investment passport of the city of oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfsection...

29
Investment passport of Oleksandriya city Oleksandriya

Upload: others

Post on 07-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Investment passport of Oleksandriya city

Oleksandriya

Page 2: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

СONTENTS

SECTION I. СHARACTERISTICS OF THE CITY

3

1.2. Demography ......................................................................................... 5

1.3. Human resources…............................................................................... 5

1.4. Education ............................................................................................. 6

1.5. Economic potential .............................................................................. 7

1.6. Foreign economic activity……………………………………………………………….. 13

1.7. Transport and communications........................................................... 14

1.8. Areas of health, culture, leisure and recreation................................... 1.9. Environmental protection in the city Oleksandriya...........................

17

19

1.10. Cooperation with international financial organizations……………….. 20

1.11. Large-scale investment projects, what are implemented……………….. 21

SECTION II. PROPOSALS FOR INVESTORS

2.1. Priority Areas for Investing................................................................... 24

2.2. Industrial real estate and land plots.................................................... 25

2.3. Strategy …………………………………………………………………………………………. 28

SECTION III. CONTACT INFORMATION ................................. 29

Page 3: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

SECTION I. СHARACTERISTICS OF THE CITY

1.1. Natural-geographical and climatic conditions

The city of Oleksandriya is located in the

central part of Ukraine and is part of the

Kirovohrad Region. It has an advantageous

geographical location – it’s the crossing of

two basic motorways and two railways.

The city is located in the east of the region,

at a distance of 75 km northeast of

Kropyvnitsky. Together from subordinate

the settlements of Olexandriyske and

Pantaivka, the area of the city Oleksandriya

is 6142 hectares.

The city is surrounded by heights on three

sides, which have marks of 136 m – 142 m.

Namely, basic industrial areas are located

on them.

Along the diameter of the road to pass the

motorway "Kyiv - Dnipro".

The city is dividing into two parts: northin

and southin. Two rivers Ingulets and

Berezivka pass through the city, which flow

from north to south, the channel first queue

of the "Dnipro-Kryvyi Rih" has been built.

Through the city pass Two European

motorways E-50 and E-584, and the

railway that connects the city with the other

areas of Ukraine and other countries.

The City of Oleksandriya on the map of Kirovohrad Region

Oleksandriya

Roads location of Ukraine

Railways location

Page 4: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

The climate is temperate-continental. Summer is long and hot, and winter is short,

with little snow. The absolute maximum temperature of + 35.6 ° in summer and

minimum -32 ° in winter. Precipitation is distributed unevenly during the year. In the

warm period, precipitation is 336 mm, cold - 177 mm. North and north-east winds

dominate in the winter months. In summer the winds north and northwestern.

The natural and climatic conditions of Olexandriya are favorable for the cultivation of

winter wheat, corn, sugar beet, potatoes and other crops, as well as horticulture and

vegetable growing.

There is are two on the territory of the city the forest massif: Zvenigorodsky the

forest massif the total area of 287 hectares and forest massif near the veterans' house

the total area of 83 hectares. The total area of plantations is 862.48 hectares. The

surface waters of the city include rivers Ingulets, Beshka, Berezivka, Voynivsʹke

reservoir on Ingulets river, rates, flooded spent quarries and opencast coal mine.

Mineral and natural resources:

Brown coal – operating and fact capacity put

coal of 207.5 million tons (around the city)

Deposits of graphite (Balahivske deposit)

(near the city)

Put clay, granite and sand

Underground supplies of potable water

Underground springs of radon water

Gneiss

Loam

Quartzite

Network of free land plots

Balance stocks of brown coal

No The reserves are

millions tons

Stocks for

combustion

1 Of all 207,5 384

2 Were developed 63,5 125,6

3 Reserve 144 258,4

Page 5: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.2. Demography

NUMBER OF POPULATION - 86,92 thousand people

15,17%

55,47%

29,36%

AGE STRUCTURE

0-16 years 16-59 years 59 years or more

44,61%

55,39%

FEMALE GENDER AND MALE GENDER

man women

1.3. Human resources

NUMBER OF EMPLOYED POPULATION - 49.55 THOUSAND PEOPLE

THE NUMBER OF REGISTERED UNEMPLOYED PERSONS IS 6948

AVERAGE WAGES – 7 493 UAH.

Page 6: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.4. Education

Educational establishments, including:

City Council establishments:

• 17 institutions of preschool education

• 16 institutions of general secondary

education

• 3 institutions of extracurricular education.

Regional institutions:

• DVNZ «Oleksandriya Polytechnic College» -

673 students

• KVNZ «Oleksandriya Pedagogical College

named after. VO Sukhomlynsky» –

306 students

• Oleksandriya College of Bila Tserkva

National Agrarian University – 254 students

• KVNZ «Oleksandriya College of Culture and

Arts» – 245 students

• KVNZ «Oleksandriya Medical College» –

291 students

• DNZ «Oleksandriya Professional Lyceum» -

399 students

Education has a significant impact on all aspects of

the life and activities of the city of Oleksandriya,

the main indicator of which is the provision of

quality educational services. In the educational

establishments of the city a number of measures

were taken to improve the learning environment,

namely:

modern demonstration equipment was

purchased and computer classes were equipped

− equipped special facilities for children with

special needs are arranged

− carried out repair and finishing works of food

units, bathrooms, play rooms, sleeping rooms,

sports grounds and sports halls

− video surveillance cameras are installed

− schools and kindergartens are equipped with

modern furniture

Page 7: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

FOOD INDUSTRY

The food industry in Olexandriya has a potential impact on the

economic component of the city and provides the population with

various types of products, mainly bakery, meat, confectionery,

flour, cereals, beverages, etc. Among large enterprises, a group of

companies should be singled out «Ahrodar LTD» LTD - is the

largest producer and supplier of the highest quality grain, wheat

flour and cereals. The products are manufactured on original Swiss equipment of the world famous company «Buhler».

PNVP «URAN» - production of

products of the flour and cereals

industry, oil and animal fats.

PE «SLAVIANOCHKA» manufactures and sells

a wide range of flour confectionery, cakes,

pastries, bakery products.

«AHROPRODSNEK» LTD

is engaged in the manufacture of

sugar confectionery such as halva,

oriental sweets, waffle semi-

finished products, edible seeds.

VK PrAT «OBOLON» - a powerful enterprise for the

production of soft and low-alcohol beverages. Also at the

enterprise, a bottling line for cans and glass bottles

manufactured by the German company KHS was launched.

The capacity of this line is 32 thousand cans per hour. The company successfully operates a line for the processing of PET bottles with a capacity of 500 kg per hour.

VKF «OKSAMYT» LTD -

enterprise for production and

processing of meat, production of

sausages, processing and canning

of fish, crustaceans and mollusks.

1.5. Economic potential

The industrial potential of the city is industrial enterprises

Page 8: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

FOREST AND FURNITURE INDUSTRY

Group of enterprises:

• «Katerynoslavski meblevi maysterni» LTD

• «Yunayted Development» LTD

• « Best Foam Solution» LTD - companies № 1

in Ukraine with the productions of orthopedic

mattresses, sleep accessories equipped with high-tech

equipment from leading manufacturers

in Europe and the United States.

Production of plastics in primary forms,

cold wire drawing.

The company has a full cycle of production of

mattresses, and its own shop for the production

of spring blocks «Bonnel» і «Pocket Spring»

guarantees a qualitative basis of an orthopedic mattress.

«UkrEnerhoProdukt LTD » - produces and

sells charcoal briquettes, combustible

briquettes, big bags of high technical and

thermal strength.

«BFS» LTD - production and sale of

furniture, adhesives, chemical products,

production of plastics in primary forms.

CHEMICAL INDUSTRY

«Avtotekhprom» LTD – an enterprise

engaged in the manufacture of chemical

reagents for drilling gas and oil wells.

Page 9: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

MACHINE-BUILDING INDUSTRY

«Zavod« Oleksandriysʹka livarna

kompaniya» LTD and «Oleksandriysʹki

lazerni tekhnolohiyi» LTD -

specialize in: casting of cast iron, steel

and aluminum parts by various methods;

production of industrial fans, parts for

agricultural machinery, manufacture of

metal structures for the construction,

engineering and trade industries, as well

as the production of consumer goods.

«Oleksandriysʹka mashynobudivna

grupa» LTD - the company introduced

the release of innovative modifications

of shredders, fans, chimney,

agricultural machinery: sunflower

headers, mulchers, sunflower

harvesting devices, shredders-spreaders

Group of enterprises «Elektromekhanichnyy

zavod «Etal» - a leading enterprise for the

production of electrical products, namely contact

equipment, printed circuit boards and low-voltage

components, push buttons, control posts, buzzers,

switchboard equipment, elevator equipment,

housings, transformers, etc. Today, the association

has a special design bureau, an accredited testing

laboratory, and tool production.

The «Etal» plant has started production of

Ukrainian-developed windmills.

Ukrnasosservis Trade Company Ltd - Ukrainian company that offers various services related to pumps:

- design; - production; - sales; - service. The range of production makes: units centrifugal console like K and KM, Units vortex console like VK and vortex console weighted like VKS, pumps.

«NVF» Pidyomnyk» LTD - production and supply of

bridge and gantry cranes.

The main objects of production are:

- cabins for cranes and excavators;

- Armchairs for the crane operator;

- Crane beams (basic and suspended);

- Crane panels (input and control of drives), including using

contactless system technology, etc.

Page 10: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

«Lizava» LTD - Ukrainian company for the

manufacture of agricultural equipment,

agricultural machinery of various complexity.

The company's products are in demand not only

in our country but also abroad. Agricultural

machinery is actively manufactured, including

harvesters, harrows, trailers, truck scales,

openers, cutters, compost tedders, assemblies

and parts, pipe products, etc.

«ZPTU« Vira-Servis Intermash» LTD is one

of the domestic manufacturers of lifting and

transport equipment and loading and

unloading equipment, provides services for

repair and maintenance of machinery and

equipment for industrial purposes; is

engaged in the production of prefabricated

metal structures and installation of assembly

machines.

«ZPTU« Vira-Servis Intermash» LTD

manufactures dimensional bridge cranes

with a maximum load capacity of up to 125

tons, span length up to 43 m; gantry cranes

with a maximum capacity of up to 65 tons, a

bridge length of up to 120 m.

PE «UniversalKranServis» - is engaged in the

production of lifting and transport equipment and

cranes, electric drives and metal structures of any

complexity. And also provides services for

installation, commissioning, repair and

reconstruction of lifting and transport equipment.

Additionally, the following types of products have

been introduced into serial production:

- el. bridge cranes;

- gantry cranes;

- crane - beams (suspended and supporting);

- control cabins to el. bridge, gantry cranes

(open and closed types);

- electric taps equipment (control panels, resistor

units, current collectors, trolley holders).

MACHINE-BUILDING INDUSTRY

Page 11: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

PE «Ferumbudenerho» -specializes in

the production of metal structures

(sleepers, clamps, brackets, machining

of metal products, plasma cutting of

metal, etc.).

«Vyrobnycha kompaniya Inoks time» LTD-

manufactures equipment for the food industry,

namely: stainless steel products for meat processing

plants, sausage shops, restaurants, shops. Smoking

frames, production tables, for deboning meat,

smoking sticks, carts (Chinese), carts for minced

meat, carts for carcasses, logs for chopping meat and

bones, carts for defrosting, rickshaw wheelbarrows

and much more.

«Renesans - tekh» LTD -

manufacture of components and

parts for agricultural engineering

and forestry, machining of metal

products, wholesale of

agricultural machinery and

equipment, repair and

maintenance of finished metal

products.

"TD REMTEKHSERVIS" LTD -

repair and manufacture of spare parts

for mining equipment and other

products of general engineering, a

wide range of services for precision

metalworking, manufacture of

components and mechanisms of

varying complexity. Maintenance of

machines for the mining industry.

"AHROLEND-

ZAPCHASTYNA" LTD -

manufacture of

components and parts

for agricultural

engineering

"PV GRUP

UKRAYINA“ LTD -

production of machines

and equipment for

agriculture and forestry

MACHINE-BUILDING INDUSTRY

Page 12: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Volume of sold products, ths. UAH, is:

2017 year – 1 431,8 million UAH

2018 year – 1 759,2 million UAH (122,9 % to 2017 year)

2019 year – 1615,4 million UAH

There is a prospect of development of brown coal production: brown coal mining, processing,

synthesis gas production, electricity production based on synthesis gas combustion;

The trading retail network - 5 markets, a network of supermarkets and wholesale and retail

bases, shops and pharmacies, parking lots and gas stations, pharmacies, restaurants, hotels,

etc.;

Small and medium businesses are dynamically.

Small and medium businesses :

individual entrepreneurs 8908 people, including;

hir workers 5296 people.

individual entrepreneurs – 3612 people.

number of small and medium enterprises - 240.

In total, about 9.5 thousand people work in the field of entrepreneurship.

Areas of activity:

• food and non-food trade;

• provision of various services (consulting, engineering, legal and household services, etc.);

• production (baking, furniture, textile, food, woodworking, etc.);

• transport (freight and passenger transportation);

• industry (production of alternative fuels, metal constructions, aggregates, equipment,

electrical equipment, hinged equipment, parts for agricultural machinery, etc.);

• service stations (repair and maintenance services of trucks and cars);

• constructions and construction services.

Sectoral structure of industry (in production)

0

5

10

15

20

25

30

35

40

45

50

24,1

0,07 1,2 0,37

49,54

25,8

0,07

(Specific weight, %)

Page 13: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.6. Foreign economic activity

Oleksandriya is interested in cooperation and involvement of foreign partners in the development

of socio-economic infrastructure of the city and offers the following areas of cooperation:

• creation of powerful productions, enterprises and new workplaces in the territory of the

industrial park of Oleksandriya;

• creation of an electric transport company of general use for the transportation of passengers in

the city of Oleksandriya and adjoining territories;

• alternative and renewable energy;

• the creation of a complex for the processing of solid domestic wastes and the production of

alternative energy;

• development and improvement of sports infrastructure;

• creation of logistics centers;

• creation of a new production for the extraction, processing of brown coal and the production of

electricity and heat based on it, consumers of which may be enterprises and the social sphere of

the city;

• creation of production for the production of building clay and the manufacture of building

materials;

• creation of production from water supply of the city from underground water deposits;

• development of free land plots for the organization of various activities;

• profitable investments in the construction of boiler houses on alternative fuels for heating

budget institutions.

145

218

381,5

199,6

2016 year 2017 year 2018 year 2019 year

2016 year

2017 year

2018 year

2019 year

Volume of capital investments (UAH million):

9,5

10,8 11,8

13,4

2016 year 2017 year 2018 year 2019 year

Foreign investments, USA million:

Page 14: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.7. Transport and communications

Transport : 2 railway stations - Oleksandriya station and Korystivka junction – 12 km from the city;

1 bus station;

a network of paved roads – total length 325 km;

two European routes pass through the town: route E 50 and E 584 and a number of

international routes; (scheme 2);

public transport - 27 city bus routes (scheme 1);

the volume of bus passenger traffic - 3.55 million passengers per year;

cargo transportation is carried out by 40 enterprises, including private entrepreneurs -

930 thousand tons per year.

Freight traffic on the territory of the city of Alexandria is carried out by the following

companies :

«Nova Poshta» LTD

АT «Ukrposhta» «Іn-Time» LTD

«Deliveri» LTD

«Autolux Express Poshta» LTD

International highways through city Oleksandriya

Network of city bus routes

Scheme 1

Scheme 2

Page 15: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Communications: Water supply and sewage:

Provides Oleksandriya VKG OKVP "Dnipro-Kirovograd", which serves - 41.0 thousand

people.

The average annual implementation of water is year 3 million m³.

Water supply and drainage is centralized and round the clock.

Water supply and drainage reliability - is high.

Name Unit Quantity

Water supply

Total power thousand cubic

meters / day

48

Length of water supply networks km 288,6

drainage

Bandwidth of treatment facilities thousand cubic

meters / day

22,8

Length of sewer networks km 130,8

The developed network of high-

pressure, medium and low pressure

gas pipelines is developed: Serves LLC «Kirovohradgas»:

Gasified - 46 797 dwellings

including private sector - 2 383

Gasification level - 87,5%

The average gas consumption per year is

37.5 million m³

Including the population - 36,5 million m³

Power supply: Provides PAT «Kirovohradoblenergo»

The total length of the transmission lines is

250 km

In operation: 3 independent substations with voltage

154/35/10 kV,

4 substations for voltage 35/10/6 kV, 210

substations with a voltage of 10/6 / 0.4 kV.

Heat supply provides: 1) KP «Teplocomunenerho» of the Oleksandriyan City Council

Readings Unit District boiler

house

Southern boiler

house

Of all

Installed power Gcal 105 30 135

Attached heat load Gcal / hour. 78,91 12,93 91,84

including heating -//- 62,51 9,66 72,17

on GWP -//- 16,4 3,27 19,67

Useful heat energy is used Gcal / year. 183004 30556 213560

including heating

-//- 132290 20444 152734

on GWP -//- 50714 10112 60826

Production of thermal energy -//- 225197 37611 262808

KP «Teplocomunenerho» serves – 20 boiler houses.

Total Installed Power – 114,457 Gcal / hour.

Natural gas consumption - 21.2 million m3

Production of thermal energy per year – 141011 Gcal.

Page 16: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Telecommunications: 1) Communication

Provided by VAT «Ukrtelekom»

Number of subscribers - 22 thousand

Mobile operators:

«Vodafone Ukraine», Кyivstar, lifecell, Utel, Intertelekom.

2) Internet

Provided by the following Internet Service Providers:

TRK "KTM" LTD;

TRK "KTM" LTD + ;

«Shtorm»;

VAT «Ukrtelekom»;

«Кyivstar»;

ТRК «Intelkon» LTD;

«Intertelekom».

3) Сable television

Provided by the : TRK «KTM» LTD, «ТRK «Kontakt LTD»

4) TV and radio companies:

Communal Institution «City Radio Broadcasting»;

ТRК «Mayak».

2) «Zakhid - Skhid – Enerho» LTD serves - 6 boiler-

houses, which heat budget institutions

Total Installed Power – 3,483 Gcal / hour.

Production of thermal energy per year – 5550 Gcal.

3) BF PP «Kayard - Ukraine» «Kayard - Bohdanivka»

serves - 2 boiler-houses

Total Installed Power – 3,784 Gcal / hour.

Production of thermal energy per year – 5407,152 Gcal

Page 17: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Healthcare facilities:

On the territory of the city of Olexandriya there are 12

separate medical, institutions including:

1) institutions of the city council:

MK LPZ – «City Hospital № 1»;

MK LPZ – «City Hospital № 3»;

MK LPZ – «Children's City Hospital»;

MKLPU – «Dental Polyclinic»;

КP «Center for Primary Health Care of Oleksandriya».

2) Regional institutions :

KNP «Oleksandriya Narcological Dispensary of the Kirovohrad

Regional Council»;

КNP «Oleksandriya Skin - Venereal Dispensary»;

КNP «Oleksandriya Cancer Dispensary»;

КNP «Oleksandriya antituberculous Dispensary

КNP «Oleksandriya psychiatric hospital»;

«КNP «Oleksandriya psychiatric hospital»;

Oleksandriya ambulance substation of Kirovograd Regional

CSEMT»;

«Oleksandriya Municipal Interregional Department of the State

Institution «Kirovograd Regional Laboratory Center of the State

Sanitary and Epidemiological Service of Ukraine».

To date, the medical institutions of the city of Oleksandriya have

undergone enormous changes, the hospitals have been renovated and

equipped with modern medical equipment, first and foremost, the

following measures have been taken for patients' needs:

• Catheterization laboratory for vascular examination was opened;

• A modern mobile X-ray machine has been purchased;

• Modern angiograph is purchased;

• A new balneological whirlpool bath is purchased;

• The latest endoscopic video stand for the diagnosis of various

diseases of the gastrointestinal tract and endoscopic operations has

been purchased.

• Purchased a modern computed tomograph Supria 32, made in

Japan, which has 32 slices per revolution.

• Modern equipment for Dental Outpatient Clinic was purchased;

• the newest equipment for extraction and vibration-heat and roller

massage of the spine was purchased;

• computers have been purchased and Medical staffs were arranged,

and others.

The comfortable conditions for patients and medical staff of the in-

patient department of traumatology are created, surgery,

physiotherapy department, the therapeutic department, department of

sports medical, City Children's Hospital was restored and Center of

primary health care.

In October 2020, the Center of Nephrology and Dialysis was opened

in Alexandria to provide medical care to patients with chronic renal

failure who need treatment by hemodialysis. Modern equipment was

purchased and Fresenius hemodiafiltration devices were installed,

one of the best in all of Ukraine.

1.8. Areas of health, culture, leisure and recreation

Page 18: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Cultural institutions:

On the territory of the city there are modern renovated cultural establishments, that are popular both in

the city, and beyond:

Oleksandriya City Palace of Culture

reconstructed to the modern look as early as 1902,

is an architectural monument our city

City Palace of solemn events

Palace of culture «Svitlopilsky»

The city is constantly working on updating

and improving cultural institutions, taking

measures to save them.

Bibliotheca

(13)

ПСМNZ

(4)

Oleksandriya

children's music school

Children's Music School "Perlyna"

settlement of Oleksandriysʹke

Pantaivka Children's

Music School

Oleksandriya children's art

school

Сlubs

(4)

Palace of culture « Svitlopilsky»

City Palace of culture

House of сulture

settlement of Pantaivka

House of сulture

settlement of Oleksandriysʹke

Museums

(1)

КZ «Oleksandriya City Museum Center

them Khudiakova A.F. »

Art

(3)

Palace of solemn events

City instrumental ensemble

«Melody»

City Wind Orchestra

«Lira»

Recreation and sports : - 2 children's - youth schools

- 7 sports clubs

- Swimming pool

- 2 football stadiums with the developed

infrastructure (House of football, press center,

hotel, spare football football fields, two

artificial playgrounds), meets UEFA standards

and provide appearances of the football club of

PFC «Oleksandriya», which is among the

leaders of the Ukrainian Football

Championship in the higher league.

Page 19: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.9. Environmental protection in the city Oleksandriya

In accordance with the decision of the city

council of October 23, 2015, No. 1799, accepted

the Program for the protection of the natural

environment of the city of Olexandriya for 2016-

2020 years, therefore, the holding of

environmental protection measures in

Oleksandriya is vital, as it provides comfortable

accommodation for the inhabitants and guests of

the city.

City authorities together with subordinate

institutions and organizations ensure the

implementation of environmental measures,

priority areas which are:

- carrying out of actions on greening of a city;

- provision of environmentally safe collection,

transportation, storage, treatment, utilization,

removal and disposal of waste;

- detection and elimination of unauthorized

dumps on the territory city;

- prevention of pollution of underground and

surface waters;

- reduction of pollutant emissions and

improvement of atmospheric air;

- protection of lands and soils from water

erosion and other types of degradation;

- prevention of parking of motor vehicles on

sidewalks, lawns, green areas of the city;

- creation of the system of ecological education

and informing the population about the state

of the environment.

Each year, about 1500 thousand trees and shrubs

are planted, are planted a bouts 5000 thousand

flowers of own growing are planted,

arranged landscaping of squares, parks and

squares.

KP "Municipal Security" of the city council

regularly monitors the state of the environment

on the territory of the city.

Page 20: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.10. Cooperation with international financial organizations

Title of the project /

program

«Reconstruction of the central heating point 118 for a gas boiler

house with high-efficiency energy saving equipment»

Donor

Northern Ecological Finance Corporation NEFCO, European Bank for

Reconstruction and Development

Recipient KP «Teplokomunenerho» of the Oleksandriya City Council

Beneficiary KP «Teplokomunenerho» of the Oleksandriya City Council

Sector heat supply

The term of the project

implementation

2013-2015 years.

Sources of funding Northern Ecological Finance Corporation NEFCO, European Bank

for Reconstruction and Development, own

funds KP «Teplokomunenerho»

Total cost of the project,

thousand euro

740,0

Financed, Thousand Euro 113,636 – own funds KP «Teplokomunenerho» of the Oleksandriya

City Council

326,364 – a loan from the European Bank for Reconstruction and

Development

300,0 – grant funds NEFCO

The purpose of the project Replacement of boilers, the renovation of thermal networks, due to

the wear and tear of which was the largest heat loss in the past, with

their replacement loss reduced to 7-8%. Savings from project

implementation: thermal energy - 2225 MW. h / year,

gas- 1000 m³ /year, reduction of electricity consumption by 565 kWh

/ year, saving of drinking water - 71%

Implementation status The project has been successfully implemented, at the end of 2015

the boiler-house has been put into operation. Serves a boiler house of

6 adjoining multi-apartment buildings and one school.

In 2013 the city of Oleksandriya has passed selected with the project

"Reconstruction of the central heating point 118 for a gas boiler house with high-

efficiency energy saving equipment» and has won a grant within the international

Demo Ukraine program on energy efficiency and the environment, which is funded

by the «NEFCO» North Environmental Finance Corporation.

Page 21: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

1.11. Large-scale investment projects, what are implemented

Integrated modernization of street lighting in Oleksandriya,

Kirovograd region and suburbs

Implementation period: 2016-2020 years.

The given large-scale project allows to save and effectively use budget funds,

improves the quality of visibility of carriageways, sidewalks, squares.

The forces of the specialists sphere of housing and communal services of the city are

replacing the old low-power incandescent lamps with modern LED lighting fixtures.

Today the city has already received high-quality lighting of its central part and a

considerable part of distant microdistricts - more than 3,000 fixtures have been

installed.

2016 2018

At the current stage of the street lighting modernization project, we have already

received a significant financial effect in the form of reducing budget financing for

electricity, as well as a significant economic effect - this is an opportunity to involve

municipal enterprises of the city to perform these works with the subsequent payment

of their labor. This has simplified the quality control and execution of works in a

timely manner.

All modernization of street lighting is carried out at the expense of the local budget

and UAH 3.0 million. loan to OJSB «Ukrgasbank».

Since the beginning of 2020, 2292 energy-saving LED lamps have been installed in

the city's outdoor lighting system.

During the period 2018-2020, more than 7,000 energy-saving LED lamps were

installed.

Page 22: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

«Safe City»

Implementation period: 2017-2020 years.

Established KP "Municipal Security of Olexandriya City Council" for crime

prevention in the city, public order as, prevention of administrative offenses, control

over observance of the rules landscaping of settlements, implementation of land and

nature conservation legislation.

At the expense of the city budget, 32 video surveillance cameras were purchased and

installed, which provide an overview and fixation of life of the city in the most

problematic areas of its territory.

The plans - are to increase the number of street surveillance cameras.

For the storage and generalization of information, its analysis and systematization, a

special information center has been created.

As part of the project implementation «Safe city» 5 educational institutions are

equipped with video surveillance equipment, in two of them the equipment was

installed in 2019. This is an educational complex “ZNZ I-III degrees №9 - a

specialized school", educational complex “ZNZ I-III degrees №17 -

lyceum, educational complex “ZNZ I-III degrees №15, educational complex

«Oleksandriya Collegium-Specialized School» and educational complex

«Oleksandriya Gymnasium named after T.G. Shevchenko» – ZNZ І-ІІ degrees –

school of arts». 82 video surveillance cameras are located both externally along the

perimeter of schools and inside the premises. The presence of camcorders ensures an

increase level the safety of children, preventing penetration third-party persons in

schools, prevention of offenses in the educational environment, as well as the

preservation of school property.

The situation in schools are observed around the clock around.

Page 23: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

«Optimization of the heat supply system of the city of

Oleksandriya of the Kirovograd region»

Implementation period: 2020-2024 years.

Oleksandriya has passed selected with the project European Investment Bank «Municipal

Infrastructure Development Program of Ukraine» on introduction of energy-saving technologies

and reconstruction of heating networks. In accordance with the task European Investment Bank,

expert - advisory company «RamBoll» it was the financial - economic and technical state of the

communal enterprise "Teplocomunenerho" was studied and the feasibility study was provided.

Coordinating Committee and European Investment Bank a decision on lending was made КP

"Teplocomunenerho" for a total amount of 17.4 million euros (excluding VAT) with a maturity of

22 years, grace period - 5 years, loan repayment - within 17 years.

The purpose of the project : is to modernize the district heating system in order to increase the

reliability of heat supply and increase the comfort and achieve affordable prices for heat.

The main objectives of the project towards a more sustainable and energy efficient centralized heat

supply are:

Reconstruction of the "District" boiler house, "Southern" boiler house and boiler room № 35.

Construction of a new boiler-house on the basis of CTP-136.

Construction of pipelines for connection of natural gas.

Decommissioning of 2.35 km of the system district heating network pipelines in the of supply

"District boiler house".

Complete replacement / construction of a district heating network using pre-insulated pipelines -

40.4 km.

Installation 153 ІTP and heat meters in supply heat "district boilers “house", "Southern" boiler

house, boiler room № 35 and boiler-house on the basis of CTP-136.

Implementation of dispatch control, management systems, SCADA data management and boiler-

houses automation.

Economic effect after full implementation (from 2024)

Indicators Unit Natural

quantities

thousand

euro/ year

thousand

UAH / year

Gas savings thousand m3 / year 3 433 765 26777,4

Electricity savings MWh / year 1 013 81 2832,3

Cost savings for repairs 4 140,0

Saving water thousand m3 / year 41 64 2239,8

Cost savings on staff Man-month 840 135 4725,0

Saving in general 1049 36714,6

Payback period of the Project years 16,5

Page 24: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

SECTION II.

PROPOSALS FOR INVESTORS

2.1. Priority Areas for Investing

Key factors

Earth / Territory: Kukolivske highway, 7,

Oleksandriya city,

Kirovograd region

Property: Communal property,

land industry

Goal: The industrial park «Oleksandriya»

is created by combining five land

plots, the area of the common

territory and industrial park is

24.4803 hectares.

It is planned to build a complex of

industrial and agro-industrial

enterprises.

Infrastructure:

Electricity supply at a distance of 200 meters

from the boundary of the plot

is located transformer

substation 110/35/10 kW

Gas supply possibility to create a medium pressure gas

pipeline by connecting it to the gas distributing

unit a station that is at a distance 2300 meters from

the plot

Water supply

on the territory of the industrial park there are

plumbing networks D-500 mm

Financial indicators

• Investments on the construction of engineering

transport infrastructure in the territory industrial

park : 0.74 million USD

• Investments on the construction of engineering

and transport infrastructure to the territory

industrial park: 1,16 million USD

• Investments on arranging entities: 18,24 million

USD

• Total size of preferences: 0,69 million USD

Project status

Pre-design and preparatory work І period

(the main purpose of this 2017-2018

stage is an organization

work and preparation of the necessary

documentations)

ІІ period 2019-2022

Land improvement and construction

Industrial Park

(construction of the necessary engineering-

technical infrastructure and proper arrangement

of the park's territory)

ІІІ period 2022-2026

Organization of activities

filling and development

Industrial Park

(involvement of participants and ensure the

effective functioning of the park)

Introduction of the designed capacity of 24.5

hectares 2026

Indexes efficiency project

IRR=17,4798 %

DPP = 87 months

NPV = $ 6 377,39 thousands.

Рі = 1,31

CBR = 1,17

Creating new 1330 jobs

Total investment 20,14 million USD

Oleksandriya City Council as a city that is attractive in its structure for investment invites international

and domestic investors and potential members of the management company

invest in an industrial park for the construction of industrial and manufacturing enterprises and the

introduction of business.

Project realization term: 49 years (February

2018 - February 2067.).

Creation of the Industrial Park “Oleksandriya”

Page 25: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

Implementation period: 2019-2025 years.

Goal:

creation of safe and comfortable conditions of transportation, ensuring transportation of

people with special needs;

development of a fair competitive environment in the market of transport services for the

carriage of passengers by public transport by creating a municipal enterprise.

Goal Realization:

1) The municipal electric transport company is planned to be located on the territory, which

will fully meet the needs for free placement of the necessary machinery, administrative

buildings, the presence of a viewing pit;

2) In order to achieve the goal, it is necessary to make a phased purchase of technology,

equipment and components, namely:

7 electron buses "Electron" models Е19101 (on 1 electric bus per year, in the last two years -

on 2 units, taking into account reserve electric buses);

1 charge station QCBus with available power levels of 40 kW, 90 kW and 150 kW;

component parts;

3) Creation of a municipal electric transport company requires the recruitment of the necessary

personnel to service this enterprise and ensuring its effective operation. In total it is

necessary to provide employment of 31 employees of the main personnel :

director, for each electric bus 2 drivers (7*2=14 people), 2 conductors (7*2=14 people),

1 mechanic, 1 nurse (labor agreement).

Performance metrics:

Internal rate of return:

IRR=10,7 %.

Payback period of the project : 3 years.

Total investment:

2.64 million EUR (81.75 million UAH)

Social effect

Project implementation will promote:

improving the organization of

passenger transportation;

increaseing the level of comfort of

transportation;

accessibility of transport for passengers

with special needs;

much lower fare than other types of

passenger transport.

Creation of a municipal transport enterprise cities of Oleksandriya

Page 26: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

2.2. Industrial real estate and land plots

№ Name of the object Location Owner

1. Separate non-residential premises with a total area

of 927,6 square meters.

Titov street , 2.

Oleksandriya

Communal property

2. Separate premises with an area of 434.6 square meters. m

(total))

Pershotravneva

street , 9.

Oleksandriya

Communal property

3. Production area, the total area of the land plot is 2.6072

hectares.

Including under buildings – 0,1697 hectares, under the

yard – 2,438 hectares.

Building of chemical composition-1103,3 square, length

(m) - 48,6 m, width (m) - 24,68 m, height(m) -7,8 m,

KPP buildings - 8,0 square meters, length(m ) - 3,9 м,

width (m) -3,45 m, height (m) – 3,50 m.

Technical condition - medium.

Pylyp Hrytsenko

street,1/3

Oleksandriya

Private property

«ZPTU «VIRA SERVIS

INTERMASH» LTD

4. Total area of the premises–

34,3 m², length (m) - 5,50,

width(m) – 5,53, height – 3,95.

Technical condition - medium

Perspektyvna

street, 30а.

Oleksandriya

Communal property

5. Total area of the premises – 30,8 m², length (m) - 5,27,

width (m) – 5,53, height – 3,95.

Technical condition - medium

Perspektyvna

street, 30а.

Oleksandriya

Communal property

6.

Basement with an area of 148.5 sq.m.

Bulʹvarna street, 1, Oleksandriya

Communal property

7. Office space - an area of between 20 and 40 square meters

Street

Svyatomikolaevskaya street ,17,

Oleksandriya

Private property

POH «OUVP UTOS»

LIST

investment objects that are offered for the

implementation of investment projects

http://olexrada.gov.ua/category/invest_pol

To get acquainted with information on land plots, their

cartographic images and real estate objects in Ukrainian and

English, you will be able to follow the link:

Page 27: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

LIST

land plots offered for the implementation of

an investment projects

№ Area Location

1. 1,7362 hectares Dnepropetrovsk motorway (Zavodsʹkyy microdistrict),

city Oleksandriya

2. 23,1027 hectares street Nevsʹkoho (Baidakivsky microdistrict), city

Oleksandriya

3. 15,1568 hectares street Nevsʹkoho (Baidakivsky microdistrict), city

Oleksandriya

4. 111,29 hectares street Kilʹtseva (Baidakivsky microdistrict), city

Oleksandriya

5. 4,5546 hectares street Tsehlyana, 3, («Brickworks»), city

Oleksandriya

6. 4,6284 hectares «Pivdennyy» microdistrict Near the Garage

Cooperative TEMP-14, city Oleksandriya

7. 13 hectares street Philipа Gritsenko, 1, (the former territory of the plant ZPTU «VIRA – SERVIS INTERMASH» LTD), city Oleksandriya

8. 8,74 hectares street Pozharskoho, 17 (PMK - 14), city Oleksandriya

9. 4,6284 hectares street Tsehlyana, 5, («Brickworks»), city

Oleksandriya

10. 11 hectares street Zavodsʹka, 1, (the former territory of the plant EMZ «ETAL» LTD), city Oleksandriya

11. 1,6919 hectares street Maria Kozynets, 36 (DHC

«Oleksandriyavuhillya») city Oleksandriya

12. 2,8254 hectares street Energetikov, 3A (DHC «Oleksandriyavuhillya»)

city Oleksandriya

13. 2,32 hectares Zvenigorodskoe highway, 8 (factory of reinforced

concrete products), city Oleksandriya

14. 0,4809 hectares Dnepropetrovsk motorway, city Oleksandriya

To get acquainted with information on land plots, their

cartographic images and real estate objects in Ukrainian and

English, you will be able to follow the link:

http://olexrada.gov.ua/category/invest_pol

Page 28: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

2.3. Strategy

The city in 2016 adopt

Sustainable Development

Strategy for the city of

Olexandriya until 2030, which

was developed according to the

United Nations Organization

standards.

This strategy is posted on the

United Nations website, which

speaks of the information

capacity, relevance and

comprehensiveness of this

Strategy.

http://www.unece.org/ppp/pppf

orcities2016.html#/ Oleksandriya is one of the first cities in

Ukraine where the above-mentioned document

was developed and adopted, the purpose of which

is to create a modern European city, attractive for

living and doing business,

basing on the effective use of available resources,

competitive advantages of the city, preserving the

environment and developing human capital, as

well as the introduction of innovations and best

practices in sustainable development

management.

The Strategy of Sustainable Development of

Olexandriya city until 2030 includes the

main objectives, namely:

improving the quality of life

health promotion

gender equality

effective use of financial resources

rational use of natural resources

infrastructure development

introduction of innovations

use of alternative energy sources

elimination of poverty

clean water and sanitation

global partnership in the interests of

development

qualitative education

The primary tasks in the framework of the Strategy for Sustainable Development of the city is: - development of the Urban

Infrastructure Plan, aimed at achieving the goals of Sustainable Development;

- creation in the city of the Center for Strategic Development, responsible for the preparation and implementation of local infrastructure plans, monitoring of the implementation of these plans and strategies, reporting to the city residents information on issues related to their implementation.

Page 29: Investment passport of the City of Oleksandriyaolexrada.gov.ua/doc/eco/investpasport_en.pdfSECTION I. СHARACTERISTICS OF THE CITY 1.1. Natural-geographical and climatic conditions

SECTION III. CONTACT INFORMATION

Oleksandriya City Council

Ave. Soborniy, 59,

Oleksandriya city,

Kirovohrad region,

tel/fax: +38 (05235) 7-13-40

e-mail: [email protected]

City Mayor, Kuzmenko Serhii Anatoliiovych

Deputy Mayor on the issues activities of the

executive bodies of the council

Shkliaruk Yurii Volodymyrovych

tel: +38 (05235) 7-22-21

e-mail: [email protected]

Responsible person for working with investors: Head of the department of economics

of the city council ,

Cherevashko Rostislav Evgenyvich

tel: +38 (05235)70725, +38 (05235)71434

e-mail: [email protected],

[email protected]