Investment Opportunities in Public Works and Highways Secretary MARK A. VILLAR Imperial Hotel, Tokyo, Japan February 28, 2017 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Upload: others

Post on 06-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Investment Opportunities in Public

Works and Highways

Secretary MARK A. VILLAR

Imperial Hotel, Tokyo, Japan February 28, 2017

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 2: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

$3.5B

P 175.4 B (1.8%)

FY 2011

$16.9B

P 847.2 B (5.3%)

FY 2017

PHILIPPINES INFRASTRUCTURE BUDGET (Billions and % of GDP)

TARGET INFRASTRUCTURE SPENDING 7% of GDP

1 US $ - P 49.987 (as of Feb. 20, 2017) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 3: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

SOURCE: www.build.org.ph

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 4: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Traffic Decongestion Program (Construct / widen national roads and bridges; Construct by-passes/diversion roads;

Construct flyovers; interchanges and underpasses)

Integrated and Seamless Transport System (Construct/improve logistics infrastructure network in Northern Mindanao, Davao,

SOCSARGEN and CARAGA (MLIN); Construct/improve roads leading to growth corridors in

Western Mindanao; Study and implement Inter-island linkage projects through long-span

bridges; Connect gaps along national roads; Construct/replace bridges; Initiate studies on

tunneling technology)

Public-Private Partnership Program (Augment and complement Locally-Funded and Foreign-Assisted projects; Construct High-

Standard Highway Network based on Masterplan and Technical Studies.)

Convergence and Rural Road Development Program (Construct/upgrade local access roads to designated tourism destinations, RORO ports /

seaports and airports; Construct Farm to Market Roads (FMRs); Construct/improve roads

leading to industrial trade corridors.)

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 5: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Livable, Sustainable and Resilient Communities

Integrated Water Resources Management Program (Construct/rehabilitate flood mitigation structures along major river basins and

principal rivers; Construct water impounding projects to optimize water resources;

Construct water supply/septage & sewerage/rain collectors; Upgrade/improve

drainage capacity)

Disaster Risk Reduction and Climate Change Adaptation Program (Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to

highly vulnerable areas; Improve national roads vulnerable to flooding, landslide

and slope failure; Build evacuation centers; Upgrade quality standards based on

Design Guidelines, Criteria & Standards (DGCS) 2015)

Infrastructure Support for Marginalized Sectors (Construct support facilities for marginalized sectors (senior citizens, physically

challenged persons, women sector, etc.)

Create Environment-Friendly Communities (Build more bike lanes and pedestrian infrastructure.)

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 6: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

$1.8B

P90.7B

FY 2011

$8.6B

P428.4B

FY 2017

DPWH FY 2017 INFRASTRUCTURE PROGRAM (Amount in Billion)

P107.8 B ($2.2B) Traffic Decongestion Program

P18.8 B ($0.4B) Convergence and Rural Road Development

Program (TRIP, ROLL-IT)

P95.9 B ($1.9B) Integrated and Seamless Transport System

(Includes P31.1 B for Mindanao Logistics Infrastructure Network, MLIN)

P104.4 B ($2.1B) Livable, Sustainable and Resilient

Communities

1 US $ - P 49.987 (as of Feb. 20, 2017) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 7: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Traffic Decongestion Program

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 8: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

6.90 km – 4 lane elevated expressway from

the end point of NAIA Expressway Phase I to

PAGCOR Entertainment City.

It will provide access to NAIA Terminals 1, 2

and 3 as well as an interface with the Skyway

and Cavitex.

Will reduce travel time between Skyway and

Terminal 1 from 24 minutes to 8 minutes.

Will benefit 80,000 travelers per day.

Project Cost: P20.45 B ($409.11 M)

Schedule: 2014-2017

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 9: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Widening/Concreting of 3.24 kilometers

section of Radial Road 10 (R-10) into 6 lanes

road including lateral and cross drainage.

2,107 Informal Settler Families (ISFs)

were relocated and 427 ISFs availed financial

assistance.

Will reduce travel time between Manila and

Navotas City from 1hour to 30 minutes.

Project Cost: P378.18 M ($7.56 M)

Schedule: 2006-2017

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 10: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

5.65 km -6 lanes elevated expressway connecting

McArthur Highway and C-3.

