SITE SPECIFIC SAFE OPERATING PROCEDURE INSTRUMENTATION, LPG DEPERTMENT Moderated on 27 th March, 2015 INTRODUCTION Instrumentation Section of LPG Department is mainly responsible for planning, coordination and execution of Preventive and breakdown maintenance schedule of Instruments and control systems of recovery and filling plant and ensures timely completion of jobs at LPG Recovery and Filling Plant. The instrumentation system of LPG Recovery&Filling plant includes: 1. Gauges: Pressure, Temperature, Level 2. Pneumatic Level Controller 3. Smart Transmitters: Pressure, Temperature, Level 4. Mass flow meters 5. HC Gas Detectors 6. Ultrasonic Flow meters 7. I/P Positioners 8. Digital Valve Controllers 9. Tank Farm Field Instruments 10. Expander PLC 11. Dehydrator PLC 12. Gas Chromatograph 13. Burner Management System 14. ABB PLC 15. PLC 16. MB TFM 17. 24 Point Electronic Filling Machine 18. GD Unit/PT Unit of Kosan Crips plant

Upload: others

Post on 13-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • SITE SPECIFIC SAFE OPERATING PROCEDURE INSTRUMENTATION, LPG DEPERTMENT

    Moderated on 27th

    March, 2015

    INTRODUCTION

    Instrumentation Section of LPG Department is mainly responsible for planning, coordination and

    execution of Preventive and breakdown maintenance schedule of Instruments and control

    systems of recovery and filling plant and ensures timely completion of jobs at LPG Recovery and

    Filling Plant. The instrumentation system of LPG Recovery&Filling plant includes:

    1. Gauges: Pressure, Temperature, Level

    2. Pneumatic Level Controller

    3. Smart Transmitters: Pressure, Temperature, Level

    4. Mass flow meters

    5. HC Gas Detectors

    6. Ultrasonic Flow meters

    7. I/P Positioners

    8. Digital Valve Controllers

    9. Tank Farm Field Instruments

    10. Expander PLC

    11. Dehydrator PLC

    12. Gas Chromatograph

    13. Burner Management System

    14. ABB PLC

    15. PLC

    16. MB TFM

    17. 24 Point Electronic Filling Machine

    18. GD Unit/PT Unit of Kosan Crips plant

  • 19. Weighing Bridge

    20. Tanker Filling System, etc.

    CONTENTS:

    CHAPTER 1: ACTIVITIES OF INSTRUMENTATION SECTION

    CHAPTER 2: HAZARDS & GENERAL SAFETY PRECAUTION FOR MAINTENANCE JOBS.

    CHAPTER 3: SOP OF CALIBRATION OF GAS DETECTOR

    CHAPTER 4: SOP OF CALIBRATION OF LEVEL TRANSMITTER

    CHAPTER 5: SOP FOR CALIBRATION OF PRESSURE SWITCH

    CHAPTER 6: SOP FOR CALIBRATION OF PRESSURE TRANSMITTER.

    CHAPTER 7: SOP FORCALIBRATION OF PRV.

    CHAPTER 8: SOP FOR CALIBRATION OF TEMP TRANSMITTER.

    CHAPTER 9: SOP FOR CALIBRATION OF TEMP. SWITCH.

    CHAPTER 10: SOP FOR CHECKING OF FIELD INSTRUMENTS CONTROL PANEL.

    CHAPTER 11: SOP FOR ERECTION AND INSTALLATION OF INSTRUMENT.

    CHAPTER 12: SOP FOR MAINTENANCE OF CONTROL VALVES AND POSITIONER

    CHAPTER 13: SOP FORMAINTENANCE OF DCS.

    CHAPTER 14: SOP FORMAINTENANCE OF DYNAMIC CHECK SCALE AND PRE-CHECK

    SCALE.

    CHAPTER 15: SOP FOR MAINTENANCE OF EJECTION UNIT

    CHAPTER 16: SOP FOR MAINTENANCE OF ELECTRONIC FILLING MACHINE

    CHAPTER 17: SOP FOR MAINTENANCE OF GAS CHROMATOGRAPH.

