INVITATION TO BID FOR INSTALLATION OF BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM OF BAGGING PLANT FOR M/S NFL (VIJAIPUR- UNIT) PART-1 COMMERCIAL (ITB NO- NFVP/Bagging/2016) NFL VIJAIPUR DISTT. GUNA (MP) - 473111

Upload: phungngoc

Post on 17-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INVITATION TO BID FOR

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

PART-1 COMMERCIAL (ITB NO- NFVP/Bagging/2016)

NFL VIJAIPUR

DISTT. GUNA (MP) - 473111

Page 2: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNO COMMERCIAL DOCUMENTS

(Part-1) INVITATION TO BID

NFVP/Bagging/2016 0

REV

SHEET 1 OF 1

CONTENTS

DOCUMENT DESCRIPTION NO. OF SHEETS

NOTICE INVITING TENDER 10

PRE-QUALIFICATION CRITERIA 02

ATTACHMENT–I INSTRUCTION TO BIDDERS 1-21

ATTACHMENT–II GENERAL CONDITIONS OF PURCHASE 1-31

ATTACHMENT–III SPECIAL CONDITION OF CONTRACT 1-12

ATTACHMENT–IV BID FORM , PRICE SCHEDULE SUMMARY OF TERMS AND CONDITIONS

1-9

ATTACHMENT–V PROFORMA OF BANK GUARANTEE FOR ADVANCE PAYMENT / PROGRESS PAYMENT , BID SECURITY FORM , PERFORMANCE BANK GURANTEE FORM

1-7

ATTACHMENT–VI FORMAT FOR EXCEPTIONS / DEVIATIONS 1-2 ATTACHMENT–VII SITE WORKING AND SAFETY CONDITION 1-8

ATTACHMENT–VIII APPLICABLE INDIAN ACTS RULES AND REGULATIONS

1-3

ATTACHMENT–IX PROFORMA FOR INTEGRITY PACT 1-7

ATTACHMENT–X MSMED POLICY 1-4

ATTACHMENT–XI DECLARATION FORM I & II 2

ATTACHMENT–XII INDEMNITY BOND 2

TECHNICAL SPECIFICATIONS 45

NFVP/Bagging/2016

Page 3: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

NATIONAL FERTILIZERS LIMITED

(A Govt. of India Undertaking)

Vijaipur, Distt.- GUNA (MP) -

473111

Fax: 07544 - 273089, 273109

INVITATION TO BID (COMPETITIVE BIDDING)

As per list attached

ITB No. NFVP/Bagging/2016

E-Tender No. 842

Date of Issue 25/10/2016

Pre- Bid Meeting Pre bid meeting shall be held on

08/11/2016 at 1100 hrs in NFL Vijaipur.

Bidders need to provide the list of clarifications

required, if any along with para/clause No. of the

tender document, two days prior to pre bid meeting.

Bid Closing Date & Time 24/11/2016 (15.30 HRS IST)

Tech. Bid opening Date & Time 24/11/2016 (15.30 HRS IST)

Price Bid opening Date & Time Shall be intimated later on to

Technically and Commercially

acceptable Bidder.

Venue of Bid opening NFL Vijaipur

Type of Bid Two Stage / Sealed Bid Public opening

Earnest Money Deposit (EMD) Rs. 1.00 Lakhs

Cost of tender documents Rs.1000

Estimated value of work Rs.4.18 Crores

Validity of quotation 180 days from bid closing date

Completion time As per clause No 5.0 of the Technical Specifications

M/s National Fertilizer Limited (NFL) Vijaipur owns and operates two Ammonia plant of re-assessed capacity of 1520 MTPD and four (4) streams of Urea plant each having a re-assessed capacity of 1310 MTPD at NFL, Vijaipur. The plants are located in Guna District of MP state. NFL has revamped its plants recently enhancing the capacity of existing Ammonia-I and Ammonia-II plants from 1520 MTPD to 1750 M TPD and 1864 M TPD respectively and that of Urea plant from 2x1310 MTPD(U-I) to 2x1515 MTPD (U-I) and 2x1310 MTPD(U-II) to 2X1615.5 MTPD(U-II).The product Urea is dispatched to various consumption centers through Rail & Road. The annual average quantity of Urea dispatched during the last three financial years (2013-16) was 2137094 MT, out of which 93.51 % ( 1998429 MT) was dispatched through rail. To reduce rake loading time NFL invites sealed bids for detailed design, engineering, manufacture, inspection, painting, supply, packing, forwarding ,erection, testing & commissioning of BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM for 13 No’s loading stations of Urea Bagging Plant at VIJAIPUR UNIT. To start with the modification shall be carried out in two stations only remaining 11 stations shall be modified subject to the vendor successfully demonstrating the performance of the first two stations as per the performance parameters to the full satisfaction of NFL.

In this composite Supply cum Erection enquiry, National Fertilizers Limited, Vijaipur invites sealed Bids for supply of the following items.

Page 4: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SL. NO.

DESCRIPTION QUANTITY

1.

Scope:-

Complete Design, Manufacture, procurement, Supply, Erection, Testing, Commissioning OF BAG LOADING SYSTEM for 13 No’s stations on platform A and B, compatible with existing loading system and demonstration at site of bag loading/Conveying system along with existing loading system as per the guarantee clause No 10 of the Technical specification.

Perform Adequacy check of the present system w.r.t the modified system. The system is to be designed in such a fashion that in the event of disruption in loading from any station the loading can be resumed seamlessly from any of the adjacent stations without shunting of the partly filled wagon. Complete system Engineering including supply of engineering data and two year spares for all the accessories.

Suitable reversible modifications to the existing bag loading system and infrastructure to make it work in sync with the new system.

All the modification cost for existing system is to be borne by the bidder. The scope of supply of Bag loading system shall include but not be limited to the following:

Inclined flat belt conveyor Belt conveyor with adjustable height Motor operated Bag Diverters Drive Motors , Gears and cooling/ ventilation blowers First charge of lubricants Rail Track (Rails to be installed over grouted sheet metal)

All Civil Work

Pre-fabrication and Fabrication structures at shop/site as required, loading, unloading & transportation, storage at site, assembly,

Civil construction work foundations, supports and other allied civil works (including demolition and re-storation of existing construction).

Erection of conveyors & motors, supports, electrical & instrumentation system etc. Motor module with starter, power & control cables, LCS, safety devices, bag counters, interlocks along with necessary hardware & software for instrumentation & control. All the hardware & software for hooking up the new system with the existing PLC / SCADA.

Inspection, testing, painting, statutory approvals, calibration etc. Pre-commissioning, commissioning, trial runs and guarantee test.

(For complete scope bidder is advised to go through the full set of bidding documents)

As per Technical Specifications & Scope of supply along with attachments as referred therein.

Page 5: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

For preparation and submission of Bids, evaluation and comparison of Bids, kindly see the commercial documents.

1. The Pre-Contract Integrity pact as per Attachment-IX shall be invariably be submitted by all the bidders along with tender documents and it will form a part of the contract .

2. The various provisions contained in the Government of India, Gazette No. 503 dated 26.03.2012 for Public Procurement Policy on procurement of goods and services from Micro and Small Enterprises (MSEs) by all central Ministries/Departments/PSUs for promotion and development of Micro and Small Enterprises shall be applicable. All such bidders to refer Attachment-X in this regard.

3. Following enclosed documents shall form part of Invitation To Bid : i) Part-1 - Techno Commercial documents ii)Part-2 – Price bid

4. Mode of Tendering:

The Vijaipur Unit of National Fertilizers Ltd. has decided to line up the contract

through e-tendering mode under TWO PART BID system. The NIT will be posted on our

E-Tender Portal https://nfl.etenders.in from where the registered Tenderer(s) / Bidder(s)will

be able to download the tender documents for participation in the tender and submit their bids

online. The tender submission, tender closing and opening will be done electronically and

online.

5. NFL has appointed M/s NexTenders (India) Private Limited, Mumbai as its service provider

for its e-tendering solution. Also, as per IT ACT 2000, use of digital signatures certificate

shall be mandatory for participating in e-tendering process.

6. The tender shall be made through e-Tendering process. In this process, the tenders shall be

submitted online duly digitally signed and encrypted by the Tenderer using their Digital

Signature Certificate on the website https://nfl.etenders.in.

7. No oral, email, telephonic, telegraphic tenders or tenders submitted in hard copies / physical

form will be entertained.

8. Tenderers are requested to read the terms and condition of the tender thoroughly along with

the General Terms and condition etc. as given in Tender Documents.

9. The Tenderers must submit / upload online, one set of tender documents duly digitally signed

by using digital certificates in token of acceptance of all the terms and conditions along with

their techno-commercial bid failing which their tender may not be considered.

10. MSMED Declaration:

In case you are registered as MICRO, SMALL Enterpriser (MSES) under ‘The Micro, Small

& Medium Enterprises Development Act, 2006 (MSMED Act)’ promulgated by Government

of India vide Notification dated 16/06/2006, please indicate the relevant category of

registration in your Office and enclose a copy of the valid certificate issued by the concerned

authorities as specified by the Ministry of MSME.

The Micro & Small Enterprises (MSEs) shall be entitled for benefits under the Public

Procurement Policy for Micro & Small Enterprises subject to the terms and condition.

It shall also be confirmed by the Bidders if the MSEs owned by SC / ST Entrepreneurs and in

that case submit a copy of documentary proof issued by concerned authority.

Page 6: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

11. System requirements to participate in the e-Tendering are as under:

i. Computer with minimum i3 Processor or equivalent, having 1 GB RAM and 80

GB HDD Capacity (Minimum)

ii. Operating System Required:

- Window 7 Ultimate / Professional / Enterprises / Ultimate

- Window XP (Service Pack 3 and Above)

iii. Internet Speed of 512 kbps or above

iv. Browsers: Preferred Browsers Mozilla Firefox or Google Chrome

v. Adobe Acrobat Profession 6 or above for digitally signing the Document

vi. Java 7 Update 67 (Updated 32 bit Java version & above) – Essential

vii. Java Settings

- Download and Install Java 7 Update 67 available under ‘System Requirement’

Tab on the home page of https://nfl.etenders.in

- After installation, open Control Panel and Click on Java Icon

- Click ‘Security’ Tap on the Java Configuration Panel and bring the Security Level

to Medium. Click on Edit Site List Tab and add the URL name

https://nfl.etenders.in and click ‘Add’ Tab and ‘Ok’ Tab

- Open the Java Control Panel and Click the Tab ‘Advanced’

- Select ‘Show Console’ under Java Console

- Select ‘Always Allow’ under JNLP File/MIME Association

- Select ‘Disable Verification (Not recommended)’ under Mixed Code (Sandboxed

vs. Trusted) Security Verification

Once the above pre−requisites are configured / available in the system, users can click

on https://nfl.etenders.in and the e-Tender portal will be available

viii. Digital Certificate

For performing e-commerce, class II and above (organization) Digital Certificate is

required.

Digital Signature Certificate (Class II or Class III Organizational) are being issued by

many Govt. approved (CCA of India) agencies as per IT Act 2000. For your

convenience, we have made arrangements to get the Digital Signature Certificates

from our service provider M/s. NexTenders (India) Private Limited on payment of

necessary fees.

ix. Download and Install Digital Certificate setup (NxtCryptoSetup.msi) available under

System Requirement link of home page https://nfl.etenders.in using Administrator

user access.

Page 7: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

12. The above Tender will be available on URL https://nfl.etenders.in. Interested Tenderer(s)

/ Bidder(s) shall visit the URL for downloading of tender documents, bid preparation, hash

submission, bid submission etc.

Note: - Please refer Bidder Manual which is available on the home page

https://nfl.etenders.in for system requirement, browser configuration, procedures etc.

13. Tenders are required to be submitted online duly digitally signed and encrypted by using

their Digital Signature Certificate.

14. Tenderer(s) / bidder(s) are requested to scrutinize the terms and condition of this tender

thoroughly along with the General Terms and condition etc. as given in tender documents

before proceeding for preparation of Online Bid / e-Tendering.

15. No amendment to the tender would be admissible under any circumstances, whatsoever after

the closing date and time of receipt of tenders.

16. The Earnest Money Deposit shall be deposited with NFL by way of Demand Draft / Bank

Guarantee.

17. For queries regarding e-tendering process, you may contact our Service Provider M/s.

NexTenders (India) Private Limited, Mumbai or NFL. Contact details are as under:

i. National Fertilizers Limited (For Tender details)

i. Name: T.K.Batra DGM (P)

Contact No.: 07544 273338

Email: [email protected]

ii Name: Rajeev Khulbe CM (P)

Contact No.: 07544 273579

Email: [email protected]

iii Name: C.K.Gaur Sr Manager (P)

Contact No.: 07544 273579 Email: [email protected]

ii. M/s. NexTenders (India) Private Limited, Mumbai (For e-Tender

Process/Procedure related matters)

Technical Support Contact (For Parties / Contractors):

Name: Desk No. 2

Contact No: 091672 46751

Landline No: 020 – 30187500

Email ID: [email protected]

For Digital Certificate Support:

Name: Mr. Aziz Kariyania

Phone No.: 022 – 2879 0311 / 098203 98781 / 092234 00489

Address: Adweb Techno Trade Private Limited

309, Krishna Commercial Centre, 6, Udyog Nagar

Off. S.V. Road, Goregaon (West), Mumbai – 400 062

18. All the Tenderer(s) / Bidder(s) participating in the online e-tender have to abide by the

process involved in the entire workflow of the e-tender.

19. NFL shall not be held responsible for any mistake made by the tenderer(s) at the time of

tendering / bidding process. In case any tenderer(s) submits any invalid bid due to any reason

whatsoever including typing mistake/human error, such invalid bid will be disqualified and

Page 8: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

such tenderer(s) shall not be allowed to further participate in that tender. The remaining

process shall be completed considering the other valid bids.

20. For submitting price bid through e-tendering, the successful tenderers will have to use a

Class II or Class III Digital Signature Certificate issued by any India CA approved by CCA of

India as per IT Act 2000. The same can also be taken through NFL’s service provider i.e. M/s.

E-tender Technologies Limited, Ahmedabad on payment of necessary fees.

21. It is mandatory for the Tenderer(s) / Bidder(s)to use the digital certificate in all their bidding

Process.

22. It is the entire responsibility of the Tenderer(s) / Bidder(s)to protect their own login id and

Password and keep their digital certificate safe so that is not misused by any other person.

23. Tender Schedule:

S. No. Tender Stage Date and Time

1 Date & time of issue of Tender Date: 25/10/2016 Time: 10:00 AM

2 Last date & time of receipt of Tender Date: 24/11/2016 Time: 03:30 PM

3 The date & time of opening of Tender

(Unpriced Techno-Commercial Bid)

Date: 24/11/2016 Time: 03:30 PM

4 Place of opening of Tender Office of DGM (P), NFL, Vijaipur.

Note: After expiry of date & time for a particular activity as mentioned above, that

particular activity cannot be done unless the schedule for the same is extended / amended.

Similarly no activity can be done before start date & time specified for that particular activity

unless the schedule for the same is preponed / amended

24. The activity defined for Tenderer(s) / Bidder(s) are Download of Tender document, Bids

Preparation, Re-encryption of Online bid and Uploading of bids.

