investment albina vision $55m - metro...albina vision implementation. key elements . include: urban...

1
2020 TRANSPORTATION FUNDING MEASURE Let’s get moving with Albina Vision N WILLIAMS AVE N RUSSELL ST N VANCOUVER AVE N INTER STATE AVE Broadway Bridge Steel Bridge Lillis-Albina Park NE KNOTT ST NE BROADWAY NE WEIDLER NE LLOYD BLVD NE MULTNOMAH ST NE MARTIN LUTHER KING JR BLVD NE MARTIN LUTHER KING JR BLVD E V A D N A R G E N E V A H T 7 E N CP.5 Albina Urban Design Strategy Areawide Develop plans and strategies to guide Albina Vision implementation. Key elements include: urban design strategy, Rose Quarter TC, bridgehead and river connections, multimodal connections. 6 Broadway/Weidler Streetscape Broadway Bridge to NE 7th (.6 miles) Develop an Albina “main street” with street lighting, public art, and enhanced transit stations to improve access and safety for all. 1 1 1 Interstate/N. Portland Greenway Steel Bridge to NE Tillamook (.8 miles) Enhanced crossings and a multi-use path to connect the Rose Quarter Transit Center to employment and housing areas further north. 2 2 Multnomah St Streetscape NE Interstate to 7th Ave (.5 miles) Green street features, lighting and upgraded transit stations to provide safe connections between Lower Albina, Convention Center and Lloyd neighborhoods. 3 3 Vancouver/Williams NE Russell to Multnomah (.8 miles) Street lighting, beer transit stops, and improvements to existing bikeway. 4 4 4 Lloyd Blvd Steel Bridge to NE 7th Ave (.5 miles) Multi-use path to strengthen mulitmodal connection between Albina, Lloyd and SE Portland. 5 5 STREET LIGHTING IMPROVED BIKEWAYS BETTER TRANSIT STATIONS SAFER CROSSINGS MULTI-USE CONNECTORS "MAIN STREET" FEATURES DISTRICT PLANNING KEY projEct ElEmEnts $55M RECOMMENDED INVESTMENT DRAFT

Upload: others

Post on 31-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INVESTMENT Albina Vision $55M - Metro...Albina Vision implementation. Key elements . include: urban design strategy, Rose Quarter TC, bridgehead and river connections, multimodal connections

2020 TRANSPORTATION FUNDING MEASURE

Let’s get moving with

Albina Vision

N W

ILLI

AM

S A

VE

N RUSSELL ST

N V

AN

COU

VER

AV

E

NW NAITO PKWY

N INTERSTATE AVE

Broadway Brid

ge

Steel Bridge

Lillis-Albina Park

D

N RUSSELL ST

N V

AN

COU

VER

AV

E

NW NAITO PKWY

N INTERSTATE AVE

Broadway Brid

ge

Steel Bridge

Lillis-Albina Park

NE

15TH

AV

E

NE KNOTT ST

NE BROADWAY

NE WEIDLER

NE LLOYD BLVD

NE MULTNOMAH ST

NE

12TH

AV

E

NE

MA

RTIN

LU

THER

KIN

G JR

BLV

DN

E M

ART

IN L

UTH

ER K

ING

JR B

LVD

EVA

DN

ARG E

N

EVA

HT7 EN

NE

15TH

AV

E

NE KNOTT ST

NE BROADWAY

NE WEIDLER

NE LLOYD BLVD

NE MULTNOMAH ST

NE

12TH

AV

E

NE

MA

RTIN

LU

THER

KIN

G JR

BLV

DN

E M

ART

IN L

UTH

ER K

ING

JR B

LVD

EVA

DN

ARG E

N

EVA

HT7 EN

+

+

CP.5 +

CP.5

+ indicates an enhanced version of a project Albina Urban Design StrategyAreawide

Develop plans and strategies to guide Albina Vision implementation. Key elements include: urban design strategy, Rose Quarter TC, bridgehead and river connections, multimodal connections.

6

Broadway/Weidler StreetscapeBroadway Bridge to NE 7th (.6 miles)

Develop an Albina “main street” with street lighting, public art, and enhanced transit stations to improve access and safety for all.

1

1

1

Interstate/N. Portland GreenwaySteel Bridge to NE Tillamook (.8 miles)

Enhanced crossings and a multi-use path to connect the Rose Quarter Transit Center to employment and housing areas further north.

2

2

Multnomah St StreetscapeNE Interstate to 7th Ave (.5 miles)

Green street features, lighting and upgraded transit stations to provide safe connections between Lower Albina, Convention Center and Lloyd neighborhoods.

3

3

Vancouver/WilliamsNE Russell to Multnomah (.8 miles)

Street lighting, better transit stops, and improvements to existing bikeway.

4

4

4

Lloyd BlvdSteel Bridge to NE 7th Ave (.5 miles)

Multi-use path to strengthen mulitmodal connection between Albina, Lloyd and SE Portland.

5

5

STREET LIGHTING

IMPROVED BIKEWAYS

BETTER TRANSIT STATIONS

SAFER CROSSINGS

MULTI-USE CONNECTORS

"MAIN STREET" FEATURES

DISTRICT PLANNING

KEY projEct ElEmEnts

$55MRECOMMENDED

INVESTMENT

DRAFT