Lisbon July 08 th 2017 Investments in the Rail Sector in Portugal Ferrovia 2020 Paulo Tavares IP Project Manager International South Corridor (Railway)

Upload: others

Post on 02-Sep-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

Lisbon July 08th 2017

Investments in the Rail Sector in PortugalFerrovia 2020

Paulo Tavares

IP Project Manager International South Corridor (Railway)

Page 2: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

INTERNATIONAL NORTH CORRIDOR

Leixões Line,

Aveiro-Vilar Formoso Corridor

Beira-Baixa Line

INTERNATIONAL SOUTH CORRIDOR

Sines/Setúbal/Lisboa-Caia Corridor

NORTH-SOUTH CORRIDOR

Minho Line and North Line

COMPLEMENTARY CORRIDORS

Oeste Line

Douro Line and Algarve Line

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real deS. António

Lagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

FERROVIA 2020

Page 3: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

FERROVIA 2020

- Modernization

- New Rail Lines

- Modernization and Eletrification

Values in km

- Eletrification

Total: 914 km

5

112

0

18

205

39

91

00 0 0

246

46

26

126

0

Internacional NorthCorridor

Internacional SouthCorridor

Norte / SulCorridor

OtherCorridors

13515%

33537%

24627%

19822%

Investment typology for

line extension 2016-2021

The Plan "Ferrovia 2020", materializes a clear bet on the requalification of the National Railway Network, contemplating a

global investment of 2,000 M€.

Page 4: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

TRAINS

35.000.000 Trains km/year

ELECTRIFIED LINE

1.633,7km of electrified line

RAIL LINE

2.562km of rail line

STATION

500 More than500 stations

FREIGTH /RAIL

10.000.000Tons/year

BIGNUMBERS

TRAINS

35,000,000 Trains km/year

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real deS. António

Lagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Page 5: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

RAILWAY NETWORK

OPERATIVE LINES and BRANCHES 2 544 km

Single track - total 1 934 km

Double track or more - total 610 km

ELECTRIFIED LINES and BRANCHES 1 630 km

Single track, wide gauge 1 020 km

Double track or more, wide gauge 610 km

Complementary Network

Main Network

Page 6: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

SIGNALING AND TELECOMMUNICATIONS

OBJECTIVES

Increase infrastructure capacity

Improve the quality and safety of services

Replace equipment in technological obsolescence

Reduce operational costs and contribute to financial sustainability of IP

Page 7: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

SIGNALING

Command, control and supervision

systems for rail traffic including

automation of level crossings

SIGNALING AND TELECOMMUNICATIONS

TELECOMMUNICATIONS

Telecommunication systems

supporting railway operation

SPEED CONTROL

Systems that transmit to the train

information about the state of the

signaling and speed allowed by the

infrastructure

CENTRALIZED COMMAND OF SIGNALS IN

THE CCO

Command and remote control of

signaling installations from

operational control centers(CCO)

Page 8: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

SIGNALINGMAP 1 – Sistemas and Current Suppliers in RFN MAP 2 – Changes in Signaling under the FERROVIA 2020

# Emp.

(Mapa)

Alterações previstas na Sinalização no âmbito do

Ferrovia 2020Comando

CentralizadoTroços da RFN

1 Linha do Minho – Nine - Valença CCO Porto

2 Linha do Norte – Ovar - Gaia CCO Porto

3 Linha do Norte – Vale de Santarém -Entroncamento CCO Lisboa

4Linha do Oeste – Louriçal - Figueira da Foz, Ramal do Louriçal e

Ramal de AlfarelosCCO Lisboa

5 Linha do Norte – Nova Estação Técnica de Francelos CCO Porto

6 Linha do Norte – Estação do Entroncamento CCO Lisboa

7 Linha do Douro – Caíde – Marco - Régua CCO Porto

8 Linha do Oeste – Mira Sintra-Meleças - Caldas da Rainha CCO Lisboa

9Corredor Norte – Guarda (inc) - Vilar Formoso + Concordância

LBB e a Linha da Beira AltaCCO Lisboa

10 Corredor Norte – Covilhã – Guarda (exc) CCO Lisboa

11 Corredor Norte – Pampilhosa (exc) – Mangualde CCO Lisboa

12 Corredor Norte – Mangualde (exc) – Guarda (exc) CCO Lisboa

13Corredor Norte – Pampilhosa (inc) – Coimbra (exc) +

Concordância LN/LBA

CCO Lisboa

CCO Porto

14 Corredor Sul – Évora - Elvas - Caia CCO Lisboa

15 Corredor Sul – Sines - Ermidas

CTC Setúbal16 Corredor Sul – Canal Caveira

17 Corredor Sul – Grândola

18 Linha do Algarve – Olhão / VRSACTC Faro

19 Linha do Algarve – Tunes / Lagos

20 Linha do Norte – Terminal da Bobadela CCO Lisboa

21 Linha do Norte – Alteração do Layout de Alfarelos CCO Lisboa

Signaling to contract

Lote A signaling – in course

Siemens - SSI

Siemens - Westlock

Thales - ESTW

Thales - PIPC

Relés

Mecânica

Alstom - SiSE

Signaling to contract

Signaling to contract

Signaling to contract

Page 9: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

ELECTRIFICATION

OBJECTIVES

Energy efficient systemUse of renewable sources, energy recovery, reduced specific consumption

Improved rolling stock performanceLess weight, more power, better accelerations and speeds

Less polluting engine material

No exhaust fumes resulting from diesel combustion

Less Noisy Engine Material

Page 10: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real deS. António

Lagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres Vedras

Azambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra-B

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

AbrantesCentral do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

Campanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldas da Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Plataforma de Cacia

Canal Caveira

Lisboa

Francelos

CorucheQ.ta Grande

MAP 1 – Electrified Lines - Nowadays MAP 2 – Electrified Lines after FERROVIA 2020

Electrified Lines 2017

Non Eletricfied Lines

Porto(S.Bento)

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real deS. António

Lagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres Vedras

Azambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra-B

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

AbrantesCentral do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

Campanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldas da Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Plataforma de Cacia

Canal Caveira

Lisboa

Francelos

CorucheQ.ta Grande

Electrified Lines 2017

Non Eletrified Lines

Eletrified Lines after FERROVIA 2020

FERROVIA 2020

- More 5 new traction substations

- More 480 km of electrified lines

ELECTRIFICATION

Page 11: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

TECHNICAL STATIONS WITH 750m

OBJECTIVES

Allow the circulation and crossing of 750m trains;

To make double traction financially feasible - currently double-traction

traffic does not allow an increase in train compliance and is therefore not

easily monetable by the operator;

Increase line capacity;

Enhance the use of the railroad and the routes to and from the national

ports;

Increase the competitiveness of the railway by reducing the cost of

transport (€km/ conteiner);

Page 12: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

MAP 1 – Intervened sections MAP 2 – Location of Technical Stations with 750m

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real deS. António

Lagos

Ermidas-Sado

Casa Branca

Pragal Pinhal NovoPoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixõesSão Bento

Campanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real deS. AntónioLagos

Casa Branca

Pragal Pinhal NovoPoceirãoÁguas de Moura

Pinheiro Évora

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

AbrantesCentral do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

LousadoErmesindeLeixões

São BentoCampanhã

EspinhoPocinho

Régua

Barreiro

Leiria

LamarosaCaldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

PortoContumil

Bombel

AlvercaCaia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

TECHNICAL STATIONS WITH 750m

Page 13: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

INTERNATIONAL NORTH CORRIDOR

Objectives

PROJECTTotal

CostCompartic.

Candid. UE

Compartic.

PortugalConclusion Program

NORTH CORRIDOR 692,3 473,9 218,3

LEIXÕES LINE Project 1,3 0,65 0,65 1T 19 CEF Geral

PAMPILHOSA-VILAR FORMOSO 550,0 377,0 173,0 3T 20CEF Geral /

CEF Coesão

AVEIRO-VILAR FORMOSO: ERTMS 56,1 28,0 28,0 4T 20 CEF Geral

BEIRA BAIXA LINE – COVILHÃ-GUARDA 84,9 68,3 16,6 2T 19 Compete 2020 Values in M€

Improving the rail link between northern and central Portugal with Europe

Increase capacity to more than double the current capacity: from 14 trains/day from 500 m to 20 from 750 m

Reduce travel time due to the use of traction trains

Improve safety conditions by eliminating level crossings and the installation of electronic signaling

Reduce IP operation costs of 500.000 €/year

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real de

S. AntónioLagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real de

S. AntónioLagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Page 14: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

Ensuring the rail link between southern Portugal and Europe

Increase capacity to 2.5 times the current: from 36 trains/day from 400 m to 51 of 750 m

Reduce the time of travel between Sines and Elvas/Caia, in about 1:30 h, and allow the use of electric

Reduce road fatalities with the elimination of PN and shift from road to rail mode

Reduce IP OPEX by 0.17 M€ per year and Operator by 1.8 M€ per year

PROJECTTotal

Cost

Compartic.

Candid. UE

Compartic.

PortugalConclusion Program

SOUTH CORRIDOR (6/30 IEVA) 629,6 358,5 271,0

SINES-ERMIDAS-GRÂNDOLA 125,0 89,8 35,2 4T 21CEF Coesão / PT

2020

ÉVORA-ÉVORA NORTE 20,2 8,1 12,1 3T 19 CEF Geral

ÉVORA NORTE–ELVAS/FRONTEIRA (CAIA) 456,0 246,4 209,6 2T 20CEF Geral / CEF

Coesão

ÉVORA-CAIA: ERTMS 24,9 12,4 12,4 4T 20 CEF Geral

PORTO DE SETÚBAL-PRAIAS DO SADO 3,5 1,75 1,75 4T 18 CEF Geral

INTERNATIONAL SOUTH CORRIDOR

Objectives

Values in M€

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real de

S. AntónioLagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Page 15: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

Improving the rail link between the Atlantic axis of Portugal and Europe

Increase capacity by allowing the movement of freight trains of up to 750 m

Reduce travel time for long-distance services

Increase the safety and reliability of the operation as a result of the installation of a new S&T system

Reduce IP OPEX by 3.30 M€ per year

PROJECTTotal

Cost

Compartic.

Candid. UE

Compartic.

PortugalConclusion Program

NORTH-SOUTH CORRIDOR (1/30 IEVA) 315,8 225,9 89,9

OVAR (VÁLEGA)-GAIA 158,8 113,6 45,2 2T 21 Compete 2020

ALFARELOS-PAMPILHOSA 105,9 75,7 30,2 2T 18 Compete 2020

VALE DE SANTARÉM-ENTRONCAMENTO 40,1 28,7 11,4 4T 20 Compete 2020

BRAÇO DE PRATA-ALVERCA (TERMINAL DA

BOBADELA)11,0 7,9 3,1 4T 20 Compete 2020

NORTH-SOUTH CORRIDOR: NORTH LINE

Objectives

Values in M€

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real de

S. AntónioLagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Page 16: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

Reduce travel time by using traction trains and eliminating load breakage in Nine

Increase the efficiency of rail transport by allowing the movement of freight trains of 750 m

Increase capacity to triple the current: from 15 trains of 300 m per day to 20 trains of 750 m

Increase the safety and reliability of the operation as a result of the installation of a new S&T system

Increase rail and road safety, as a result of the suppression of PN and construction of unevenness

PROJECTTotal

Cost

Compartic.

Candid. UE

Compartic.

PortugalConclusion Program

NORTH-SOUTH CORRIDOR (1/30 IEVA 83,2 59,2 24,0

NINE-VIANA-VALENÇA 83,2 59,2 24,0 3T 19 Compete 2020

NORTH-SOUTH CORRIDOR: MINHO LINE

Objectives

Values in M€

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real de

S. AntónioLagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Page 17: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

COMPLEMENTARY CORRIDORS

Modernization, including electrification and intervention in signaling and telecommunications systems

Electrification and introduction of signaling (ongoing between Caíde and Marco de Canaveses), in order to ensure the electric traction of the regional and urban service

Electrification on the sections between Faro and Vila Real de Sto. António and between Tunes and Lagos in order to allow the use of electric traction by the regional services

OESTE LINE

DOURO LINE

ALGARVE LINE

PROJECTTotal

Cost

Compartic.

Candid. UE

Compartic.

PortugalConclusion Program

OUTRAS LINHAS 199,2 140,5 58,7

OESTE – MELEÇAS-CALDAS 106,8 74,1 32,7 3T 21 Compete 2020

DOURO – CAÍDE-MARCO 14,2 10,2 4,0 3T 17 Compete 2020

DOURO – MARCO-RÉGUA 46,6 33,5 13,1 4T 20 Compete 2020

ALGARVE 31,6 22,7 8,9 4T 20 Compete 2020 Values in M€

Objectives

Porto de Sines

OuriqueFuncheira

Beja

Tunes

Neves-corvo

Vila Real de

S. AntónioLagos

Ermidas-Sado

Casa Branca

PragalPinhal Novo

PoceirãoÁguas de Moura

PinheiroÉvora

Grândola

Pombal

Setil

Braço de Prata

Torres VedrasAzambuja

Cascais

Santarém

Alfarelos

Sintra

Vendas Novas

Vila Francade Xira

Tomar

Coimbra

Figueira da Foz

Portalegre

Elvas

Torredas Vargens

Abrantes Central do Pêgo

Mouriscas-A

Castelo Branco

Nine

TuaMarco

Sernada do Vouga

Pampilhosa

Aveiro

Covilhã

Vilar Formoso

Guarda

Mangualde

Valença

Viana do Castelo

Braga

Guimarães

Lousado

ErmesindeLeixões

São BentoCampanhã

Espinho

Pocinho

Régua

Barreiro

Leiria

Lamarosa

Caldasda Rainha

Caíde

Ovar

Meleças

Espanha(Vigo)

Espanha (Salamanca)

Faro

Gaia

Louriçal

Porto de Aveiro

Espanha (Badajoz)

Coimbra Cidade

Entroncamento

Setúbal

Lisboa

Évora Norte

Olhão

Porto

Contumil

Bombel

Alverca

Caia

Mato Miranda

Castanheirado Ribatejo

Terminal da Bobadela

Plataforma de Cacia

Canal Caveira

Page 18: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

INTERNATIONAL NORTH CORRIDOR CIN

INTERNATIONAL SOUTH CORRIDOR CIS

NORTH-SOUTH CORRIDOR CNS

v v v v v v v v v v v v v v v v v v v v v v v

COMPLEMENTARY CORRIDORS CCP

Project Contratation Project Works Contratation Works Comissionning

Faro-Vila Real de Santo António F-LA045-FAR.VSA

Lagos-Tunes

Caíde-Marco F-LD006-CAI.MCS

Marco-Régua F-LD006-MCS.REG

Ramal de Alfarelos (Desvio ativo entre Verride-Marujal e

Estação Louriçal)F-RA022-BLA.ALF

Meleças-Caldas (Desnivelamentos) F-LO023-MEL.CRA

Meleças-Caldas (Modernização) F-LO023-MEL.CRA

Braço de Prata-Alverca (Terminal da Bobadela) F-LN008-BPR.ACA

Vale de Santarém-Entroncamento

Feixe de recepção/expedição da triagem do EntroncamentoF-LN008-VSM.ENT

Vale de Santarém-Entroncamento

Mato Miranda, ZN SST do ENT, LMR (VA) entre RIA e ENTF-LN008-VSM.ENT

Alfarelos-Pampilhosa (Desnivelamentos e Estação de

Alfarelos)F-LN008-ALF.PAM

Vale de Santarém-Entroncamento

LMR (VD) e acessos ao TVTF-LN008-VSM.ENT

Alfarelos-Pampilhosa (RIV) F-LN008-ALF.PAM

Alfarelos-Pampilhosa (Taludes) F-LN008-ALF.PAM

Espinho-Gaia F-LN008-ESP.GAI

Ovar (Válega)-Espinho F-LN008-VLA.ESP

Nine-Viana F-LM001-NIN.VCA

Viana-Valença F-LM001-VCA.VAL

Porto de Setúbal-Praias do Sado F-LS037-SBM.PSO

Elvas-Fronteira (Caia) F-LL027-ELV.ELF

Linha de Venda Novas F-VN033-BSV.VNO

Évora-Évora Norte F-LE039-EVO.EVN

Évora Norte-Elvas F-LE039-EVN.BCA

Sines-Ermidas-Grândola F-0000-PSN.GRA

Poceirão-Bombel F-LA034-POO.BOL

Concordância LBA-LBB F-CB186-BBX.BBS

Guarda-Vilar Formoso F-BA020-GUA.VFO

Covilhã-Guarda F-BB025-COA.GUA

Pampilhosa-Mangualde F-BA020-PAM.MAN

Mangualde-Guarda F-BA020-MAN.GUA

Concordância LN-LBA (inclui Estação da Pampilhosa) F-CM192-BMD.BVA

3T 4T

Linha de Leixões F-LL005-COL.LES

1T 2T 3T 4T 1T 2T3T 4T 1T 2T 3T 4T1T 2T 3T 4T 1T 2T3T 4T 1T 2T 3T 4T1T 2T 3T 4T 1T 2T2018 2019 2020 2021 2022 2023

INVESTMENTS WBS2015 2016 2017

1T 2T 3T 4T

Page 19: Investments in the Rail Sector in Portugal Ferrovia 2020 · FERROVIA 2020 - Modernization - New Rail Lines - Modernization and Eletrification Values in km - Eletrification Total:

www.infraestruturasdeportugal.pt