25. During the Download sequence, the Tenderer(s) / Bidder(s) who have been invited will be

able to download the main tender document and the supporting documents.

26. During the Bid Preparation and Hash Submission Stage, the bidders who have downloaded

the tender document during the previous sequence will be preparing their bids and submitting

their bid signed hashed online. Additionally, hashes will be generated for each single

document (files) that is committed to be part of the bid. The bids will be prepared and hashes

will be generated and signed envelope-wise. The signatures will be done digitally using DCs.

27. During Re-encryption of Online Bid sequence the bidders will re-encrypt their bid data and

upload the documents for which hashes have been generated and submitted during the bid

preparation and hash submission stage. The bids will be re-encrypted with the publickey of

the proprietary key pair that has been assigned to this tender.

28. Tender Opening:

The tenders will be opened electronically by NFL from Vijaipur Office in the presence of

representatives of Tenderer(s) / Bidder(s) who wish to attend the price bid opening. The

submission of bids may however be done by Tenderer(s) / Bidder(s) from their office or from

place of their choice or they can visit our Vijaipur Office and use NFL’s facilities for

preparation and submission of their bids. However bids cannot be submitted after the bid

submission due date & time as per the schedule.

Page 9: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

Price bid of all the Tenderer(s) / Bidder(s) who are techno-commercially acceptable shall be

opened electronically.

29. NFL takes no responsibility for delay, loss or non-receipt of EMD and Tender Fee sent by

post / courier.

30. Earnest Money Deposits:

Bidders must submit Earnest Money Deposit (EMD) of Rs. 1, 00,000/- (Rupees One Lalc

only) in the form of: Crossed Demand Draft in favour of National Fertilizers Limited of any

Nationalized / scheduled Bank payable at State Bank of India (SBI), Bavrikhera Branch

(Code: 8455), NFL Complex, Vijaipur-473111, Dist: Guna (MP) (Details of DD No & date,

amount, Banker’s name etc. has to be submitted in relevant field / column of online module)

OR

Bank Guarantee from a scheduled / Nationalized Bank (except Rural / Co-operative Banks)

as per prescribed format (see Bid Security Form attached in Tender documents). The bank

Guarantee should be valid for of 180 days from Tender Opening date and will give an

undertaking for extension of the Bank Guarantee in case the same is desired by NFL (the

details of BG No & date, amount, Banker’s name etc. has to be submitted in the relevant field

/ column of online module).

Earnest Money deposited by unsuccessful tenderers shall be returned as early as possible.

31. Tender Fee:

Bidders must submit Tender Fee of Rs. 1,000/- (Rupees One Thousand only). The Tender

Fee shall be submitted in the form of Crossed Demand Draft drawn in favour of National

Fertilizers Limited on State Bank of India payable at SBI, Bavrikhera Branch [Code: 8455],

NFL Complex, Vijaipur-473111, Dist: Guna

The original Demand Draft or Bank Guarantee of EMD and Tender Fee should reach

Vijaipur Unit for verification before opening date of Techno-Commercial un-price bid. In

case the original DD or Bank Guarantee of EMD and Tender Fee do not reach before due

date, the bid of that / those bidder(s) shall not be opened.

32. Cheques towards EMD and Security Deposits shall not be accepted in any case.

33. Estimated value of Work: Rs. 418 lacs

34. Completion Time:

The contract shall be valid for a period as defined in clause 5 of the Technical specifications.

35. Validity of Tender: 180 days from the Date of Opening of Tender.

36. National Fertilizers Limited reserves the right to reject any or all tenders without assigning

any reason whatsoever and also do not bind to accept the lowest tender.

37. System failures and remedial measures thereof / course of action to be followed

NFL shall make all efforts to rectify the problem(s) leading to system failure during the live

tendering. However in case the system could not be restored within the reasonable time

period as deemed fit by NFL, the following remedial measures shall be taken under such an

eventuality:

Page 10: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

1 Tender is prepared and released but

Tenderer(s) / Bidder(s) are not able

to submit their bids.

The due date of closing / opening shall be

extended suitably.

2 Bids have been submitted but the

same cannot be opened by NFL.

The due date of opening shall be extended

suitably.

38. Name & Address of the Vijaipur Unit:

DGM (P)

National Fertilizers Limited

Vijaipur-473111

Dist. Guna (M.P)

39. Payment Mode:

(i) Payment shall be released by RTGS / NEFT. Successful Tenderer(s) / Bidder(s) shall provide the

requisite details of their Account No., Name & Branch code of Bank, Acceptance / request for

release of payment by ECS / EFT.

(ii) If any contractor wants payment by way of transfer of funds to their account, the contractor should

indicate the local bank account number accordingly to avail the facility. Such A/c No. will be

incorporated in all A/c Payee cheques.

40. Change in Tender Schedule:

NFL reserves the right to change / amend the tender schedule (date and / or time) and shall intimate all

the tenderers well in time by e-mail / fax / telephonically of such changes along with notice of revised

schedule. However, it shall be the responsibility of the bidders to visit the designated web site regularly as

per the time schedule to get the details of any such changes, as the same shall be available against this

tender on the said website.

NFL shall not be responsible if bidder(s) is not able to participate in any activity related to this tender

due to change in schedule or any other reason.

41. The bidder shall sign each page of the tender documents at bottom right hand corner along with

undertaking duly signed by the tenderer in token in acceptance of the terms and conditions content

therein and upload the same.

Page 11: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

42. Procedure For Bids

The bidders shall upload duly signed copies of their bids / Documents in the following manner:

i. Submission / uploading of EMD and Tender Fee

The bidder shall upload scanned copies of (1) Crossed Demand Draft / Bank Guarantee towards

EMD and (2) DD of tender document fees as required by clause No.30 &31 . Original DD/BG

should reach CM (P) i/c before opening of Techno-commercial un-price bid.

ii. Uploading of Tender documents duly signed by the Tenderer(s) / Bidder(s)

The tenderer / bidder shall sign each page of the tender documents along with undertaking duly signed by

the tenderer in token in acceptance of the terms and conditions content therein. The tender documents and

under taking shall be uploaded as per clause No 41 as above.

iii. Submission of price bid as per "Schedule of Rates"

The price details as per format of "Schedule of Rates" given in Attachment-IV shall be uploaded

by the tenderer / bidder.

iv. The ORIGINAL Demand Draft (DD) / Bank Guarantee of EMD and DD of Tender Fee should reach

Vijaipur Unit at following address before opening of Techno commercial un-price bid.

DGM (Prod.)

National Fertilizers Limited

Vijaipur, Distt. GUNA (M.P.) Pin code: 473 111

If the original DDs / Bank Guarantee does not reach before due date at above address, the bid of that /

those bidder(s) shall not be opened. NFL takes no responsibility for delay, loss or non-receipt of EMD &

Tender Fee sent by post / courier.

43 On the scheduled date of opening, Technical and Commercial Bid & EMD will be opened first. The

Technical & Un-priced Commercial Bid and EMD shall be examined. The bids found meeting the

Eligibility Criteria and the other requirements shall only be considered for further opening of the price

Bids ( i.e. Schedule of rates). Price Bids of the eligible bidders only will be opened on date & time to be

intimated later. Decision of NFL in this regard shall be final and binding on all bidders

44 The bids shall be filled by the bidders neatly and accurately. Any alteration erasing or overwriting should be

avoided.

45 Bidders should quote the rates both in figure and words. In case of any discrepancy, rates quoted in words

shall be applicable.

46 All the requests for interpretations, clarification in connection with bid document shall be addressed in writing to

the C M. (Production) i/c, NFL, Vijaipur at least seven days prior to the closing date of the bid.

47 Incomplete bids or bids received late shall be summarily rejected without further reference whatsoever. NFL

reserves the right to reject any or all bids without assigning any reason thereof.

48 Bidders shall upload their bids complete in all respects with all documents mentioned in the bid.

49 NFL reserves the right to accept the lowest or any other bid in its own discretion without assigning any reason.

50 Bid shall be made in English Language only, however literature submitted in any other language has to

accompanied by English translation.

Page 12: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

51 Bid containing eraser and alterations of the bid documents are liable to be rejected unless the alterations are

authenticated by the signee.

52 Bidders are required to go through the documents thoroughly and ensure submission of his bid in time. It may be

noted that bid documents are non-transferable.

53 The bidder must enclose the following document along with the Technical BID and other required details

in the offer:

a.Commercial Summary of Terms and Conditions

b.Unpriced copy of price schedule indicating “Quoted/Not quoted ”against each head

c.Time Schedule in the form of a Bar Chart indicating main activities.

d.List of deviations if any

e.Reference list of similar jobs done

f.Integrity Pact as per Attachment IX

g.Declaration Form I & II as per Attachment XI

54 Successful bidders will be required to submit documents / drawings to NFL for comments and

approval.

55 It is preferred that Bidder should visit to M/s NFL, Vijaipur plant site for assessment and quantum of work

involved including Hook-ups and facilities available at site at their own cost without any

commercial implications to Owner before submitting the techno-commercial bid.

56 Wherever the terms and conditions in special Conditions of Contract are at variance with General

conditions of contract and any provision of Contract elsewhere, special Conditions of contract shall

prevail.

57 The Bidders must take note of current Finance Bill and EXIM Policy while bidding.

58 Please furnish two valid Email IDs for further communication.

59 The price bid opening date and time shall be communicated later on to the bidders who shall qualify for

the price bid opening.

For & on behalf of

National Fertilizers Limited,

T.K.Batra, Deputy General Manager (P)

Page 13: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PRE-QUALIFICATION CRITERIA FOR BAG LOADING SYSTEM

NFVP/Bagging/2016 0

DOCUMENT NO REV

SHEET 1 OF 2

PRE-QUALIFICATION CRITERIA 1.0

Name of Work

Value of satisfactorily completed works

Last three years

Average yearly

financial turnover not

less than (Rs. in Crores)

Solvency Certificate issued by any Nationalized Bank issued not earlier than six months from the date of Bid

submission date.( Rs. in Crores)

Installation of Bag loading System

Single completed work of not less than Rs. 2.00 crores or Two completed works of not less than Rs. 1.25 crores each or Three completed works of not less than Rs. 1.0 crores each.

1.25 1.25

1.1 The Bidder should have satisfactorily completed similar works of value stated under column

-2 of above table during the last 15 years ending last day of the month preceding the bid submission month. For this purpose, “cost of work” shall mean Gross value of the completed work including the cost of materials, if any supplied by the Bidder .

Bidders to enclose the following document as evidence of the above experience criteria:

1) copy of work order giving details of scope of work. 2) completion certificate issued by the engineer in charge/owner indicating value

of work completed and date of completion.

The similar works means “job including Engineering, Procurement, Supply and Erection of Equipment’s & Machinery, Electrical & instrument systems” in an Oil, Petrochemical, cement, Fertilizer plant or port facility for Bag loading System / Machinery for loading rake .

1.2 The Bidder should have had average annual financial turnover of value stated in the

table above on similar works during last three years ending 31st

March, 2016. 1.3 The Bidder should be a profit-making firm and should not have made losses during last

three years ending 31st

March, 2016. 1.4 The Bidder should have Liquid Assets/Credit facility or total of both of value not less than

the value stated in table above. To check the positive net worth of bidders, bidders will furnish the copies of audited balance sheet and profit & loss a/c of the company for the last three successive years in support of above.

1.5 Other Desired Information. 1.5.1 The Bidder should have sufficient number of technical hands and administrative

employees for the proper execution of Contract. The Bidder shall submit a list of these employees stating clearly how they would be involved in this work.

1.5.2 Reference list of work orders executed by the Bidder during preceding fifteen (15) years and in hand .

Note :- 1) Bidder shall provide all information related to Pre-qualification criteria along with EMD. 2) Evaluation shall be done on the basis of documents provided along with the bid. 3) Bidders not complying to the Pre-qualification criteria (point No 1) will be disqualified.

Page 14: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

Sr no Description Requirement Remark s

1 Reference of minimum one satisfactorily completed similar works during the last 15 years as per clause 1.1 of PQ criteria

Submit the copies of PO/WO and their completion certificate issued by client as per clause no 1.1 of PQ criteria

2 The bidders should have sufficient experience of executing similar work i.e., Single work costing not less than Rs. 2.00 crores

or Two works costing not less than Rs. 1.25 crores each

or

Three works costing not less than Rs. 1.0 crores each

Submit documentary evidence in support of the same. Copies of the WO’s & job completion certificates issued by the concerned vendor.

3 Last three years Average yearly financial turnover (not less than Rs. 1.25 Crores) as per clause 1.2 of PQ

Submit the copies of Audited P&L and balance sheet for the last three successive years prior to bid submission date.

4 Bidder to confirm that the firm has not made losses in last three years ending 31.03.2016 as per clause 1.3 of PQ

Attach copies of Audited P&L and balance sheet for the last three successive years

5 Solvency (not less than Rs. 1.25 Crores) as per clause no-1.4 of PQ

Submit latest Solvency certificate from Bank not earlier than six months from the bid submission date.

6 Bidder to confirm that the firm has not been black listed by any PSU / Government agency in present or past

Submit an affidavit on non- judicial stamp paper of Rs. 10 duly signed by notary

PRE-QUALIFICATION CRITERIA FOR BAG LOADING SYSTEM

NFVP/Bagging/2016 0

DOCUMENT NO REV

SHEET 2 OF 2

FORMAT FOR PRE-QUALIFICATION CRITERIA

(To be filled and submitted along with the PQ documents duly signed and stamped

Page 15: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 1 of 21

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

INSTRUCTIONS TO BIDDERS

Page 16: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 2 of 21

TABLE OF CONTENTS

SL.NO DESCRIPTION PAGE

1.0 COST OF BIDDING ............................................................................................... 3

2.0 BIDDING DOCUMENTS ....................................................................................... 3

3.0 CLARIFICATION OF BIDDING DOCUMENTS................................................. 3

4.0 AMENDMENT OF BIDDING DOCUMENTS ..................................................... 3

5.0 LANGUAGE OF BID.............................................................................................. 4

6.0 ORIGIN OF GOODS AND SERVICES............................................................... 4

7.0 DOCUMENTS COMPRISING THE BID............................................................. 4

8.0 BID FORM ............................................................................................................... 7

9.0 BID PRICE .............................................................................................................. 7

10.0 DOCUMENTS ESTABLISHING BIDDER’S QUALIFICATIONS .................. 08

11.0 DOCUMENTS ESTABLISHING CONFORMITY OF GOODS TO BIDDING DOCUMENTS………………………………… .......................................... ...09

12.0 BID SECURITY .................................................................................................... 09

13.0 PERIOD OF VALIDITY OF BIDS ...................................................................... 10

14.0 FORMAT OF BID ................................................................................................. 10

15.0 SYSTEM REQUIREMENT FOR E- TENDERING………………………….. 11

16.0 SYSTEM FAILURE............................................................................................... 11

17.0 MODIFICATIONS AND WITHDRAWAL OF BIDS ......................................... 11

18.0 OPENING AND CLARIFICATION OF BIDS.................................................... 12

19.0 PRELIMINARY EXAMINATION......................................................................... 12

20.0 EVALUATION AND COMPARISON OF BIDS ................................................ 12 21.0 TERMS OF PAYMENT ....................................................................................... 17

22.0 ADVANCE PAYMENT AGAINST BANK GUARANTEE................................ 18

23.0 CONTACTING THE OWNER …………………................................................ 19

24.0 RIGHT TO CHOOSE THE ALTERNATIVE BID ............................................. 19

25.0 ACCEPTANCE OF ANY BID AND REJECTION OF ANY OR ALL BIDS .. 19

26.0 NOTIFICATION OF AWARD OF ORDER ....................................................... 19

27.0 SIGNING OF CONTRACT / PURCHASE ORDER ....................................... 20

28.0 SECURITY CUM PERFORMANCE GUARANTEE........................................ 20

29.0 DELIVERY............................................................................................................. 21

30.0 EXCEPTIONS....................................................................................................... 21

31.0 BIDDER’S DATA .................................................................................................. 21

Page 17: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 3 of 21

NFVP/BAGGING/2016 Instructions to Bidders

1.0 COST OF BIDDING

The Bidder shall bear all costs associated with the preparation and submission of the Bid, and National Fertilizers Limited (hereafter referred to as NFL or Owner) will, in no case, is responsible or liable for these costs, regardless of the conduct or outcome of the bidding process.