    CHAPTER 18: SOP FOR MAINTENANCE OF GD UNIT.

    CHAPTER 19: SOP FOR MAINTENANCE OF PLC.

    CHAPTER 20: MAINTENANCE OF PT UNIT.

  • CHAPTER 21: SOP FOR MAINTENANCE OF TANKER LOADING SYSTEM

    CHAPTER 22: SOP FOR MAINTENANCE OF WT. CORRECTION UN IT

    CHAPTER –I

    ACTIVITIES OF INSTRUMENTATION SECTION

    Instrumentation section is an integral part of LPG department of Oil India Limited.

    It is responsible for

    Smooth and trouble free functioning of all the Instrumentation and control systems associated with recovery and Filling plants.

    Installation and commissioning of any new equipment / instrument in recovery and Filling plant.

    Implementation of safety related instrument as and when recommended by OISD.

    Execution of various instrumentation related contract jobs under the department.

    Planning & execution of day to day and annual maintenance jobs related to Instrumentation & control system.

    Planning, budgeting and procurement of instrument item.

    Spare parts management for maintenance of instrumentation & control system of recovery & filling plant.

    Following are the objectives of the Instrument section:

    Ensuing smooth running of the plant and equipment safely.

    To maintain various Instrument and control system of both the plants.

    To facilitate the operators / engineers for easy and safe handling of equipment.

    To keep good relation and understanding with other sections of the department.

    To keep good relation and understanding with other departments of the Company.

    To keep good relation with the suppliers and contractors.

  • CHAPTER –II

    GENERAL SAFETY PRECAUTION FOR INSTRUMENTATION SECTION

    2.01 Toolbox Meeting must be done every day after job allocation / before

    starting of job.

    2.02 Special PPEs relevant to the specific job must be used while doing the job.

    Safety shoes must be used all the times.

    2.03 Inspect each tool for damage before use. Get instruction from Supervisor, if you are unfamiliar with a tool.

    2.04 Keep all tools clean. Keep the tools at their proper storage location.

    2.05 Un-authorized persons should not be allowed in the working area.

    2.06 Outsiders / Trainees / Visitors should be always under supervision.

  • CHAPTER- III

    SOP OF ON SITE CALIBRATION OF GAS DETECTOR (GD).

    GENERAL OPERATIONS

    ACTIVITY ON SITE CALIBRATION OF GAS DETECTOR (GD).

    HAZARDS Electric shocks, Headache, Skin problem,respiration problem.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree helmets, and hand gloves before starting the jobs.

    ii) Keep ready quickDry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Digital Calibrator and Pressure

    Calibrator.

    iv) Standard sample gas, Nozzle for sample gas, Small hair brushfor

    CleaningPurposes,Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the Gas detector physically and the cable gland.

    2. Connect Multimeter in serieswith power supply of the Gas detector

    to measure Milliamps.

    3. Check any leakage voltage with Digital Multimeter.

    4. Clean the Gas detector with dry cloth.

    5. Use small hand brush to clean inside the cover.

    6. Check powersupply tothe GD.

    7. Carefully spray sample gas to GD.

    8. Check 0% and 100% as per range (20% Lower Explosive Limit).

    9. Check alarm condition in Control room.

    10. Remove Multimeter from the Gas Detector and connect to its

    Original position after calibration.

  • CHAPTER- IV

    SOP OF CALIBRATION of Level Transmitter (LT).

    GENERAL OPERATIONS

    ACTIVITY CALIBRATION of Level Transmitter (LT).

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the LT. Keep ready quick

    Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Digital Calibrator and Pressure Calibrator.

    iv) Small hair brush for cleaning Purposes. Proper range of Fuse.

    Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the LT physically and the cable gland.

