invergordon service base phase 4 development ......volume 4-j: drawings 30.16.12 to 30.16.13 may...

20
Invergordon Service Base Phase 4 Development Environmental Impact Assessment Report Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018

Upload: others

Post on 07-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Invergordon Service Base Phase 4 Development

Environmental Impact Assessment Report

Volume 4-J: Drawings 30.16.12 to 30.16.13

May 2018

Page 2: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

39.6° Angle of View (50mm Pages 4,6,8)

27° Angle of View (75mm Pages 5,7,9)

65.5° Angle of View (Page 2 & 3)

KeyExisting berthExisting reclamation areaExisting rock armourNew berthNew reclamation areaNew rock armour

Visualisations are generated using Ordnance Survey’s Terrain 50 which do not take into account the screening effects of buildings or vegetation.*Refers to the number of turbines for which blade tips can be seen rather than the number of individual tips seen from the viewpoint.

Re

pro

du

ce

d b

y p

erm

issi

on

of

Ord

na

nc

e S

urv

ey o

n b

eh

alf o

f H

MSO

. ©

Cro

wn

Co

pyrig

ht

an

d d

ata

ba

se r

igh

t 2018. A

ll rig

hts

re

serv

ed

. O

rdn

an

ce

Su

rve

y L

ice

nc

e N

o A

L100048146 (

Atm

os)

Invergordon Port Phase 4

Viewpoint DataGrid ReferenceElevation

Wireframe/PhotographHeight above groundCamera and LensDateTime

Figure 30.16.12Viewpoint 2 - King George Street, Invergordon

E270012, N86882215.2m AOD

1.5mCanon 5D Mark II with fixed 50mm lens15/03/201813:30

Scale 1:50,000@ A3

0km 3km2km1km

Page 3: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

Focal Length:28mm horizontal (65.5°)

Predicted View

The images contained on this page and the following page are not representative of scale and distance from the actual viewpoint and show the development in its wider landscape context only.

For empirical testing, the wireline image on the next page can be accurately assessed in the field when converted to a transparency. If viewed with one eye at a distance of 300mm from exactly the same location and height as the original camera lens, the image will fit the real landscape cues.

IMAGES FOR LANDSCAPE ASSESSMENT

Focal Length:50mm vertical (27°)

Distance to permanent infrastructure: 0.4 km

Page 4: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

Existing View

3D Model

Focal Length:28mm horizontal (65.5°)

Distance to permanent infrastructure: 0.4 km

Page 5: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

When viewed at a comfortable arms length (approx. 500mm), this printed image is representative of our detailed central vision, but is not representative of scale and distance.

IMAGES FOR VISUAL IMPACT ASSESSMENT

Focal Length: 50mmDistance to cruise ship:

0.7 km

Temporary scenario - Cruise ship - Predicted View (50mm)

Page 6: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

This image should be viewed at a comfortable arm's length (approx. 500mm)

Focal Length: 75mmDistance to cruise ship:

0.7 km

Temporary scenario - Cruise ship - Predicted View (75mm)

IMAGES FOR VISUAL IMPACT ASSESSMENT

Page 7: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

When viewed at a comfortable arms length (approx. 500mm), this printed image is representative of our detailed central vision, but is not representative of scale and distance.

IMAGES FOR VISUAL IMPACT ASSESSMENT

Focal Length: 50mmDistance to rig:

0.7 km

Temporary scenario - Rig - Predicted View (50mm)

Page 8: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

This image should be viewed at a comfortable arm's length (approx. 500mm)

Focal Length: 75mmDistance to rig:

0.7 km

Temporary scenario - Rig - Predicted View (75mm)

IMAGES FOR VISUAL IMPACT ASSESSMENT

Page 9: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

When viewed at a comfortable arms length (approx. 500mm), this printed image is representative of our detailed central vision, but is not representative of scale and distance.

IMAGES FOR VISUAL IMPACT ASSESSMENT

Focal Length: 50mmDistance to nearest infrastructure: 0.4 km

Temporary scenario - Offshore Renewables - Predicted View (50mm)

Page 10: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Viewpoint 2: King George Street,Invergordon

Invergordon Port Phase 4 Figure 30.16.12 27/04/201819401_PM_C002b

Drawn by TH Checked by AA Approved by TH

Distance to nearest infrastructure: 0.4 km

This image should be viewed at a comfortable arm's length (approx. 500mm)

Focal Length: 75mm

IMAGES FOR VISUAL IMPACT ASSESSMENT

Temporary scenario - Offshore Renewables - Predicted View (75mm)

Page 11: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

39.6° Angle of View (50mm Pages 5,7,9)

27° Angle of View (75mm Pages 6,8,10)

65.5° Angle of View (Page 2 - 4)

Visualisations are generated using Ordnance Survey’s Terrain 50 which do not take into account the screening effects of buildings or vegetation.*Refers to the number of turbines for which blade tips can be seen rather than the number of individual tips seen from the viewpoint.