2.0 BIDDING DOCUMENTS

The Bidder is expected to examine all instructions, forms, terms and conditions in the Bidding Documents. The invitation to Bid together with all its attachments thereto shall be considered to be read, understood and accepted by the Bidder, unless deviations are specifically stated, in seriatim, by the Bidder. Failure to furnish all information required by the Bidding Documents or submission of a Bid not substantially responsive to the Bidding Documents in any respect will be at Bidder’s risk and may result in the rejection of the Bid. However, Alternative Bid from the Bidder can be considered by Owner provided the base Bid is in conformity with the Bidding Documents.

3.0 CLARIFICATION OF BIDDING DOCUMENTS

A prospective Bidder requiring any clarification shall obtain the same from Owner’s office in writing by e-mail / fax or by letter or in person so as to ensure submission of Bid on or before Bid Closing date. Owner will respond in writing to such queries within one week from the receipt of such clarification letter date.

4.0 AMENDMENT OF BIDDING DOCUMENTS

4.1 At any time prior to the Due Date for submission of Bids, the Owner, for any reason, whether at their own initiative or in response to a clarification requested by a prospective Bidder, may modify the Bidding Documents by amendment thereto.

4.2 The amendment will be notified in writing by letter or by e-mail / fax to all prospective

Bidders, who have received the Bidding Documents, and will be binding on them.

4.3 In order to afford prospective Bidders reasonable time in which to take the amendment into account in preparing their Bids, the Owner may, at their discretion, extend the Due Date for the submission of Bids.

4.4 The Owner may, at their discretion, extend the Due Date for the submission of

Bids by amending the Bidding Documents in accordance with articles 4.1 to 4.3 above, in which case all rights and obligations of the Owner and Bidders previously subject to the Due Date will thereafter be subject to the Due Date as extended.

Page 18: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 4 of 21

NFVP/BAGGING/2016 Instructions to Bidders

5.0 LANGUAGE OF BID

5.1 The Bid prepared by the Bidder and al l correspondence/drawings and documents relating to the Bid exchanged between the Bidder and the Owner shall be written in English language only. The Bids submitted in any other language, other than English, shall be summarily rejected. However, any printed literature furnished by Bidder if written in another language shall be accompanied by an English translation.

5.2 The metric measurement system shall be applied for weights and dimensions .

6.0 ORIGIN OF GOODS AND SERVICES

6.1 For purpose of this article ‘origin’ means the place where the Goods are mined, grown or produced or from which the ancillary services are supplied. Goods are produced through manufacturing, processing or substantial and major assembling of components; a commercially recognized product results that is substantially different in basic characteristics in purpose or utility from its components.

6.2 The origin of Goods and Services is distinct from the nationality of the Bidder.

The Bidder shall furnish the following declaration as part of the Bid, ‘I, undersigned,

hereby certify that the offered Goods will be produced in (name of the country/ countries) in the event of an order.

7.0 DOCUMENTS COMPRISING THE BID

7.1 The Bid prepared by the Bidder shall comprise of the following components:

a) Bid form and a price schedule completed in accordance with articles 8 and 9.

Documentary evidence established in accordance with Article 10 that the Bidder is qualified to perform the contract if the Bid is accepted.

c) Documentary evidence established in accordance with Article 11 that the Goods

and ancillary Services to be supplied by the Bidder conform to the Bidding Documents and

d) Bid Security furnished in accordance with Article 12.

7.2 The Bid submitted shall contain two parts.

Part-I Bid Security & PQ Documents Technical & Un-Priced Commercial Bid and Part-II Priced Bid

7.2.1 Part-I - Bid Security

The Bid shall be accompanied with a Bid Security as outlined in clause 12 below.

Page 19: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 5 of 21

NFVP/BAGGING/2016 Instructions to Bidders

7.2.2. Part-I - Technical & Un-Priced Commercial Bid

Part-I should cover the Technical Bid and the Un- Priced Commercial Bid as follows: -

7.2.2.1 Technical Bid shall include/indicate the following to the extent applicable:

a) ITB No. due date:

b) Documentary evidence establishing that the Goods and ancillary Services to be supplied by the Bidder conform to the Bidding Documents.

c) Complete Scope of Supply supported by Drawings, Documents, brochures,

standards, catalogues, etc. as applicable.

d) List of spare parts for: i) Erection and commissioning period ii) Two years’ operation and maintenance

Should a preliminary spare parts list be attached to the Technical specifications, the same shall be quoted as complement to the above.

e) List of special maintenance tools and materials, lubrication schedules,

whenever required.

f) Layout Drawings and s ketches with (approximate) dimensions of equipment and indication of limits of Supply.

g) Bidder shall state the names of the sub-manufacturers proposed for every

equipment /item and materials which is not of his own manufacture and establish that Bidder is duly authorized by the manufacturer to Supply such Goods in India.

h) Bidder should certify that he would give shop Drawings of spare parts and

also main equipment to enable repair and maintenance after installation at site. Reproducible of ‘as built’ Drawings shall be furnished.

i) Nature of maintenance assistance available / offered by Bidder.

j) Nature of erection and commissioning assistance offered by Bidder.

k) Delivery schedule and place of manufacture / delivery.

Page 20: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 6 of 21

NFVP/BAGGING/2016 Instructions to Bidders

l) Manufacturer’s schedule: A brief statement of the activities and time estimation leading to quoted delivery separately for each category of equipment, e.g. procurement of raw materials, fabrication, Inspection, testing schedule etc. justifying the quoted delivery.

m) Reference List of customers using similar equipment supplied by the Bidder

including civil work during last 15 years with complete technical details and Performance status.

n) Complete Data Sheets.

o) Information on shipping weights and cubage (length, width, height) with

special attention to heavy and oversize packages and any other limiting factor which requires special attention during transportation.

p) Deviation from Owner’s specifications and Technical conditions, (if any).

q) Bidder shall submit the documents regarding PAN, Income Tax Clearance Certificates, Service Tax registration, PF registration etc.

7.2.2.2 Un-Priced Commercial Bid shall indicate the following

a) Terms of payment

b) Confirmation, that firm prices have been quoted.

c) Port of shipment/station of dispatch.

d) Statement that all taxes levied by the exporting country are included (In case of Foreign Bids).

e) Acceptance of General Conditions of Contract / Purchase /Contract or

deviations/exceptions, if any, in seriatim.

f) Terms and conditions for deputing engineers and technicians.

g) Confirmation, that validity of Bid is for 180 days from Bid closure date.

h) Indian bidder shall quote the delivery period for both Ex FOT works as well as FOT site destination basis by road only.

i) Name of bankers and important terms of letter of credit in case of foreign bidders.

Page 21: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 7 of 21

NFVP/Bagging/2016

j) Summary of terms and conditions as per Format C-2

k) Statement regarding expiry date of labour contracts at the Bidder’s manufacturing works.

l) Certified Financial Statements / Annual Accounts for the last 3 (three) years

and organization chart.

m) Country of origin of Goods and Services

n) Copy of the Priced Bid with prices blanked and bid form.

o) Completion period from the date of issuance of Notification of Award by Fax /

Letter of Intent.

p) Any other information required as per commercial part of ITB.

7.2.3 Part-II - Priced Bid

Part-II should cover the Bid price and other related costs in accordance with Article 9 and appropriate Price schedule.

8.0 BID FORM

Bidder shall complete the Bid form and the appropriate price schedule furnished in the Bidding Documents as per the attachment IV, indicating for the Goods to be supplied, a brief description of the Goods, their country of origin, quantity and prices.

9.0 BID PRICE

9.1 The Bidders shall complete the appropriate Price Schedule Form as attached to these Documents. The price schedule is bifurcated into two parts viz (1) Supply of Materials and ( 2) Services and two separate orders shall be placed for Supply and Services. However, the bidder shall be responsible for complete Supply , erection , commissioning till handing over of all items covered under this enquiry.

9.2 Indian Bidder

9.3.1 The Indian Bidders shall quote the price FOT WORKS for the Indian Shop, duly packed, and on F OT Site basis as per price schedule showing separately 1) Supply of Materials and ( 2) Services. Such prices shall include duties and taxes paid or payable on raw materials and components incorporated or to be incorporated in the Goods offered.

9.3.2 Indian Bidder must quote separately his price and time for transportation of the materials to Vijaipur site respectively.

Page 22: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 8 of 21

NFVP/Bagging/2016

9.4 The following information wherever applicable is to be submitted in a separate

schedule.

a) Indian taxes and duties such as excise, sales tax etc. for the Goods offered by Indian Bidders.

b) Packing, Forwarding and Loading charges should be included in FOT Ex-

works price for Indian Bidders.

c) Item wise prices for recommended spare parts separately for Two years’ Operation and Maintenance Spares . SPARES FOR COMMISSIONING ARE INCLUDED IN THE VENDOR’S SCOPE .

d) Agency commission, if any, is included in the quoted price.

e) Per Diem rates for deputing Engineers and Technicians.

f) Fee / charges payable for Inspection by LRIS/ BVIS/ TUV/ PDIL as third party

Inspection agency as required by Owner.

g) Bidder’s cost of site assembly, pre-commissioning and commissioning until acceptance as per Technical specifications wherever applicable.

9.5 a. The breakup of price components indicated by the Bidder in the price schedule

will be solely for the purpose of facilitating the comparison of Bids by the Owner and will not in any way limit the Owner’s right to contract on different terms.

b. Vendors shall provide the details of imported items and value of imported

components in their bids.

9.6 Fixed Price

9.6.1 Prices quoted by the Bidder shall be fixed and not subject to any escalation whatsoever during the period of Bid validity and execution of the Contract / Purchase Order. A Bid submitted with an adjustable price may be treated as non- responsive and rejected.

9.6.2 Prices shall be written in both Words and figures. In the event of difference, the

prices in words shall be valid and binding. Unit prices shall be considered correct in the event of any discrepancy with regard to the total price.

10.0 DOCUMENTS ESTABLISHING BIDDER’S QUALIFICATIONS

10.1 Pursuant to Article 7 the Bidder shall furnish, as part of the Bid, Documents establishing the Bidder’s qualifications to perform the contract, if the Bid is accepted.

10.2 The documentary evidence of the Bidder’s qualifications to perform the contract,

if the Bid is accepted, shall establish to the Owner’s satisfaction.

Page 23: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 9 of 21

NFVP/Bagging/2016

a) that, in case of a Bidder offering to Supply Goods under the order which

Goods the Bidders does not manufacture or otherwise produce, the Bidder has been duly authorized by the Goods’ manufacturer or producer to Supply the Goods in Owner’s country, India.

b) that, the Bidder has the financial capacity necessary to perform the contract

in the form of a Certificate from their Bankers.

11.0 DOCUMENTS ESTABLISHING CONFORMITY OF GOODS TO BIDDING

DOCUMENTS

11.1 Pursuant to Article 7, the Bidder shall furnish, as part of the Bid, Documents establishing conformity to the Bidding Documents of all Goods and Services which the Bidder proposes to Supply under the conditions of Contract / Purchase

11.2 The documentary evidence of the conformity of Goods and Services to the Bidding

Documents may be in the form of literature, Drawings and Data. Bidder shall furnish: a) Detailed description of the essential Technical and Performance

characteristics of the Goods.

b) A list, giving full particulars including available sources and current prices of all spare parts, special tools etc., necessary for the proper and continuous functioning of the Goods for a period of two years following commencement of the use of Goods by the Owner; and

c) Clause-by-clause comments on the Owner’s Technical specifications

demonstrating the substantial responsiveness of the Goods and Services to those specifications or a statement of exceptions to the provisions of the Technical specifications.

11.3 For purpose of the comments to be furnished pursuant to article 11.2 (c) above, the Bidder shall note that standards for workmanship, material and equipment and reference to brand names or catalogue numbers, designated by the Owner in his Technical specifications are intended to be descriptive only and not restrictive.

The Bidder may substitute alternative standards, brand names and/ or catalogue numbers in his Bid provided that he demonstrates to the satisfaction of Owner that the substitutions are substantially equivalent or superior to those designated in the Technical specifications.

12.0 BID SECURITY

12.1 The Bidder shall furnish, as part of his Bid, one Bid Security in the form of a Bank Guarantee, issued by a Nationalized Indian Bank. The Bid Security shall be

in favour of the National Fertilizers Limited. The amount shall be as indicated in

the body of ITB. The Bank Guarantee shall be in the form, which is attached at

Page 24: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 10 of 21

NFVP/Bagging/2016

Attachment V. A Bid Security can be in the form of a demand draft in favour of National Fertilizers Limited payable at Vijaipur.

12.2 Any Bid other than that mentioned in article above not accompanied with the Bid

Security may be rejected by the Owner as non-responsive.

12.3 The Bid securities will be returned to the unsuccessful Bidders on acceptance of

one of the invited Bids or when the Bid is cancelled by Owner.

12.4 The successful Bidder’s Security will be di charged upon the Bidder accepting the Contract / Purchase Order and furnishing the Performance Security required by each Contract / Purchase Order.

12.5 A Bid Security may be forfeited without prejudice to any other right or remedy of

Contract / Purchaser

a) If a Bidder withdraws his Bid during the period of Bid validity specified by the Bidder on the Bid forms; or

b) In the case of successful Bidder, if the Bidder fails:

i) To sign the Contract / Purchase Order in accordance with article 27,

or ii) To furnish Performance Security in accordance with article 28

13.0 PERIOD OF VALIDITY OF BIDS

13.1 Bids shall be kept valid for at least 180 days from the Bid closure date. A Bid valid for shorter period may be rejected by the Owner as non-responsive.

13.2 In exceptional circumstances, the Owner may solicit the Bidder’s consent to an extension of the period of validity. The request and the responses thereto shall be made in writing or by fax / email. A Bidder having been granted the request, will neither be required nor permitted to alter the Bid.

