INVENERGY LLC
Meeting Summary Report Lake Simcoe Regional Airport Solar Project
August 2015
Prepared by Dillon Consulting Limited
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
i
Table of Contents Acronyms, Abbreviations, Definitions
1.0 Introduction 1 2.0 Distribution of Notice of Public Community Meeting 2
2.1 Newspaper Circulation .................................................................................................. 2
2.2 Notice Mailing ............................................................................................................... 2
2.3 Contact List .................................................................................................................... 2
2.4 Project Website ............................................................................................................. 3
3.0 Format, Displays and Attendance 4
3.1 Format ........................................................................................................................... 4
3.2 Display Panels ................................................................................................................ 4
3.3 Attendance .................................................................................................................... 5
4.0 Comments Received and Responses 6
Appendices
A Notice of Public Community Meeting
B Display Materials
C Comments Received and Responses
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
iii
Acronyms, Abbreviations, Definitions – C –
CEP, Community Engagement Plan; the document provides details of how the Proponent
intends to engage with the public and other interested stakeholders as part of the LRP I RFP
process.
– I –
IESO, Independent Electricity System Operator; organization responsible for overseeing long-
term planning for power generation in Ontario, administering the LRP I RFP process.
Invenergy, Invenergy LLC; the qualified applicant per the LRP I RFP.
– k –
kW, kilowatt; unit of energy.
– L –
LRP I RFP, Large Renewable Procurement Request for Proposals; process through which
renewable energy generation projects are granted contracts by the IESO.
– M –
MSR, Meeting Summary Report; provides details of public meeting(s) undertaken by the
Proponent as part of the LRP I RFP process.
MOECC, Ministry of Environment and Climate Change; provincial ministry responsible for
overseeing the REA process.
MW, megawatt; a unit of energy.
– O –
OPA, Ontario Power Authority; predecessor agency formerly responsible for administering the
LRP I RFP process, since replaced by the IESO.
– R –
REA, Renewable Energy Approval; approvals process through which all renewable energy
projects must proceed and complete in order to begin operation.
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
1
1.0 Introduction
On June 12, 2013, the Minister of Energy issued a Directive to the Independent Electricity
System Operator (IESO; formerly the Ontario Power Authority (OPA)) to develop a new
competitive process for the procurement of renewable energy projects in Ontario larger than
500 kilowatts (kW). Invenergy LLC (Invenergy) will be submitting a proposal to the IESO in
fulfillment of their Large Renewable Procurement Request for Proposals (LRP I RFP) for a
proposed 8.5 megawatt (MW) project to be known as the Lake Simcoe Regional Airport (LSRA)
Solar Project (“Project”).
The LRP I RFP requires proponents to develop a meeting summary report (MSR) for each public
community meeting and post it on the Project website (www.invenergyllc.com/lsra). In
addition, the MSR must be made available to the clerk (or other designate) for the municipality
in which the Project is located.
This report summarizes the public community meeting held for the Project at the Old Town
Hall, located at 833 Line 7 North at the 15/16th Sideroad, Oro-Medonte, Ontario, on August 4,
2015, from 7:00 to 9:00 p.m. The purpose of the public community meeting was to introduce
the Project and obtain input on the planning and design process. This document builds upon
the community engagement plan (CEP) developed for the Project.
http://www.invenergyllc.com/lsra
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
2
2.0 Distribution of Notice of Public Community Meeting
2.1 Newspaper Circulation
The Notice of Public Community Meeting (provided in Appendix A) was published in the July 17
and 18, 2015, editions of the Barrie Examiner.
2.2 Notice Mailing
A copy of the notice was also mailed to stakeholders on the contact list including those
identified in the LRP I RFP (as applicable). The mailing list generally included the following
categories of stakeholders:
• Government officials;
• Landowners;
• Provincial crown land leaseholders, as applicable;
• Aboriginal communities;
• Local boards and/or commissions; and,
• Utility companies.
Approximately 58 copies of the notice were distributed to agencies and landowners beginning
July 15, 2015, via Canada Post. The notice was based on the Prescribed Template – Notice of
Public Community Meeting and generally contained background information on the Project, a
description of the study process, meeting details and project contacts.
2.3 Contact List
A contact list was developed for the Project and was used to engage and manage
correspondence with stakeholders. In addition to the required stakeholder categories, the
contact list was further developed to include parties who had expressed an interest in being
contacted at the public community meeting. The list was supplemented with online searches of
government listings, studies completed in the area, letters received, website notifications,
emails and telephone calls. The list conforms to the requirements of the LRP I RFP.
A copy of the contact list is available however is being kept confidential per the Freedom of
Information and Protection of Privacy Act, R.S.O., 1990.
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
3
2.4 Project Website
A website was established to provide stakeholders with information about the Project and
provide a contact platform through which stakeholders could ask questions. The website will
be updated throughout the LRP process to provide up to date information.
The Project website is located at the following URL:
www.invenergyllc.com/lsra
http://www.invenergyllc.com/lsra
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
4
3.0 Format, Displays and Attendance
3.1 Format
The public community meeting was an informal walk-in session with displays summarizing the
work completed to date. Appendix B provides a copy of the display panels. Invenergy and
Dillon Consulting Limited (Dillon) staff were in attendance to explain the displays, record
comments and answer questions.
The following key Invenergy and consultant staff were present:
• Richard Deacon, Senior Manager, Business Development, Invenergy;
• Ian Howes, Development Consultant, Soventix; and,
• Christie Cestra, Associate, Dillon Consulting Limited.
3.2 Display Panels
The content of the display panels used during the course of the public community meeting is
shown in Appendix B. The panels were used to describe the following key components of the
Project:
• Information on Invenergy and the LRP I RFP;
• Introduction to solar energy;
• LRP and REA timeframe;
• Project details and preliminary site layout;
• Construction activities, potential effects and mitigation measures;
• Community Benefits Fund;
• Community engagement approach;
• Next steps; and,
• Contact information for feedback.
The Community Engagement Plan (CEP) and Site Considerations Information were also on
display to the public.
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
5
3.3 Attendance
Upon arrival at the meeting venue, all attendees were
asked to sign the public community meeting Record of
Attendance sheet (sign-in sheets). Five individuals
signed the Record of Attendance.
The Record of Attendance is available however is being
kept confidential per the Freedom of Information and
Protection of Privacy Act, R.S.O., 1990.
Attendees were also encouraged to complete comment
sheets. Those who took comment sheets home after
the event were requested to forward their responses to
the contact shown on the notice within the next couple
of weeks.
General comments expressed by attendees related to
potential effects to aesthetics in the area, impacts to
local roads and agricultural lands during construction,
and plans for project decommissioning.
Photo taken during the LSRA Public Community Meeting.
-
INVENERGY LLC Meeting Summary Report - Lake Simcoe Regional Airport Solar Project Prepared by Dillon Consulting Limited
6
4.0 Comments Received and Responses
Comments received during the public meeting engagement process are included in Appendix C.
One comment form was received at the public community meeting.
A summary of respondent submissions and Proponent responses is provided in Appendix C.
-
Appendix A
INVENERGY LLC Meeting Summary Report Prepared by Dillon Consulting Limited
A - 1
A Notice of Public Community Meeting
-
Lake Simcoe Regional Airport Solar Project
Notice of Public Community Meeting For a Project Proposal Under the Large Renewable Procurement
The proponent identified below is proposing to submit a proposal to the Independent Electricity System Operator (IESO) to design, build, and operate a Large Renewable Project for the generation of electricity under the IESO’s Large Renewable Procurement (LRP).
The LRP is a competitive process for procuring large renewable energy projects generally larger than 500 kilowatts. At the conclusion of the LRP, the IESO may award contracts for successful projects up to the specified procurement targets for each renewable fuel: 300 megawatts (MW) for wind, 140 MW for solar, 75 MW for waterpower, and 50 MW for bioenergy.
This notice is being distributed to notify members of the public of a public community meeting that has been scheduled to discuss the Large Renewable Project proposal. Information regarding the proponent, the Large Renewable Project proposal, and the meeting details are described below.
This public community meeting is being held as part of the early community engagement requirements of the LRP. The public community meeting will present details about the Large Renewable Project and its proposed connection line. Representatives of the proponent will be available to discuss the Large Renewable Project and the overall LRP process. Should this Large Renewable Project be awarded a contract, the Large Renewable Project would need to obtain all required permits and approvals and conduct any further required community engagement activities.
Further details regarding the LRP are available at www.ieso.ca/lrp.