    2. Isolate all power supply to the LT or switch OFF or remove fuse

    3. Loosen the mounting cover.

    4. Check any leakage voltage with Digital Multimeter.

    5. Clean the LT with cleaning agent.

    6. Use small hand brush to clean contacts and screws.

    7. Check proper supply Voltage to LT with Multi meter

    8. Carefully connect the digital calibrator to the LT.

    9. Use pressure calibrator to generate required pressure.

    10. Check 0%, 25%, 50%, 75%, 100% as per range of the LT.

    11. Use dry cotton cloth to rub.

    12. Close with cover after calibration of LT

    13. Switch ON power supply and check the LT.

  • CHAPTER- V

    SOP OF CALIBRATION OF PRESSURE SWITCH (PS).

    GENERAL OPERATIONS

    ACTIVITY CALIBRATION of Pressure Switch (PS).

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the P.S. Keep ready quick

    Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Digital Pressure Calibrator.

    iv) Small hand hair brush for cleaning Purposes.

    v) Proper range of Fuse. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the PS physically and the cable gland.

    2. Isolate all power supply to the PS or switch OFF or remove fuse

    3. Loosen the mounting cover.

    4. Check any leakage voltage with Digital Multi meter.

    5. Clean the PS with cleaning agent

    6. Use small hand brush to clean contacts and screws.

    7. Check proper supply Voltage to PS with Multi meter

    8. Carefully connect the digital calibrator to the PS.

    9. Use pressure calibrator to generate required pressure.

    10. Check ON/OFF (NO/NC) as per range of the PS.

    11. Use dry cotton cloth to rub.

    12. Close with cover after calibration of PS

    13. Switch ON power supply and check the PS.

  • CHAPTER- VI

    SOP OF CALIBRATION OF PRESSURE TRANSMITTER (PT).

    GENERAL OPERATIONS

    ACTIVITY CALIBRATION of Pressure Transmitter(PT)

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the PT. Keep ready quick

    iii) Dry cleaning agents, Proper tools and equipment’s.

    iv) Standard Digital Multi meter and Digital Calibrator and Pressure

    Calibrator. Small hair brush for cleaning Purposes.

    v) Proper range of Fuse. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the PT physically and the cable gland.

    2. Isolate all power supply to the PT or switch OFF or remove

    Fuse.

    3. Loosen the mounting cover.

    4. Check any leakage voltage with Digital multi meter.

    5. Clean the PT with cleaning agent.

    6. Use small hand brush to clean contacts and screws.

    7. Check proper supply Voltage to PT with Multi meter

    8. Carefully connect the digital calibrator to the PT.

    9. Use pressure calibrator to generate required pressure.

    10. Check 0%, 25%, 50%, 75%, 100% as per range of the PT.

    11. Use dry cotton cloth to rub.

    12. Close with cover after calibration of PT

    13. Switch ON power supply and check the PT.

  • CHAPTER- VII

    SOP OF CALIBRATION OF PRE ROTATION VANE (PRV).

    GENERAL OPERATIONS

    ACTIVITY CALIBRATION of Pre Rotation Vane (PRV).

    HAZARDS Cramp, fall, back injury, slip, Noise.

    PPEs Safety Shoes, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate all mounting studs, Dry cleaning agents,

    iii) Proper tools and equipment, Digital Pressure Calibrator, pressure

    Gauge, standard pressure regulator, Air Hose, Dry Compressed air.

    iv) Dry cotton clothes, proper SS straight connector, and manometer.

    STEP BY STEP

    PROCEDURE

    1. Check the PRV and remove the mounting studs.

    2. Close all pneumatic connections of PRV and dismantle.

    3. Hold the PRV carefully and bring it to Workshop for calibration.

    4. Remove the actuator parts for cleaning.

    5. Replace all damaged O-Rings with new ones.

    6. Clean the PRV parts with proper cleaning agent

    7. Use small hand brush to clean sensitive parts.

    8. Assemble the PRV parts as it is.

    9. Give air supply to the PRV through regulator.

    10. Give signal in PSI and measure the movement of the

    Stem in mm.

    11. Use proper Scale to measure the length of the piston stem.

    12. Check 0%, 25%, 50%, 75%, 100% movement of stem as per

    Supply air pressure in PSI

    13. Use dry cotton cloth to rub and clean the PRV.

    14. Assemble the PRV and fit back in Inlet compressor.

  • CHAPTER- VIII

    SOP FORCALIBRATION OF TEMPERATURE TRANSMITTER

    (TT).

