial Lift.
Conclusion: Crane Erection/Testing & Transport may be delayed 53 days without delaying milestone.
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
12
3 4
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
Manually Flag tasks for inclusion in Scope of Key
Milestone (FTP1/Section1).
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
Manually Flag tasks for inclusion in Scope of Key
Milestone (FTP1/Section1).
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
Manually Flag tasks for inclusion in Scope of Key
Milestone (FTP1/Section1).
Check and Tag ALL Predecessors of Key
Milestone, not just driving.
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
Manually Flag tasks for inclusion in Scope of Key
Milestone (FTP1/Section1).
Check and Tag ALL Predecessors of Key
Milestone, not just driving.
Need Data Persistence
on.
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
Manually Flag tasks for inclusion in Scope of Key
Milestone (FTP1/Section1).
Check and Tag ALL Predecessors of Key
Milestone, not just driving.
Need Data Persistence
on.
BPC Logic Filter for Microsoft Project- Real World Example – Industrial EPC (4 Plants)- Check for Missing Logic in Defined Scope
Manually Flag tasks for inclusion in Scope of Key
Milestone (FTP1/Section1).
Check and Tag ALL Predecessors of Key
Milestone, not just driving.
Need Data Persistence
on.
Highlight Missing Logic
BPC Logic Filter for Microsoft Project
Conclusion
• Questions?
“I didn’t write BPC Logic Filter to overcome all the shortcomings of MSP; rather I wrote it to extract and present the logic-related information that is already there but which MSP does not show. In this case - as in most - it tells a more complete story than Total Slack alone.”