It will utilize the existing PNR railroad tracks that cut

across Valenzuela City & Malabon City.

Will decongest Metro Manila by providing access to

NLEX without passing through EDSA or the

Balintawak Toll Plaza and improve movement of

cargo between NLEX and Radial Road 10.

Project Cost: P9.00 B ($ 180.05 M)

Schedule: 2014-2017

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 11: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

8 km- four lane expressway from C3 Road in

Caloocan City to PUP, Sta. Mesa, Manila and

will connect to common alignment of Skyway

Stage 3.

Will reduce travel time between SLEX and

NLEX from 1.5 - 2 hours to 15 - 20 minutes.

Will reduce travel time between Clark and

Calamba from 3 hours to 1 hour and 40

minutes.

Will benefit 35,000 travelers per day.

Project Cost: P23.30 B ($466.12 M)

Schedule: 2018-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 12: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

14.8km - 6lane expressway that will connect

Balintawak, Quezon City to Buendia, Makati

Will decongest EDSA and other major roads

in Metro Manila (e.g., Quezon Ave., Araneta

Ave., Nagtahan, Quirino Ave) by as much as

55,000 vehicles daily.

Will reduce travel time from Buendia to

Balintawak from 2 hours to 15 to 20 minutes

Project Cost: P37.43 B ($748.79M)

Schedule: 2015-2018

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 13: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Construction/widening of two (2) bridges,

rehabilitation/concreting of existing 7.46 kms

road with provision of additional two lanes,

including construction of 2-meter wide

planting strips and 3 meter bike lane.

Will reduce travel time from Taytay via C-5 to

Bicutan from 1 hour to 30 minutes via Laguna

Lake Highway.

Project Cost: P1.068 B ($21.36 M)

Schedule: 2013-2018

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 14: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

34 kms - 6-lanes expressway from Skyway FTI,

Paranaque City to Batasan, Quezon City.

Its alignment will connect to Skyway Stage 1

at FTI, towards C5/Diego Silang, going

towards Laguna de Bay, intersecting Ortigas

extension at Tikling intersection in Antipolo

City midway, crossing Marcos Highway and

terminating in Batasan Complex.

Project Cost: P31.32 B ($626.56 M)

Schedule: 2016-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 15: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

50 expressway that will connect Bataan with

Metro Manila and providing direct access to

the provinces of Bulacan and Pampanga.

City Flood Control in the coastal waters of

Navotas City.

Coastal Sea Barrier through the northern

part of Manila Bay covering the coastal areas

of Bulacan, Pampanga and Bataan.

Project Cost: P399.66 B ($7,995.28 M)

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 16: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

88.85-km expressway from Tarlac City to

Rosario, La Union.

Will reduce travel time between Tarlac City

and Rosario, La Union from 3.5 hours to 1

hour.

Will benefit 20,000 travelers per day.

Project Cost: P24.42 B ($488.53 M)

Schedule: 2010-2018

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 17: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

30 km –four lane expressway from Tarlac City

to Cabanatuan City, Nueva Ecija.

Will reduce travel time between Tarlac City

and Cabanatuan City from 70 minutes to 20

minutes.

Will benefit 11,200 motorists per day.

Decongest traffic by about 48% passing thru

Daang Maharlika

Project Cost: P14.94 B ($298.88 M)

Schedule: 2016-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 18: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

44.2 km – four lane expressway with 8

interchanges and 12,207 lm bridges

(inclusive of 4,618 lm viaduct)

Will connect CAVITEX in Kawit, Cavite

and SLEX-Mamplasan interchange in

Biñan, Laguna.

Will reduce travel time between CAVITEX

and SLEX from 1.5 hours to 45 minutes

Project Cost: P35.68 B ($713.79 M)

Schedule: 2017-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 19: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

56.87 km – 4 lane expressway extension from

Sto. Tomas, Batangas to Tayabas / Lucena,

Quezon

Will facilitate faster and safer travel to Laguna,

Batangas, Quezon and Bicol Region.

Will reduce travel time from Sto. Tomas,

Batangas to Lucena, Quezon from 4 hrs to 1

hour.