    GENERAL OPERATIONS

    ACTIVITY CALIBRATION of Temperature Transmitter (TT).

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet,

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the TT.

    iii) Keep ready quick Dry cleaning agents, Proper tools and equipments.

    iv) Standard Digital Multi meter and Digital Calibrator.

    v) Small hand hair brush for cleaning Purposes. Proper range of Fuse,

    Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the TT physically and the cable gland.

    2. Isolate all power supply to the TT or switch OFF or remove

    Fuse.

    3. Loosen the mounting cover.

    4. Check any leakage voltage with Digital multi meter.

    5. Clean the TT with cleaning agent

    6. Use small hand brush to clean contacts and screws.

    7. Check proper supply Voltage to TT with Multi meter

    8. Carefully connect the digital calibrator to the TT.

    9. Select type of primary sensor such as RTD, thermocouple.

    10. Check 0%, 25%, 50%, 75%, and 100% as per range of the TT.

    11. Use dry cotton cloth to rub.

    12. Close with cover after calibration of TT

    13. Switch ON power supply and check the TT.

  • CHAPTER- IX

    SOP FORCALIBRATION OF TEMPERATURE SWITCH (TS).

    GENERAL OPERATIONS

    ACTIVITY CALIBRATION of Temperature Switch (TS).

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the T.S. Keep ready quick

    Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Digital Temperature Calibrator.

    iv) Small hand hair brush for cleaning Purposes. Proper range of Fuse.

    v) Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the TT physically and the cable gland.

    2. Isolate all power supply to the Temperature Switch.

    3. Loosen the mounting cover.

    4. Check any leakage voltage with Digital multi meter.

    5. Clean the Temp. Switch with cleaning agent

    6. Use small hand brush to clean contacts and screws.

    7. Remove Temp. Switch and bring to Workshop for calibration

    8. Carefully insert the Temp Switch to the calibration unit.

    9. Use Multi meter to get the contact condition.

    10. Check ON/OFF (NO/NC) of the Temp Switch at required Temp.

    11. Use dry cotton cloth to rub.

    12. Close the cover after calibration of Temp Switch

    13. Fitted back the temp switch in its position.

    14. Check the thermo well of its tightness.

  • CHAPTER- X

    SOP FORCHECKING OF FIELD INSTRUMENTS, FIELD CONTROL

    PANELS, RECORDING OF PLANT PARAMETERS

    GENERAL OPERATIONS

    ACTIVITY Checking of field instruments, field control panels, recording of plant

    parameters

    HAZARDS Falling, Slips, Headache, Skin problem, Heat Radiation, Noise,

    electric shocks

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet,

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    Standard Digital Multi meter and Vacuum Pump.

    iii) Small hand hair brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check normal process variables of field instruments

    2. Isolate all power supply to the field Panels.

    3. Check any leakage voltage with Digital multi meter.

    4. Clean panel and cabinet with vacuum pump.

    5. Use small hand brush to clean nuke and corner.

    6. Use dry cotton cloth to rub.

    7. Check all panel instrument physically and rectify problem if found.

    8. Use envelopes of conductive plastic for taking optimum

    Protection in case of Electronic Items.

    9. Take care of circuit board while removing particularly MOS/ CMOS

    Components. Read and note down the warning label

    Of the circuit boards.

    10. Store all cards in proper envelopes and proper place with

    Utmost care.

    11. Avoid metallic surface for handling cards

    12. Calibrate field Instruments as per calibration procedure.

  • CHAPTER- XI

    SOP FORERECTION AND INSTALLATION OF INSTRUMENT.

    GENERAL OPERATIONS

    ACTIVITY ERECTION AND INSTALLATION OF INSTRUMENT.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand hair

    brush for cleaning Purposes. Dry cotton clothes.

    iv) Take permission for Hot/Cold job as per OISD.

    v) Isolate Power supply.