Re

pro

du

ce

d b

y p

erm

issi

on

of

Ord

na

nc

e S

urv

ey o

n b

eh

alf o

f H

MSO

. ©

Cro

wn

Co

pyrig

ht

an

d d

ata

ba

se r

igh

t 2018. A

ll rig

hts

re

serv

ed

. O

rdn

an

ce

Su

rve

y L

ice

nc

e N

o A

L100048146 (

Atm

os)

Invergordon Port Phase 4

Viewpoint DataGrid ReferenceElevation

Wireframe/PhotographHeight above groundCamera and LensDateTime

Figure 30.16.13Viewpoint 3 - Invergordon High Street

E270527, N8685556m AOD

1.5mCanon 5D Mark II with fixed 50mm lens15/03/201812:10

Scale 1:50,000@ A3

0km 3km2km1km

Page 12: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

Focal Length:28mm horizontal (65.5°)

Predicted View

The images contained on this page and the following page are not representative of scale and distance from the actual viewpoint and show the development in its wider landscape context only.

For empirical testing, the wireline image on the next page can be accurately assessed in the field when converted to a transparency. If viewed with one eye at a distance of 300mm from exactly the same location and height as the original camera lens, the image will fit the real landscape cues.

IMAGES FOR LANDSCAPE ASSESSMENT

Focal Length:50mm vertical (27°)

Distance to permanent infrastructure: 0.6 km

Page 13: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

Focal Length:28mm horizontal (65.5°)

Predicted View

The images contained on this page and the following page are not representative of scale and distance from the actual viewpoint and show the development in its wider landscape context only.

For empirical testing, the wireline image on the next page can be accurately assessed in the field when converted to a transparency. If viewed with one eye at a distance of 300mm from exactly the same location and height as the original camera lens, the image will fit the real landscape cues.

IMAGES FOR LANDSCAPE ASSESSMENT

Focal Length:50mm vertical (27°)

Distance to permanent infrastructure: 0.6 km

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography

Page 14: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

Existing View

3D Model

Focal Length:28mm horizontal (65.5°)

Distance to permanent infrastructure: 0.6 km

Page 15: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

When viewed at a comfortable arms length (approx. 500mm), this printed image is representative of our detailed central vision, but is not representative of scale and distance.

IMAGES FOR VISUAL IMPACT ASSESSMENT

Focal Length: 50mmDistance to cruise ship:

0.6 km

Temporary scenario - Cruise ship - Predicted View (50mm)

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography

Page 16: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

This image should be viewed at a comfortable arm's length (approx. 500mm)

Focal Length: 75mmDistance to cruise ship: 0.6

km

Temporary scenario - Cruise ship - Predicted View (75mm)

IMAGES FOR VISUAL IMPACT ASSESSMENT

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography

Page 17: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

When viewed at a comfortable arms length (approx. 500mm), this printed image is representative of our detailed central vision, but is not representative of scale and distance.

IMAGES FOR VISUAL IMPACT ASSESSMENT

Focal Length: 50mmDistance to rig:

0.7 km

Temporary scenario - Rig - Predicted View (50mm)

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography

Page 18: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

This image should be viewed at a comfortable arm's length (approx. 500mm)

Focal Length: 75mmDistance to rig:

0.7 km

Temporary scenario - Rig - Predicted View (75mm)

IMAGES FOR VISUAL IMPACT ASSESSMENT

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography

Page 19: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

When viewed at a comfortable arms length (approx. 500mm), this printed image is representative of our detailed central vision, but is not representative of scale and distance.

IMAGES FOR VISUAL IMPACT ASSESSMENT

Focal Length: 50mmDistance to nearest infrastructure: 0.2 km

Temporary scenario - Offshore Renewables - Predicted View (50mm)

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography

Page 20: Invergordon Service Base Phase 4 Development ......Volume 4-J: Drawings 30.16.12 to 30.16.13 May 2018 Viewpoint 2: King George Street, Invergordon Invergordon Port Phase 4 Figure 30.16.12

Figure 30.16.13Viewpoint 3: Invergordon High StreetInvergordon Port Phase 4 27/04/201819401_PM_C003b

Drawn by TH Checked by AA Approved by TH

Distance to nearest infrastructure: 0.2 km

Temporary scenario - Offshore Renewables - Predicted View (75mm)

This image should be viewed at a comfortable arm's length (approx. 500mm)

Focal Length: 75mm

IMAGES FOR VISUAL IMPACT ASSESSMENT

nb - to allow unobstructed views of the temporary Phase 4 features, the rig structure in the Queen’s Dock has been removed from baseline photography