Will benefit 17,000 travelers per day

Project Cost: P13.10 B ($262.07 M)

Schedule: 2017-2021

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 20: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

180 kilometer expressway that will start

about two (2) kilometers from the end of

the proposed TR-4 project and will end

before the start of the proposed

Camarines Sur Expressway.

To provide a direct and fast route

between both provinces, the trade of

goods will also prosper not only between

Quezon and Bicol but also in the

Northern part of Luzon because travel

time for trucks will be reduced.

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 21: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Four (4) lane divided underpass along Senator

Gil Puyat Avenue passing through the Makati

Avenue and Paseo de Roxas intersections.

Underpass/Covered tunnel-570m; approaches

and At-grade Transition-310m (Length = 880 m)

It will relieve traffic congestion along EDSA,

Kalayaan Ave and Osmena Highway in Makati

City and nearby C-5 Road, Pres Quirino Ave and

Roxas Boulevard.

Project Cost: P1.01 B ($20.21 M)

Schedule: 2015-2018

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 22: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Four (4) lane 2nd level flyover along Gov.

Forbes St. from Alcantara St. crossing Fajardo

St., Loyola St., Espana Blvd., and Laong Laan

St. and down ramp at mid-point of Maria Clara

St. and Aragon St. in the City of Manila.

It also involves the construction of a 433 lm

down ramp along Dimasalang St. and road

improvement along Espana Blvd. (1,600 m)

The project will benefit from the reduction of

intersection delays using at-grade controlled C-

2/R-7 intersection.

Project Cost: P2.30B ($46.01 M)

Schedule: 2018-2019

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 23: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

EDSA/North Ave.-West Ave. Interchange

North Ave.-Mindanao Ave. Interchange

C-5/Greenmeadows / Acropolis / Calle

Industria Interchange

EDSA/Roosevelt-Congressional Avenue

Interchange

Project Cost: P4.02 B ($80.42 M)

Schedule: 2017-2019

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 24: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Sta. Monica-Lawton Bridge:

614 m - 4 lane bridge across Pasig River

connecting Lawton Ave. in Makati City and

Sta. Monica St. in Pasig City.

Lawton Ave.-Global City Viaduct:

337 m – 4 lane viaduct structure traversing

Lawton Avenue onwards to the entrance of

Bonifacio Global City in Makati City.

Will decongest traffic from EDSA and C-5

particularly along the section of Guadalupe

Bridge and Bagong Ilog Bridge respectively.

Project Cost: P1.95 B ($39.01 M)

Schedule: 2017-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 25: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Bridges crossing Pasig River (6)

•North and South Habor Bridge

•Binondo-Intramuros Bridge

•2nd Ayala Bridge (Carlos Palanca-San Marcelino)

•Beata-F.Y. Manalo Bridge (Pandacan-Sta. Ana)

•F. Blumentritt-Antipolo Bridge

•Estrella-Pantaleon Bridge

Bridges crossing Marikina River (4)

•Kabayani-Katipunan Bridge

•Reposo-Guatemala Bridge

•J.P. Rizal-Yale Bridge

•G. Gabriel St.-Mercury Ave. Bridge

Bridges crossing Manggahan Floodway (2)

•East Bank-West Bank Bridge 1

•East Bank-West Bank Bridge 2

Project Cost: P18.98 B ($379.70 M)

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 26: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Construction of a 4-lane 3rd Level Flyover at

the intersection of EDSA and Taft Ave.

It starts between F.B. Harrison and Roxas

Blvd. and ends from near approach of Tramo

left turning flyover on EDSA. 1,696 m

(Northbound), 1,046 m (Southbound).

Travel time will be reduced by half to cross the

intersection.

Project Cost: P2.70 B ($54.01 M)

DPWH has put the project on hold to give way

to the construction of NAIA Expressway Phase

II.

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 27: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

1,844 m - 4 lane viaduct along C-5/Katipunan

Avenue, Quezon City

Travel time in Katipunan and CP Garcia will

be reduced by 80%.

Will mitigate vehicle congestion in the C-

5/Katipunan areas since the viaduct will cater

all the thru traffic skipping the choke points

along the Ateneo and Miriam schools, and the

intersection of CP Garcia Avenue, as well as

UP Town Center.

