ABOUT USAL RAJHI MISSION
Contracting field in the kigdom had great experience in the field of building because of great building movement in the kingdom and its neighbors. The big building business enabled the large competition in contracting business, building and construction meeting increasing clients needs for housing units and real estate and commercial projects.
And the grace of God and then fixed steps of Al Rajhi For Building & Construction joined the com-petition business under the name of Rose Co. for building and construction in 1432 H. to open developing horizons professionally and honestly in the field of contracting.
During this long successful and continuous developing. Al Rajhi For Building & Construction im-plemented several construction project for both of governmental sector and private sector in addition to bank field and private projects for individuals
RBC is certified under ISO 9001 and ISO 14000
5
TABLE OF CONTENTS
1. INTRODUCTION2. COMPANY INFORMATION3. RESOURCES4. QS CERTIFICATION5. LIST OF PROJECTS
6
ABOUT USINTRODUCTION
Nearly twenty years ago, has been building name «Al-Rajhi Company for the construction and re-construction of Contracting and Real Estate Investment» where Habbeina resources, knowledge and personnel to do any engineering work and we have a proven track record in dealing seam-lessly with all departments and agencies and ministries, banks and government and non-govern-mental departments, and along those years we had experience grew day after day «thankfully» supported also the quality of work and mastery, where we spend time record in kindness and provisions of the belief that the control of God Almighty above any control and Tovsag, and God is not pleased, but that the insured work on the complete picture and this was confirmed by the Messenger Muhammad bin Abdullah Allah bless him and headed where he said: (God loves when one of you to do it well). With the support of the national economy, we realize that we make great efforts to be in a position that allows us to live up to that responsibility, and strive to achieve our goals, which is to integrity, honesty, responsibility and full and genuine respect for the rules and ethics of the profession because we want to be trustworthy for all our customers. We understand that the coming period full of economic challenges, political, social, and we are quite confident that we have the tools and personnel necessary to overcome this challenge, and through our hu-man resources enormous. May God help us in achieving what it set up access to what is good to serve our beloved country of Saudi Arabia and ask God for success in the whole matter.
The company will continue to distinguish the application of quality system in technical manage-ment in the implementation of projects and attract technical and administrative excellent com-petencies and raising the level of its employees and to provide support and training for them and introduce them to techniques and modern requirements accompanying regional and global development, as Al Rajhi pay for the construction and reconstruction interest very important cus-tomers of government ministries and private departments work with.
We wish all the employees of the company, all progress and success, success, and we make an effort to appended to the obstacles and the provision of supplies to enable them to carry out the work according to the latest and best technologies and under the environmental, health, safe and sound conditions.
RBC is certified under ISO 9001 and ISO 14000
7
ABOUT USCOMPANY INFORMATION
Main Office : P.O.Box 35009 Riyadh 11488Kingdom of Saudi ArabiaT: 966-11-298 3258F: 966-11-422 4824E: [email protected]: www.alrajhi-co.sa
8
9
10
11
COMPANY RESOURCES
13
Board of Directors
Managing Director
Executive Director
Group General Manager
Executive Secretariat Finance Division
Chief FinanceOfficer
Central & ProjectAccounts
Legal & TechnicalAdvisor
Central &Projects Workshop
Chief Engineer
Cost ControlCell
Manager Contracts& Claims
Quantity & ClaimCell
Safety Cell QA/QC Cell
QA/QC &HSE Manager
SourcingCell
ConstructionManager
Quality AssuranceManager
ConstructionSupervision Cell
SafetyEngineer
Project Manager 1 Project Manager 2 Project Manager 3
Manager Plant & Equipment
Electrical & Mech. Workshop
Project Co-ordinators
Electrical Division
MechanicalDivision
Manager Admin.& Human Resource
Admin.Cell
Human ResourcesCell
Manager Procurement
Central & ProjectProcurement
Central & ProjectStores
Manager Planning& Monitoring
Planning& Monitoring
Manager Stores
Manager Technical
QS Drafting &Comupter Cell
PrequalificationCell
Manager BuisnessDevlopment
GM Plants &Equipments GM E/M
QUALITY SYSTEM CERTIFICATION
15
ABOUT USQUALITY SYSTEM CERTIFICATION
Enclosures : Under ISO-9001:2008Vincotte International Middle East.Certificate No.Q09-003aUnder ISO-14001:2004
Enclosures : Lloyds CertificateMEA1205267-B dt 11th March 2013Under OHSAS 18001:2007
Enclosures : Lloyds CertificateMEA1205267/C dt 11th March 2013
Enclosures : Quality Management Structure Chart
Enclosures : References.
16
17
18
SELECTED CONSTRUCTION PROJECTS“RETURN KEY”
20
RBCSELECTED CONSTRUCTION PROJECTS
21
RBCSELECTED CONSTRUCTION PROJECTS
22
RBCSELECTED CONSTRUCTION PROJECTS
34 Construction for Abha’s general prison buildings Abha
35 Construction for Tabuk’s general prison buildings Tabuk
36 Renovation for prison buildings in Almadina Almonawarah Almadina Almonawarah
37 Development of Civil Defense Directorate warehouse in Asser Asser
38 Add buildings at Prince Mohammad bin Nayef camp Riyadh
39 Construction for Technical College for Boys in Sarat Obeida Sarat Obeida
40 Construction for Technical College for girls in Bilgaren Bilgaren
41 Create Entrepreneurship Institute in Riyadh Riyadh
42 Construction for Nisah Educational Complex Nisah
43 Construction for Qasim ibn Maan Educational Complex Riyadh
44 Construction for Rimah Educational Complex Rimah
45 Construction for Jaw Educational Complex Jaw
SELECTED PROJECTS
24
RBCSELECTED PROJECTS
Project name : Construction of Al-Sultan Real estate Complex
Project No. : W/O
Owner : Naser Bin Mahdi Al- Sultan
Location : Riyadh – KSA
Consultant : Al-Mashwarah Engineering office
Performance period : (1440) days
Brief : Construction of (150) villas (2 floors, and upper appendix, the to-tal buildings surface Area (220)M, turn key .
25
RBCSELECTED PROJECTS
Project name : Construction of Al-Saif Real estate Complex
Project No. : W/O
Owner : Al-Sheikh/ Abdurrahman Bin Abdul Aziz Al-Saif
Location : Riyadh – KSA
Consultant : Al-Mashwarah Engineering office
Performance period : (1080) days
Brief : Construction of (45) villas and apartments (2 floors, each villas 450 M, and each villa contain swimming pool in addition to the “apartment” upper appendix, ground and upper tank.
26
RBCSELECTED PROJECTS
Project name : Construction of Mehdath Intermediate, Eastern Shubra, Riyadh
Project No. : 24/01/0351/06/03/4
Owner : Ministry of Education
Location : Riyadh – KSA
Consultant : Engineering Affairs at ministry of education
Performance period : (720) days
Brief : Studying rooms/ classes of 2 floors and sport hall and open space for education activities plus tanks.
27
28
RBCSELECTED PROJECTS
Project name : Construction of Abdurrahman Bin Ghanam education complex at Nazeem
Project No. : 24/01/0350/06/03/4
Owner : Ministry of Education
Location : Riyadh – KSA
Consultant : Engineering Affairs at ministry of education
Performance period : (720) days
Brief : Studying rooms/ classes of two floors and fences, sport hall and open space for education activities plus tanks.
29
30
RBCSELECTED PROJECTS
Project name : Developing of main hall for Riyadh
Project No. : W/O
Owner : Riyadh
Location : Riyadh – KSA
Consultant : High Commission for Riyadh City development
Performance period : (215) days
Brief : Dismantle and installation of floor and marble ceramic and floors, stairs and renewal of electrical connections , plumber works, wa-ter connections and sewages at Emirate.
31
32
RBCSELECTED PROJECTS
Project name : Construction of Prince Bandar Bin Abdul Aziz education complex
Project No. : 24/01/000/0350/06/03/04
Owner : Ministry of education
Location : Riyadh – KSA
Consultant : Engineering affairs at ministry of education
Performance period : (780) days
Brief : Studying rooms/ classes of two floors and fences, sport hall and open space for education activities plus tanks and necessary damping works
33
34
RBCSELECTED PROJECTS
Project name : Construction of Ayoub An-Ansari education complex
Project No. : 24/01/5002/01/01/4
Owner : Ministry of education
Location : Riyadh – KSA
Consultant : Engineering affairs at ministry of education
Performance period : (720) days
Brief : Studying rooms/ classes of two floors and fences, sport halls and open space for education activities plus tanks
35
36
RBCSELECTED PROJECTS
Project name : Construction of Assad Bin Khuwailed education complex
Project No. : 01/ 0350/ 05/ 03/ 4
Owner : Ministry of education
Location : Riyadh – KSA
Consultant : Engineering affairs at ministry of education
Performance period : (720) days
Brief : Studying rooms/ classes of two floors and fences, sport halls and open space for education activities plus tanks
37
38
RBCSELECTED PROJECTS
Project name : Construction of Al-Morooj District education complex
Project No. : 24/ 01/ 0350/ 05/ 03/ 4
Owner : Ministry of education
Location : Riyadh – KSA
Consultant : Engineering affairs at ministry of education
Performance period : (720) days
Brief : Studying rooms/ classes of two floors and fences, sport halls and open space for education activities plus tanks
39
40
RBCSELECTED PROJECTS
Project name : Developing of training wards at civil defense centre -Riyadh
Project No. : 2/E/A/22
Owner : General Province for Civil Defense
Location : Riyadh – KSA
Consultant : Engineering affairs at General Province for Civil Defense
Performance period : (720) days
Brief : The project as building consist of two separate buildings, each one of two floors, total Area for the training centre is (20,000)SM, including administrative offices, studying halls, accommodation rooms for individual resident and Captains resident rooms.
41
RBCSELECTED PROJECTS
Project name : Addition buildings to Al-Baha police buildings and traffic, and jail complex, providing ready rooms with checking points.
Project No. : 2/E/A/22
Owner : Ministry of interior
Location : Sirat Abeedah – KSA
Consultant : Engineering affairs at ministry of education
Performance period : (270) days
Brief : Create buildings to Al Baha’s police consists of three floors of checkpoints +4 Rooms for arrest based on our requirements at-tached.
42
RBCSELECTED PROJECTS
Project name : Additional and improvement of public security building.
Project No. :
Owner : Ministry of interior – public security
Location : Dammam – KSA
Consultant : Engineering affairs at Public security
Performance period : (15) months
Brief : Repair and construction works, repainting, finishing and mainte-nance of electrical wires, plumbing works and extensions, tele-phone and TV cameras
43
RBCSELECTED PROJECTS
Project name : Construction of Al-Medmar primary school
Project No. :
Owner : Ministry of education
Location : Serat Abeedah – KSA
Consultant : Engineering affairs at ministry of education
Performance period : (320) days
Brief : Construction of studying rooms/ classes and administrative of-fices , of total area 2200 SM, in additional to ground and upper tank, fences, gate, water and sewage net, electrical, sport halls and play grounds
44
RBCSELECTED PROJECTS
Project name : Return he décor of lecture hall at Riyadh police, and additional at Afif police building and Sajer
Project No. : 16/E/A/23
Owner : Ministry of interior - Public security
Location : Afif & Sajer – KSA
Consultant : Engineering affairs at public security
Performance period : (9) months
Brief : Structural work renovations, re-paint, plaster finishes, mainte-nance of electrical wiring auditorium Riyadh police and adding buildings Afif and Sager.
45
RBCSELECTED PROJECTS
Project name : Resident villa
Project No. : Riyadh (11)
Owner : Mohammed Al-Mosa Al-Eliyan
Location : Jeddah city – KSA
Consultant : Al- Qusaeer Engineering office
Performance period : (10) months
Brief : Construction of villa on total capacity area 420SM with supple-mentary, water tank and fence including all work and finishing (turn key)
46
RBCSELECTED PROJECTS
Project name : Iron warehouses
Project No. : Riyadh (10)
Owner : Mosa Hamad Al-Eliyan
Location : Riyadh city- Sillay – KSA
Consultant : Al- Qusaeer Engineering office
Performance period : (16) months
Brief : Construction of iron warehouses and concrete offices, store and WC. And outside supplementary, iron fence with block, water tank and inside well with concrete block for grounding , roads pavement, internal corridors complete in additional to the fire ex-tensions, total area is 26000SM, corridors and internal roads is 6000SM
47
RBCSELECTED PROJECTS
Project name : Agricultural secondary Institute building at Kharj
Project No. : Kharj (9)
Owner : General Cooperation for technical education andvocational training
Location : Kharj city – KSA
Consultant : Al- Jazeerah Engineering Consultant office
Performance period : (15) months
Brief : Construction of agricultural institute at Sabhaa , Kharj city, con-sist of two floors, classes and administrative offices of armed concrete in additional to the fence and site as general and iron gates.
48
RBCSELECTED PROJECTS
Project name : Civil Defense centers at Buraidah and Badae- Qaseem
Project No. : Qaseem (08)
Owner : General province for civil defense
Location : Qaseem area – KSA
Consultant : Engineering affairs department civil defense
Performance period : (15) months
Brief : Construction of two centers for civil defense at Buraidh and Ba-dae, Qaseem area, consist of two floors, officers and administra-tors offices with all facilities in additional to the fire fighting cars parking and relief teams, its metal buildings with block ground with armed concrete .
49
RBCSELECTED PROJECTS
Project name : Branch of A/C factory and Al-Jazeera Coolers
Project No. : Jeddah (7)
Owner : Bader Mohammed Abdul Aziz Al-Rajehi
Location : Jeddah – KSA
Consultant : Tajuldeen Engineering Consultant office
Performance period : (7) months
Brief : Construction of factory from iron and concrete offices, store and W.C and outside supplementary , iron fence with block , water tank and well inside with concrete for the ground, total capacity Area is 5000 SM
50
RBCSELECTED PROJECTS
Project name : civil defense centers at Arafat and holy area
Project No. : Makkah Al-Mokarmah (07)
Owner : General province for civil defense
Location : Makkah Al-Mokarmah – KSA
Consultant : Engineering Affairs department at civil defense
Performance period : (12) months
Brief : Construction of warehouse and ( 4 ) civil defense centers consist of iron frame for fire fighting cars parking , ambulance and officers and police offices with electrical extensions and water in addi-tional to the ground concrete
51
RBCSELECTED PROJECTS
Project name : Ajyad police centre building- Makkah Al-Mokarmah
Project No. : Makkah Al-Mokarmah (06)
Owner : Public security -ministry of interior
Location : Makkah Al-Mokarmah – KSA
Consultant : Engineering Affairs department at public security
Performance period : (24) months
Brief : Building consist of ground floor and three floors repeated as general entrainment and individual jail, administrative offices for the officers with total capacity area 3500 SM in additional to the gates and iron barriers at jail rooms and electrical and water ex-tensions.
52
RBCSELECTED PROJECTS
Project name : Mosques of lieutenant general /Abdullah Rashid Al-Bosaili
Project No. : Southern (03)
Owner : lieutenant general /Abdullah Rashid Al-Bosaili
Location : Khamees Mushait and Abha areas – KSA
Consultant : Al-Shebal Engineering office
Performance period : (15) months
Brief : Establishment of four mosques in Khamis Mushait and finished the creation of four mosques in Abha.
53
RBCSELECTED PROJECTS
Project name : Warehouses and stores
Project No. : Riyadh (04)
Owner : Dhyban Bin Abdullah Dhyban Al-Sael
Location : Riyadh city – KSA
Consultant : Engineer: Dhyban and Ayed company
Performance period : (7) months
Brief : onstruction of iron warehouses and building of white block on total area of 7120 SM divided into (18)warehouses , each one has guard room, water tank and well out side the warehouse plus ground concrete and iron gates and electrical extensions.
54
RBCSELECTED PROJECTS
Project name : Al-Subaie buildings projects
Project No. : Riyadh (05)
Owner : Abdullah& Ibrahim Naser Al-Subaie
Location : Riyadh city- Aseer street – KSA
Consultant : Engineer office at Al-Subaie company
Performance period : (12) months
Brief : Construction of 6 resident and commercial buildings of total area 6000 SM each building consist of three floors (ground, first and second floor) plus upper appendix. Each building has (18)apart-ment and (6) commercial stores.
55
RBCSELECTED PROJECTS
Project name : Abdurrahman Bin Abe Baker school (primary & Intermediate)
Project No. : 29 / 24
Owner : Ministry of education
Location : Serat Abeedh province – KSA
Consultant : Engineering affairs department at ministry of education
Performance period : (270) days
Brief : Building of Studying rooms/ classes and administrative buildings, with total area 2200 SM , in additional to the appendixes and ser-vices ( upper and ground water tank, fence , gate water and sew-age , electricity sport halls and play ground.
56
RBCSELECTED PROJECTS
Project name : Bin Hazam Intermediate school
Project No. : 29 / 24
Owner : Ministry of education
Location : Serat Abeedh province – KSA
Consultant : Engineering affairs department at ministry of education
Performance period : (270) days
Brief : Building of Studying rooms/ classes and administrative buildings, with total area 2400 SM , in additional to the facilities and ser-vices ( upper and ground water tank, fence , gate water and sew-age, electricity sport halls and play ground
57
RBCSELECTED PROJECTS
Project name : Wael Bin Hager school (primary & Intermediate)
Project No. : 29/ 24
Owner : Ministry of education
Location : Serat Abeedh province – KSA
Consultant : Engineering affairs department at ministry of education
Performance period : (270) days
Brief : Building of Studying rooms/ classes and administrative buildings, with total area 2200 SM , in additional to the appendixes and ser-vices ( upper and ground water tank, fence , gate water and sew-age , electricity sport halls and play ground.
58
RBCSELECTED PROJECTS
Project name : Al-Qairwan Education Complex-Serat Abeedh province
Project No. : 29/ 24
Owner : Ministry of education
Location : Serat Abeedh province – KSA
Consultant : Engineering affairs department at ministry of education
Performance period : (270) days
Brief : Building of Studying rooms/ classes and administrative buildings, with total area 2200 SM , in additional to the appendixes and ser-vices ( upper and ground water tank, fence , gate water and sew-age, electricity sport halls and play ground
59
RBCSELECTED PROJECTS
Project name : Construction of sport hall at sport affairs building- Dairab
Project No. : 7 / 26
Owner : General province for civil defense - Riyadh
Location : Riyadh city – KSA
Consultant : Engineering affairs department at civil defense
Performance period : (15) Months
Brief : Construction of Sport hall , swimming pool with audience steps
60
RBCSELECTED PROJECTS
Project name : construction of Abdullah Bin Omer primary school
Project No. :
Owner : Ministry of education
Location : Haferul Batten city – KSA
Consultant : Engineering affairs department at ministry of education
Performance period : (720) days
Brief : Construction of Studying rooms/ classes and administrative buildings , with total area 3600 SM , in additional to the facilities and services ( upper and ground water tank, fence , gate water and sewage and electricity and sport halls and play ground.
61
RBCSELECTED PROJECTS
Project name : Institute of qualifying handicap at Abha
Project No. : Abha (01)
Owner : Lieutenant General /Abdullah Bin Rashid Al-Busaili
Location : Abha city – KSA
Consultant : Al-Shebal office ( Engineers & Consultant)
Performance period : (14) months
Brief : Construction of Studying rooms/ classes, training halls and ad-ministrative buildings , with total area 5000 SM , in additional to the facilities and services (upper and ground water tank, fence , gate water and sewage and electricity and internal roads)
62
RBCSELECTED PROJECTS
Project name : Building of interior ministry.
Project No. : 08481
Owner : Interior Ministry - Saudi Oger Co. Ltd.
Location : Sourth region & Riyadh
Consultant : Khatib and Alami
Performance period : 24 months
Brief : Construction of Civil Defense centers, Mujahedeen centers, And Investigation Office .
63
RBCSELECTED PROJECTS
Project name : Construction of Civil Defense Centers, Mujahedeen centers, In-vestigation.
Project No. : 8081
Owner : Saudi Oger Co. Ltd.
Location : Abha city – KSA
Consultant : Khatib and Alami
Performance period : 28 months
Brief : Construction of Civil Defense centers, Mujahedeen centers, And Investigation Office in Riyadh, Abha.
64
65
RBCSELECTED PROJECTS
Project name : Construction for Rimah Educational Complex
Project No. : 01832
Owner : Ministry of education
Location : Riyadh – KSA
Performance period : (630) days
Brief : Establishment of an educational complex with all its facilities.