Proponent: LSRA Solar Energy Partnership
Qualified Applicant from the LRP Request for Qualifications stage associated with the proponent: Invenergy LLC
Name of the Large Renewable proposal: Lake Simcoe Regional Airport Solar Project Renewable fuel of the Large Renewable Project: Non-Rooftop Solar Proposed capacity of the Large Renewable Project (MW): 8.5 MW
Proposed connection point of the Large Renewable Project: Existing 44 kilovolt circuit south of Highway 11 at the 6th Line
Proposed location of the Large Renewable Project and proposed connection line: The Lake Simcoe Regional Airport Solar Project address, as shown below, is 224 7th Line North, Oro Station, ON L0L 2E0
Public Community Meeting Location: Old Town Hall 833 Line 7 North at the 15/16th Sideroad Oro-Medonte, ON Date: August 4, 2015 Time: 7:00 to 9:00 p.m.
Contact information for the proponent Ryan Ralph Senior Business Development Manager (416) 901-9463 [email protected] 120 Front Street East, Suite 201 Toronto, ON M5A 4L9 www.invenergyllc.com/lsra www.invenergyllc.com Lake Simcoe Regional Airport Solar Project
http://www.ieso.ca/lrpmailto:[email protected]://www.invenergyllc/http://www.invenergyllc.com/
-
Appendix B
INVENERGY LLC Meeting Summary Report Prepared by Dillon Consulting Limited
B - 1
B Display Materials
-
.ΧΜΓ�5ΚΟΕΘΓ�4ΓΙΚΘΠΧΝ�#ΚΤΡΘΤς�5ΘΝΧΤ�2ΤΘΛΓΕς�
/ŶǀĞŶĞƌŐLJ�==��WƵďůŝĐ��ŽŵŵƵŶŝƚLJ�ΧĞĞƚŝŶŐ�
�ƵŐƵƐƚ�ϰ͕�ϮϬϭϱ�
+ΠΞΓΠΓΤΙ[�..%�ΚΥ�Χ�3ΩΧΝΚΗΚΓΦ�#ΡΡΝΚΕΧΠς� /ŶǀĞŶĞƌŐLJ�==��ƋƵĂůŝĨŝĞĚ�ƚŽ�ƉĂƌƚŝĐŝƉĂƚĞ�ŝŶ�ƚŚĞ�.�]ϑ�>ĂƌŐĞ�ΨĞŶĞǁĂďůĞ�ςƌŽĐƵƌĞŵĞŶƚ�Ͳ�ΨĞƋƵĞƐƚ�ĨŽƌ�WƌŽƉŽƐĂůƐ�;=Ψς�.�Ψ%ςͿ�ŝŶ�ϮϬϭϱ͘��
dŚĞ�.�]ϑ�ŝƐ�ƉƌŽĐƵƌŝŶŐ�ϭϰϬ�Χσ�ŽĨ�ƐŽůĂƌ�ŝŶ�ƚŚŝƐ�Ψ%ς͘ �� /ŶǀĞŶĞƌŐLJ�ŝƐ�ƉƌĞƉĂƌŝŶŐ�ƚŽ�ƐƵďŵŝƚ�Ă�ƉƌŽƉŽƐĂů�ĨŽƌ�ƚŚĞ�>ĂŬĞ�]ŝŵĐŽĞ�ΨĞŐŝŽŶĂů��ŝƌƉŽƌƚ�]ŽůĂƌ�ςƌŽũĞĐƚ͘��
dŚĞ�ƉƌŽƉŽƐĂů�ƐƵďŵŝƐƐŝŽŶ�ĚĞĂĚůŝŶĞ�ŝƐ�]ĞƉƚĞŵďĞƌ�ϭ͕�ϮϬϭϱ�ĂŶĚ�ƚŚĞ�.�]ϑ Ɛ͛�ƉƌŽƉŽƐĂů�ĞǀĂůƵĂƚŝŽŶ�ƉƌŽĐĞƐƐ�ǁŝůů�ƌƵŶ�ƵŶƚŝů�∆ŽǀĞŵďĞƌ�ʹ��ĞĐĞŵďĞƌ�ϮϬϭϱ͘����
.ΧΜΓ�5ΚΟΕΘΓ�4ΓΙΚΘΠΧΝ�#ΚΤΡΘΤς�5ΘΝΧΤ�2ΤΘΛΓΕς� dŚŝƐ�ςƵďůŝĐ��ŽŵŵƵŶŝƚLJ�ΧĞĞƚŝŶŐ�ŝƐ�ĨŽƌ�ƚŚĞ�=ĂŬĞ�]ŝŵĐŽĞ�ΨĞŐŝŽŶĂů��ŝƌƉŽƌƚ�]ŽůĂƌ�ςƌŽũĞĐƚ�� >ŽĐĂƚĞĚ�Ăƚ�ϮϮϰ�=ŝŶĞ�ϳ�∆ŽƌƚŚ͕�ϑƌŽ�]ƚĂƚŝŽŶ͕�ϑŶƚĂƌŝŽ� �ƐƚŝŵĂƚĞĚ�ŵĂdžŝŵƵŵ�ŶĂŵĞ�ƉůĂƚĞ�ĐĂƉĂĐŝƚLJ�ŽĨ�ĂƉƉƌŽdžŝŵĂƚĞůLJ�ϴ͘ϱ�ŵĞŐĂǁĂƚƚƐ�;ΧσͿ�� WƌŽƉŽƐĞĚ��ŽŶŶĞĐƚŝŽŶ�ςŽŝŶƚ�ǁŽƵůĚ�ďĞ�ƚŚĞ�ĞdžŝƐƚŝŶŐ�ϰϰ�ŬŝůŽǀŽůƚ�ĐŝƌĐƵŝƚ�ƐŽƵƚŚ�ŽĨ�+ŝŐŚǁĂLJ�ϭϭ�
Ăƚ�ƚŚĞ�ϲƚŚ�=ŝŶĞ�
%ΘΟΟΩΠΚς[�∋ΠΙΧΙΓΟΓΠς�#ΡΡΤΘΧΕϑ�
WŚĂƐĞ�.͗�ςƌĞͲ�ŽŶƚƌĂĐƚ��ǁĂƌĚ��ŽŵŵƵŶŝƚLJ͕�ΧƵŶŝĐŝƉĂů͕�ĂŶĚ��ďŽƌŝŐŝŶĂů��ŶŐĂŐĞŵĞŶƚ��
ͻ�ƐƚĂďůŝƐŚ�Ă�ςƌŽũĞĐƚ�ǁĞďƐŝƚĞ�����ǁǁǁ͘ŝŶǀĞŶĞƌŐLJůůĐ͘ĐŽŵͬůƐƌĂ��ͻZĞƋƵĞƐƚ�ƚŽ�ŵĞĞƚ�ǁŝƚŚ�ƚŚĞ�χŽǁŶƐŚŝƉ�ŽĨ�ϑƌŽͲDĞĚŽŶƚĞ�ͻ /ĚĞŶƚŝĨLJ�ĂŶĚ�ĞŶŐĂŐĞ�ŝŶƚĞƌĞƐƚĞĚ��ďŽƌŝŐŝŶĂů�ĐŽŵŵƵŶŝƚŝĞƐ�
ͻWŽƐƚ�∆ŽƚŝĐĞ�ŽĨ�ςƵďůŝĐ��ŽŵŵƵŶŝƚLJ�ΧĞĞƚŝŶŐ�ŝŶ�ůŽĐĂů�ŶĞǁƐƉĂƉĞƌ�ĂŶĚ�ςƌŽũĞĐƚ�ǁĞďƐŝƚĞ�
ͻ,ŽƐƚ�Ă�ςƵďůŝĐ��ŽŵŵƵŶŝƚLJ�ΧĞĞƚŝŶŐ��ͻWŽƐƚ�Ă�ƐƵŵŵĂƌLJ�ŽĨ�ƚŚĞ�ςƵďůŝĐ��ŽŵŵƵŶŝƚLJ�ΧĞĞƚŝŶŐ�ŽŶ�WƌŽũĞĐƚ�ǁĞďƐŝƚĞ�
ͻWƌŽǀŝĚĞ�Ă�ĐĞŶƚƌĂů�ĞŵĂŝů�ĂĚĚƌĞƐƐ����ůƐƌĂƐŽůĂƌŝŶĨŽΛŝŶǀĞŶĞƌŐLJůůĐ͘ĐŽŵ�ͻ /ŶĐŽƌƉŽƌĂƚĞ�ĨĞĞĚďĂĐŬ�ĨƌŽŵ�ĐŽŵŵƵŶŝƚLJ�ĞŶŐĂŐĞŵĞŶƚ�ĂĐƚŝǀŝƚŝĞƐ�ŝŶƚŽ�ςƌŽũĞĐƚ�ƉůĂŶ�ĂŶĚ�=Ψς�.�Ψ%ς�ƐƵďŵŝƐƐŝŽŶ�
WŚĂƐĞ�..͗�ςŽƐƚ��ŽŶƚƌĂĐƚ��ǁĂƌĚ�ZĞŶĞǁĂďůĞ��ŶĞƌŐLJ��ƉƉƌŽǀĂů�;Ψ��Ϳ�WƌŽĐĞƐƐ�ʹ��ŽŵŵƵŶŝƚLJ͕�ΧƵŶŝĐŝƉĂů͕�ĂŶĚ��ďŽƌŝŐŝŶĂů��ŽŶƐƵůƚĂƚŝŽŶ�
ͻDĂŝŶƚĂŝŶ�Ă�ςƌŽũĞĐƚ�ǁĞďƐŝƚĞ�ǁǁǁ͘ŝŶǀĞŶĞƌŐLJůůĐ͘ĐŽŵͬůƐƌĂ�ͻZĞƐƉŽŶĚ�ƚŽ�Ă�ĐĞŶƚƌĂů�ĞŵĂŝů�ĂĚĚƌĞƐƐ�ůƐƌĂƐŽůĂƌŝŶĨŽΛŝŶǀĞŶĞƌŐLJůůĐ͘ĐŽŵ��
ͻ�ŶƐƵƌĞ�ůŽĐĂů�ŵƵŶŝĐŝƉĂůŝƚLJ�ŝƐ�ŝŶĨŽƌŵĞĚ�ĂďŽƵƚ�ƉƌŽũĞĐƚ�ĂĐƚŝǀŝƚŝĞƐ�ĂŶĚ�ŵŝůĞƐƚŽŶĞ�ĚĂƚĞƐ�
ͻ�ŽŶƚŝŶƵĞ�ƚŽ�ƉƌŽǀŝĚĞ�ƵƉĚĂƚĞƐ�ƚŽ�ŝŶƚĞƌĞƐƚĞĚ��ďŽƌŝŐŝŶĂů�ĐŽŵŵƵŶŝƚŝĞƐ�
ͻWŽƐƚ�ƌĞƐƵůƚƐ�ŽĨ�Ψ���ƐƚƵĚŝĞƐ�ĂŶĚ�ŽƚŚĞƌ�Ψ���ƌĞƉŽƌƚƐ�ƚŽ�ƚŚĞ�WƌŽũĞĐƚ�ǁĞďƐŝƚĞ�
ͻ,ŽƐƚ�Ăƚ�ůĞĂƐƚ�ƚǁŽ�ƉƵďůŝĐ�ŵĞĞƚŝŶŐƐ�ŝŶ�ςƌŽũĞĐƚ�ĐŽŵŵƵŶŝƚLJ�ͻ>ŝƐƚĞŶ�ƚŽ�ĐŽŵŵƵŶŝƚLJ�ĐŽŶĐĞƌŶƐ�ĂŶĚ�ƉƌŽƉŽƐĞ�ƌĞĂƐŽŶĂďůĞ�ƐŽůƵƚŝŽŶƐ�
ͻ^ŚĂƌĞ�Ă�ƐƵŵŵĂƌLJ�ŽĨ�ĐŽŵŵƵŶŝƚLJ�ĐŽŶĐĞƌŶƐ�ĂŶĚ�ŵŝƚŝŐĂƚŝŽŶ�ƉůĂŶƐ�ƚŽ�ĂĚĚƌĞƐƐ�ĨĞĞĚďĂĐŬ�ŽŶ�ƚŚĞ�ςƌŽũĞĐƚ�ǁĞďƐŝƚĞ���
�ŽŶƚƌĂĐƚ���ǁĂƌĚ�
/ŶǀĞŶĞƌŐLJ�ĞŶĚĞĂǀŽƌƐ�ƚŽ�ŬĞĞƉ�ŵĞŵďĞƌƐ�ŽĨ�ƚŚĞ�ςƌŽũĞĐƚ�ĐŽŵŵƵŶŝƚLJ�ŝŶĨŽƌŵĞĚ�ƚŚƌŽƵŐŚŽƵƚ�ƚŚĞ�ςƌŽũĞĐƚ͛Ɛ�ĚĞǀĞůŽƉŵĞŶƚ�ƉƌŽĐĞƐƐ�ďLJ�ĂĚŚĞƌŝŶŐ�ƚŽ�ƚŚĞ�ĐŽŵŵƵŶŝƚLJ�ĞŶŐĂŐĞŵĞŶƚ�ŐƵŝĚĞůŝŶĞƐ�ƐĞƚ�ďLJ�ƚŚĞ�.�]ϑ͘�
(ΓΓΦ∆ΧΕΜ�9ΓΝΕΘΟΓ�dŚĂŶŬ�ψŽƵ�%Žƌ��ƚƚĞŶĚŝŶŐ͊� zŽƵƌ�ĂƚƚĞŶĚĂŶĐĞ�Ăƚ�ƚŽĚĂLJ Ɛ͛�ŵĞĞƚŝŶŐ�ŝƐ�ĂƉƉƌĞĐŝĂƚĞĚ͘�σĞ�
ĞŶĐŽƵƌĂŐĞ�LJŽƵ�ƚŽ�ǁƌŝƚĞ�ĚŽǁŶ�LJŽƵƌ�ĐŽŵŵĞŶƚƐ�Žƌ�ƋƵĞƐƚŝŽŶƐ�ĂŶĚ�ĞŝƚŚĞƌ�ƉůĂĐĞ�ƚŚĞŵ�ŝŶ�ŽƵƌ�ĐŽŵŵĞŶƚ�ďŽdž͕�Žƌ�ƉƌŽǀŝĚĞ�ƚŚĞŵ�ƚŽ�Ă�ĐŽŵƉĂŶLJ�ƌĞƉƌĞƐĞŶƚĂƚŝǀĞ�
tĞ�ǁĞůĐŽŵĞ�LJŽƵƌ�ĨĞĞĚďĂĐŬ�ĂŶĚ�ƚŚĂŶŬ�LJŽƵ�ĨŽƌ�ĂƚƚĞŶĚŝŶŐ�ƚŚŝƐ�ƉƵďůŝĐ�ĐŽŵŵƵŶŝƚLJ�ŵĞĞƚŝŶŐ�
�ĚĚŝƚŝŽŶĂů�ĐŽŵŵĞŶƚƐ�ĨŽůůŽǁŝŶŐ�ƚŚŝƐ�ŵĞĞƚŝŶŐ�ĐĂŶ�ďĞ�ƐĞŶƚ�ƚŽ�ůƐƌĂƐƐŽůĂƌŝŶĨŽΛŝŶǀĞŶĞƌŐLJůůĐ͘ĐŽŵ�
sŝƐŝƚ�ǁǁǁ͘ŝŶǀĞŶĞƌŐLJůůĐ͘ĐŽŵͬůƐƌĂ�ĨŽƌ�ςƌŽũĞĐƚ�ƵƉĚĂƚĞƐ�
9ϑΧς�ΚΥ�1ΠςΧΤΚΘ∂Υ�.ΧΤΙΓ�4ΓΠΓΨΧ∆ΝΓ�2ΤΘΕΩΤΓΟΓΠς��2ΤΘΙΤΧΟ!�
/Ŷ�ƌĞĐĞŶƚ�LJĞĂƌƐ͕�ƚŚĞ�%ĞĞĚͲŝŶ�χĂƌŝĨĨ�;%.χͿ�ςƌŽŐƌĂŵ�ǁĂƐ�ƚŚĞ�ǀĞŚŝĐůĞ�ƚŚĂƚ�ĞŶĂďůĞĚ�ůĂƌŐĞ�ƌĞŶĞǁĂďůĞ�ĞŶĞƌŐLJ�ĚĞǀĞůŽƉŵĞŶƚ�ŝŶ�ϑŶƚĂƌŝŽ�
/Ŷ�9ƵŶĞ�ϮϬϭϯ͕�ƚŚĞ�ϑŶƚĂƌŝŽ�ΧŝŶŝƐƚĞƌ�ŽĨ��ŶĞƌŐLJ�ĚŝƌĞĐƚĞĚ�ƚŚĞ�.ŶĚĞƉĞŶĚĞŶƚ��ůĞĐƚƌŝĐŝƚLJ�]LJƐƚĞŵƐ�KƉĞƌĂƚŽƌ�;.�]ϑ͕�ĨŽƌŵĞƌůLJ�ƚŚĞ�ϑŶƚĂƌŝŽ�ςŽǁĞƌ��ƵƚŚŽƌŝƚLJ͕�Žƌ�ϑς�Ϳ�ƚŽ�ĐĂŶĐĞů�ƚŚĞ�%.χ�ςƌŽŐƌĂŵ�ĨŽƌ�ůĂƌŐĞƌ�ƌĞŶĞǁĂďůĞ�ĞŶĞƌŐLJ�ƉƌŽũĞĐƚƐ�ĂŶĚ�ĚĞǀĞůŽƉ�Ă�ŶĞǁ�ĐŽŵƉĞƚŝƚŝǀĞ�ƉƌŽĐƵƌĞŵĞŶƚ�ƉƌŽĐĞƐƐ��
/Ŷ��ĞĐĞŵďĞƌ�ϮϬϭϯ͕�ƚŚĞ�ΧŝŶŝƐƚĞƌ�ŽĨ��ŶĞƌŐLJ�ƌĞůĞĂƐĞĚ�ϑŶƚĂƌŝŽ Ɛ͛�ŶĞǁ�=ŽŶŐͲdĞƌŵ��ŶĞƌŐLJ�ςůĂŶ�;=χ�ςͿ͕��ĐŚŝĞǀŝŶŐ��ĂůĂŶĐĞ͘�ρŝƐŝƚ�ǁǁǁ͘ĞŶĞƌŐLJ͘ŐŽǀ͘ ŽŶ͘ĐĂͬĞŶͬůƚĞƉ�ƚŽ�ůĞĂƌŶ�ŵŽƌĞ�ĂďŽƵƚ�ƚŚŝƐ�ƉůĂŶ�
�ŽŶƐĞƋƵĞŶƚůLJ͕ �ƚŚĞ�.�]ϑ�ĚĞǀĞůŽƉĞĚ�Ă�=ĂƌŐĞ�ΨĞŶĞǁĂďůĞ�ςƌŽĐƵƌĞŵĞŶƚ�;=ΨςͿ�ƉƌŽŐƌĂŵ�ŝŶ�ƌĞƐƉŽŶƐĞ�ƚŽ�ƚŚŝƐ�ŶĞǁ�ƉůĂŶ�ƚŽ�ŝŶĐůƵĚĞ�Ă�ƚǁŽͲƉŚĂƐĞ�ƉƌŽĐƵƌĞŵĞŶƚ�ƉƌŽĐĞƐƐ͗�° �Ŷ�ŝŶŝƚŝĂů�ΨĞƋƵĞƐƚ�ĨŽƌ�ΞƵĂůŝĨŝĐĂƚŝŽŶƐ�;Ψ%ΞͿ�ƉƌŽĐĞƐƐ�ƚŽ�ƋƵĂůŝĨLJ�ĂƉƉůŝĐĂŶƚƐ�ǁŚŽ�ǁŝƐŚ�ƚŽ�ƉĂƌƚŝĐŝƉĂƚĞ�ŝŶ�ƚŚĞ �=Ψς�° ��ΨĞƋƵĞƐƚ�ĨŽƌ�ςƌŽƉŽƐĂů�;Ψ%ςͿ�ƉƌŽĐĞƐƐ�ƚŽ�ĞǀĂůƵĂƚĞ�ƚŚĞ�ƉƌŽũĞĐƚƐ�ƉƌŽƉŽƐĞĚ�ďLJ�ƋƵĂůŝĨŝĞĚ�ĂƉƉůŝĐĂŶƚƐ �
�
-
+ΠΞΓΠΓΤΙ[�..%�� /ŶǀĞŶĞƌŐLJ�==��ŚĞĂĚƋƵĂƌƚĞƌĞĚ�ŝŶ��ŚŝĐĂŐŽ�ǁŝƚŚ�ƌĞŐŝŽŶĂů�ŽĨĨŝĐĞƐ�
ŝŶ�χŽƌŽŶƚŽ͕��ĞŶǀĞƌ͕ �σĂƌƐĂǁ͕�ΧĞdžŝĐŽ��ŝƚLJ�ĂŶĚ�χŽŬLJŽ� /ŶǀĞŶĞƌŐLJ��ĂŶĂĚĂ�ďĂƐĞĚ�ŝŶ�χŽƌŽŶƚŽ� EŽƌƚŚ��ŵĞƌŝĐĂ Ɛ͛�ϲƚŚ�ůĂƌŐĞƐƚ�ƌĞŶĞǁĂďůĞ�ĞŶĞƌŐLJ�ŐĞŶĞƌĂƚŝŽŶ�
ĐŽŵƉĂŶLJ�;ůĂƌŐĞƐƚ�ŝŶĚĞƉĞŶĚĞŶƚͿ� �ĞǀĞůŽƉĞĚ�ϵ͕ϬϬϬ�Χσн�ŝŶ�∆ŽƌƚŚ��ŵĞƌŝĐĂ�Θ��ƵƌŽƉĞ͕�ŝŶĐůƵĚŝŶŐ�
ϵϴϬнΧσ�ŝŶ��ĂŶĂĚĂ� /ŶǀĞŶĞƌŐLJ�ŝƐ�ĐŽŵŵŝƚƚĞĚ�ƚŽ�ǁŽƌŬŝŶŐ�ǁŝƚŚ�ĐŽŵŵƵŶŝƚŝĞƐ�ƚŽ�
ĚĞǀĞůŽƉ�ƉƌŽũĞĐƚƐ�ƚŚĂƚ�ĂƌĞ�ƐƵĐĐĞƐƐĨƵů�ĨŽƌ�ĞǀĞƌLJŽŶĞ�ŝŶǀŽůǀĞĚ��
+ΠΞΓΠΓΤΙ[�%ΧΠΧΦΧ� /ŶǀĞŶĞƌŐLJ�ŚĂƐ�ĚĞǀĞůŽƉĞĚ�ƚŚĞ�ĨŽůůŽǁŝŶŐ�ƉƌŽũĞĐƚƐ�ŝŶ��ĂŶĂĚĂ͗�É ZĂůĞŝŐŚ�σŝŶĚ�;ϳϴ�ΧσͿ�É >Ğ�ςůĂƚĞĂƵ�.�ĂŶĚ�..�σŝŶĚ�;ϭϯϴ͘ϲ�Χσ�ĂŶĚ�Ϯϭ͘ϭϱ�ΧσͿ�É �ĞƐ�ΧŽƵůŝŶƐ�.�ĂŶĚ�..�σŝŶĚ�;ϭϯϱ͘ϳ�Χσ�ĂŶĚ�Ϯϭ͘ϭ�ΧσͿ�É ^ƚ͘��ůĂŝƌ�&ĂƐ�;ϱϴϰ�ΧσͿ�É ^ĂŶĚƌŝŶŐŚĂŵ�]ŽůĂƌ�;ϭϬ�ΧσͿ�É tŽŽĚǀŝůůĞ�]ŽůĂƌ�;ϭϬ�ΧσͿ�
5ΘΝΧΤ�∋ΠΓΤΙ[� �ĂƉƚƵƌŝŶŐ�ƚŚĞ�ƐƵŶ͛Ɛ�ƌĂLJƐ�ŵĂLJ�ďĞ�ŽŶĞ�ŽĨ�ƚŚĞ�ŽůĚĞƐƚ�ǁĂLJƐ�ƚŽ�ŚĂƌŶĞƐƐ�ĞŶĞƌŐLJ� dŚĞ�ςƌŽũĞĐƚ�ǁŝůů�ƵƐĞ�ƐŽůĂƌ�ƉŚŽƚŽǀŽůƚĂŝĐ�;ςρͿ�ƚĞĐŚŶŽůŽŐLJ� ςρ�ĐĞůůƐ�ĐŽŶǀĞƌƚ�ůŝŐŚƚ�ŝŶƚŽ�ĞůĞĐƚƌŝĐŝƚLJ� dŚĞ�ŵŽƌĞ�ĐĞůůƐ͕�ƚŚĞ�ŵŽƌĞ�ĞůĞĐƚƌŝĐŝƚLJ�ƉƌŽĚƵĐĞĚ� �ůů�ĞůĞĐƚƌŝĐŝƚLJ�ŐĞŶĞƌĂƚĞĚ�ďLJ�ƚŚĞ�ςƌŽũĞĐƚ�ǁŝůů�ďĞ�ĨĞĚ�ĚŝƌĞĐƚůLJ�ŝŶƚŽ�ƚŚĞ�
ƉƌŽǀŝŶĐŝĂů�ĞůĞĐƚƌŝĐŝƚLJ�ŐƌŝĚ� ^ŽůĂƌ�ςρ�ŝƐ�ƵƐĞĚ�ƉƌŝŵĂƌŝůLJ�ĨŽƌ�ŐƌŝĚͲĐŽŶŶĞĐƚĞĚ�ĞůĞĐƚƌŝĐŝƚLJ�ƚŽ�ŽƉĞƌĂƚĞ�
ƌĞƐŝĚĞŶƚŝĂů�ĂƉƉůŝĂŶĐĞƐ͕�ĐŽŵŵĞƌĐŝĂů�ĞƋƵŝƉŵĞŶƚ͕�ůŝŐŚƚŝŶŐ�ĂŶĚ�Ăŝƌ�ĐŽŶĚŝƚŝŽŶŝŶŐ�ĨŽƌ�Ăůů�ƚLJƉĞƐ�ŽĨ�ďƵŝůĚŝŶŐƐ�
^ŽůĂƌ�ςρ�ƉĂŶĞůƐ�ĐĂŶ�ďĞ�ŐƌŽƵŶĚ�ŵŽƵŶƚĞĚ͕�ŝŶƐƚĂůůĞĚ�ŽŶ�ďƵŝůĚŝŶŐ�ƌŽŽĨƚŽƉƐ�Žƌ�ĚĞƐŝŐŶĞĚ�ŝŶƚŽ�ďƵŝůĚŝŶŐ�ŵĂƚĞƌŝĂůƐ�Ăƚ�ƚŚĞ�ƉŽŝŶƚ�ŽĨ�ŵĂŶƵĨĂĐƚƵƌŝŶŐ��
∃ΓΠΓΗΚςΥ�ΘΗ�5ΘΝΧΤ�∋ΠΓΤΙ[�ς��;��∆�Ψ&ψ�∆���]� ^ŽůĂƌ�ŐĞŶĞƌĂƚŝŽŶ�ƉƌŽǀŝĚĞƐ�ĞŶĞƌŐLJ�
ĚƵƌŝŶŐ�ƚŚĞ�ĚĂLJ͕ �ǁŚĞŶ�ĚĞŵĂŶĚ�ŝƐ�ŚŝŐŚĞƐƚ͕�ŵĂŬŝŶŐ�ƐŽůĂƌ�Ă�ĨƵĞůͲĨƌĞĞ�ƐŽƵƌĐĞ�ŽĨ�ƉĞĂŬ�ƉŽǁĞƌ��
�=��∆͕�&Ψ��∆��∆�Ψ&ψ� ^ŽůĂƌ�ĞŶĞƌŐLJ�ŝƐ�ŝŶĨŝŶŝƚĞůLJ�
ƌĞŶĞǁĂďůĞ͗�° �ŵŝƚƐ�ŶŽ�ĐůŝŵĂƚĞ�ĐŚĂŶŐŝŶŐ�
ŐƌĞĞŶŚŽƵƐĞ�ŐĂƐĞƐ�° �ƌĞĂƚĞƐ�ŶŽ�Ăŝƌ�Žƌ�ǁĂƚĞƌ�ƉŽůůƵƚŝŽŶ�° ,ĂƐ�ůŝƚƚůĞ�ŝŵƉĂĐƚ�ŽŶ�ůĂŶĚ͕�ǁŝůĚůŝĨĞ�Žƌ�
ĞĐŽƐLJƐƚĞŵƐ͕�ĂŶĚ�ůĞĂǀĞƐ�ŶŽ�ŚĂnjĂƌĚŽƵƐ�ǁĂƐƚĞ�
�
��ϑ∆ϑΧ.���ϑΧς�χ.χ.ρ�∆�]]� ^ŽůĂƌ͕ �ŽƚŚĞƌ�ƌĞŶĞǁĂďůĞ�ĞŶĞƌŐLJ͕ �
ĂŶĚ�ĞŶĞƌŐLJ�ĐŽŶƐĞƌǀĂƚŝŽŶ�ĂƌĞ�ƐƚƌŽŶŐ�ĚƌŝǀĞƌƐ�ƚŚĂƚ�ǁŝůů�ďŽůƐƚĞƌ��ĂŶĂĚĂ Ɛ͛�ĞĐŽŶŽŵŝĐ�ĐŽŵƉĞƚŝƚŝǀĞŶĞƐƐ͕�ĞŶƐƵƌĞ�Ă�ƌĞůŝĂďůĞ�ƐƵƉƉůLJ�ŽĨ�ĞŶĞƌŐLJ�ĂŶĚ�ĞŶŚĂŶĐĞ�ŽƵƌ�ŐůŽďĂů�ƌĞƉƵƚĂƚŝŽŶ�ĂƐ�ĂŶ�ĞŶĞƌŐLJ�ƐƵƉĞƌƉŽǁĞƌ��
9ϑ���Ψ��χ.ϑ∆� ^ŽůĂƌ�ĞŶĞƌŐLJ�ĐƌĞĂƚĞƐ�ŵŽƌĞ�ũŽďƐ�
ƉĞƌ�ŵĞŐĂǁĂƚƚ�ŽƵƚƉƵƚ͕�ĂŶĚ�ƉĞƌ�ĚŽůůĂƌ�ŝŶǀĞƐƚĞĚ�ƚŚĂŶ�ĂŶLJ�ŽƚŚĞƌ�ĞŶĞƌŐLJ�ƐŽƵƌĐĞ���
∗ΘΨ�5ΘΝΧΤ�∋ΠΓΤΙ[�9ΘΤΜΥ��2ΧΤς���
DŽůƚĞŶ�ƐŝůŝĐŽŶ�ŝƐ�ƵƐĞĚ�ƚŽ�ŵĂŬĞ͘͘͘�
ǁĂĨĞƌƐ�ǁŚŝĐŚ�ĂƌĞ�ƉƵƚ�ƚŽŐĞƚŚĞƌ�ƚŽ�ĐƌĞĂƚĞ͘͘͘�
ĐĞůůƐ�ƚŚĂƚ�ǁŚĞŶ�ƉƵƚ�ƚŽŐĞƚŚĞƌ�ŵĂŬĞ͘͘͘�
Ă�ŵŽĚƵůĞ�ƚŚĂƚ�ŝƐ�ŵŽƵŶƚĞĚ�ŽŶ�Ă�ƌĂĐŬ͘�
∗ΘΨ�5ΘΝΧΤ�∋ΠΓΤΙ[�9ΘΤΜΥ��2ΧΤς��� tŚĞŶ�ůŝŐŚƚ�ƐŚŝŶĞƐ�ŽŶ�Ă�ĐĞůů͕�ŝƚ�ĨƌĞĞƐ�ĞůĞĐƚƌŽŶƐ�ĨƌŽŵ�ƚŚĞ�ƐĞŵŝĐŽŶĚƵĐƚŽƌ�ǁĂĨĞƌƐ�ĐƌĞĂƚŝŶŐ�ĞůĞĐƚƌŝĐŝƚLJ��
sĞƌLJ�ůŽǁ�ŵĂŝŶƚĞŶĂŶĐĞ�ƌĞƋƵŝƌĞĚ�
-
∋ΣΩΚΡΟΓΠς� dŚĞ�ƐŽůĂƌ�ŵŽĚƵůĞƐ�ǁŝůů�ďĞ�ƉŽůLJ�Žƌ�ŵŽŶŽĐƌLJƐƚĂůůŝŶĞ�
ƉƌŽĚƵĐŝŶŐ�ϮϬϬͲϯϬϬ�ǁĂƚƚƐ�ŽĨ�ĚŝƌĞĐƚ�ĐƵƌƌĞŶƚ�;��Ϳ�ĞŶĞƌŐLJ� ���ǁŝƌŝŶŐ�ǁŝůů�ĐŽŶŶĞĐƚ�ƚŚĞ�ŵŽĚƵůĞƐ�ƚŚƌŽƵŐŚ�ƚŚĞ�ƌĂĐŬƐ�
ĂŶĚ�ƚŽ�ƚŚĞ�ŝŶǀĞƌƚĞƌ� /ŶǀĞƌƚĞƌƐ�ǁŝůů�ďĞ�ϮϱϬ�ƚŽ�ϱϬϬ�ŬŝůŽǁĂƚƚƐ�;ŬtͿ�ĞĂĐŚ�
ĐŽŶǀĞƌƚŝŶŐ����ƚŽ����;ĂůƚĞƌŶĂƚŝŶŐ�ĐƵƌƌĞŶƚͿ� ���ǁŝƌŝŶŐ�ǁŝůů�ĐŽŶŶĞĐƚ�ƚŚĞ�ŝŶǀĞƌƚĞƌ�ƚŽ�ƚŚĞ�ƐƵďƐƚĂƚŝŽŶ�
5ΘΝΧΤ�/ΘΦΩΝΓΥ�ΧΠΦ�+ΠΞΓΤςΓΤΥ�
^ŽůĂƌ�ΧŽĚƵůĞ�.ŶƐƚĂůůĂƚŝŽŶ�
/ŶǀĞƌƚĞƌƐ�ĂƌĞ�ƌĞƋƵŝƌĞĚ�ƚŽ�ĐŽŶǀĞƌƚ����ŵŽĚƵůĞ�ĞůĞĐƚƌŝĐĂů�ŽƵƚƉƵƚ�ƚŽ����ĞůĞĐƚƌŝĐŝƚLJ͘ �
/ŶǀĞƌƚĞƌ��ŽŶƚƌŽů��ĂďŝŶĞƚ�
/ŶǀĞƌƚĞƌ��ŽŶƚƌŽů��ĂďŝŶĞƚ�
%ΘΠΥςΤΩΕςΚΘΠ��ĐƚŝǀŝƚŝĞƐ�ŝŶĐůƵĚĞ͗� ^ŝƚĞ�ĐůĞĂƌŝŶŐ�ĂŶĚ�ŐƌĂĚŝŶŐ� /ŶƐƚĂůůĂƚŝŽŶ�ŽĨ�ƐŝƚĞ�ĨĞŶĐŝŶŐ�ĂŶĚ�
ĞƌŽƐŝŽŶ�ĐŽŶƚƌŽů�ŵĞĂƐƵƌĞƐ� hŶĚĞƌŐƌŽƵŶĚ�ĐĂďůĞ�ŝŶƐƚĂůůĂƚŝŽŶ� ZĂĐŬ�ĨŽƵŶĚĂƚŝŽŶ͕�ŵŽĚƵůĞ�ĂŶĚ�
ǁŝƌŝŶŐ�ŝŶƐƚĂůůĂƚŝŽŶ� /ŶǀĞƌƚĞƌ�ŝŶƐƚĂůůĂƚŝŽŶ� ^ƵďƐƚĂƚŝŽŶ�ĐŽŶƐƚƌƵĐƚŝŽŶ�
�ŽŶƐƚƌƵĐƚŝŽŶ�ǁŝůů�ďĞ�ĐŽŵƉůĞƚĞĚ�ĂĐĐŽƌĚŝŶŐ�ƚŽ�ŝŶĚƵƐƚƌLJ�ďĞƐƚ�ƉƌĂĐƚŝĐĞƐ͘��ŶLJ�ƉŽƚĞŶƚŝĂů�ŝŵƉĂĐƚƐ�ǁŝůů�ďĞ�ŵŝŶŝŵŝnjĞĚ�
ƚŚƌŽƵŐŚ�ƚŚĞ�ŝŵƉůĞŵĞŶƚĂƚŝŽŶ�ŽĨ�ŵŝƚŝŐĂƚŝŽŶ�ŵĞĂƐƵƌĞƐ͘�
8ΚΥΩΧΝ�5ΕΤΓΓΠΚΠΙ�/ΚςΚΙΧςΚΘΠ�
0ΓΖς�5ςΓΡΥ� dŚĞ�ŶĞdžƚ�ƐƚĞƉ�ŝŶ�ƚŚĞ�ƉƌŽĐĞƐƐ�ŝƐ�ƚŽ�ƉƌĞƉĂƌĞ�Ă�ŵĞĞƚŝŶŐ�ƐƵŵŵĂƌLJ�ƌĞƉŽƌƚ�;Χ]ΨͿ�ĨŽƌ�
.�]ϑ�ĂŶĚ�ƉŽƐƚ�ŝƚ�ŽŶ�ƚŚĞ�ƉƌŽũĞĐƚ�ǁĞďƐŝƚĞ͘�χŚĞ�ƌĞƉŽƌƚ�ǁŝůů�ďĞ�ƉƌŽǀŝĚĞĚ�ƚŽ�ƚŚĞ�ŵƵŶŝĐŝƉĂů��ůĞƌŬ�;Žƌ�ŽƚŚĞƌ�ĚĞƐŝŐŶĂƚĞͿ͘�χŚĞ�ƌĞƉŽƌƚ�ǁŝůů�ĚŽĐƵŵĞŶƚ�LJŽƵƌ�ƋƵĞƐƚŝŽŶƐ�ĂŶĚ�ĐŽŵŵĞŶƚƐ�ĂƐ�ǁĞůů�ĂƐ�ĚŝƐĐƵƐƐ�ŚŽǁ�LJŽƵƌ�ŝŶƉƵƚ�ŚĂƐ�ŝŵƉĂĐƚĞĚ�ƚŚĞ�ƉƌŽũĞĐƚ͘���
dŚĞ�ƉƌŽƉŽŶĞŶƚ�ǁŝůů�ŝŶĐůƵĚĞ�ƚŚĞ�ƌĞƉŽƌƚ�ŝŶ�ŝƚƐ�=ĂƌŐĞ�ΨĞŶĞǁĂďůĞ�ςƌŽũĞĐƚ�;=ΨςͿ�ƉƌŽƉŽƐĂů�ƐƵďŵŝƐƐŝŽŶ�ƚŽ�.�]ϑ�ŝŶ�ƚŚĞ�%Ăůů�ŽĨ�ϮϬϭϱ�;ƚĂƌŐĞƚͿ͘�ϑŶĐĞ�ƚŚĞ�ĐŽŵƉůĞƚĞ�ƉƌŽƉŽƐĂů�ŝƐ�ƌĞĐĞŝǀĞĚ͕�.�]ϑ�ǁŝůů�ĞǀĂůƵĂƚĞ�Ăůů�ƉƌŽƉŽŶĞŶƚ�ƉƌŽƉŽƐĂůƐ�ĂŶĚ�ŶŽƚŝĨLJ �ƐĞůĞĐƚĞĚ�ƉƌŽƉŽŶĞŶƚƐ�ďLJ�ƚŚĞ�ĞŶĚ�ŽĨ�ϮϬϭϱ�;ƚĂƌŐĞƚͿ͘�.ƚ�ŝƐ�ĞdžƉĞĐƚĞĚ�ƚŚĂƚ�ƐƵĐĐĞƐƐĨƵů�=Ψς�ƉƌŽƉŽŶĞŶƚƐ�ǁŝůů�ĐŽŵŵĞŶĐĞ�ƚŚĞ�ΨĞŶĞǁĂďůĞ��ŶĞƌŐLJ��ƉƉƌŽǀĂů�;Ψ��Ϳ�ƉƌŽĐĞƐƐ�ƚŚĂƚ�ŝŶĐůƵĚĞƐ�ĂĚĚŝƚŝŽŶĂů�ĐŽŶƐƵůƚĂƚŝŽŶ�ŝŶ�ϮϬϭϲ͘�
�
%ΘΟΟΩΠΚς[�∃ΓΠΓΗΚςΥ� /Ĩ�ƚŚĞ�ςƌŽũĞĐƚ�ŝƐ�ĂǁĂƌĚĞĚ�Ă�ƉŽǁĞƌ�ĐŽŶƚƌĂĐƚ͕�.ŶǀĞŶĞƌŐLJ�ǁŽƵůĚ�ĞƐƚĂďůŝƐŚ�Ă�ĐŽŵŵƵŶŝƚLJ�ďĞŶĞĨŝƚ�
ĨƵŶĚ�ƚŽ�ďĞ�ĂĚŵŝŶŝƐƚĞƌĞĚ�ďLJ�ůŽĐĂů�ǀŽůƵŶƚĞĞƌƐ�ĨŽƌ�ĐŽŵŵƵŶŝƚLJ�ƉƌŽũĞĐƚƐ�ĂŶĚ�ŽƚŚĞƌ�ůŽĐĂů�ŐŽŽĚ�ǁŽƌŬƐ�
dŚĞƌĞ�ǁŽƵůĚ�ďĞ�ĂŶ�ĂŶŶƵĂů�ĐŽŶƚƌŝďƵƚŝŽŶ�ƚŽ�ƚŚĞ�ĨƵŶĚ�ĨŽƌ�ƚŚĞ�ĚƵƌĂƚŝŽŶ�ŽĨ�ƚŚĞ�ƉŽǁĞƌ�ĐŽŶƚƌĂĐƚ� ��ƐƚĞĂĚLJ�ĨůŽǁ�ŽĨ�ĨƵŶĚƐ�ĐĂŶ�ŚĂǀĞ�ŵĂŶLJ�ƉŽƐŝƚŝǀĞ�ŝŵƉĂĐƚƐ�ŽŶ�Ă�ĐŽŵŵƵŶŝƚLJ�� dŚĞ�ƉŚŽƚŽƐ�ďĞůŽǁ�ŚŝŐŚůŝŐŚƚ�ĞdžĂŵƉůĞƐ�ĨƌŽŵ�ƚŚĞ�ϳϴ�Χσ�ĞŶĞƌŐLJ�ĐĞŶƚƌĞ�ƐŽƵƚŚ�ŽĨ��ŚĂƚŚĂŵ͕�
KŶƚĂƌŝŽ�ǁŚŝĐŚ�ŚĂƐ�ĚŝƐƚƌŝďƵƚĞĚ�ŽǀĞƌ�ΨϭϱϬ͕ϬϬϬ�ůŽĐĂůůLJ�ƐŝŶĐĞ�ϮϬϭϭ���
DĞƌůŝŶ�ƐƉůĂƐŚ�ƉĂĚ͕�ƐƵŵŵĞƌ�ϮϬϭϯ�ΨϮϬ͕ϬϬϬ�ĐŽŶƚƌŝďƵƚŝŽŶ�ĨƌŽŵ���%�
Ϯϰ�.ƉĂĚƐ�ĨŽƌ�ΧĞƌůŝŶ�ςƵďůŝĐ�]ĐŚŽŽů�Ψϱ͕ϬϬϬ�ĐŽŶƚƌŝďƵƚŝŽŶ�ĨƌŽŵ���%�
-
∋ΠΞΚΤΘΠΟΓΠς�ΧΠΦ�∗ΓΧΝςϑ� /ƚ�ŚĂƐ�ďĞĞŶ�ĚĞŵŽŶƐƚƌĂƚĞĚ�ƚŚĂƚ�ǁŚĞŶ�]ŽůĂƌ�ƉŽǁĞƌ�ƉůĂŶƚƐ�ĂƌĞ�ĐŽŶƐƚƌƵĐƚĞĚ�ƵƐŝŶŐ�ďĞƐƚ�
ŵĂŶĂŐĞŵĞŶƚ�ƉƌĂĐƚŝĐĞƐ͕�ƚŚĞLJ�ĐĂŶ�ƉƌŽǀŝĚĞ�Ă�ƉŽƐŝƚŝǀĞ�ďĞŶĞĨŝƚ�ƚŽ�ďŝŽĚŝǀĞƌƐŝƚLJ� ^ŽůĂƌ�ĞŶĞƌŐLJ�ŝƐ�ŽĨƚĞŶ�ǀŝĞǁĞĚ�ĂƐ�ŚĂǀŝŶŐ�ǀĞƌLJ�ŵŝŶŝŵĂů�ǁĂƐƚĞ�ďĞĐĂƵƐĞ�ƚŚĞƌĞ�ŝƐ�ŶŽŶĞ�
ƉƌŽĚƵĐĞĚ�ĚƵƌŝŶŐ�ŽƉĞƌĂƚŝŽŶ� �ƵƌƌĞŶƚůLJ͕�ŵĂŶLJ�ƐŽůĂƌ�ĐŽŵƉĂŶŝĞƐ�ŵĞĞƚ�Žƌ�ĞdžĐĞĞĚ�ŶĂƚŝŽŶĂů�ĂŶĚ�ŝŶƚĞƌŶĂƚŝŽŶĂů�ƐƚĂŶĚĂƌĚƐ�
ĨŽƌ�ŚĂŶĚůŝŶŐ�ĂŶĚ�ŵŝƚŝŐĂƚŝŶŐ�ŚĂnjĂƌĚŽƵƐ�ŵĂƚĞƌŝĂůƐ� �ǀŝĚĞŶĐĞ�ŚĂƐ�ďĞĞŶ�ƉƵďůŝƐŚĞĚ�ƚŚĂƚ�ůĂƌŐĞͲƐĐĂůĞ�]ŽůĂƌ�ƉůĂŶƚƐ�ƵƐĞ�ůĞƐƐ�ůĂŶĚ�ƚŚĂŶ�ƐŽŵĞ�
ƚƌĂĚŝƚŝŽŶĂů�ĞŶĞƌŐLJ�ƐŽƵƌĐĞƐ͕�ƐƵĐŚ�ĂƐ�ĐŽĂů͕�ǁŚĞŶ�ůĂŶĚ�ƵƐĞĚ�ĨŽƌ�ŵŝŶŝŶŐ�;ĨŽƌ�ƚŚĞ�ĞŶĞƌŐLJ�ƐŽƵƌĐĞ�ͿŝƐ�ƚĂŬĞŶ�ŝŶƚŽ�ĐŽŶƐŝĚĞƌĂƚŝŽŶ�;&ƚŚĞŶĂŬŝƐ�ĂŶĚ�;ŝŵ͕�ϮϬϬϵͿ�
^ŽůĂƌ�ƉĂƌŬƐ�ĐĂŶ�ŝŶĐƌĞĂƐĞ�ƚŚĞ�ŶƵŵďĞƌ�ŽĨ�ƐƉĞĐŝĞƐ�ŝŶ�Ă�ŐŝǀĞŶ�ĂƌĞĂ�;'ĞƌŵĂŶ�ΨĞŶĞǁĂďůĞ��ŶĞƌŐLJ��ŐĞŶĐLJ͕ �ϮϬϭϬͿ͘�σŚĞŶ�ƐŽůĂƌ�ƉĂƌŬƐ�ĂƌĞ�ŵĂŶĂŐĞĚ�ƌĞƐƉŽŶƐŝďůLJ͕�ƚŚĞLJ�ĐĂŶ�ĐƌĞĂƚĞ�ŶĞǁ�ŚĂďŝƚĂƚƐ�ĨŽƌ�ĞŶĚĂŶŐĞƌĞĚ�ĂŶŝŵĂůƐ�ĂŶĚ�ƉůĂŶƚƐ�ĂŶĚ�ŵĂŬĞ�ƉŽƐŝƚŝǀĞ�ƵƐĞ�ŽĨ�ŵĂƌŐŝŶĂů�ĂŶĚ�ƌĞŵĞĚŝĂƚĞĚ�ůĂŶĚƐ�
ZĞĐŽŵŵĞŶĚĞĚ�ďĞƐƚ�ƉƌĂĐƚŝĐĞƐ�ŝŶĐůƵĚĞ�ĂǀŽŝĚĂŶĐĞ�ŽĨ�ƉĞƐƚŝĐŝĚĞƐ�ĂŶĚ�ĨĞƌƚŝůŝnjĞƌƐ͕�ƵƐĞ�ŽĨ�ƐŚĞĞƉ�ĨŽƌ�ŐƌĂnjŝŶŐ�ƚŽ�ƌĞĚƵĐĞ�ƐŝƚĞ�ŵĂŝŶƚĞŶĂŶĐĞ�ĂĐƚŝǀŝƚŝĞƐ͕�ĂŶĚ�ƌŝƐŬ�ĂƐƐĞƐƐŵĞŶƚƐ�
^ŽƵƌĐĞ͗��ƐƐĞƐƐŵĞŶƚ�ŽĨ�ƚŚĞ��ŶǀŝƌŽŶŵĞŶƚĂů�ςĞƌĨŽƌŵĂŶĐĞ�ŽĨ�]ŽůĂƌ�ςŚŽƚŽǀŽůƚĂŝĐ�dĞĐŚŶŽůŽŐŝĞƐ�Ͳ��ŶǀŝƌŽŶŵĞŶƚ��ĂŶĂĚĂ͕�ŝŶ�ƉĂƌƚŶĞƌƐŚŝƉ�ǁŝƚŚ�∆ĂƚƵƌĂů�ΨĞƐŽƵƌĐĞƐ��ĂŶĂĚĂ Ɛ͛��ĂŶŵĞƚ�∆�Ψ&ψ�
2ΤΘΡΓΤς[�8ΧΝΩΓΥ�dŚĞ�ĨŽůůŽǁŝŶŐ�ĂƌĞ�ďĂƐĞĚ�ŽŶ�ƌĞƐĞĂƌĐŚ�ĚŽŶĞ�ŽŶ�ƉƌŽƉĞƌƚŝĞƐ�ŝŶ�∆ŽƌƚŚ��ĂƌŽůŝŶĂ� �ŽŶĐůƵĚĞĚ�ƚŚĂƚ�ƚŚĞƌĞ�ŝƐ�ŶŽ�ŝŵƉĂĐƚ�ŝŶ�ƐĂůĞ�ƉƌŝĐĞ�ĨŽƌ�ƌĞƐŝĚĞŶƚŝĂů �͕ĂŐƌŝĐƵůƚƵƌĂů�Žƌ�ǀĂĐĂŶƚ�ƌĞƐŝĚĞŶƚŝĂů�ůĂŶĚ�ƚŚĂƚ�ĂĚũŽŝŶƐ �
ĞdžŝƐƚŝŶŐ�Žƌ�ƉƌŽƉŽƐĞĚ�ƐŽůĂƌ�ĨĂƌŵƐ� >ĂƌŐĞƌ�ƐŽůĂƌ�ĨĂƌŵƐ�ƵƐŝŶŐ�ĨŝdžĞĚ�ƉĂŶĞůƐ�ĂƌĞ�Ă�ƉĂƐƐŝǀĞ�ƵƐĞ�ŽĨ�ƚŚĞ�ůĂŶĚ�ƚŚĂƚ�ŝƐ�ĐŽŶƐŝĚĞƌĞĚ�ŝŶ�ŬĞĞƉŝŶŐ�ǁŝƚŚ�Ă�
ƌƵƌĂůͬƌĞƐŝĚĞŶƚŝĂů�ĂƌĞĂ� �ŽŵƉĂƌŝŶŐ�Ă�ƐŽůĂƌ�ĨĂƌŵ�ƚŽ�Ă�ůĂƌŐĞƌ�ŐƌĞĞŶŚŽƵƐĞ�ĂƐ�ƐŚŽǁŶ�ďĞůŽǁ�ŝƐ�Ă�ǀĞƌLJ�ƌĞĂƐŽŶĂďůĞ�ĐŽŵƉĂƌŝƐŽŶ�ŐŝǀĞŶ�ƚŚĂƚ�Ă �
ŐƌĞĞŶŚŽƵƐĞ�ŝƐ�ĞƐƐĞŶƚŝĂůůLJ�ĂŶŽƚŚĞƌ�ŵĞƚŚŽĚ�ĨŽƌ�ĐŽůůĞĐƚŝŶŐ�ƉĂƐƐŝǀĞ�ƐŽůĂƌ�ĞŶĞƌŐLJ͘ �χŚĞ�ŐƌĞĞŶŚŽƵƐĞ�ƵƐĞ�ŝƐ�ǁĞůů�ƌĞĐĞŝǀĞĚ�ŝŶ�ƌĞƐŝĚĞŶƚŝĂůͬƌƵƌĂů�ĂƌĞĂƐ�ĂŶĚ�ŚĂƐ�Ă�ƐŝŵŝůĂƌ�ǀŝƐƵĂů�ŝŵƉĂĐƚ�ĂƐ�Ă�ƐŽůĂƌ�ĨĂƌŵ �
^ŽƵƌĐĞ͗��ƉƉƌĂŝƐĂů��ŽŶƐƵůƚ�ŽŶ�ςŝƚ�ϲϰ�ƐŽůĂƌ�ƉƌŽƉŽƐĂů�Ͳ�ZŝĐŚĂƌĚ��͘�
-
Appendix C
INVENERGY LLC Meeting Summary Report Prepared by Dillon Consulting Limited
C - 1
C Comments Received and Responses
-
Comment/Response Table Lake Simcoe Regional Airport Solar Project Meeting Summary Report
Invenergy LLC
1
This table provides the responses to comments received from agencies, the public and Aboriginal communities at, or following, the public
community meeting required per the Large Renewable Procurement Request for Proposals (LRP I RFP). The LRP I RFP is a qualifying process
being led by the Independent Electricity System Operators (IESO). The IESO has not awarded any applicant with the rights to construct a project
at this time. Invenergy LLC, like other applicants, is preparing to submit a proposal for this project to the IESO. The proposal submission
deadline is September 1, 2015 and the IESO’s proposal evaluation process will run until November/ December 2015. It is expected that successful
LRP I RFP applicants will commence the Renewable Energy Approval (REA) process if they are awarded a project by the IESO. This process
includes additional requirements and consultation which would likely commence in 2016.
Date Method Name Comment Received Proponent Response
August 4,
2015
Comment
Form
Landowner Requested copy of Site Considerations
Information and Community
Engagement Plan.
Copies of these documents were available during
the public community meeting. Attendees were
advised that the documents are available on the
project website at: www.invenergyllc.com/lsra
August 4,
2015
Verbal
Comment
Landowner Need for site screening If Invenergy is successful and awarded a contract
for the project, Invenergy will be required to
follow the REA process and will work with the
local municipality and community to determine
the appropriate level of visual screening for the
project.
August 4,
2015
Verbal
Comment
Landowner Decommissioning plans If Invenergy is successful and awarded a contract
for the project, Invenergy will be required to
follow the REA process. The proponent will be
required to complete a variety of technical reports
including a project description report,
construction plan report, consultation report,
design and operations report and a
decommissioning plan report.
All projects that require an REA must meet
stringent decommissioning requirements.
During the REA process, a Decommissioning
Plan Report will be developed which will address
http://www.invenergyllc.com/lsra
-
Comment/Response Table Lake Simcoe Regional Airport Solar Project Meeting Summary Report
Invenergy LLC
2
Date Method Name Comment Received Proponent Response
procedures for dismantling or demolishing the
facility, abandonment of the project, activities
related to the restoration of any land and water
negatively affected by the facility, and procedures
for managing excess materials and waste.
Invenergy is prepared to execute a Municipal
Agreement with the township, which will include
assurances for decommissioning and
decommissioning security.
Please refer to the Guide to Provincial Approvals
for Renewable Energy Project provided on the
Ministry of Energy’s website for more
information on the REA process:
http://www.energy.gov.on.ca/en/renewable-
energy-facilitation-office/resources-and-contacts-
2/guide-to-provincial-approvals-for-renewable-
energy-projects/#Introduction.
August 4,
2015
Verbal
Comment
Landowner Impacts to agricultural lands The IESO non-rooftop solar rules stipulate that
solar facilities cannot be placed on Prime
Agricultural land. In order for this project to be
bid into the IESO Large Renewable Procurement
Request for Proposals, Invenergy would have to
demonstrate that the project is not occupying
Prime Agricultural land.
During the REA process, a Decommissioning
Plan Report will be developed which will address
procedures for dismantling or demolishing the
facility, abandonment of the project, activities
related to the restoration of any land and water
negatively affected by the facility, and procedures
http://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introductionhttp://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introductionhttp://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introductionhttp://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introduction
-
Comment/Response Table Lake Simcoe Regional Airport Solar Project Meeting Summary Report
Invenergy LLC
3
Date Method Name Comment Received Proponent Response
for managing excess materials and waste.
Invenergy is prepared to execute a Municipal
Agreement with the township, which will include
assurances for decommissioning and
decommissioning security.
Please refer to the Guide to Provincial Approvals
for Renewable Energy Project provided on the
Ministry of Energy’s website for more
information on the REA process:
http://www.energy.gov.on.ca/en/renewable-
energy-facilitation-office/resources-and-contacts-
2/guide-to-provincial-approvals-for-renewable-
energy-projects/#Introduction
August 4,
2015
Verbal
Comment
Community Member Where do you propose to locate the
electrical line connecting the project to
the interconnection point?
The proposed connection line would be located in
the Line 6 North municipal right of way on the
same side of the road as the existing pole line, the
result being the connection line and the existing
power line would then share the same hydro
poles. If the project proceeds, Invenergy will
consult with Hydro One to determine what poles
are required (existing or new) to accommodate