Project Cost: P2.96 B ($59.22 M)

Schedule: 2017-2019

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 28: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

9.96-km bypass road including 4 bridges, drainage

facilities, and slope stabilization works.

Traverses the municipalities of Balagtas, Guiguinto,

Plaridel, Bustos and San Rafael in Bulacan and

connects NLEX in Balagtas, Bulacan with Maharlika

Highway in San Rafael, Bulacan.

Will reduce average travel time between Burol,

Balagtas and Maasim, San Rafael in Bulacan from 69

minutes to 24 minutes.

Will benefit 15,132 motorists per day.

Project Cost: P3.34 B ($66.82 M)

Schedule: 2014-2018

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 29: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

South Section (Road) and Center Section (Tunnel)

JICA PH-P261- P 14.23 B

Road: 28.8 km

Tunnel: 2.28 km

Improvement of existing two connector (local)

roads: 10.20 km

North Section (Road) - P5.58 B

Road: 15.78 km

Will reduce travel time from 1 hour and 44 minutes

via Pan-Philippine Highway and Diversion Road to 49

minutes via Davao By –pass road.

Project Cost: P19.81 B ($396.30)

Schedule: 2018-2022

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 30: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Integrated and Seamless Transport System (Inter-Island Linkage Projects)

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 31: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Construction of a bridge across Panguil Bay

connecting the City of Tangub in Misamis

Occidental and Municipality of Tubod in

Lanao del Norte.

Center span (main bridge): 320 meters

Approach viaduct: 2,040 meters

Approach roads: Tubod-856 meters; Tangub

City -260 meters

Project Cost: P4.86 B ($97.22 M)

Schedule: 2017-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 32: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Construction of 23 km long bridges linking the

Visayas islands of Panay, Guimaras and Negros.

Estimated Project Cost: P21.67B ($433.51 M)

Project Duration: Six Years

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 33: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Construct/improve logistics infrastructure

network in Northern Mindanao, Davao,

SOCSARGEN and CARAGA (Length-2,074 km)

Aims to enhance the agribusiness

competitiveness in Mindanao by developing an

intermodal logistics system that will address

the constraints caused by high cost of transport

and inadequate logistics infrastructure, among

others.

Project Cost: P80.41 B ($1.61 B)

Schedule: 2015-2018

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 34: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program)

Name of Project Php’B $’M

Pasig-Marikina River Improvement and Dam Construction

198.44 3,969.83

Meycauayan River Improvement 14.04 280.87

Malabon-Tullahan River Improvement 21.64 432.91

South Parañaque-Las Piñas River Improvement

17.34 346.89

East Mangahan Floodway (Cainta & Taytay River Improvement)

25.90 518.13

West Laguna Lakeshore Land Raising 25.19 503.93

Land Raising for Small Cities around Laguna Lakeshore

7.16 143.24

Improvement of the Inflow Rivers to Laguna Lake

0.64 12.80

Manila Core Area Drainage Improvement 27.26 545.34

West Mangahan Area Drainage Improvement

5.52 110.43

Valenzuela-Obando-Meycauayan (VOM) Improvement

8.61 172.24

Total Estimated Requirement: P351.7 B $7,036.6M

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 35: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Channel improvement works consisting of revetments,

parapet walls, riverbank excavation, dredging works,

dike embankment, drainage improvement, sluice

structures, bridge foundation protection at remaining

sections of Pasig River and priority critical sections of

Lower Marikina River.

Will decrease flood inundation by 18%.

Will reduce flood damages by P14.3 billion.

Will reduce affected population by 0.2 million.

Project Cost: P7.55 B ($151.04 M)

Schedule: 2014-2017

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 36: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Modernization of Drainage Areas.

Minimizing Solid Waste in Waterways.

Participatory Housing and Resettlement .

Project management, support, and coordination.

Project Development Objective is to reduce flood

risks in flood-prone areas of Metro Manila that

are served by targeted pumping stations.

Approximately 2 million beneficiaries.

Project Cost: P23.47 B ($469.52 M)

Schedule: 2018 - 2023

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 37: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Cagayan River:

Revetment structures for the most eroded river banks

located at Brgy. Alibago and Cataggaman, Tuguegarao City

to address serious bank erosion resulting to loss of valuable

lands in the targeted areas of Tuguegarao City and parts of

Cagayan Province.