14.0 FORMAT OF BID

The Vijaipur Unit of National Fertilizers Ltd. has decided to line up the contract

through e-tendering mode under TWO PART BID system. The NIT will be posted on

our E-Tender Portal https://nfl.etenders.in from where the registered Tenderer(s) /

Bidder(s)will be able to download the tender documents for participation in the tender and

submit their bids online. The tender submission, tender closing and opening will be done

electronically and online.

15.0 SYSTEM REQUIREMENT FOR E- TENDERING

i. Computer with minimum i3 Processor or equivalent, having 1 GB RAM and 80

GB HDD Capacity (Minimum)

Page 25: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 11 of 21

NFVP/Bagging/2016

ii. Operating System Required: - Window 7 Ultimate / Professional / Enterprises / Ultimate - Window XP (Service Pack 3 and Above) iii. Internet Speed of 512 kbps or above iv. Browsers: Preferred Browsers Mozilla Firefox or Google Chrome v. Adobe Acrobat Profession 6 or above for digitally signing the Document vi. Java 7 Update 67 (Updated 32 bit Java version & above) – Essential vii. Java Settings - Download and Install Java 7 Update 67 available under ‘System Requirement’ Tab on the home page of https://nfl.etenders.in - After installation, open Control Panel and Click on Java Icon - Click ‘Security’ Tap on the Java Configuration Panel and bring the Security Level to Medium. Click on Edit Site List Tab and add the URL name https://nfl.etenders.in and click ‘Add’ Tab and ‘Ok’ Tab - Open the Java Control Panel and Click the Tab ‘Advanced’ - Select ‘Show Console’ under Java Console - Select ‘Always Allow’ under JNLP File/MIME Association - Select ‘Disable Verification (Not recommended)’ under Mixed Code (Sandboxed vs. Trusted) Security Verification viii. Digital Certificate Once the above pre−requisites are configured / available in the system, users can click on https://nfl.etenders.in and the e-Tender portal will be available

16.0 SYSTEM FAILURE

NFL shall make all out efforts to rectify the problems leading to system failure during the live tendering. However in case the system could not be restored within a reasonable time period as deemed fit by NFL, the following measures shall be taken under such an eventuality:

1 Tender is prepared and released but

Tenderer(s) / Bidder(s) are not able

to submit their bids.

The due date of closing / opening shall be

extended suitably.

2 Bids have been submitted but the

same cannot be opened by NFL.

The due date of opening shall be extended

suitably.

17.0 MODIFICATIONS AND WITHDRAWAL OF BIDS

17.1 No amendment to the tender would be admissible under any circumstances, whatsoever after the closing date and time of receipt of tenders.

17.2 A withdrawal notice may also be sent by e-mail / fax, but it has to be followed by a

signed confirmation copy, post marked not later than the Due Date for submission of Bids.

Page 26: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 12 of 21

NFVP/Bagging/2016

17.3 No Bid shall be withdrawn in the interval between the Due Date for submission of Bids and the expiration of the period of Bid validity specified by the Bidder on the Bid form.

18.0 OPENING AND CLARIFICATION OF BIDS

18.1 The Bids will be opened online on the date and time stipulated in the ITB. 18.2 To assist in the examination, evaluation and comparison of Bids, the Owner may, at

their discretion, ask the Bidder for any clarification of Bid.

19.0 PRELIMINARY EXAMINATION

19.1 The Owner will examine the Bids to determine whether they are complete, whether any computational errors have been made, whether the required Bid securities have been furnished, whether the Documents have been properly signed, whether validity of the Bid is in conformity with the ITB and whether the Bids are generally in order.

19.2 The prices should be written both in words and figures and that in case of any

deviation, prices in words shall be valid and binding. In case of any error in totals indicated by Bidder, the unit prices shall be considered valid and binding on Bidder.

19.3 Prior to the detailed evaluation, the Owner will determine the substantial

responsiveness of each Bid with reference to the Bidding Documents. For the purpose of this article a substantially responsive Bid is one which conforms to all the terms and conditions of the Bidding Documents without material deviations. The

Owner’s/Consultant’s determination of a Bid’s responsiveness is to be based on the

contents of the Bid itself without recourse to extrinsic evidence.

19.4 A Bid determined as substantially non-responsive is liable to be rejected by the Owner and may not subsequently be made responsive by the Bidder by correction of the non-conformity.

19.5 The Owner may waive any minor informality or non-conformity or irregularity in a

Bid, which does not in their opinion, constitute a material deviation.

19.6 After a preliminary screening based on bot h Technical and Un-Priced Commercial evaluation, Bidders will be short-listed. In the event that any clarifications are required, then such clarifications shall be obtained from such short-listed Bidders only. Based on the clarifications, the Technically acceptable Bidders may be permitted to submit a revised price or add on price on their original quoted price, if any, (in a sealed cover) on a prefixed date and time which shall be communicated to the Bidder.

20.0 EVALUATION AND COMPARISON OF BIDS

20.1 The Owner will evaluate and compare only those Bids, which are determined to be substantially responsive pursuant to Article 19.

Page 27: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 13 of 21

NFVP/Bagging/2016

20.2 The Owner’s evaluation of a Bid shall be done on the basis of Cost as completed at Vijaipur and take into account the following:

i Base price of equipment, materials, civil work and erection & commissioning work.

ii The cost of spare parts for erection & commissioning and recommended

maintenance spares for 2-years trouble free services. This cost will be added to the Equipment cost.

iii Interest Calculation against Mobilization Advance (a) Interest calculation against Mobilization Advance.

Mobilization advance not exceeding 10% contract value may be considered for Bidders. Interest shall be calculated on mobilization advance @SBI PLR+1% (presently SBI PLR is 14.05%),per Annum

Sn Payment Terms Period of Loading . 1. Advance against LOI/PO Full completion period + 30 days

iv. Inland Transportation Charges

Inland transportation charges shall be calculated as - upto 400 K ms @1% EXW Price; for 401 to 800 k ms-@2% EXW Price & above 800 k ms @3% EXW Price for Indian and CIF price for Foreign bidders.

All Indian parties are requested to quote EXW Price and freight charges up to Vijaipur Site, compulsorily. If all the parties have given freight charges up to site the same shall be considered for evaluation. However, if only some parties have given freight charges, NFL reserves the right to load for such parties who have not quoted freight charges with prevailing freight charges. NFL’s decision on this regard shall be final and binding on these Bidders.

v Inland Insurance

The Inland Insurance shall be calculated @0.05% .

vii Custom Duty

All formalities with custom authorities including Contract Registration, finalization and reconciliation shall be completed by the Contractor at their own cost.

vii Taxes and Duties

As quoted by Bidders, otherwise as applicable.

Page 28: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 14 of 21

NFVP/Bagging/2016

viii Loading On Account Of Higher Completion Period

(a) In the event of quoted completion time for project being more than the stipulated time as per clause 5.0 of the technical specs, the quoted price for the project shall be loaded @ Rs 920000 (nine lac twenty thousand four hundred and forty nine)/ month for the difference in quoted and stipulated time. It may be noted that no benefit shall be granted in the event quoted completion time for project being less than the stipulated time as per clause 5.0 of the technical specs.

(b) The loading as mentioned at (a) shall not be applied in case the quoted delivery does not meet the project requirement and the bid shall not be qualified.

ix Calculation of Effective Completion Period

The enquiry provides the delivery to be counted from LOI. Wherever the Bidder does not agree to the above condition following criteria will be used for calculating the effective completion period for evaluation purpose:

Delivery basis as per bidder offer

Loading in months to be added to quoted delivery

From receipt of PO One month

From drawing approval Two months or time indicated for Submission of approval, whichever Is more.

On receipt of Letter of Credit Two months

When the Bidders ask for grace period for applicability of damages, the same shall be added to the quoted delivery period. The completion period computed on the above basis shall be taken as completion period for each Bidder for the purpose of evaluation.

x Price Reduction Due To Delay in completion If deviation is noted in the quoted damages, the following loading criterion shall be adopted:

Quoted damages Loading Criterion

-------------------- --------------------- 0.50% per week subject to a ceiling of No loading 5.00% of total order value (as per enquiry)

Reduction accepted on undelivered value 2.50% loading on total instead of total order value (as per enquiry) installed price

Non acceptance of damages 5.00% loading on total

Installed price

Liquidated Damages accepted in place of Price Reduction Clause 5.00% loading on total installed

Price

Page 29: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 15 of 21

NFVP/Bagging/2016

xi Loading on account of discrepant/variation in the Warranty period

Enquiry calls for Warranty period of 12 m months from the date of commissioning. Wherever the Bidder quoted reduced Warranty period, the following loading criterion shall be adopted:

Warranty Period Loading as % of total contract Price

-------------------- --------------------------------------------- Less than 12 months from 10% x (12- quoted Warranty in months)/ 12 Date of commissioning

In case bidder quotes lower % of Performance Bank Guarantee (PBG) and the same is acceptable, warranty period remaining same, price shall be loaded as follows:

PBG amount loading as % of total contract Price.

Less than 10% (10 – quoted percentage of total contract Price)

If the sum of loading under 22.2 xiii

is more than 10% of total landed Price, then the loading shall be limited to 10%

xii. Any clarification / confirmation having negative price implications received from Bidder after price Bid opening shall be considered only for ordering purposes and not for evaluation purposes. However, clarification/confirmations having additional price implication shall be considered for evaluation purpose.

xiii Other Charges

Other charges, if any, such as documentation charges for providing extra sets of Drawings/ reproducible etc. shall be considered as under:

In case of item wise evaluation, the documentation charges quoted by the Bidder, will be loaded on each item. In other cases, it will be loaded on total cost.

xiv Third Party Inspection Charges

Wherever Bidders have not indicated third party Inspection charges, highest third party Inspection charges quoted by other Bidder shall be loaded for comparison purpose.

xv No Mod-vat credit will be considered for evaluation purposes but excise registration will be insisted upon.

xvi Contract / Purchase pr eference for products and s ervices of Central Public Sector Undertakings enterprises will be allowed as per Government Circular No DPE/13(12)/2003-Fin-Vol.II dated 18/07/2005 for Contract / Purchase value of Rs 5.0 Crore but not exceeding 100.00 crore as and if applicable on the date of bid opening. However this Contract / Purchase preference to Public Enterprises shall be subjected to penalties for cost overrun etc.

xvii Vendor should submit their bid strictly as per Price Bid format. NFL reserves the right to load the offer of the parties who have not indicated the details of component

Page 30: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 16 of 21

NFVP/Bagging/2016

mentioned in price bid format with the highest rate quoted by other bidder for the particular component.

xviii Evaluation of bid shall be done on composite basis i.e. Supply portion plus Erection and Commissioning portion.

20.3 The Owner’s evaluation shall also take into account the following:

1. Bidder's experience in manufacturing similar equipment for similar duties and whether such equipment are in service and operating satisfactorily for a minimum period to two years in plant installation of any project completed within the previous fifteen years at designed conditions. Bids not fulfilling this requirement may not be considered technically acceptable.

2. Maintainability of supplied items and availability of maintenance

assistance/ support.

3. Bidder's financial stability.

4. The availability of spares parts, components and after-sales service .

5. Confirmation of the sub-Bidders that for future Supply of spare parts for bought out items, the sub-Bidder shall Supply such spare parts directly to the owner, if so requested.

6. Technical quality (Efficiency, Reliability and Suitability).

7. Expiry date of Bidder's wage agreement with their worker's unions.

8. Bidder's quoting firm prices will be given preference over Bidder's prices subject to

escalation.

9. Guarantee delivery period as stipulated in the invitation to Bid.

10. Terms of payment.

11. Cost of spare parts for 2-year trouble free service.

12. Cost of Bidder assistance in erection and commissioning.

13. Cost of expediting and Inspection.

14. Bidders Guarantee (nature of warranties and Warranty period).

15. Compliance with Bid terms in respect of specifications, Drawings and

Data Sheets.

16. Willingness to give shop Drawings of spare parts and main equipment.

17. Bidder's from Indian PSE's (Public Sector Enterprises) or Joint venture with PSE's.

Page 31: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 17 of 21

NFVP/Bagging/2016

20.4 Following tenders are liable to summary rejection:

1. Tenders that do not fulfill all or any of the conditions in Eligibility Criteria or are incomplete

in any respect.

2. Tenders which contain uncalled for remarks or any alternative/additional conditions;

3. Tenders submitted by tenderers who resort to canvassing.

4. NFL reserves the right to blacklist such parties for participating in any of the present or

future biddings for a period of two years 2 years , if the bidder with the malafide intention

of committing fraud tries to hamper or delay the bidding process on the basis of

unsubstantiated / baseless complaints or publicity .

5. Tenders where prices have not been quoted strictly as per enclosed Schedule of Rates.

6. Once the tenders are opened, no correspondence offering rebates etc will be accepted

by the Company under any circumstances, unless asked for by NFL

7. The bidder must ensure that tender documents/offer has been signed by an

appropriate/authorized representative of the Company.

21.0 TERMS OF PAYMENT

21.1 The payment to Contractor will be made as per terms of payment set forth herein. No payments shall become due and payable before :

a) Acceptance of Letter of Award. b) Submission of Bank Guarantee in Attachment V for interest bearing advance

payment of maximum up to 10%, if agreed by owner of the total order price plus interest as applicable and acceptance of the such Bank Guarantee by the OWNER.

c) Submission of Security cum Performance Bank Guarantee for 10% of the Total Contract Price in Attachment V and acceptance of the same by Owner.

d) Signing of Contract Agreement e) Signed commercial invoices

Payment shall be made within 30 day s of receipt of a l l the above

Documents, physical verification & certification by the owner.

21.2 Mobilization advance not exceeding 10% of contract amount may be considered for Indian Bidders with interest at a flat rate of SBI PLR+1% (presently SBI PLR is 14.05%),per annum. 21.2.1 Delay in payment of advance for any reasons shall not increase the agreed delivery

period. 21.3 Progressive payment against milestone shall be considered on the following basis.

a) 85 % after adjustment of advance pro-rata payment if any against

completion of following activities after physical verification & certification by Owner .

Page 32: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 18 of 21

NFVP/Bagging/2016

i) License & Basic Design Fees : 85% after adjustment of advance if any on submission of Basic Engineering Package.

(ii) Civil Work : 85% after adjustment of advance if any on pro-rata monthly instalments linked with progress of work against certification of Owner as per the billing schedule submitted by the Contractor and approved by the Owner.

(iii) Supply of Equipment’s, machinery, electrical, instruments, piping,. Proprietary supplies, commissioning spares etc. including Taxes and Duties, Transportation to site, port handling and clearance charges: 85% after adjustment of advance if any on pro-rata basis on receipt of items at site against physical verification & certification by Owner .

(iv) Spares including taxes & duties, transportation to site, port handling & clearance charges : 85 % after adjustment of advance if any on physical handing over of spares and acceptance of the same by owner.

(v) Insurance Charges: 85% after adjustment of advance if any against the documentary evidence in support of taking insurance cover and on proof of instalment payment.

b) MECHANICAL COMPLETION :

5 % of Total order Price on acceptance & issue of Mechanical Completion Certificate for all the thirteen machines. [Mech completion shall mean the checking and testing of all

equipment (Mech., Electrical, Instrument) and construction to confirm that the installation is in accordance with drawings and specifications and ready for service in a safe manner and in compliance with project requirements(clause 1.5 of Attachment-III]

c) FINAL PAYMENT :

10% of the Total order Price on successful completion of guarantee tests as specified in the contract and within 60 days of FINAL ACCEPTANCE of the plants & facilities by the Owner and shall be released subject to fulfilment of conditions of ITB. However if the project is shelved off after modification in first two stations the

payment shall be made as per clause 23.1 l of the Attachment-II (general conditions).

21.4 All Bank charges of Contractor / Supplier’s Bankers shall be to the Contractor /

Supplier’s account.

21.5 Dispatches after due delivery date with pre-determined damages as per provisions of article 23.1 of the General Conditions of Contract / Purchase shall be made only after written approval of Owner which may be accorded at Owner’s discretion in exercise of options available under aforesaid article 23 of the General Conditions of Contract / Purchase.

22.0 ADVANCE PAYMENT AGAINST BANK GUARANTEE

22.1 In the event that the terms of payments in the Contract / Purchase Order stipulate payment of advance, Bidder shall furnish a Bank Guarantee on stamp paper of

Page 33: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 19 of 21

NFVP/Bagging/2016

Rs.100/- (Rs. One hundred only) for the amount to be paid in advance, as per pro- forma enclosed issued by or counter-guaranteed by any nationalized Bank. Such advances shall bear interest at a f lat rate of @SBI PLR+1% (presently SBI PLR is14.05%), per annum. The charges for confirmation, if any, will be to the Contractor / Supplier’s account. The Bank Guarantees shall have a validity period upto 180 days from the date of delivery stated in the Contract / Purchase Order. The validity will be subject to extension should delays in delivery occur.

23.0 CONTACTING THE OWNER

Any effort by a Bidder to influence to Owner in the Owner’s Bid evaluation, Bid comparison or Contract / Purchase order award decisions may result in the rejection of the Bidder’s Bid.

24.0 RIGHT TO CHOOSE THE ALTERNATIVE BID

24.1 Owner shall have the right to choose the Alternative Bid for award of order, and the

decision taken by Owner shall be final and binding on Bidder.

24.2 The Owner will determine to their satisfaction whether the Bidder selected is qualified in their opinion to satisfactorily perform the contract.

24.3 The determination will take into account the Bidder’s financial, Technical and production capabilities. It will also be based on an examination of the documentary evidence submitted by the Bidder.

24.4 An affirmative determination will be a prerequisite for award of order to the Bidder. A

negative determination will result in rejection of the Bidder’s Bid.

24.5 Subject to article 20, the Owner will award the order to the successful Bidder, whose

Bid has been determined to be substantially most responsive and has been determined as the lowest evaluated Bid after the final negotiations held with (if deemed necessary by Owner) the most competitive Bidders.

25.0 ACCEPTANCE OF ANY BID AND REJECTION OF ANY OR ALL BIDS

Notwithstanding anything to the contrary contained herein, the Owner reserve the right to accept or reject any Bid, and to annul the Bidding process and reject all Bids, at any time prior to award of Contract / Purchase Order, without thereby incurring any liability to the affected Bidder, or Bidders, or of any obligations to inform the affected Bidder, or Bidders of the grounds for the Owner’s action.

26.0 NOTIFICATION OF AWARD OF ORDER

26.1 Prior to the expiration of the period of Bid validity or extension thereof, the Owner will notify the successful Bidder by fax to be confirmed by post copy that the Bid has been accepted and the fax above will constitute formation of the Contract / Purchase Order. The Notification of award shall be done separately for Supply and Services.

Page 34: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 20 of 21

NFVP/Bagging/2016

26.2 The successful Bidder on receipt of “Notification of Award of Order” which may be in

the form of Letter of Intent shall convey his acceptance by return fax and to be confirmed by letter within 10 days.

26.3 Completion period / schedule shall be counted from the date of transmission of

“Notification of Award of Order”.

27.0 SIGNING OF CONTRACT / PURCHASE ORDER

27.1 Owner will send three copies of the Contract / Purchase Order to the successful Bidder who, within 10 days of the receipt of the same, shall sign and return two copies to the Owner as a token of his unconditional acceptance failing which Owner has the right to cancel / withdraw the Contract / Purchase Order and forfeit the Bid Security.

28.0 SECURITY CUM PERFORMANCE GUARANTEE

28.1 Within 30 days of Notification of Award of Order from the Owner, the successful Bidder shall furnish the Security cum Performance Guarantee in the form of Bank Guarantee issued or counter Guaranteed by any Nationalized Bank in accordance with the general conditions of Contract / Purchase or any other form acceptable to the owner.

28.2 The Security cum Performance Guarantee in the form of Bank Guarantee shall be

for an amount equal to 10% of the Contract / Purchase Order value and s hall be valid for the duration of the Contract / Purchase Order delivery period plus any defects-liability period, and s hall be towards faithful Performance of the Contract / Purchase Order obligations by the Contractor / Supplier, and to fulfil all the warranties and Guarantees. The Bank Guarantee shall be valid to cover delivery period plus 12 months from the date of commissioning with a claim period of six ( 6) months over and above the validity The Bank Guarantee shall be issued or counter Guaranteed by a Nationalized Bank. The charges for confirmation, if any, will be to Contractor / Supplier’s account. This Bank Guarantee shall be ex tended for a further period as stated at Article 9.4 of the General Conditions of Contract / Purchase to cover the defects-liability period.

28.3 Failure of the successful Bidder to comply with the requirements of article 27 or

article 28 shall constitute sufficient grounds for the annulment of the award in which event the Owner may make the award to the other responsive Bidder or call for new Bids, without prejudice to Owner’s/Consultant’s right and remedies as set forth in

article 25 of general conditions of Contract / Purchase. 28.4 The non-judicial paper shall have to be Purchased in the name of the Bankers

executing the Bank Guarantee and not in the name of the Bidders.

Page 35: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INSTRUCTION TO BIDDERS

ATTACHMENT- I

NFVP/BAGGING/2016 0

REV

Page 21 of 21

NFVP/Bagging/2016

29.0 DELIVERY

29.1 The Bidders are required to quote their best delivery period for equipment under this enquiry.

29.2 Delays shall attract price reduction which shall be predetermined and mutually

agreed for such delay. The application of such clause shall be notified to Contractor / Supplier.

30.0 EXCEPTIONS

No exceptions are to be taken by the Bidder to the Bid Documents including Technical specifications, general and special conditions of Contract / Purchase. However, unavoidable exceptions, if any, both Technical and commercial, are required to be listed and submitted separately, as per Attachment VI including the applicable cost and time in the priced commercial Bid. Exceptions should be clearly stated in the Un-Priced Commercial Bid with a statement that cost implications for withdrawal have been given in the priced commercial Bid. Time implications of withdrawal of exceptions should be given in the Un-Priced Commercial Bid.

Unless the exceptions are listed separately as explained above, the Owner will assume that the Bidder is complying with the Bid Documents, and no cognizance shall be given to any exceptions stated anywhere else in the Bidder’s offer.

31.0 Bidder’s Data

31.1 In addition to compilation of Documents/ Drawings/ Data required in the Technical specifications, Bidder’s Data, as noted on the attached Bidder Data requirements form, are also to be furnished by the dates noted in the applicable column. Bidder is to comply with all “Instructions” detailed in this form. All Bidder Data are to be submitted to Owner / Consultant. Bidder Data shall be furnished in electronic form also.

31.2 Bidder shall incorporate Contract / Purchase Order number, requisition number(s),

item number(s), item(s) description and tag number(s) on al l Bidder Data as called for on the attached form and any other Data required by applicable specifications pertaining to the Contract / Purchase Order.

31.3 The reproducible Drawings furnished by Bidder must be of top quality from which legible and clearly defined prints can be obtained. Drawings not meeting this requirement will be returned until acceptable reproducible are received. Installation, operation and maintenance details, when called for on the attached Bidder Data requirements form, shall include instruction books, dimensional / sectional Drawings, recommended spare parts list and interchangeability, lubricant recommendation and complete parts list with detailed information for each part.

Page 36: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 1 of 31

NFVP/BAGGING/2016 General Conditions

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

GENERAL CONDITIONS

Page 37: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 2 of 31

NFVP/BAGGING/2016 General Conditions

ATTACHMENT-II GENERAL CONDITIONS OF CONTRACT

1.0 DEFINITIONS

In this general condition of CONTRACT the following terms shall be interpreted as indicated.

1.1 THE CONTRACT: shall means the agreement entered into between Owner and the

SUPPLIER, as recorded in the CONTRACT form, signed by the parties, including all Attachments and Annexures thereto and all documents incorporated by reference therein together with any subsequent modifications thereof in writing.

1.2 THE CONTRACT PRICE: shall mean the price payable to the SUPPLIER under

CONTRACT for the full and proper performance of his CONTRACTUAL obligations.

1.3 THE GOODS: shall means all of the equipment, machinery, and/or other materials which the SUPPLIER is required to supply to the owner under the CONTRACT.

1.4 SERVICES: shall means supervision to installation, commissioning, provision of

technical assistance, training and other such obligations of the SUPPLIER covered under the CONTRACT.

1.5 OWNER: shall mean NATIONAL F ERTILISER LI MITED having their corporate office

at A-11, Sector-24, Distt Gautam Budh Nagar, Noida, India and their registered office at Scope complex, Core III, 7 I nstitutional Area, Lodhi Road, Scope complex, New Delhi and shall include all their legal representatives, successors and assignees.

1.6 SUPPLIER OR VENDOR: shall mean the individual or firm supplying the goods and

services under the CONTRACT/ purchase order.

1.7 SUB CONTRACT: shall mean order placed by the SUPPLIER, for any portion of the order or work, after necessary consent of Owner.

1.8 SUB CONTRACTOR: shall mean any person or persons or firm or their legal

representatives, successors, assignees to whom part of order has been sub-let by the SUPPLIER.

1.9 DELIVERY: if not specifically mentioned earlier or elsewhere, the date shown on the bill

of lading, airway bill or railway receipt or lorry receipt(for Indian bidders only), as the case may be shall be deemed to be the date of dispatch along with the invoices together with all other documentation as shall be specified in the conditions of the CONTRACT/ purchase order. In case of FOR destination, CONTRACT/ purchase order delivery date shall be the date of receipt of equipment at site.

1.10 SITE: Shall mean the plant location at Vijaipur, District Guna (Madhya Pradesh) India

for which this CONTRACT has been issued and where the equipment shall be erected..

1.11 BATTERY LIMIT: shall mean the area within which plant/equipment are to be located.

Page 38: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 3 of 31

NFVP/BAGGING/2016 General Conditions

1.12 EQUIPMENT: Shall mean and include any equipment, machinery, electrical, instruments, materials, stores, good to be provided for under this CONTRACT and amendments thereto.

1.13 PLANT: Shall mean entire assembly of the equipment within specified battery limit.

1.14 DRAWINGS: Shall mean and include engineering drawings, sketches showing plants,

sections and elevations related to the CONTRACT together with modifications and/or revisions thereto.

1.15 SPECIFICATIONS: Shall mean and include schedules, detailed description, and

statement of technical data, performance characteristics, standards (Indian as well as international) as applicable and specified in the CONTRACT.

1.16 ENGINEER: Shall mean the engineer or executive-in-charge at site nominated by

Owner.

1.17 INSPECTOR: Shall mean any person or outside agency nominated or agreed by Owner to inspect equipment stage wise as well as final inspection, before dispatch, at Supplier’s work and on receipt at site as per the terms of the CONTRACT.

1.18 TESTS: Shall mean such process or processes to be carried out by the SUPPLIER as

are prescribed in the CONTRACT or considered necessary by Owner or their representatives in order to ascertain quality, workmanship, performance and efficiency of equipment or part thereof.

1.19 APPROVAL: Shall mean and include the written consent, either manuscript, type-written

or printed statement, under signature or seal, as the case may be, of the Owner or their authorized representative on documents, drawings or other particulars in relation to the CONTRACT.

1.20 FOB, C&F, CIF, FAS, FOR, FOT & EX-WORKS: Shall mean the terms as defined in the

international rules for the interpretation of trade terms 2000 ( Incoterms) with the latest modifications incorporated. The terms FOR and F OT are exclusively meant for Indian bidders only.

1.21 TERMS AND EXPRESSIONS not herein defined shall have the same meaning as are

assigned to them in the Indian sale of goods act, 1930, failing that in the Indian CONTRACT act (1872) and failing that in the General Clauses Act (1897) including amendments thereof, if any.

1.22 COMMENCEMENT DATE OF CONTRACT: Shall mean the date on which the letter of

intent is issued

1.23 COMPLETION PERIOD: Shall mean the period from the commencement date of CONTRACT to mechanical completion, erection and commissioning of all the equipment’s under the CONTRACT.

1.24 MECHANICAL COMPLETION: Shall men readiness to take feed except on minor

respect, which does not prevent trial runs with all necessary statutory approvals duly obtained as may be required, for the purpose of carrying out the trial runs.

Page 39: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 4 of 31

NFVP/BAGGING/2016 General Conditions

1.25 TRIAL RUN AND COMMISSIONING: Shall mean complete erection, testing, commissioning and securing of guarantees for defect free operation.

1.26 PROJECT COMPLETION: Shall mean the readiness of the facilities in all respect for

commissioning at its rated capacity after successful trial run. 1.27 MONTH: Shall mean a calendar month.

2.0 SCOPE OF CONTRACT

2.1 Scope of the CONTRACT shall be as defined in the CONTRACT specifications,

drawings and annexure and Attachments thereto. 2.2 Completeness of the equipment shall be the responsibility of the SUPPLIER. An y

equipment, fittings and accessories which may not be specifically mentioned in the specifications or drawings but which are usual or necessary for the satisfactory functioning of the equipment (successful operation and functioning of the equipment being SUPPLIER's responsibility) shall be provided by the SUPPLIER without any extra cost.

2.3 The SUPPLIER shall follow the best modern practices in the manufacture of high quality

equipment notwithstanding any omission in the specifications. The true intent and meaning of these documents is that SUPPLIER shall in all respects design, engineer, and manufacture and supply the equipment in a thorough workman like manner and supply the same in prescribed time to the entire satisfaction of Owner.

2.4 The SUPPLIER shall furnish six(06) copies in English language of technical documents,

final drawings, preservation instructions, operation and maintenance manuals, test certificates, spare parts catalogues. Before dispatch under confirmation to the Owner reproducible for final drawings shall also be furnished along with above 06 copies along with two Soft copy in CD

2.5 The documents once submitted by the SUPPLIER shall be firm and final. The SUPPLIER shall be responsible for any loss to the Owner consequent to furnishing of the incorrect data/drawings.

2.6 All dimensions and weights should be in metric system.

2.7 All equipment’s to be supplied and work to be carried out under the CONTRACT shall

conform to and comply with the provisions of relevant regulations/acts (state govt. or central government) as may be applicable to the type of equipment/work carried out and necessary certificates shall be furnished.

2.8 The SUPPLIER shall provide cross-sectional drawings wherever applicable to identify

the spare part numbers and t heir location. The sizes of bearings their make & number shall be furnished.