the new lines for the project.
August 4,
2015
Verbal
Comment
Community Member Other large solar projects in the area
involved surface grading and concrete
pouring during the construction of
foundations, potentially difficult to
restore during decommissioning
While the type of project foundation will not be
determined until a geotechnical study is
completed, Invenergy prefers to use either helical
pile or ballast foundations for solar panels.
Helical piles are screwed directly into the
subsurface and ballast foundations rest on the
surface. There is little movement of surface
material, and no concrete is required for either
http://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introductionhttp://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introductionhttp://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introductionhttp://www.energy.gov.on.ca/en/renewable-energy-facilitation-office/resources-and-contacts-2/guide-to-provincial-approvals-for-renewable-energy-projects/#Introduction
-
Comment/Response Table Lake Simcoe Regional Airport Solar Project Meeting Summary Report
Invenergy LLC
4
Date Method Name Comment Received Proponent Response
foundation type. Removal of these types of
foundations is similarly low in surface
disturbance.
August 4,
2015
Verbal
Comment
Community Member Community Benefit Fund (CBF) If the Project is awarded a contract, Invenergy
would establish a CBF and provide an annual
contribution of funds per megawatt for the
duration of the solar plant’s operations. The terms
of the CBF, including the amount, will be
outlined in a Municipal Agreement with the
Township of Oro-Medonte.
Other Correspondence
July 21,
2015
Email Township of Oro-
Medonte
Provided project-related information
and confirmed receipt of Community
Engagement Plan and Site
Considerations Information.
Confirmed receipt of deputation
request.
Comment noted.
August 5,
2015
Phone Community member Where will the connection line be
located?
The proposed connection line for the solar project
would run in the municipal right of way along
Line 6 North, and is proposed to maintain the
same location as the current poles now occupy
(on the North East side of Road). If the project
moves forward, we would consult with Hydro
One to determine the upgrades required to the
existing pole infrastructure to accommodate the
new lines for the project. We anticipate that the
current single phase pole configuration would be
upgraded to a three-phase pole configuration.
Invenergy followed-up with an email that
included pictures of a three-phase pole
-
Comment/Response Table Lake Simcoe Regional Airport Solar Project Meeting Summary Report
Invenergy LLC
5
Date Method Name Comment Received Proponent Response
configuration from one of Invenergy’s 10 MW
projects developed and built near Lindsay,
Ontario. Invenergy expects the connection line
poles for the Lake Simcoe Regional Airport
project to look similar.