introduction to the seminar ilc detectors: status and prospects akiya miyamoto kek ipns 18 july 2007...

10
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Upload: earl-dawson

Post on 18-Jan-2018

226 views

Category:

Documents


0 download

DESCRIPTION

Reference Design Report 3 Vol. 1 Executive Summary Vol. 2 PhysicsVol. 3 AcceleratorVol. 4 Detectors Final Release is at Daegue, August The latest draft: (Asian mirror site) ~680 pageshttp://ilc.kek.jp/RDR Links to the draft version for physics and detectors available at Authorship: those who have contributed, plan to contribute, or just want to support the project, are welcomed to sign up from

TRANSCRIPT

Page 1: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Introduction to the seminar

ILC Detectors: Status and ProspectsAkiya Miyamoto

KEK IPNS18 July 2007

1

Page 2: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Jim Brau Workshop Charge LCWS07, Fermilab May 30, 2007

2

The GDE Plan and ScheduleThe GDE Plan and Schedule

2005 2006 2007 2008 2009 2010

RDR:We are Here Next: EDR

Page 3: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Reference Design Report

3

Vol. 1 Executive Summary

Vol. 2 Physics Vol. 3 Accelerator Vol. 4 Detectors

Final Release is at Daegue, August 2007. The latest draft: http://ilc.kek.jp/RDR (Asian mirror site) ~680 pages Links to the draft version for physics and detectors available at http://www.linearcollider.org/wiki/doku.php?id=dcrdet:dcrdet_home Authorship: those who have contributed, plan to contribute, or just want to support the project, are welcomed to sign up from http://www-flc.desy.de/dcr

Page 4: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

ILC Configuration

4

~31km

Layout for Ecm=200~500 GeV, L~2x1034cm-2s-1

Pulse rate = 5Hz, 1000~5400 bunches in ~1msec pulse1 IR is shared by two detectors Beam crossing angle – 14mrad

Page 5: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Detector Concepts

5

LDCSiD

4thGLD

Detector concept team is not a collaboration.

Page 6: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Detector Concepts

6

TrackingTracking ECalECalInnerInnerRadiusRadius

SolenoidSolenoid EM EM CalCal

HadronHadronCalCal

OtherOther

SiDSiD siliconsilicon 1.27 m1.27 m 5 Tesla5 Tesla Si/WSi/W DigitalDigital(RPC..)(RPC..)

Had cal Had cal inside inside coilcoil

LCDLCD TPCTPCgaseousgaseous

1.68 m1.68 m 4 Tesla4 Tesla Si/WSi/W DigitalDigitalor or AnalogAnalog

Had cal Had cal inside inside coilcoil

GLDGLD TPCTPCgaseousgaseous

2.1 m2.1 m 3 Tesla3 Tesla W/W/Scin.Scin.

Pb/Pb/Scin.Scin.

Had cal Had cal inside inside coilcoil

4th4th TPCTPCgaseousgaseous

1.4 m1.4 m 3.5/1.53.5/1.5 crystalcrystal Multi-Multi-fiber fiber readoutreadout

DoubleDoubleSolenoidSolenoid(open mu)(open mu)

See Detector Outline Documents for details - http://physics.uoregon.edu/~lc/wwstudy/concepts/

Page 7: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

ILC Detector Roadmap ILC detector roadmap has been discussed in ILC community,

WWSOC and ILCSC since last year Boundary conditions

ILC IR design needs input from detectors. Can push-pull scheme works ? Beam stability ? Magnet fields

? … Detector construction will take similar time as accelerator.

Accelerator will take ~ 7 years. Detectors are assembled on surface similar to CMS. But CMS took ~ 6 years for construction

Detectors should be prepared in phase with the accelerator Detector EDR in ~2010 GDE will prepare (ready for the project approval ) EDR in 2010

Openness of the detector program should be maintained

7

Page 8: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

ILC Detector Roadmap - 2

Summer 2007 ILCSC announces call for LOI due Summer 2008.

LOI is “to express an interest to design , engineer and eventually build a detector at the ILC”

Summer 2008 Detector design teams submit LOI.

End 2008 Two detector designs recognized for development

toward the engineering design phase. ~2010

Engineering designs completed for two detectors in a synchronized way with the accelerator EDR.

8

− The process is open to new comers to join.− Some sub-detector technologies choices may be open.

Road map endorsed by ILCSC in June 2007

Page 9: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Exp. Program Management

ILCSC: A body to oversight the global effort of ILC, including the experimental program.

WWS is a bottom-up organization and has been guiding the experimental program.

In order to enhance the executive authority and its accountability with respect to the ILCSC in the era beyond the RDR, ILCSC has decided to appoint the Research Director.

Research Director Appointed by and reports to the ILCSC Responsible for the experimental program. Advisory / Review structure : under discussion

9

Page 10: Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1

Today’s Program Introduction

Akiya Miyamoto, KEK

GLD-LDC Detector Concepts, Yasuhiro Sugimoto, KEK

SiD Concept and detector R&D in the US Harry Weerts, ANL

10