2.9 Specifications, design and drawings issued to the SUPPLIER along with tender

specifications and CONTRACT are not sold or given but loaned. These remain property

Page 40: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 5 of 31

NFVP/BAGGING/2016 General Conditions

of Owner or their assignees and are subject to recall by Owner. The SUPPLIER and his employees shall not make use of the drawings, specifications and technical information for any purpose at any time except for manufacture against the CONTRACT and shall not disclose the same to any person, firm or corporate authorities, without written permission of Owner. All such details shall be kept confidential.

2.10 SUPPLIER shall pack, protect, mark and arrange for dispatch of equipment as per

instructions given in the CONTRACT 3.0 STANDARDS

3.1 The goods supplied under this CONTRACT shall conform to the standards mentioned in

the technical specifications, or such other standards which ensure an equal or higher quality and when no applicable standard is mentioned, to the latest standards issued by an authority/recognized institution in the country of origin of the goods shall be applicable.

4.0 INSTRUCTIONS, DIRECTIONS AND CORRESPONDENCE

4.1 The materials described in CONTRACT are to be supplied according to the standards,

data sheets, tables, specifications and drawings attached hereto and/or enclosed with the CONTRACT itself and according to all conditions both general and specific enclosed with the CONTRACT, unless any or all of them shall have been modified or cancelled in writing as a whole or in part.

A) All instructions and orders to SUPPLIER shall, excepting what is herein provided, be

given by Owner.

B) All the work shall be carried out under the direction of and to the satisfaction of Owner.

C) All communications including technical/commercial clarifications and/or comments shall

bear reference to the CONTRACT.

D) Invoice for payment against CONTRACT shall be addressed to Owner.

E) The CONTRACT number shall be shown on all invoices, communications, packing lists, containers and bills of lading etc.

4.2 All correspondence from SUPPLIER shall be forwarded in duplicate (2 copies) to

owner's office in India on following address: ED NFL VIJAIPUR P.O.NFL TOWNSHIP DISTRICT GUNA MADHYA PRADESH PIN – 473 111 INDIA Fax no.: 07544-273089, 273109 Phone no: 07544- 273101

Email: [email protected]

Page 41: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 6 of 31

NFVP/BAGGING/2016 General Conditions

4.4 Correspondence on technical and commercial matters shall be deal t with in separate letters for each CONTRACT and each copy of the letter shall be complete with all Annexures.

4.5 Correspondence for expediting and inspection shall be done directly with inspector with

two copies to consultant and one copy to owner at Delhi and one copy to owner at site office.

5.0 CONTRACT CONFIRMATION

5.1 Within ten (10) days from date of Notification of award of order, SUPPLIER shall sign

the CONTRACT and return it to the Owner. The copy of the CONTRACT shall be signed by an authorized officer of the company.

5.2 After CONTRACT confirmation/signing, the terms and conditions contained therein take

precedence over SUPPLIER's bid conditions and all previous correspondence. 5.3 If after award of CONTRACT, as per article 26 in ATTACHMENT-I the SUPPLIER does

not acknowledge receipt of award of order and/or fails to deposit the performance bank guarantee within the time period specified in the CONTRACT, as per Article 28 of ATTACHMENT I, the OWNER reserves the right to cancel the CONTRACT without prejudice to various rights and remedies the Owner may be entitled to as per terms and conditions of CONTRACT and without being liable in any manner whatsoever to the SUPPLIER.

6.0 MODIFICATIONS IN CONTRACT

6.1 All modifications leading to changes in the CONTRACT with respect to technical or

commercial aspects including terms of completion period shall be considered valid only when accepted in writing by Owner by issuing amendment to the CONTRACT. Issuance of acceptance or otherwise in such cases shall not be any ground for extension of agreed completion date and also shall not affect the performance of CONTRACT in any manner except to the extent mutually agreed to, through a modification to CONTRACT. Owner shall have the right to modify or amend the CONTRACT subject to an adjustment in the CONTRACT price and/or completion date in accordance with the applicable provision of the CONTRACT, if any, or pursuant to mutual agreement.

6.2 OWNER shall not be bound by any printed conditions, provisions in the SUPPLIER's bid

forms or acknowledgement of CONTRACT, packing list and other documents which purport to impose any condition at variance with or supplemental to CONTRACT.

7.0 USE OF CONTRACT/ PURCHASE ORDER DOCUMENTS AND INFORMATION

7.1 SUPPLIER shall not, without the Owner's prior written consent, disclose the

CONTRACT/ PURCHASE ORDER or any provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or on behalf of the Owner in connection therewith, to any person other than a person employed by the CONTRACTOR/ SUPPLIER in the performance of the CONTRACT/ PURCHASE

ORDER. Disclosure to any such employed person shall be made in confidence and shall extend only so far as may be necessary for purpose of such performance.

Page 42: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 7 of 31

NFVP/BAGGING/2016 General Conditions

7.2 CONTRACTOR/ SUPPLIER shall not without the Owner's prior written consent, make use of any document or information enumerated in article 7.1 except for purpose of performing the CONTRACT/ PURCHASE ORDER.

7.3 Any document other than CONTRACT/ PURCHASE ORDER, itself, enumerated in

article 7.1 shall remain the property of the Owner and shall be returned (all copies) to the Owner on completion of the CONTRACTOR/ SUPPLIER's performance under the CONTRACT/ PURCHASE ORDER if so required by the Owner.

8.0 PATENT RIGHTS

8.1 the CONTRACTOR/ SUPPLIER shall indemnify the Owner against all third party claims

of infringement of patent, trademark or industrial design rights arising from use of the goods or any part thereof in the Owner's country.

8.2 PATENT INDEMNITY

Seller hereby warrants that the use or sale of the materials delivered hereunder will not infringe claims of any patent covering such material (to the extent the design for such materials is not furnished by Owner ) and seller agrees to be responsible for and to defend at its sole expense all suits and proceedings against Owner based on any such alleged patent infringement and to pay all costs, expenses, judgments and damages which Owner may have to pay or incur by reason of any such suit or proceedings. Notwithstanding the foregoing Owner does not warrant against and s hall not be responsible for, claims of patent infringement based solely on the use of such materials in combination with other materials or equipment or in the operation of any process other than such process as may be inherent in the use of such materials.

8.3 MECHANICS LIEN

CONTRACTOR/Supplier agrees to indemnify and hold harmless Owner against all labourer's material man's and/or mechanic's liens arising from its work, and shall keep the premises of Owner free from all such claims, liens and encumbrances.

8.4 PERMITS AND CERTIFICATES

CONTRACTOR/Supplier shall procure, at its expense, all necessary permits, certificates and licenses required by virtue of all applicable laws, regulations, ordinances and other rules in force at the place where any of the works is to be performed, and seller further agrees to hold Owner harmless from liability or penalty which might be imposed by reason of any asserted or established violation of such laws, regulations, ordinances or other rule. N FL shall provide the necessary permits for seller's personal to undertake any work in India in connection with CONTRACT/ PURCHASE ORDER.

9.0 PERFORMANCE SECURITY

9.1 Within 30 day s after Notification of award of order (LOI) /CONTRACT/ PURCHASE

ORDER by CONTRACTOR/ SUPPLIER, the CONTRACTOR/ SUPPLIER shall furnish

to the Owner security in the form of a bank guarantee issued or counter guaranteed by Scheduled banks other than co-operative banks as per Article 28 of ATTACHMENT I for an amount equivalent to 10% of the value of CONTRACT/ PURCHASE ORDER or as specified in the special conditions of CONTRACT/ PURCHASE ORDER.

Page 43: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 8 of 31

NFVP/BAGGING/2016 General Conditions

9.2 The proceeds of performance security shall be appropriated by the Owner as

compensation for any loss resulting from the CONTRACTOR/ SUPPLIER's failure to complete its obligations under the CONTRACT/ PURCHASE ORDER without prejudice to any of the rights or remedies the Owner may be entitled to as per terms and conditions of CONTRACT/ PURCHASE ORDER.

9.3 The performance security shall be denominated in the currency of the CONTRACT/

PURCHASE ORDER and shall be in the form of a bank guarantee issued by one of the banks located in the owner’s country or counter guaranteed by a Scheduled bank as per article 28 of ATTACHMENT I

9.4 The performance security in the form of a bank guarantee shall be valid for the duration

of the supply period and of defects liability period. The period of defects liability shall be 12 months from the date of commissioning of equipment .With a claim period of 6 ( six) months over and above the validity The proforma for this bank guarantee is enclosed as ATTACHMENT-V. the performance security will be di scharged by the Owner not later than 15 days after the CONTRACTOR/ SUPPLIERs performance obligation including any warranty obligation under the CONTRACT/ PURCHASE ORDER are fulfilled. Note: Any bank guarantee may it be for advance payment, bid security or performance shall be issued or counter guaranteed by one of the Scheduled banks other than co-operative banks. Or in the alternative the guarantee may be given by the foreign bank duly counter guaranteed/confirmed by a scheduled bank other than co-operative bank. The charges for confirmation, if any, shall be to the CONTRACTOR/ SUPPLIER's account.

10.0 INSPECTION, TESTING AND EXPEDITING

10.1 All components of the system shall be subjected to inspection and testing at different

stages of manufacture by the Vendor as per relevant standard. After award of job a quality control plan shall be submitted by the bidder for review & approval by Owner / Owner’s inspection agency. Owner may inspect the material before despatch.

10.2 The OWNER or its representatives shall have their right to inspect and/or to test the goods to confirm to the specifications laid down in the CONTRACT/ PURCHASE ORDER. The OWNER shall notify the CONTRACTOR/Supplier in writing of the identity of any other representatives retained for this purposes. Expediting performed by Owner's representative in no way relieves the CONTRACTOR/Supplier of completion obligation under the terms and conditions of this CONTRACT/ PURCHASE ORDER.

10.3 The inspections and tests may be conducted on the premises of the CONTRACTOR/Supplier or his subcontractor/ supplier at point of completion and/or at the good's final destination. When conducted on the premises of the supplier or his sub- CONTRACTOR/ Supplier, all reasonable facilities and assitance including access to drawings and production data shall be furnished to the inspector at no charge to the

OWNER.

10.4 The OWNER's right to inspection, test and where necessary, reject the goods after the goods arrival in the OWNER's premises shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by the OWNER or their representative prior to the goods shipment.

Page 44: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 9 of 31

NFVP/BAGGING/2016 General Conditions

10.5 The inspector shall follow the progress of the manufacture of the equipment under the CONTRACT/ PURCHASE ORDER to ensure that the requirements outlined in the CONTRACT/ PURCHASE ORDER are not being deviated with respect to schedule and quality.

10.6 CONTRACTOR/ SUPPLIER shall allow the inspector to visit, during working hours, the workshops relevant for execution of the CONTRACT/ PURCHASE ORDER during the entire period of CONTRACT/ PURCHASE ORDER execution.

10.7 CONTRACTOR/ SUPPLIER shall place at the disposal of the inspector, free of charge all tools, instruments, and other apparatus necessary for the inspection and/or testing of the equipment. The inspector is entitled to prohibit the use and di spatch of equipment and/or materials which have failed to comply with the characteristics required for the equipment during tests and inspections.

10.8 CONTRACTOR/ SUPPLIER shall ensure that the same permission is granted by his sub-CONTRACTOR/supplier to the inspector.

10.9 In respect of this inspection, CONTRACTOR/ SUPPLIER shall advise in writing of any delay in the programme at the earliest possible date, describing in detail what has caused the delay and the proposed corrective action.

10.10 All tests and trials in general, including those to be carried out for materials not manufactured by CONTRACTOR/ SUPPLIER shall be witnessed by the inspector. Therefore, CONTRACTOR/ SUPPLIER shall confirm with the OWNER by telex or cable about the exact date of inspection, with at least 30 day s notice. C ONTRACTOR/ SUPPLIER shall specify the CONTRACT/ PURCHASE ORDER item and quantities ready for testing and indicate whether a preliminary or final test is to be carried out.

10.11 If on receipt of this notice, OWNER should waive the right to witness the test, timely information will be given accordingly to the CONTRACTOR/Supplier.

10.12 Any and all expenses incurred in connection with tests, preparation of reports and analysis made by qualified laboratories/institutions, necessary technical documents, testing documents, and documents, and drawings shall be to CONTRACTOR/ SUPPLIER's cost. The technical documents shall include the reference and numbers of the standards used in the construction, wherever deemed practical by the inspector, with copy of such standards. CONTRACTOR/ SUPPLIER shall be held responsible for any possible delay in the approval or testing phase as well as for any possible delay in the remittance of necessary certificates. Delay on the part of the above mentioned institutions will not be considered a case of 'force majeure'.

10.13 Nothing in this article 10 shall in any way release the CONTRACT/ PURCHASE ORDER or from any warranty or to his obligations under this contract.

10.14 Arrangements for all inspections required by Indian statutory authorities and as specified in technical specifications shall be made by the CONTRACTOR/Supplier

10.15 Participation or presence of OWNER or their representatives at any tests or their failure to be present at or to witness any tests to be undertaken pursuant hereto shall not in any way or manner relieve or release the CONTRACTOR/ SUPPLIER from any of

Page 45: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 10 of 31

NFVP/BAGGING/2016 General Conditions

its warranties, guarantees or other obligations under the CONTRACT/ PURCHASE ORDER.

10.16 Copies of all test results/report of the tests shall be furnished promptly by the contractor to the owner.

. 11.0 TIME SCHEDULE AND PROGRESS REPORTING

11.1 Time schedule network/bar chart.

11.1.1 Together with the CONTRACT/ PURCHASE ORDER confirmation, CONTRACTOR/

SUPPLIER shall submit to OWNER, his time schedule regarding the documentation, supply and manufacture of equipment and materials as well as information of his sub CONTRACT/ PURCHASE ORDERs to be placed with their parties, including the dates on which CONTRACTOR/ SUPPLIER intends to issue such sub CONTRACT/ PURCHASE ORDERs.

11.1.2 The time schedule will be i n the form of a network or a bar chart clearly indicating all

main or key events regarding documentation, supply of raw materials, manufacturing, testing, delivery, erection & commissioning.

11.1.3 The original issue and subsequent revisions of CONTRACTOR/ SUPPLIER's time

schedule and or sub CONTRACTOR’s / suppliers time schedules shall be sent to consultant in four copies .

11.1.4 The time schedule network/bar chart shall be updated at least every fortnight.

11.2 PROGRESS TREND CHART/MONTHLY REPORT

11.2.1CONTRACTOR/ SUPPLIER shall report fortnightly to OWNER the progress of the execution of CONTRACT/ PURCHASE ORDER and achievement of targets set out in time bar chart.

11.2.2The progress will be expressed in percentages shown in the progress trend chart.

11.2.3The first issue of the progress trend chart will be forwarded together with the time bar

chart along with CONTRACT/ PURCHASE ORDER confirmation.

11.2.4The monthly reporting will bear the updating of the progress trend chart.

11.3 PROGRESS PERFORMANCE

11.3.1OWNER or his representatives shall have the right to inspect CONTRACTOR/

SUPPLIER's premises to evaluate the actual progress of work on the basis of CONTRACTOR/ SUPPLIER's time schedule documentation.

