investvietnam - belt and road summit€¦ · m power demand in quang tri up to 2035 average demand...
TRANSCRIPT
https://investvietnam.vn
CONTENT
1. Renewable Energy in Vietnam
2. Power Demand in Quang Tri up to 2035
3. Project Overview
4. Geographical Location
5. Project Progress
6. Investment Effects
7. Investment Procedure
8. Contact
IP
AV
IE
TN
AM
RENEWABLE ENERGY IN VIETNAM
One of the most dynamic emerging market in
South East Asia
Installed capacity of approximately 43,000MW
with an increasing need of electrification
moving forward
Very high power demand growth rate of 11.5%
per annum over the last decade 2005-2015
Power demand growth rate in coming years is
forecasted to be between 10-12% per annum
The planned power volum expansion in the
revised master plan VII includes:
- 2020: 850MW
- 2025: 4,000MW
- 2030: 12,000MW
IP
AV
IE
TN
AM
Map of wind energy
POWER DEMAND IN QUANG TRI UP TO 2035IP
AV
IE
TN
AM
Average demand growth per year
2021 - 2025 2026 - 2030 2031 - 2035
11.70% 9.10% 8.00%
Power demand in the whole province
2020 2025 2030 2035
166 MW 288 MW 445 MW 654 MW
PROJECT OVERVIEWIP
AV
IE
TN
AM
Location: Huong Hoa District, Quang Tri Province, Vietnam
Capacity scale: 48MW
Land area: 339.1 ha
Total estimated investment capital: USD 85 million
Implementation schedule: Q.4/2019 –> end of 2020
Expected first year electricity output: 181,654 MWh
Cooperation plan: maximum 50% shares of total investment capital
GEOGRAPHICAL LOCATIONIP
AV
IE
TN
AM
Coordinates: 16°44'25.6"N 106°41'14.5"E
Wind speech: 7.49 m/s
Land situation: mountain terrain
- Agricultural land: 5.38 ha
- Regenerated trees: 19.16 ha
- Planted woods: 0.31 ha
- Other planted forest: 70.09 ha
- Empty land: 244.14 ha
PROJECT PROGRESSIP
AV
IE
TN
AM
1. Wind measurement: completed
2. Add to the master plan: completed
3. FS and basic design: nearly completed
4. Site clearance and construction design: 7/2019 - 12/2019
5. Infrastructure construction: 1/2020 - 6/2020
6. Equipment import: 1/2020 - 7/2020
7. Erection of turbines: 8/2020 - 5/2021
8. Acceptance and operation: 6/2021 - 7/2021
INVESTMENT EFFECTSIP
AV
IE
TN
AM
Total land area 339.1 Hectares
Total investment 1,745 Billion VND
Capacity 48 MW
Annual output 181,654.0 MWh/Year
PPA rate $8.5 Cents/KWh
Index Unit Economic Analysis Financial Analysis
IRR % 19.1 26.51
NPV Bil VND 1,384.46 753.35
Payback Year 9 8
INVESTMENT PROCEDURE : 3 PHASESIP
AV
IE
TN
AM
Phase 1 - Investment Registration
1. Obtaining approval of Pre- Feasibility Study
2. Obtaining the approval of supplement into the power planning of
provinces, MOIT or Prime Minister (as case may be) if the Project
has not been included in the relevant planning yet
3. Obtaining investment policy decision for the Project
4. Obtaining Investment Registration Certificate
5. Obtaining Enterprise Registration Certificate
INVESTMENT PROCEDUREIP
AV
IE
TN
AM
Phase 2 - Construction
1. Obtaining approval of Feasibility Study
2. Working with EVN and reaching an agreement with EVN on connection point,
the design of SCADA/EMS…
3. Negotiating and signing the power purchase agreement (PPA) with EVN
4. Obtaining approval for the environmental impact assessment report (EIA)
5. Obtaining the land lease or allocation decisions
6. Approval of permissible heights of construction works
7. Obtaining the construction permits for the construction works
INVESTMENT PROCEDUREIP
AV
IE
TN
AM
Phase 3 - Power Operation
1. Obtaining the power operation permit from the competent authority
2. Approval & work permits for foreign employees and other documents relating
to labour issues
3. Application, documents for declaration, payment and finalization of taxations
The 1st market intelligence & e-bidding platform
CONTACTIP
AV
IE
TN
AM
Vietnam Investment Promotion and Associates Corporation
R.605, Toyota My Dinh Building, 15 Pham Hung St, Hanoi, Vietnam
Hotline: +84-83-555-3388 I Email: [email protected]
Website: www.investvietnam.vn l Skype: fdiconsult