    STEP BY STEP

    PROCEDURE

    1. Check the instrument physically before installation.

    2. Keep ready all required tools and equipment.

    3. Check and remove any hazardous materials.

    4. Take permission from authorized person of the installation.

    5. Clean the area so that all will be comfortable for work.

    6. Take clearance from other sections if needed.

    7. Installation to be done as per OEM instruction.

    8. Use all protective equipment and tools during installation.

    9. Inform authorized person after erection and installation of the

    instrument.

    10. Test and trial run of the instrument before giving online.

  • CHAPTER- XII

    SOP FORMAINTENANCE OF CONTROL VALVES AND

    POSITIONERS.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of CONTROL VALVES AND POSITIONERS.

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise, Falling, slips

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet,

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter. Small hand brush for cleaning Purposes.

    Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check control valves and positioner physically

    2. Clean control valves and positioner with cleaning agent. .

    3. Check air supply and maintain pressure at 35 PSI in the positioner.

    4. Clean flapper –Nozzle assembly with cleaning agent.

    5. Use small hand brush to clean flapper - nozzle

    6. Check diaphragm of the control Valves

    7. Check output of the I/P converter ( 3 psi to 15 psi )

    8. Maintain and regulate 20 psi in the I/P converter

    9. Observe opening /closing of control valves as per signal from the

    controller

    10. Adjust stem of the valve if required

    11. Check for any leakage after calibration of the valve.

  • CHAPTER- XIII

    SOP OF MAINTENANCE OF DISTRIBUTED CONTROL

    SYSTEM(DCS) AC460/ FRONTEND 800XA.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of Distributed Control System(DCS) AC460/ FRONTEND

    800xA.

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the DCS.

    iii) Keep ready quick Dry cleaning agents, Proper tools and Equipment.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand

    Hair brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Take total backup of the Program

    2. Isolate all power supply to the DCS or switch OFF power supply.

    3. Put on panel ground wristband before touching the cabinet.

    4. Loosen all mounting screws with screw Driver.

    5. Check any leakage voltage with Digital multi meter.

    6. Clean card and cabinet with vacuum pump

    7. Use small hand brush to clean contacts

    8. Use dry cotton cloth to rub.

    9. Check all cards and cabinet physically and rectify problem if found.

    10. Carefully handle the cards

    11. Use envelopes of conductive plastic for taking optimum

    Protection

    12. Take care of circuit board while removing particularly MOS/ CMOS

    Components. Read and note down the warning labelof the circuit

    Boards.

    13. Store all cards in proper envelopes and proper place with utmost care.

  • 14. Avoid metallic surface for handling cards

    15. Use antistatic table for DCS works.

  • CHAPTER- XIV

    SOP FORMAINTENANCE OF DYNAMIC CHECK SCALE AND PRE-

    CHECK SCALE.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of Dynamic check scale and pre-check scale.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet,

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand hair brush

    for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check dynamic and pre-check scale physically.

    2. Check Crisplant Universal Controller(CUC) and its Programs and

    Supply voltage.

    3. Check air pressure to the machine.

    4. Check all air supply tubes of the machines.

    5. Check bearings and chain.

    6. Clean base plate and machines

    7. Use small hand brush to clean CUC.

    8. Use dry cotton cloth to rub.

    9. Carefully handle the cards and CUC if removed.

    10. Replace all damaged bearings of the machines

    11. Check the tightness of chain of Dynamic check scale

    12. Take care of circuit board while removing Electronic Components.

    13. Read and note down the warning label of the circuit boards.

    14. Store all cards in proper envelopes and proper place with utmost care.

    15. Avoid metallic surface for handling cards

    16. Use new bushing for balancing of the machine.

    17. Calibrate the machines with Standard weight of 20 kg, 10kg.

  • CHAPTER- XV

    SOP FORMAINTENANCE OF EJECTION UNIT.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of EJECTION UNIT.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury

    Impact, thrust.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet,

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and

    Equipment.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand

    Hair brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check Ejection unit physically.