11.3.2 Irrespective of such inspection, CONTRACTOR/ SUPPLIER shall advise OWNER at the

earliest possible date of any anticipated delay in the programme indicating the reasons thereof and corrective measures proposed thereto.

Page 46: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 11 of 31

NFVP/BAGGING/2016 General Conditions

11.3.3 In the event that the delay is caused by a delay in the completion of sub-CONTRACT/ PURCHASE ORDER equipment, CONTRACT/ PURCHASE ORDER or shall submit details together with copies of the appropriate orders and agreements entered with such sub-CONTRACT/ PURCHASE ORDER s.

11.4 Notwithstanding the above, in case progress on the execution of CONTRACT/

PURCHASE ORDER at various stages is not as per phased time schedule and i s not satisfactory in the opinion of the OWNER which shall be conclusive or if the CONTRACTOR/ SUPPLIER shall neglect to execute the CONTRACT/ PURCHASE ORDER with due diligence and expedition or shall contravene the provisions of the CONTRACT/ PURCHASE ORDER, OWNER may give notice of the same in writing to the CONTRACTOR/ SUPPLIER calling upon hi m to make good the failure, neglect or contravention complained of. Should the CONTRACTOR/ SUPPLIER fail to comply with such notice within the period of 30 days, the OWNER shall have the option and at liberty to take the CONTRACT/ PURCHASE ORDER wholly or in part out of the CONTRACTOR/ SUPPLIER's risk and cost and recover from the CONTRACTOR/ SUPPLIER all extra costs incurred by the OWNER on this account and agreed penalty. In such an event OWNER shall not be responsible for any loss that the CONTRACTOR/ SUPPLIER may incur and CONTRACTOR/ SUPPLIER shall not be entitled to any gain. OWNER shall, in addition have the right to confiscate performance security in full or part.

12.0 PACKING

12.1 The CONTRACTOR/ SUPPLIER shall provide such packing of the goods as is sea

worthy and is such as shall prevent damage or deterioration to them or any part thereof during transit to their final destination. The packing shall be sufficient to withstand without limitation to rough handling during transit and exposure to extreme temperatures, salt and precipitation during transit and open storage., packing case size and weights shall take into consideration, where appropriate, the remoteness of the

goods' final destination and the absence of heavy handling facilities at all points in transit.

12.2 The packing, marking and documentation within and outside the packages shall comply

strictly with such special requirements as shall be expressly provided for in the CONTRACT/ PURCHASE ORDER/purchase order and subject to any subsequent instructions issued by the OWNER.

12.3 CONTRACTOR/ SUPPLIER shall be obliged to make compensation for all losses

suffered by owner due to CONTRACTOR/ SUPPLIER’s improper packing of the goods.

a) Spares shall be packed separately and identification marks tagged to each of the items, containing the following information’s and as per instructions specified in the CONTRACT/ PURCHASE ORDER :

i) Details Of Equipment’s And CONTRACT/ PURCHASE ORDER ii) Nomenclature Of Part/Component iii) Part No. iv) S.No of Part in CONTRACT/ PURCHASE ORDER. v) S.No Of Part In Spares Catalogue.

b) All Fragile and All Exposed Parts Shall Be Packed With Due Care and Packages

Shall Bear the Words "With Care "In English.

Page 47: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 12 of 31

NFVP/BAGGING/2016 General Conditions

c) All nozzles, pipes and all sheets shall be marked with straps bearing progressive

numbers.

d) All Holes And Openings As Also All The Machined Surfaces Shall Be Carefully Protected Against weather And Damages.

e) All Manufactured Surfaces Shall Be Painted With Rust Proof Paint.

f) All Threaded Fittings Shall Be Greased And Provided With Plastic Caps.

g) All Bright and Machined Parts Shall Be Coated with Appropriate Protective

Material suitable For Tropical and Coastal Climatic Conditions.

h) All Small Pieces Shall Be Wrapped In Jute Bags Lined With Polythene And Packed In Cases.

12.4 CONTRACTOR/ SUPPLIER is fully responsible for specification of the storage conditions for his equipment and materials, and C ONTRACTOR/ SUPPLIER is also responsible for any damage incurred due to faulty or missing instructions.

12.5 At least 30 ( thirty) days prior to final technical inspection, CONTRACTOR/ SUPPLIER

shall submit to Owner a complete description of the packing.

12.6 The CONTRACTOR/ SUPPLIER shall be liable for all damage or breakage to the equipment due to the defective or insufficient packing as well as for corrosion due t o insufficient protection. I n such an event CONTRACTOR/ SUPPLIER shall arrange for free replacement without any cost to owner.

12.7 In each package CONTRACTOR/ SUPPLIER will ensure that there is a packing list in

English language. The storage classification shall be agreed with Owner and indicated in the conditions of CONTRACT/ PURCHASE ORDER. A separate packing list in polythene / cellophane cover shall be affixed on to outside of each package.

13.0 DELIVERY AND DOCUMENTS

13.1 Delivery of the goods shall be made by the CONTRACTOR/ SUPPLIER in accordance

with the terms specified by Owner in schedule of requirements and the special conditions of Contract/Purchase and the goods shall remain at the risk of the CONTRACTOR/ SUPPLIER until delivery has been completed.

13.2 Dispatch shall be deemed to have been made when inspector has cleared the goods

for despatch and the CONTRACTOR/ SUPPLIER has dispatched the goods as per instructions contained in the order. Contractual delivery date shall be date of bill lading or railway receipt or lorry receipt as per the case may be, unless otherwise agreed in the body of the CONTRACT/ PURCHASE ORDER

13.3 The delivery terms are binding and final, consequently, no delay is allowed without the

written approval by owner / consultant. Any request concerning delay, though submitted by registered letter, will be void unless accepted by Owner through a modification / amendment to the CONTRACT/ PURCHASE ORDER. Request for extending delivery date should be made well before the due date of delivery.

Page 48: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 13 of 31

NFVP/BAGGING/2016 General Conditions

13.4 Delivery time shall include time for submission of drawings for approval, incorporation of comments, if any, and final approval of drawings by owner.

13.5 In the event of delay in supply of equipment and / or documents, CONTRACT/Purchase

order shall be liable for Price deduction as stipulated in Article 23.

13.6 If any part of equipment delivered has no commercial use, the delivery of the equipment shall be considered as delayed and owner reserves the option to send back the equipment so received to the C ONTRACTOR/ SUPPLIER in case the supply of balance items / orders are delayed beyond stipulated delivery period.

13.7 In case of delayed delivery period beyond the stipulated delivery even though formal

extension of completion time is allowed by owner, all extra costs on account of changes of statutory regulations / acts or increase in price of any other account

including price variation clause, if any, shall not apply to the CONTRACT/ PURCHASE ORDER price and shall be borne by the CONTRACTOR/ SUPPLIER.

13.8 The goods will not be considered as delivered in accordance with the CONTRACT/

PURCHASE ORDER and may invite a possible application of price reduction, if all the documents necessary for forwarding of the goods covered by CONTRACT/ PURCHASE ORDER as well as the required technical documentation and certificates as certified in the documentation delivery schedule attached to the technical specifications have not been received by owner / consultant.

13.9 The additional copies of final drawings and instructions will be included in the package

of equipment, properly enveloped and protected.

14.0 INSURANCE

Clause no. 4.0 of Special Conditions of contract is applicable.

15.0 DISPATCH TRANSPORTATION & SHIPPING INSTRUCTIONS

15.1 CONTRACTOR/ SUPPLIER shall arrange for dispatch of the goods by rail/road/air after

proper packing and protection as per instructions given in the CONTRACT/ PURCHASE ORDER All consignments shall be dispatched after inspection and issue of acceptance certificates unless otherwise agreed to in writing. All consignments shall be dispatched to consignee and not to self.

15.2 Part dispatches of the CONTRACT/ PURCHASE ORDER / purchase order shall not be

resorted to, unless otherwise agreed to in writing and provided in the CONTRACT/ PURCHASE ORDER.

15.3 ASSEMBLY MARKS AND NAME PLATES

15.3.1 All components/parts of the equipment, which dispatched in unassembled state, shall be adequately visible, indelibly hard marked with identification marks, comprising equipment description and number, part number and CONTRACT/ PURCHASE ORDER number which shall also be shown on drawings to facilitate speedy identification, assembling or dismantling.

15.3.2 Name plates on each equipment, name plate indicating basic details, pressure rating,

wherever applicable code number of equipment, electrical characteristics in case of

Page 49: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 14 of 31

NFVP/BAGGING/2016 General Conditions

electrical equipment, name of instrument with tag no. Manufacturer's name shall be fixed at proper place.

15.4 HEAVY LIFT OR OVER DIMENSIONAL CONSIGNMENTS

15.4.1 For road transport in India, packages exceeding one or more of the following

measurements:

Weight 10 tonnes., length 5.5 m, width 2.12 m., height 2.1 m will be considered as heavy lift or over dimensional consignments (HLC'S OR ODC'S).

15.4.2 For railway transport in India, packages exceeding one or more of the following

measurements will be considered as over dimensional consignments:

Broad Gauge

A) Length 13716 Mm

B) Maximum Width 2845 Mm

C) Maximum Height 2743 Mm

D) Top Width At Max. Height 610 Mm

E) Height Of Max Width 2133 Mm

F) Weight 54 T

15.4.3 CONTRACTOR/ SUPPLIER shall send immediately on receipt of CONTRACT/ PURCHASE ORDER a list of ODC packages on the basis of the dimensions given in article 15.6.1 and 15.6.2 above.

15.4.4 For obtaining the approval of the Indian railway, CONTRACTOR/ SUPPLIER shall

submit the following particulars regarding each ODC.

A) Length Of Package B) Height Of Package At The Top (In Centre) And Sides C) Width At Top, Centre And Bottom D) Dimensions Of The Projections/ Nozzles, If any, along with their location on the

equipment. E) Gross And Net Weight Of The Package. F) Centre Of Gravity On Different Axis. G) Packing And Lashing Arrangement.

H) Mode Of Loading And Unloading. I) If special wagon/mode is to be adopted for the transport of the package, the

details of the same are to be provided in a drawing. Not later than 3 months before completion ex-works, contractor/ supplier shall send two (2) copies and one reproducible of each of the drawings for the equipment package having dimensions exceeding those stated in point 15.6.2 to the Owner.

Page 50: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 15 of 31

NFVP/BAGGING/2016 General Conditions

15.5 MARKING

15.5.1 SUPPLIER shall mark the following on three sides i.e. two side faces and cover (top) with indelible paint in conspicuously printed letters not less than 5 cm in size in English:

NATIONAL FERTILISER LIMITED NFL VIJAIPUR P.O. NFL TOWNSHIP DISTRICT GUNA, MADHYA PRADESH PIN 473 111 INDIA

INSTALLATION OF BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM OF BAGGING PLANT FOR NFL VIJAYPUR

Page 51: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 16 of 31

NFVP/BAGGING/2016 General Conditions

CONTRACT/ PURCHASE ORDER no.

a) EQUIPMENT DESCRITION AND ITEM NO. b) PACKAGE NO OF c) GROSS /NET WEIGHT (KGS) d) Dimensions L x Wx H cms. e) Warning marks (fragile, attention, top, keep dry) etc. f) Forwarding no. g) Part shipment/full shipment/final shipment.

Each package shall bear a symbol stating the requirements or storing of the equipment contained in the package as follow:

"A" storage in a closed store-house. "B" storage under a shed "C" storage in the open

15.5.2 Depending on the characteristics of the equipment, packages have to be marked with

the appropriate international markings ("handle with care ","this side up", "sling mark" etc.) And any other indications necessary for correct handling such as centre of gravity and points of slinging (in case of heavy loads).

15.5.3 For packages where marking is not possible, at least two metallic name plates must be affixed. Marking on the plates will be by means of engraving or indelible paint and will include the information listed above.

15.5.4 All corners of the packages shall be painted with indelible "blue paint" at least 125 mm

in depth for easy identification/location of the packages for clearance and handling at the port.

15.5.5CONTRACTOR/ SUPPLIER will include in each package an item wise packing list,

invoice no. And associated drawings. 15.5.6 The packing list and any other documents shall be put in a closed polyethylene

envelope and included in each packages. 15.5.7 A second copy of the packing list shall be placed in a polyethylene envelope on the

outside of each package by means of metallic plate marked "documents".

As regards columns, exchangers and similar equipment, the envelope shall be placed in a nozzle being identified by an arrow in indelible paint, followed by the word "documents.

15.5.8 Shipping documents must always be presented in the number of copies indicated in the

CONTRACT/ PURCHASE ORDER/purchase order. The CONTRACT/ PURCHASE ORDER/purchase order will also include details regarding the shipping documentation.

Page 52: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 17 of 31

NFVP/BAGGING/2016 General Conditions

16.0 INCIDENTAL SERVICES 16.1 As specified in the special conditi0ns of CONTRACT/ PURCHASE ORDER, the

CONTRACTOR/ SUPPLIER may be required to provide any or all of the following services:

a) Supervision of on-site assembly/erection and or startup of the supplied Goods

b) Furnishing of tools required for assembly/ erection and or maintenance of the

supplied goods

c) Performance or supervision or maintenance and/or repair of the supplied goods, for a period of time agreed by the parties, provided that this service shall not relieve the CONTRACTOR/ SUPPLIER of any warranty obligations under this CONTRACT/ PURCHASE ORDER, and

d) Conduct of training of the OWNER's personnel, at the CONTRACTOR/

SUPPLIER's plant and/or on site , in assembly, start-up operation, maintenance and/or repair of the supplied goods.

16.2 Prices charged by the CONTRACTOR/ SUPPLIER for the preceding incidental services,

if not included in the CONTRACT/ PURCHASE ORDER price for the goods shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the CONTRACTOR/ SUPPLIER for similar services.

16.3 When required, CONTRACTOR/ SUPPLIER shall depute necessary personnel for supervision and/or erection of the Equipment at site for a duration to be specified by Owner on mutually agreed terms. CONTRACTOR/ SUPPLIER's personnel shall be available at site within 72 hours for emergency action and 10 days for medium and long term assistance, from the date of notice given by Owner.

16.4 CONTRACTOR/ SUPPLIER's personnel shall be paid part of their per diem rates in Rupees by the Owner for covering local expenses, in case charges for such services is not part of the Contract/PO.

16.5 CONTRACTOR/ SUPPLIER's personnel will follow the normal working hours at site

which is 48 hours per week, 6 days of 8 hrs/day.

16.6 At the request of consultant or owner, CONTRACTOR/ SUPPLIER shall at his expense, dismiss from work and replace any such employee as OWNER, may deem incompetent or careless or whose continued employment is deemed inimical to the interest of the OWNER or against public interest.

16.5 Other conditions of work at site shall be mutually discussed and settled.

17.0 SPARE PARTS, MAINTENANCE TOOLS AND LUBRICANTS

17.1 As specified in the CONTRACT/ PURCHASE ORDER, the CONTRACTOR/ SUPPLIER

may be required to provide any or all of the following materials and notifications pertaining to spare parts manufactured or distributed by the CONTRACTOR/ SUPPLIER.