Tagoloan River:

Construction of river dikes and partial excavation of river

channel together with drainage channel improvement.

Imus River:

Construction of two (2) off-site retarding basins along Imus

River and Bacoor River located in Brgy. Buhay na Tubig and

Brgy. Anabu.

Project Cost: P6.18 B ($123.63 M)

Schedule: 2016-2019

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 38: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Earth dike: 11,928 meters (left and right bank);

Concrete Flood Wall: 3,259 meters (left and right bank)

including 1,449 meters reinforced concrete/masonry slope

protection;

Gates and Drainage Outlets: 3 steel slide gates; 19 flap gates;

3 reinforced concrete box culverts; 18 reinforced pipe culverts;

and 1 reinforced concrete headwall;

Retarding basins: preserved 97 hectares of natural retarding

basin; developed 13 hectares of natural retarding basin;

New Road and Raising of Existing Road for Evacuation:

2,756 m;

Improved Kagayan Bridge

Project Cost: P8.55 B ($171.04 M)

Schedule: 2018-2022

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 39: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Excavating and dredging of 30.30 km. – Third River

and Eastern Branch

Improving the flow of 23.0 km – Caduang Tete River

and Sapang Maragul River

Repair of Eight (8) sluice gates

Will lessen the area affected by flooding from 4,150

hectares (ha) to 23,780 ha;

Will reduce flood depth from 1.4-2.9 m to 0.6-1.4 m;

Will shorten flood duration from 66 days to 17 days.

Project Cost: P4.22 B ($84.42 M)

Schedule: 2017-2020

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 40: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Livable, Sustainable and Resilient

Communities

(Disaster Risk Reduction and Climate Change

Adaptation Program)

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 41: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

The rehabilitation of super structure of Quezon

Bridge, along Quezon Boulevard Extension has

major scope of work underneath the steel bridge

which involved sand blasting, replacement of fire

damaged structural components and painting of

structural steel members, installation of carbon

fiber.

The scope on the bridge proper are asphalt

overlay, application of epoxy on deck slab, repair

of steel railings & lamp post and repair & painting

of pylons including parapet walls/center island.

Project Cost: P 77.83 M ($1.56 M)

Schedule: March 2016-February 2017

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 42: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Replacement of outer bridges amd

replacement of substructure

including foundation of inner bridge

of Guadalupe Bridge.

Replacement of Lambingan Bridge

with vertical geometry improvement

of both sides approach road.

Project Cost: P4.29 B ($85.82 M)

Schedule: 2019-2022

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 43: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

Target Infrastructure Spending: 7% of GDP

Improve expenditure performance• Organize Infrastructure Monitoring and Advisory Group (IMAG).

• Create a multi-media citizens feedback mechanism including 24/7 Secretary’s hotline.

• Expedite ROW resolution based on new ROW Law.

• Streamline procurement process based on New Procurement Manual.

• Institutionalize 24/7 operations.

• Update and expand coverage of masterplans on road network system and flood & drainage system.

• Initiate studies on tunneling technology.

• Fast-track project implementation thru new construction methodology such as one-day curing of

concrete pavement.

• Augment infrastructure spending thru Public-Private Partnership (PPP) projects.

DPWH will continue and pursue investments in:• Traffic decongestion programs/projects (expressways, diversion roads, by-passes, flyovers,

interchanges and underpasses).

• Logistics infrastructure network in Northern Mindanao, Davao, SOCSARGEN and CARAGA.

• Access roads leading to growth corridors in Western Mindanao.

• Inter-Island Linkage projects through long-span bridges.

• Access roads leading tourism destinations, RORO ports/seaports and airports.

• Roads leading to industrial trade corridors.

• Disaster risk reduction and climate change adaptation & mitigation programs/projects.

• Infrastructure support for marginalized sector.

• Bike lanes and pedestrian infrastructure.

Institutionalization of reforms on anti-corruption program.

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved

Page 44: Investment Opportunities in Public Works and Highways · 2017. 3. 1. · across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing

THANK YOU ! ! !

www.dpwh.gov.ph

Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved