invensys process systems - iaea · 2004. 12. 17. · • invensys respected industry leader turns...
TRANSCRIPT
![Page 1: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/1.jpg)
Invensys Process Systems
![Page 2: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/2.jpg)
Invensys I & C, COTS
Turbine IslandNuclear Island
BOP
I&C
![Page 3: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/3.jpg)
INVENSYS PROCESS SYSTEMSNUCLEAR POWER PLANT
CONTROL AND SAFETY SOLUTIONS
Ian Govan DIR of Power. Invensys
Professor Dimitar Dragoev. DICS Intertrade Ltd
![Page 4: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/4.jpg)
ABOUT IPS NUCLEAR EXPERIENCE
Supplier to the Nuclear Industry for more than 40 years
Fully certified Nuclear QA Program
Provided Safety & Control Systems to over 125 Nuclear Power Plants around the world
Multiple Power Plant Monitoring Systems
Introduced digital control technology to the Nuclear Industry in 1987
Provided the first Open Industrial Control System to the industry - 30 Installations
Currently supplying ABWR Distributed Control & Information System for Lungmen
![Page 5: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/5.jpg)
IPA - NUCLEAR APPLICATIONS
Protective (Class 1E) Systems- Reactor Protection Systems (3 channel, 4 channel)- Reactor Trip System (2 train)- Engineered Safety Features Actuation System (2 channel)- Isolation Systems (Reactor Containment)- Emergency Power - Emergency Diesel Generator Controls (start, stop,
monitor)- Load Sequencer- Emergency Auxiliary Feedwater- Cold Over/Low Temperature Pressure Protection
(COPS/LTOPS)- Reactor Vessel Level Indicating System (RVLIS)- Inadequate Core Cooling Monitoring System (ICCMS)
![Page 6: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/6.jpg)
![Page 7: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/7.jpg)
THE PROBLEM
• Neutron embritlement of the reactor vessel
• Limiting factor of nuclear reactor life time
• Operator monitor and control
![Page 8: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/8.jpg)
![Page 9: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/9.jpg)
THE SOLUTION• Assess the degree of embritlement• Anneal the vessel
– Slowly heat and cool the vessel to relieve stress
• Design a protective system• Technology selection• License / Qualify the design with
regulators– TUV Class 6– Seismically Test (real test to anchoring point)
• Thoroughly test and install the system
![Page 10: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/10.jpg)
COPS DESIGN
![Page 11: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/11.jpg)
1E Qualified
![Page 12: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/12.jpg)
Economic
![Page 13: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/13.jpg)
![Page 14: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/14.jpg)
SCADAOptimisation Accurate Confidence
![Page 15: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/15.jpg)
5 cmLevel controlBand.All transients Caused by TurbinesReactorPumpsSteam Gen
![Page 16: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/16.jpg)
![Page 17: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/17.jpg)
ABOUT IPA – Divisional product sucesses
A history of growth, increasingproduct breadth, and marketleadership
Introduced Tricon in 1986
Product focus on safety, critical and high availability control solutions
62% TMR world market share
More than 5,000 TMR and 1,500 turbine solutions installed to date
More than 140 million safe operating hours on TRICONsystems
Named #1 Safety System by Control MagazineReader’s Choice Survey for five years - 1997through 2002.
![Page 18: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/18.jpg)
TRICON TRICON -- TMR Fault Tolerant ControllerTMR Fault Tolerant Controller
Utilizes Triple Modular Redundant Architecture
from Input Termination to Output Termination
Definition of Triconex Fault ToleranceDefinition of Triconex Fault Tolerance::Identifies and Compensates for Failed Control System Elements and Allows On-Line Repair while Continuing its Assigned Task Without Process Interruption.
![Page 19: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/19.jpg)
Diagnostics are Embedded in the System -Independent of
User Written Application Programming!
1. No Single Point of Failure
2. Diagnostics
3. On - Line Repair
1. No Single Point of Failure
2. Diagnostics
3. On - Line Repair
The Difference Between Long Term and Short Term Availability and Reliability ---- Diagnostics
Triconex TMR vs. All Other PLC Triconex TMR vs. All Other PLC TechnologiesTechnologies
![Page 20: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/20.jpg)
TRICON Architecture“Transparent Triplication”
![Page 21: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/21.jpg)
Tri-Station 1131 Developer’s Workbench
• Operates Under Windows NT Version 4.0• Implements IEC 1131-3 “Standard for
Programmable Controllers, Part 3: Programming Languages, March 93”
• Supports the Following Languages• Function Block Diagram (FBD)• Ladder Diagram (LD)• Structured Text (ST) • Cause & Effect Matrix
(CEMPLE)
• Compliant with NUREGCR6463
![Page 22: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/22.jpg)
QUALITY PROGRAM • FORMAL, COMPREHENSIVE
PROGRAM– Describes the essential practices and procedures
required to ensure that the products designed, manufactured, and serviced by the Triconex Corporation meet the highest standards of quality, reliability, and maintainability.
• APPLICABILITY – All Quality-Related Activities associated with the
Product- Triconex Hardware/Software- Design, Manufacturing, Inspection, Test,
Servicing
![Page 23: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/23.jpg)
GOVERNING STANDARDS• ISO 9001:2000
– 20 Criteria
• 10CFR50 Appendix B– 18 Criteria
• Industry Standards– Certification – DIN, CSA, CE Mark, FM– Other Commitments/Practice– IEC, UL, IEEE, ISA, NFPA, MIL..
![Page 24: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/24.jpg)
QA STANDARDS CROSS-REFERENCETITLE ISO 9001 10CFR50, TRICONEX
APPENDIX B QA MANUAL
• Management Responsibility 4.1 I, II 1.1, 1.2, 1.3, 1.4• Quality System 4.2 II, V 2.1, 2.2, 2.3• Contract Review 4.3 III 3.0• Design Control 4.4 III 4.0• Document and Data Control 4.5 VI 5.1, 5.2, 5.3• Purchasing 4.6 IV, VII 6.0• Control of Customer Supplied Product 4.7 VIII 7.0• Product Identification and Traceability 4.8 VIII 8.0• Process Control 4.9 IX 9.0• Inspection and Testing 4.10 VII, X, XI 10.0• Control of Inspection, Measuring, and Test Equipment 4.11 XII 11.0• Inspection and Test Status 4.12 XIV 12.0• Control of Nonconforming Product 4.13 XV 13.1, 13.2• Corrective and Preventive Action 4.14 XVI 14.0• Handling, Storage, Packaging, Preservation, and Delivery 4.15 XIII 15.0• Control of Quality Records 4.16 XVII 16.0• Quality Audits 4.17 XVIII 17.0• Training 4.18 II 18.0• Servicing 4.19 None 19.0• Statistical Techniques 4.20 None 20.0• Reporting of Defects and Noncompliance None 10CFR21 13.3
![Page 25: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/25.jpg)
Certification - Compliant
• API RP-14C– “Recommended Practice for Analysis, Design, Installation and
Testing of Basic Surface Safety Systems for Offshore Production Platforms”
• IEC 61508, IEC 61131-2/2000• National Fire Protection Association
– NFPA 72/96 (Fire & Gas)– NFPA 8501/97 (Burner Management Systems)
• TUV– AK1 – AK6 (DIN V 19250, DIN V VDE 0801)– SIL 1 – 3 (IEC 61508)
• EPRI TR-103699 [19994]– “Programmable Logic Controller Qualification Guidelines for
Nuclear Applications”, Westinghouse
![Page 26: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/26.jpg)
Certification - Approvals
• Factory Mutual Research– Report 3010681 – “Hazardous (Class 1, Division 2)
Locations”• TUV
– Report No. 968/EZ 105.03/01• Emergency Shutdown (ESD)• Burner Management (BMS)• Fire and Gas (F&G)
• EPRI TR-1000799 [2001]– “Generic Qualification of the Triconex Corporation
TRICON Triple Modular Redundant Programmable Logic Controller system for Safety-Related Applications in Nuclear Power Plants”
• NRC Safety Evaluation Report– ADAMS Accession Number ML013470433
![Page 27: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/27.jpg)
REGULATORY COMPLIANCEIEEE Std 603-1991, “IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations”
Reliability• Reliability Analysis
– RPS/RTS Nuclear Certified Risk Assessment –“Shapire” NRC Program (independent)
• MTTR – 8 hours• Surveillance Interval (Refueling Outage) – 18
months• Excludes Sensors and Actuators
– Probability to Fail on Demand (PFD) – 2.235E-8 (1 in 44,700,000 years)
– Probability to Spurious Reactor Trip – 1 in 300 years• Experience
– > 5,000 TRICONs Installed in Safety-Related Applications
– > 200,000,000 Hours Without Failure on Demand
![Page 28: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/28.jpg)
NUCLEAR QUALIFICATION SUMMARY
TRICON PERFORMED VERY WELL
NRC APPROVAL (12/12/01)
“When properly installed and used, the Tricon PLC system is acceptable for
safety-related use in nuclear power plants.”(Еexcerpt from NRC APPROVAL)
![Page 29: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/29.jpg)
HOW DOES THE TRICON SYSTEM COMPLY WITH
REGULATORY REQUIREMENTS?
![Page 30: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/30.jpg)
REACTOR PROTECTION SYSTEMEPRI TR-103044
“Generic Requirements Specification forUpgrading the Safety-Related Reactor Trip
and Engineered Safety Features Actuation
Systems in Westinghouse PWR Nuclear Power Plants”
![Page 31: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/31.jpg)
![Page 32: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/32.jpg)
![Page 33: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/33.jpg)
DEFENSE-IN-DEPTH ---- DIVERSITY
• Physical Separation• Electrical Isolation• Small, Modular Platform• Functional Approach• Operating Experience• Replication
![Page 34: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/34.jpg)
IPA - NUCLEAR APPLICATIONSProtective (Class 1E) Systems
- Reactor Protection Systems (3 channel, 4 channel)- Reactor Trip System (2 train)- Engineered Safety Features Actuation System (2 channel)- Isolation Systems (Reactor Containment)- Emergency Power - Emergency Diesel Generator Controls (start, stop, monitor)- Load Sequencer- Emergency Auxiliary Feedwater- Cold Over/Low Temperature Pressure Protection (COPS/LTOPS)- Reactor Vessel Level Indicating System (RVLIS)- Inadequate Core Cooling Monitoring System (ICCMS)
![Page 35: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/35.jpg)
INVENSYS NUCLEAR PLANT CONTROL SYSTEM
![Page 36: Invensys Process Systems - IAEA · 2004. 12. 17. · • Invensys respected industry leader turns focus to nuclear power industry. • The TRICON - first commercial-off-the-shelf](https://reader035.vdocument.in/reader035/viewer/2022062609/60ff2573d7431501106b2877/html5/thumbnails/36.jpg)
SUMMARY
• Invensys respected industry leader turns focus to nuclear power industry.
• The TRICON - first commercial-off-the-shelf fault tolerant PLC to be qualified for generic Class 1E applications.
• Invensys solutions addresses all of the CONTROL needs of the nuclear power industry.
• Invensys provided continued support to KNPP and the future Belene project.