introducing process group
DESCRIPTION
Process Group has an established track record as a leading Global solutions provider for the Energy Industry. As well as designing and fabricating complete process trains, our expertise extends to installation, commissioning and servicing of your plant. For further details of how we can help you refer to www.processgroupintl.com.TRANSCRIPT
innovation through design
gas processing | water treatment | solids management | carbon capture | field services | spares
INTRODUCTION TO PROCESS GROUP
Who we are & how we work
Resources & facilities
Technology solutions
Clients
Major projects
Fabrication partners (e.g. South Korea)
Process Group | Overview
~130 employees | US$75M revenue
United Arab EmiratesAbu Dhabi, 2005
Singapore2007
AustraliaMelbourne: Head Office, 1978
Overview | Who we are
Overview | Who we are
Established 1978, Melbourne Head office (Design / Project Mgt. / Fab.)
Abu Dhabi est. 2005 (Design / Project Management / Fabrication)
Singapore est. 2008 (Design / Project Management / External Fab)
130 employees globally, revenue US$75mill
ISO 9001, OHSAS 18001, U-stamp (Abu Dhabi)
Overview | Resources & Facilities (Australia)
Melbourne Head Office1,200 sqm
Workshop 4 Hobbs Crt1,250 sqm
Workshop 5 Hobbs Crt2,250 sqm
Office1,000 sqm
Outside storage and construction~20,000 sqm
Factory2 x 2,100 sqm
Overview | Resources & Facilities (Abu Dhabi)
Overview | Resources & Facilities (Singapore)
298 Tiong Bahru Road,
Central Plaza,
Singapore, 168730
Capabilities
Office Size ~2000 FT 2
Project Management / Execution
Sales
Drafting
Document Control
QA
Singapore Team:
1 General Manager
1 Sales Manager
1 Eng Manager
6 Project Engineers
2 Drafting
1 Document Control
Overview | Resources & Facilities (Fabrication)
Abu Dhabi
Singapore
Melbourne
ShenZhen
Ulsan
Batam Island
Lahore
Gas Sweetening (Amine / Membrane)
Gas Dehydration (TEG / Molecular Sieve / Membrane)
Glycol Regeneration (MEG / DEG / TEG)
Dew Point Control (Refrigeration / JT / Silica Gel)
Fuel & Seal Gas Conditioning
Produced Water Treatment (Deoiler Hydrocyclones, IGF, NSF, CPI)
Sand Handling Systems (Wellhead & Process Desander Cyclones, Sand Flushing)
Mercury and H2S Removal
Mini LPG Plants
Condensate Stabilization
Desalters / Dehydrators
Heater Treaters
Overview | Technology Solutions
Deoiler Cyclones
Ocean / onshore
Discharge
DesanderCyclones
Nut Shell FiltrationGas Flotation
WATER TREATMENT
SOLIDS TREATMENT
Discharge
GasOil
Water
Reinjection underground
PRIMARY SEPARATION
Gas Sweetening
Mercury & H2S removal
Compression
Gas Dehydration
& DPCU
GasOilWaterSolids
GAS PROCESSING
Pipeline
OIL TREATMENT
Pipeline
Fuel Gas Conditioning
Well Head Desander
Crude Oil Dehydrator
Crude Oil Desalter
Overview | Clients
Major Project | Gas Dehydration (TEG)
Client
Project Platong Gas II Development
Location Thailand
Delivery 2011
Plant details
Gas flowrate: 2 x 250 MMSCFD
Lean TEG Circulation Rate: 80 USGPM
Lean TEG Concentration: 99.8 wt%
Outlet Water Content: 2.5 lb/MMSCF
Major Project | Gas Dehydration (TEG)
Client
Project GLNG Upstream Project
Location Queensland
Delivery 2012 to 2013
Plant details
Gas flowrate: 60 MMSCFD
Seven (7) Gas Dehydration Packages
Long term Service Agreement
Major Project | Gas Dehydration (TEG)
Client
Project PNG LNG Associated Gas
Location Papa New Guinea
Delivery 2011
Plant details
Gas flowrate: 3 x 100 MMSCFD
Lean TEG Circulation Rate: 46 USGPM
Lean TEG Concentration: 99.89 wt%
Outlet Water Content: 5 lb/MMSCF
Major Project | Amine Package
Client
Project Zamzama Phase II Project
Location Pakistan
Delivery 2007
Plant details
Gas flowrate: 161 MMSCFD
Amine Circulation Rate: 720 USGPM
Inlet CO2 Content: 3.49% v/v
Outlet CO2 Content: 0.01% v/v
Major Project | Solids Handling & PWTP
Client : PDO
Project : Musallim Phase I & II
Location : Oman
Delivery 2007 to 2008
Plant detailsWater Throughput : 3 x 20,000 m3/day
Oil & solids discharge limit : < 40 ppm
Oil & solids actual discharge : < 15 ppm
External Fabricator Partner (South Korea)
FactoryArea(m2)
Capacity / Year
Main Production RemarksTotal Shop
Factory #1 59,500 26,500 20,000 ton
• Pressure Vessel• Column & Reactor• Converter, Steam Drum• Refinery & Petrochemical Plant Equipment• Nuclear Power Equipment, BOPs
FactoryArea(m2)
Capacity / Year
Main Production RemarksTotal Shop
Factory #2 171,500 15,500 70,000 ton
• Semi-Rig & Offshore Floater Mega Block• Offshore Structure• Module Construction
• Jetty• Paint Shop• Moving Shel-ters
External Fabricator Partner (South Korea)
Column & Tower- Project Name: Yansab Olefins Project- Site: Saudi Arabia- Client : SABIC- Weight/Q’ty: 2,450ton/ 3 set- Size: 51t x 7,100(w) x 88,300(L) + 4,900- Material/ Weight: A537-2+S5/ 1,380ton- Delivery: March, 2007
Topside Module- Project Name: Pazflor FPSO- Site: Nigeria- Client: DSME/ TOTAL- Weight/Q’ty: 3,400ton/ 4 units- Size: 29.7m(w) x 28.6m(L) x 19.2m(H)- Delivery: March, 2010
Module- Project Name: Kearl Initial Development Project - Site: Canada- Client: AMEC/ ExxonMobil- Weight/Q’ty: 20,000ton/ 187 units- Size: 7.3m(w) x 7.8m(H) x 36.0m(L)- Delivery: August, 2011
Load-out Capacity
External Fabricator Partner (South Korea)