- Intro to Offshore Kinetics 16.04.2015

Offshore Kinetics WTSS

This is

Wind Turbine Support Structures (WTSS)

A365 Offshore Wind Farm Mother Vessel

Service vessel Launch and Recovery System (LARS)

Offshore Construction Vessel (OCV)

OK Marine Operations

2

Offshore Kinetics (3):

Wind Turbine Support Structures (WTSS)

- 1:20 scale model ready for installation in Ryfylke 05/15

A365 Offshore Wind Farm Mother Vessel

- Offshore launch, recovery and caretaking of wind farm service/crew vessels

Crew-facilities for windfarm crew. Helicopter deck etc. (lifting operations (seabed to top of turbine))

ROV ops, survey and other services during installations and future demobilization of offshore windfarms)

Service vessel Launch and Recovery System (LARS)

- robust launch & recovery system for far offshore wind farm service vessels

(to be interfaced to any type of Mother Vessels)

One of the winners in Carbon Trust’s Offshore Wind Accelerator Program 2011

Offshore Construction Vessel (OCV)

- Subsea heavy lifts, module handling.

Helicopter deck etc. ROV operations.

Survey services.

OK Marine Operations

- customer support Marine Operations, focusing areas:

planning/mgmt. of any marine- and or subsea operation related to offshore renewable energy.

- warranty, insurance matters

3

4

WindSea

4

Projects and products in development (5)

Support Structure options :

Patented and design protected 5

Projects and products in development (6)

Wind Turbine Support Structures (WTSS)

Robust, safe, cost effective Inshore assembly and testing

Nacelle

Tower

Stab-tank

Column

Flex-joint

Suction anchor(alt.: site specific)

WIND TURBINE

ASSEMBLY

ANCHOR

CONNECTION

UPENDING

TOW OUT

Patented and design protected

Projects and products in development (8)

A365 Offshore Wind Farm Mother Vessel

Launch, recovery and storage of wind farm service vessels

One of the Winners in Carbon Trust’s Offshore Wind Accelerator Programme competition (eu/uk 2011)

Registered design : NO 082900 7

Projects and products in development (9)

Service vessel launch and recovery system (LARS)

Launch & recovery system for wind farm service vessels, interfaced to a Mother Vessels

Patented and design protected 8

Far Offshore Operations & Maintenance concept development and optimisation

• With the primary objective to reduce the cost of energy of far offshore wind farms, we have

developed a computer model (Advanced decision support tool) for analysing cost of energy

through

- Vessel fleet optimisation model

o Identifies the best cost effective maintenance fleet on a wind farm, to minimise the

maintenance cost (on a predefined number of visits, duration, wind turbine down time,

limitations, etc.)

- Life cycle profit simulation model

o Simulates the maintenance in a offshore wind farm over the complete life time of the

wind farm with hourly resolution

• Offshore Kinetics can utilise the above models for any Customer

Partners:

9

Offshore Kinetics AS

The company

• Offshore wind technology / marine operations

specialists, arctic operations

• Incorporated in 2009

• Developing floating wind turbines support structures

(WTSS)

• Offshore Windfarm Maintenance support

• 10 persons full time/part time

• Locations: Stavanger & Arendal, Norway

Business idea

• Innovative, safe and cost-efficient solutions for

offshore wind power and offshore operations

Knowhow – areas of expertise

• Marine/subsea planning and operations

• Offshore oil/gas projects

• Mechanical/marine design

• Fabrication, assembly, testing, installation and

maintenance

• Risk management

• Project management

• DnV/MO/R&R

10

The Offshore Kinetics team :

11

a) Marine/ Mechanical engineer, 38 years experience

- Management, concept, operations risk management ,contracts, market

b) Multidiscipline engineer , 28 years experience

- Offshore (Vessels, Rigs, Platforms): ROV`s, Offshore construction,

supervision, inspection

- Onshore: Project management, development , engineering, testing,

documentation , QMS, routines

c) Ships engineer , 38 years experience

- Contracts, economy, market , operations, concept, plan, risk

management

d) MSc Marine Operations/ Ocean Technology, 17 years experience

- Planning, rules & regulations, economy, calculations, operations

e) Quality System Management , 13 years experience.

- QHSE Management, audits, document control.

- QMS: development, implement, revisions, management of quality

systems.

f) Planner, 33 years experience

- Planning, finance, contracts, marked , grids

g) Vessel master, 21 years experience

- Navy/ offshore: Master, warranty, harbour master, offshore

operations

- Onshore: Planning, rules & regulations, warranty survey,

operations, risk management

h) Platform manager (rig), 21 years experience

- Offshore: Master, planning, operations, personnel

- Onshore: Operations, planning, HSE, risk management

i) Project manager, 33 years experience

- Market, management , contracts, planning

j) Technical lead mechanic, 28 years experience

- Technical design, construction, detail design, studies, project

engineer, design supervision

Crew split full time / part time.

• Robust and cost effective assembly, installation and

future removal

• Inshore maintenance and repair if preferred

• HSE: minor personnel exposure only

• Major reductions in Life Cycle Cost

Summary

Thank you for the attention

Thanks for Your attention !

13