investment projects the time is now! mr. bozidar laganin fdi advisor seoul may, 2007 investment...
TRANSCRIPT
![Page 1: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/1.jpg)
INVESTMENT PROJECTSINVESTMENT PROJECTS
THE TIME IS NOW!THE TIME IS NOW!
Mr. Bozidar LaganinMr. Bozidar LaganinFDI AdvisorFDI Advisor
SeoulSeoulMay, 2007May, 2007
Investment Forum in SeoulInvestment Forum in Seoul
Serbia Investment and Export Promotion AgencySerbia Investment and Export Promotion Agency
![Page 2: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/2.jpg)
Electronic industry – EI NisElectronic industry – EI Nis
Group is a vertical conglomerate with 12 divisions and more then 100 companies
Long tradition in cooperation with foreign partners
Joint ventures with Alcatel - telephone exchanges; Siemens –VF and telephones; Bull – computers
Industrial cooperation with companies: Siemens (telecommunication and X-ray equipment); Philips in colour picture tubes and TV sets and many others.
Company name Description Privatization schedule
Jugorengen Production of diagnostic medical x-ray equipment TBD
Radio cevi Production of receiver electronic tubes October 2007
EI Sova Production of image intensifiers, night vision scopes
July/August 2007
EI 7 Oktobar Research, design, and production of electronic and professional equipment
July/August 2007
EI Informatika Software and hardware engineering and application
August 2007
EI Profesionalna elektronika
Measuring and control of power-supply consumption equipment
October/November 2007
INV
ES
TM
EN
T P
RO
JEC
TS
![Page 3: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/3.jpg)
Small hydro power plantsSmall hydro power plants
INV
ES
TM
EN
T P
RO
JEC
TS
The most significant renewable energy source in Serbia is hydropower, with potential totaling around 17,000 GWh
10,000 GWh has been used up to date while remaining 7,000 GWh is technically available hydro–potential
Hydro plants could be built on 335 selected locations, with 319 MW installed power
Annual production of 1,104,000,000 kWh, and investment return period of up to 10 years
A total project value is estimated at around €210 mn
The Strategy for energy development gives special emphasis on setting up small hydroelectric power plants
![Page 4: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/4.jpg)
INV
ES
TM
EN
T P
RO
JEC
TS
Srem irrigation systemSrem irrigation system
Two large rivers, the Sava, from the south, and the Danube, from the north and east, bound the Srem irrigation area
Beside the land resources, the region boasts a strong agricultural tradition, significant degree of developed water resources and other infrastructure,
The project covers approximately 225,130 ha, which is about 89% of its agricultural land;
The total investment needed for the construction of the whole system amounts to around $70 mn.
Total income from the irrigated land after the project completion will grow by a factor of 2.73 in regard to the present average results.
![Page 5: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/5.jpg)
INV
ES
TM
EN
T P
RO
JEC
TS
Macva irrigation systemMacva irrigation system
The Region of Macva extends over 110,000 ha of a fertile alluvial plain
Two large rivers, the Sava and the Drina, bound the area from the north, west, and north-west.
The region’s water regime is frequently affected by floods in the spring months.
Within the region, a drainage canal network has been constructed, with six large pump stations.
The total investment (divided into 10 phases) amounts to about $88.54 mn.
The internal rate of return is 19.6% (IBRD criteria).
![Page 6: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/6.jpg)
PetrohemijaPetrohemija
INV
ES
TM
EN
T P
RO
JEC
TS
The largest producer of petrochemicals with 30 years of tradition
Technologically connected to the oil refinery in Pancevo
The company is located on 328 hectares in total with:
ETHYLENE Plant,
HDPE–High Density Polyethylene Plant,
LDPE–Low Density Polyethylene Plant,
FSK–Synthetic Rubber Plant,
PANONIJAPLAST–Compound Production Plants,
PETROPLAST–PE Pipes & Fittings Production Plant,
ELECTROLYSIS–Chlor-Alkali Electrolysis Plant,
FOV–Waste Water Treatment Plant,
UTILITY PLAN–Energy Fluids Production and Distribution.
The tender for the sale of 70% of socially-owned capital is to be announced by Q3 2007
![Page 7: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/7.jpg)
INV
ES
TM
EN
T P
RO
JEC
TS
Mt. Stara PlaninaMt. Stara Planina
The main goals of the project are the following:
Establish a four season resort with accommodation for 22,000 skiers; provide ski able terrains
Build lift and trail capacities to maintain quality skiing and snowboarding conditions;
Erect base area facilities and provide accommodation in a “Resort Village.”
Public infrastructure financed by state
A project’s estimated value is €400 mn, with the implementation period of 10 years
![Page 8: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/8.jpg)
INV
ES
TM
EN
T P
RO
JEC
TS
Belgrade North Tangent Line (NTL)Belgrade North Tangent Line (NTL)
The idea is to link the radial roads, leading the traffic into the central zone, by developing ring roads of a sufficient capacity
NTL is a section of a great significance - directs the traffic flow from the North-East (bank of the Danube) to other directions without passing through the central zone
NTL also links three very frequent entry points into the city and the Belgrade-Nis Highway, as well as distant parts of the region and city
The NTL is planned as a city highway and represents one of the priority directions within the road network of the city
The planned investment value of the structure is about €800 mn.
The preparation of the plans and project documentation for this road is in progress
![Page 9: INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e685503460f94b64edf/html5/thumbnails/9.jpg)
THANK YOU!THANK YOU!
SIEPASIEPA
Vlajkoviceva 3/VVlajkoviceva 3/V
11000 11000 BelgradeBelgrade
Phone: +381 11 33 98 550Phone: +381 11 33 98 550
[email protected] [email protected]
www.siepa.sr.gov.yuwww.siepa.sr.gov.yu