introduction of ksiscaf.i-netpia.net/isaf/config_file/catalog/scaffolding_english.pdf · safety...
TRANSCRIPT
2016. 5. �
www.scaffolding.or.kr�
Introduction of KSI
Competent Authority Ministry of Employment and Labor (MOEL)
Establishment
Permission Date
November 15, 2013
LegalBasis
ŸArticle 32 of the Civil ActŸArticle 3 of the Mistrial Decree on establishment and supervisory of public institutions for MOEL
BusinessAreas
business defined on the article ofassociation
President Mr. Hong, Ki-chul
Departments
□Technical departmentŸTechnical advisory committee, ŸTechnical development team, ŸTraining and Education team, ŸAdministration department
□Research centerŸWorking at Height (incl. scaffolding)
Address
HQ 62, Daejeoro 155, Gangsugu, Busan
Regionaloffice
Ÿ331, Dongilro, Gawangjingu, SeoulŸ194, Cheonsaro, Weonju City, Gangwondo
Contact point
Main Telephone : 1600-6323 e-mail : [email protected]
Safty Scaffolding Works!
Secure the Safety Work Place.
Ⅰ. Outlook of KSI
- 2 -
þ Aims of Establishment
The purpose of this Association is to maintain and promote the safety of
workers and to contribute to national economic development by preventing
industrial accidents through establishing education and training by which
improving performance of workers and supervisors who work with scaffold and
its adjuncts; scientific and safe use of scaffold; conducting technical research
and development; providing technical assistance to workplace; and promoting
activities to eradicate illegal materials etc..
Ⅱ. Working Area
Division Main function
Training and
Education
legal compulsory or advanced training courses forscaffolder/workers on scaffolding work
education for supervisor and designer/engineerduties
Testing & Certification
Tube & Pipe, Coupler, Joint & Clamp, Work platform, Safety net, etc.
Research and
Development
standard model development and research ontechnical (safety procedure) standards, componentstandardization and accident analysis
development of materials for temporary equipments, functional test
technical research on safety equipments and theirmaterials
Safety safety diagnosis of temporary facilities,technical advice, decision on safety level
Assigned business
from government
approving business or work permission from thegovernment and policy proposal
expelling campaign/work against illegal orun-qualified products
Cooperation cooperation work with governments and otherinstitutions, TF team operation
- 3 -
Ⅳ. Training center
* Training at other sites is available
upon request.
Local training center Training date Location
HQ( 1st training
center)
Busan, Ulsan,
Gyeungsang-Do
every
Wednesday
Busan city,
KSI HQ
2nd training
center
Seoul, Incheon,
Gyeunggi-Do
every Tuesday
and Friday
Suwon city, Gyeunggi-Do
Gyeunggi cultural center
3rd training
center
Gangwon-Do, nort
part of Gyeunggi
every Friday on
first and third
week
Wonju city, Gangwon
Hanzi Themepark
4th training
centerJunla-Do every Thursday
Yeosu city
Yeosu Expo
5th training
centerChungchun-Do
every Friday on
second and
fourth week
Susan city
KWCWS
1st
2nd3rd
4th
5th
- 4 -
Ⅴ. Curriculum
1. Compulsory Training1)
time
OSH Act, Article 47 OSH Act, Article 31
Scaffolding Formwork Sheathing Timbering Steel Frame
09:00 ~
09:50related regulations related regulations related regulations related regulations
10:00 ~
10:50 scaffolding and temporary equipments
formwork general types and characteristics of
sheathing timbering
steel frame work general
11:00 ~
11:50equipment in
formworkmaterials in steel
frame work
12:00 ~
12:50lunch lunch lunch lunch
13:00 ~
13:50 erection and dismantling of
scaffold
construction of formwork earth work
construction of steel structure
14:00 ~
14:50inspection of
formwork ground improvement and
impervious methods15:00 ~
15:50inspection of
scaffold
dismantling of formwork and re-erection of
support
inspection of steel structure
16:00 ~
16:50general safety management
general safety management
general safety management
general safety management
17:00 ~
17:50
analysis and evaluation of
hazardous factors in scaffolding
work
analysis and evaluation of
hazardous factors in formwork
analysis and evaluation of
hazardous factors in sheathing
timbering work
analysis and evaluation of
hazardous factors in steel frame
construction work
foot note1) Occupational Safety and Health Act Article 47(work permit), Article31(Safety and Health education)
- 5 -
2. Advanced scaffolder courses (Level program)
① Level 1
compulsory training
1) application: individual or employer
2) regulation: OSH Act Article 47
(presidential decree of employment
restriction on hazardous works)
3) training period: 1 day
4) issue a regal certificate and licence
card(L1)
② Level 2
advance course(improved course)
1) application: individual or employer
2) regulation: OSH Act Article 31
3) training period: 3 days
4) issue a advanced licence card(L2)
③ Level 3
categoryA course (scaffolder foreman)
B course(inspector)
C course (supervisor)
requirement completion of L2 course duty holder duty holder
training period 5 days 3 days 3 days
effective period 3 years 5 years 5 years
certificatecertificate of
advanced licence (L3)
certificate of scaffolding
inspector licence
certificate of scaffolding
supervisor licence
- 6 -
Ⅵ. Business report
1. Training
<completion of scaffolding training> (‘14. 4.~’16. 5.) (unit : person)
Category Compulsory course
Advanced course
LEVEL 2 LEVEL 3
Shipbuilding 3,861 356 134
Construction and Plant 11,545 205 237
Total 15,406 561 371
※ License card (completion)
◎ Compulsory course – improving participation by seminar
- 7 -
◎ Advanced course – international standard practice and intensive training
KSI is the only public institution for advanced scaffolding training
courses in Korea.
The training courses are developed to fit into the international
standards such as The National Access and Scaffolding Confederation
NASC), Britsh Standard(BS) as well as Korean regulations.
※ 「K-SRS (Korea scaffolding institution - Scaffolder Recognition
Scheme)」 : developed by KSI ; focusing on international standard,
practice and intensified program for safe scaffolding process
< a practice in the advanced course>
<a commemoration picture of completion of a advanced course>
- 8 -
2. Workplace Safety
Evaluation
<Ex. 1> construction site (client : Korea Express Cooperation) ① instruction to inspectors, staff of client (formwork and support)
② examination of construction plan, structure map and joint
inspection to the site
③ comment and Q&A
introduction and comment
review of temporary work plan, blue print etc.
joint inspection on site
- 9 -
<Ex. 2> Chemical Plant (SK Energy)
① signed a MOU between SK Energy and KSI -developing a specified training program and materials for the
workplace, joint safety inspection ② Conducted scaffold safety training on the SK sites; issue a
licence card -staff and workers without the card have limited access to SK sites. ③ Joint inspection and review (including contractors and primary
constructor) -upgrade training materials reflecting results of inspections, advise
technical improvement -grading system: evaluation of contractors of the safety performance
and decide inspection interval on each contractor
3. R&D
◎ Research in progress
Consigned organization Research items
POSCO Ÿ light-weight and improving performance of steel pipe(UL700 material)Ÿ study on joint/clamp for tube&pipe for standardization
Korea Steel Association
※ functional/performance test with new material (UL700) in POSCO steel structure Laboratory