66
67
RBCSELECTED PROJECTS
Project name : Construction for Qasim ibn Maan Educational Complex
Project No. : 239/34
Owner : Ministry of education
Location : Riyadh – KSA
Performance period : (630) days
Brief : Establishment of an educational complex with all its facilities.
68
69
RBCSELECTED PROJECTS
Project name : Construction for Jaw Educational Complex
Project No. :
Owner : Ministry of education
Location : Riyadh – KSA
Performance period : (630) days
Brief : Establishment of an educational complex with all its facilities.
70
71
RBCSELECTED PROJECTS
Project name : Construction for Nisah Educational Complex
Project No. :
Owner : Ministry of education
Location : Riyadh – KSA
Performance period : (630) days
Brief : Establishment of an educational complex with all its facilities.
72
73
RBCSELECTED PROJECTS
Project name : Construction of civil defense warehouse
Project No. : 44/35
Owner : Ministry of Interior
Location : Aseer – KSA
Performance period : (18) months
Brief : Build a warehouse for civil defense and set up all the necessary requirements for the repository of electricity and plumbing condi-tioners and paint and plaster and all requirements
74
75
RBCSELECTED PROJECTS
Project name : Restoration of Abha’s prison
Project No. : 35/1434/1435
Owner : Ministry of Interior
Location : Abha – KSA
Performance period : (24) months
Brief : Restoration of the prison of paints and plaster and tile Plumbing conditioners and all the requirements of the prisons Abha.
76
77
RBCSELECTED PROJECTS
Project name : Construction for Technical College
Project No. : 55/102233
Owner : Technical & Vocational Training Corp
Location : Sarah – KSA
Performance period : (900) days
Brief : Technical College and all the necessary requirements for the es-tablishment of the College.
78
79
RBCSELECTED PROJECTS
Project name : Construction for Entrepreneurship Institute
Project No. : 55/38634
Owner : Technical & Vocational Training Corp
Location : Riyadh – KSA
Performance period : (360) days
Brief : Establishment of Leadership Business Institute for Technical and Vocational Training in Riyadh and all the requirements of the proj-ect.
80
81
RBCSELECTED PROJECTS
Project name : Restoration of Tabuk general prison
Project No. : 6/1435/1436
Owner : Directorate General of Prisons
Location : Tabuk – KSA
Performance period : (24) months
Brief : Restoration of the prison of paints and plaster and tile Plumbing AC and all the requirements of the prisons crisis Tabuk.
82
83
RBCSELECTED PROJECTS
Project name : Construction for Technical College for Girls
Project No. : 55/29512
Owner : Technical & Vocational Training Corp
Location : Balgarn – KSA
Performance period : (900) days
Brief : Technical College for Girls and all the necessary technical college for girls building requirements.
84
85
RBCSELECTED PROJECTS
Project name : Add dormitories and buildings
Project No. : 9 / 4.2.11
Owner : Ministry of Interior
Location : Haselah – KSA
Performance period : (60) Days
Brief : Dormitory buildings additional fields of Prince Mohammed bin Nayef, the lightning and counter-terrorism operations.
86
87
RBCSELECTED PROJECTS
Project name : Maintenance and restoration of prisons in Medina
Project No. : 73/1435/1436
Owner : The Ministry of Interior - General Directorate of Prisons
Location : Medina - Saudi Arabia
Performance period : (10) months
Brief : Rehabilitation and restoration and maintenance of buildings Me-dina area prison.
88
89
RBCSELECTED PROJECTS
Project name : Restoration and additions constructivism
Project No. : 60/34
Owner : The Ministry of Interior - General Directorate of Civil Defense
Location : Asir - Saudi Arabia
Performance period : (12) month
Brief : Restoration and additions to the building Civil Defense Depart-ment Bmhafedh Namas Aseer.
90
EQUIPMENT
92
RBCEQUIPMENT
15 Tower crane
10 Mobile crane
18 Other plate
15 Digger
16 Bulldozer
93
RBCEQUIPMENT
10 Bulldozer Load
11 Trucks
19 Tipper Truck
12 Forklift
15 Bulldozer