    2. Check pneumatic cylinder and vent ports.

    3. Check the piston rod of the unit

    4. Check air pressure to the Unit.

    5. Check all air supply tubes and pulling arm of the unit.

    6. Check machines and conveyor alignment.

    7. Use dry cotton cloth to rub.

    8. Carefully handle the pneumatic cylinder when dismantling.

    9. Replace all damaged O-ring and piston O-rings in maintenance

  • CHAPTER- XVI

    SOP FOR MAINTENANCE OF ELECTRONIC FILLING MACHINE.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of ELECTRONIC FILLING MACHINE.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper non sparking tools.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand brush

    For cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check all filling Machines physically.

    2. Check all Crisplant Universal Controller (CUC) and its Programs.

    3. Check air pressure to the machine.

    4. Check all air supply tubes and LPG hoses of the machines.

    5. Check filling head and its pin.

    6. Check Tightness of hose pipe connector.

    7. Balancing at the base plates of the filling machine too bechecked.

    8. Clean base plate and machines

    9. Use small hand brush to clean CUC.

    10. Use dry cotton cloth to rub.

    11. Carefully handle the cards and CUC

    12. Replace all damaged O-ring of the moving/running equipments

    13. Use envelopes of conductive plastic for taking optimum protection.

    14. Take care of circuit board while removing Electronic Components.

    15. Read and note down the warning label of the circuit boards.

    16. Store all cards in proper envelopes and proper place with Utmost care.

    17. Avoid metallic surface for handling cards

    18. Use new bushing for balancing of the machine.

    19. Calibrate the machines with Standard weight of 20 kg, 10kg.

  • CHAPTER- XVII

    SOP FOR MAINTENANCE OF GAS CHROMATOGRAPH (GC).

    GENERAL OPERATIONS

    ACTIVITY Maintenance of Gas Chromatograph (GC).

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Vacuum Pump.

    iv) Small hand hair brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check online sample lines

    2. Check pressure of Carrier gas and adjust pressure of carrier gas and

    Online sample gas.

    3. Maintain oven temperature at 80 degree C.

    4. Check monitor’s intensity and brightness.

    5. Check all valves inside oven.

    6. Regulate air supply at 35-40 PSI

    7. Use standard program for GC which is stored in EPROM

    8. Use dry cotton cloth to rub/clean the cabinet.

    9. Carefully handle the valves if removed for maintenance.

    10. Take care of circuit board while removing from the enclosure.

    11. Read and note down the warning label of the circuit boards.

    12. Store all cards in proper envelopes and proper place with utmost care.

    13. Avoid metallic surface for handling cards

    14. Use antistatic table while handling electronics cards.

  • CHAPTER- XVIII

    SOP FORMAINTENANCE OFGAS DETECTOR UNIT OF FILLING

    PLANT (GD UNIT).

    GENERAL OPERATIONS

    ACTIVITY Maintenance of Gas Detector Unit of Filling Plant (GD Unit).

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet,

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand hair

    Brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check GD UNIT physically.

    2. Check Crisplant Universal Controller (CUC) and its Programs.

    3. Check air pressure to the Unit.

    4. Check all air supply tubes and LPG sensing tube of the unit.

    5. Check GD head and gas detector unit.

    6. Clean GD sensor part of the unit

    7. Use small hand brush to clean CUC and sensor parts.

    8. Use dry cotton cloth to rub.

    9. Carefully handle the cards and CUC

    10. Replace all damaged O-ring of the GD Unit

    11. Use new bushing for balancing of the machine.

  • CHAPTER- XIX

    SOP FORMAINTENANCE OF PROGRAMMABLE LOGIC

    CONTROLLER(PLC) - 5/40 E AND PLC 5/25

    GENERAL OPERATIONS

    ACTIVITY Maintenance of Programmable Logic Controller(PLC) - 5/40 E and

    PLC 5/25.

    HAZARDS Electric shocks, Headache, Skin problem, Heat Radiation, Noise

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Remove and isolate power supply of the PLC. Keep ready quick Dry

    Cleaning agents.

    iii) Proper tools and equipment. Standard Digital Multi meter & Vacuum

    Pump. Small hand hair brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Take total backup of the Program

    2. Isolate all power supply to the PLC or switch OFF Power Supply.

    3. Put on panel ground wristband before touching the cabinet.

    4. Loosen all mounting screws with screw driver.

    5. Check any leakage voltage with Digital multi meter.

    6. Clean card and cabinet with vacuum pump.

    7. Use small hand brush to clean contacts.

    8. Use dry cotton cloth to rub.

    9. Check all cards and cabinet physically and rectify problem if found.

    10. Carefully handle the cards

    11. Use envelopes of conductive plastic for taking optimum

    Protection

    12. Take care of circuit board while removing particularly

    MOS/ CMOS Components. Read and note down the warning

    Label of the circuit boards.

    13. Store all cards in proper envelopes and proper place with utmost

  • Care.

    14. Avoid metallic surface for handling cards

    15. Use antistatic table for PLC works.

  • CHAPTER- XX

    SOP FORMAINTENANCE OF PRESSURE TRANSMITTER (PT) UNIT

    OF FILLING PLANT

    GENERAL OPERATIONS

    ACTIVITY Maintenance of Pressure Transmitter (PT) Unit of Filling Plant.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand hair

    Brush for cleaning purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check PT UNIT physically.

    2. Check Crisplant Universal Controller (CUC) and its Programs.

    3. Check air pressure to the Unit.

    4. Check all air supply tubes.

    5. Check PT head and pressure transmitter unit.

    6. Clean pressure sensor part of the unit

    7. Use small hand brush to clean CUC.

    8. Use dry cotton cloth to rub.

    9. Carefully handle the cards and CUC

    10. Replace all damaged O-ring of the PT Unit.

    11. Use new bushing for balancing of the machine.

  • CHAPTER- XXI

    SOP FORMAINTENANCE OF TANKER LOADING SYSTEM.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of TANKER LOADING SYSTEM.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury, dust.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper non sparking tools.

    iii) Standard Digital Multi meter and Vacuum Pump. Small hand brush

    For cleaning Purposes.

    iv) Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check tanker filling unit physically.

    2. Check Danload batch loader and Micromotion Unit and its Programs.

    3. Check solenoid valves of the Unit.

    4. Check earthing unit of the system.

    5. Check all cable gland and tubings.

    6. Use password to protect the programs.

    7. Use small hand brush to clean Danload and Micromotion unit.

    8. Use dry cotton cloth to rub.

    9. Carefully handle the cards if dismantling Danload.

    10. Replace defective card if needed.

    11. Check Brodie control valve and maintain periodically

  • CHAPTER- XXII

    SOP FORMAINTENANCE OF WEIGHT CORRECTION UNIT.

    GENERAL OPERATIONS

    ACTIVITY Maintenance of WEIGHT CORRECTION UNIT.

    HAZARDS Headache, Skin problem, Noise, Cool burn, slips, back injury.

    PPEs Safety Shoes, Wrist band, hand gloves, Dungaree, helmet.

    PREPARATION i) Wear Dungaree, helmets, and hand gloves before starting the jobs.

    ii) Keep ready quick Dry cleaning agents, Proper tools and equipment.

    iii) Standard Digital Multi meter and Vacuum Pump.

    iv) Small hand brush for cleaning Purposes. Dry cotton clothes.

    STEP BY STEP

    PROCEDURE

    1. Check the Weight correction unit physically.

    2. Check all Crisplant Universal Controller (CUC) and its Programs.

    3. Check air pressure to the machine.

    4. Check all air supply tubes and LPG hoses of the machines.

    5. Check filling head and its pin.

    6. Clean base plate, roller and machines

    7. Use small hand brush to clean CUC.

    8. Use dry cotton cloth to rub.

    9. Carefully handle the cards and CUC

    10. Use envelopes of conductive plastic for taking optimum

    Protection

    11. Take care of circuit board while removing Electronic Components.

    Read and note down the warning label of the circuit boards.

    12. Store all cards in proper envelopes and proper place with utmost care.

    13. Avoid metallic surface for handling cards

    14. Use new bushing for balancing of the machine.

    15. Calibrate the machines with Standard weight of 20 kg, 10kg.

    ------****------