Page 53: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 18 of 31

NFVP/BAGGING/2016 General Conditions

a) Such spare parts as the OWNER may opt to purchase from the CONTRACTOR/ SUPPLIER, provided that this option shall not relieve the CONTRACTOR/ SUPPLIER of any warranty obligations under the CONTRACT/ PURCHASE ORDER, and

b) All the spares for the equipment under the CONTRACT/ PURCHASE ORDER will

strictly conform to the specification and other relevant documents and will be identical to the corresponding main equipment/ components supplied under the CONTRACT/ PURCHASE ORDER and shall be fully interchangeable.

c) The CONTRACTOR/Supplier will provide the owner with all the addresses and

particulars of his sub-CONTRACTOR/ SUPPLIERs while placing the order on vendors for items/components/ equipment’s covered under the CONTRACT/ PURCHASE ORDER and will further ensure with his vendors that the owner, if so desires, will have the right to place order for spares directly on them on mutually agreed terms based on offers of such vendors.

d) The CONTRACTOR/Supplier shall guarantee the long terms availability of spares to the

owner for the full life of the equipment covered under the CONTRACT/ PURCHASE ORDER. The CONTRACTOR/Supplier shall guarantee that before going out of production of spare parts of the equipment covered under the CONTRACT/ PURCHASE ORDER, he shall give the owner at least 2 years advance notice so that the latter may order his bulk requirement of spares, if he so desires. The same provision will also be applicable to sub-CONTRACTORS Further, in case of discontinuance of manufacture of any spares by the CONTRACTOR/Supplier and/or his sub-CONTRACTOR, CONTRACTOR/Supplier will provide the owner, two years in

advance, with full manufacturing drawings, material specifications and technical information including information on alternative equivalent makes required by the owner for the purpose of manufacture/procurement of such items.

17.2 CONTRACTOR/ SUPPLIER shall complete item wise list with value of each item of

spare parts and maintenance tools requirements for

a) The construction and commissioning period b) 2 year's operation and maintenance period.

17.3 Spare parts shall be new and of first class quality as per engineering standards/codes,

free of any defects (patent or latent), deficiency in design, materials and w orkmanship and also shall be completely interchangeable with the corresponding parts.

17.4 Type and sizes of bearings shall be indicated.

17.5 Spare parts shall be packed for long storage under tropical and coastal climatic

conditions in suitable cases, clearly marked for the intended purpose. 17.6 A list of special tools and gauges required for normal maintenance and special handling

and lifting appliance if any, for the equipment shall be submitted to OWNER/consultant. 17.7 LUBRICANTS

17.7.1 Whenever lubricants are required, CONTRACTOR/ SUPPLIER shall indicate the

quantity of lubricants required for the first filling, the frequency of changing, the quantity of lubricants required for 1 year's continuous operation and the types of recommended lubricants indicating the commercial name (trade mark), quality and grade.

Page 54: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 19 of 31

NFVP/BAGGING/2016 General Conditions

17.7.2 If CONTRACTOR/ SUPPLIER are unable to recommend or where specific oil is recommended, basic recommended characteristics of the lubricants may be indicated.

17.7.3 CONTRACTOR/ SUPPLIER shall indicate various equivalents of lubricants available in

India.

18.0 WARRANTIES AND GUARANTEES

18.1 MATERIALS AND WORKMANSHIP WARRANTY

18.1.1 The CONTRACTOR/ SUPPLIER shall fully warrant that the goods supplied under the CONTRACT/ PURCHASE ORDER are new, unused; of the most recent or current models and incorporate all recent improvements in design and materials unless provided otherwise in the CONTRACT/ PURCHASE ORDER. The CONTRACTOR/ SUPPLIER shall further warrant that all goods supplied under this CONTRACT/ PURCHASE ORDER shall be of first class quality according to specifications, have no defect (patent or latent) arising from design, materials or workmanship or from any act of omission of the CONTRACTOR/ SUPPLIER that may develop under normal use of the supplied goods in the condition prevailing in the country of final destination.

18.1.2 This warranty shall be valid for 12 m onths from date of commissioning of full system

for all thirteen machines. Should any defects be noticed in the design, materials and/or workmanship within 12 months from the date of commissioning of plant, OWNER shall inform CONTRACTOR/ SUPPLIER and CONTRACTOR/ SUPPLIER shall immediately on receipt of such intimation depute their personnel within 7 days to investigate the causes of defect and arrange rectification/replacement/modification of the defective equipment at site without any cost to OWNER within a reasonable period. OWNER shall be free to take such corrective action as may be deemed necessary at CONTRACTOR/ SUPPLIER's risk and cost, after giving notice to the CONTRACTOR/ SUPPLIER. The OWNER shall promptly notify the CONTRACTOR/ SUPPLIER in writing of any claim arising under this warranty.

18.1.3 Damage to the machinery and/or equipment deriving from incomplete and erroneous

instructions issued by CONTRACTOR/ SUPPLIER will be considered CONTRACTOR/ SUPPLIER's fault and will be treated according to the provisions of this warranty clause.

18.1.4 In case defects are of such nature that equipment shall have to be taken to CONTRACTOR/ SUPPLIER's works for rectification etc. CONTRACTOR/ SUPPLIER shall take the equipment at his cost after giving necessary undertaking or security as may be required by the OWNER, OWNER shall, if so required by the CONTRACTOR/ SUPPLIER, despatch the equipment by quickest mode on f reight to pay basis to the CONTRACTOR/ SUPPLIER's works. After repairs CONTRACTOR/ SUPPLIER shall deliver the equipment at site on freight paid basis. All risks in transit to and fro shall be borne by the CONTRACTOR/ SUPPLIER.

18.1.5 Equipment or part thereof so repaired or replaced shall have further warranty for a

period of 12 months from the date of acceptance and the bank guarantee for performance shall be suitably extended.

18.1.6 If the repairs, replacements or modifications referred to are of such nature as may

affect the efficiency of the equipment, OWNER shall have the right to give to the CONTRACTOR/ SUPPLIER within one month of such replacement/renewal, notice in writing to carryout tests as may be required for acceptance of the equipment.

Page 55: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 20 of 31

NFVP/BAGGING/2016 General Conditions

18.1.7 if the CONTRACTOR/ SUPPLIER fails to meet his obligation to repair or replace defective goods within a reasonable period of time, if CONTRACTOR/ SUPPLIER refuses to carry out work under the guarantee clause and implied guarantee conditions, if danger is anticipated or in case of severe urgency. OWNER shall be entitled to carry out at CONTRACTOR/ SUPPLIER's cost and risk, repair work or replacement deliveries or have it done by a third party. In case not all goods have been delivered by CONTRACTOR/ SUPPLIER, OWNER is entitled to procure the remaining goods at CONTRACTOR/ SUPPLIER's cost and risk. This does not relieve CONTRACTOR/ SUPPLIER of any of his guarantee, obligations. T axes and duties of any kind whatsoever imposed by the authorities of the country of CONTRACTOR/ SUPPLIER or his sub-CONTRACTOR until completion shall be borne by CONTRACTOR/ SUPPLIER.

18.2 PERFORMANCE GUARANTEE

18.2.1 CONTRACTOR/ SUPPLIER shall guarantee that the performance of the

equipment supplied under the CONTRACT/ PURCHASE ORDER shall be strictly in conformity with the specifications and s hall perform the duties specified under the CONTRACT/ PURCHASE ORDER.

18.2.2 If the performance of the equipment fails to prove the guarantee set forth in

the specifications, CONTRACTOR/ SUPPLIER shall investigate the causes and provide free of cost to OWNER design, engineering, materials, and services and equipment within a reasonable period to prove guarantees. the CONTRACTOR/ SUPPLIER's liability in this respect shall be unlimited.

18.2.3 if the CONTRACTOR/ SUPPLIER fails to prove the guarantee within the reasonable

period , the owner shall have the option to take over the equipment and rectify the same, if possible, to fulfil the guarantees and/or to make necessary additions to make up the deficiency at CONTRACTOR/ SUPPLIER's risk and cost. All expenditure incurred by the OWNER in this regard shall be on CONTRACTOR/ SUPPLIER's account.

18.3 LOAD DATA

18.3.1CONTRACTOR/ SUPPLIER shall be responsible for correctness of the load data

furnished by them for civil work and foundations.

18.3.2 In the event of notice of defects in the civil works due to incorrect data furnished by the CONTRACTOR/ SUPPLIER, the cost incurred for redoing, rectifying foundations, shall be borne by the CONTRACTOR/ SUPPLIER. The cost of removal of the equipment from foundation if already erected and re-erection of the same including all related costs shall also be borne by the Contractor/Supplier.

19.0 ASSIGNMENT

19.1 The CONTRACTOR/ SUPPLIER shall not assign in whole or in part, its obligations to

perform under this CONTRACT/ PURCHASE ORDER, except with the OWNER’s prior written consent.

Page 56: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 21 of 31

NFVP/BAGGING/2016 General Conditions

20.0 SUB-CONTRACT

20.1 CONTRACTOR/ SUPPLIER shall act as an independent CONTRACTOR/Supplier and not as an agent or employee of OWNER.

20.2 CONTRACTOR/ SUPPLIER shall notify the OWNER in writing of all SUB-CONTRACTs

awarded under the CONTRACT/ PURCHASE ORDER. Such notification of award of SUB CONTRACT, if any, shall not relieve the CONTRACTOR/ SUPPLIER from any liability or obligation under the CONTRACT/ PURCHASE ORDER.

20.3 SUB-Contracting shall not imply any limitation of CONTRACTOR/ SUPPLIER's liability

to fulfil the CONTRACT/ PURCHASE ORDER. 20.4 SUB-CONTRACT shall incorporate technical conditions and inspection requirements

stipulated in CONTRACT/ PURCHASE ORDER and any amendments and changes thereto.

20.5 Copies of SUB-CONTRACT shall also be forwarded to OWNER‘s inspector.

20.6 If SUBCONTRACTOR should appear unfit to carry out his part of the CONTRACT/

PURCHASE ORDER work or the progress of SUB-CONTRACTOR’s work is such that the planned time of completion within the terms of CONTRACT/ PURCHASE ORDER is jeopardized, OWNER has the right to instruct CONTRACTOR/ SUPPLIER, in writing, to terminate the sub-CONTRACT at a short notice.

20.7 SUB-CONTRACT must comply with the provisions with respect to eligible goods and

services indicated in the bidding documents. 21.0 JOINT AND SEVERAL RESPONSIBILITIES

21.1 When the supply is a part of group including parts supplied by others, OWNER shall

hold CONTRACTOR/ SUPPLIER and the manufacturer (the manufacturer's name will be communicated separately) of the equipment to be coupled to the supply jointly & severally responsible for the perfect operation of the group, as concerns the technical and mechanical characteristics mentioned in the specification and with particular regard to the conditions of mechanical coupling, dynamic movement and starting movement. The CONTRACTOR/ SUPPLIER shall, therefore, establish all suitable contacts with the manufacturer that OWNER will indicate, ensuring the exchange of all data and information necessary for the perfect operation of the group.

22.0 DELAYS IN THE CONTRACTOR/ SUPPLIER'S PERFORMANCE

22.1 Delivery of the Goods and performance of services shall be made by the

CONTRACTOR/ SUPPLIER in accordance with the time schedule specified by the OWNER in the CONTRACT/ PURCHASE ORDER.

22.2 An unexcused delay by the CONTRACTOR/ SUPPLIER in the performance of its

completion obligations shall render the CONTRACTOR/ SUPPLIER liable to any or all of the following sanctions:

Forfeiture of its performance security, imposition of pre-determined and mutually agreed damages and/or termination of the CONTRACT/ PURCHASE ORDER for default.

Page 57: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 22 of 31

NFVP/BAGGING/2016 General Conditions

23.0 PRICE REDUCTION 23.1 If for reasons not attributable to the owner or due to conditions constituting force

majeure as defined in this CONTRACT/ PURCHASE ORDER the work is not completed in accordance with the provisions hereof within and i n accordance with the delivery as indicated in the body of the Contract/PO it is agreed that the owner shall be ent itled to and the CONTRACTOR/Supplier shall pay to the owner the following as mutually agreed damages (which are a genuine pre-estimate made by the parties of the loss and damage which the owner would have suffered on account of such delay in completion of the work and as by way of mutually determined reasonable compensation to the owner therefore after taking into consideration all circumstances) and not as liquidated damages or penalty and without the owner being required to establish and prove the actual/loss/damage suffered by the owner on account of such delay.

The pre-estimated mutually agreed damages pursuant hereto shall be payable at the rate of 0.5% per week or part thereof delay in the completion each milestone/ project (As per clause 5.1(b) of the technical specifications) subject to a maximum of 5% of total contract /PO price determined as below:

i) Delay in start of the job of modification for the first two machines beyond 180 days. j) Completion of each job beyond the stipulated period mentioned in clause 5.1(b) Table

I of the technical specifications. k) If the overall Project completes as per time schedule as mentioned in clause

5.1(b), then the amount which has been previously deducted will be refunded back to contractor.

l) In case the project is shelved off after modification in first two stations, a maximum of 16 % of contract /PO price for all the thirteen stations or actual cost ( based upon documented cost ) whichever is lower, shall be considered for final settlement.

d) Notwithstanding anything to the contrary contained in this CONTRACT/ PURCHASE ORDER and without prejudice to the rights of the owner under this CONTRACT/ PURCHASE ORDER and the entitlement to the said pre estimated mutually agreed damages and in addition and not in derogation or substitution thereof the owner shall be entitled to terminate this CONTRACT/ PURCHASE ORDER in whole or in part without being liable to the CONTRACTOR/Supplier in any manner whatsoever or to have the uncompleted portion of the work to be executed/performed pursuant hereto by the CONTRACTOR/Supplier completed/executed/performed at the risk and cost of the CONTRACTOR/Supplier and without being liable to the CONTRACTOR/Supplier in any manner whatsoever in the event of and despite 30 (thirty) days’ notice in writing the CONTRACTOR/Supplier failing to complete/execute/perform all or any part of the work to be completed/executed/performed pursuant hereto by the CONTRACTOR/Supplier within and in accordance with the time schedule as indicated in ITB hereto/the time for completion as extended in accordance with the provisions hereof or by the owner.

23.2 DAMAGES FOR FAILURE TO MEET PERFORMANCE GUARANTEES

If for reasons not attributable to the owner or due to conditions constituting force majeure as defined in this CONTRACT/ PURCHASE ORDER, there is a short fall in the

Page 58: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 23 of 31

NFVP/BAGGING/2016 General Conditions

guaranteed output or there is deficiency in the guaranteed produce quality, all as guaranteed hereunder, it is agreed that the owner shall be entitled to and the CONTRACTOR/Supplier shall pay to the owner the following as mutually agreed damages (which are a genuine pre-estimate made by the parties of the loss and damage which the owner would have suffered on account of such short fall in the guaranteed output there is deficiency in the guaranteed product quality and as by way of mutually determined reasonable compensation to the owner there of after taking into consideration all circumstances) and not as liquidated damages or penalty and without the owner being required to establish and prove the actual loss/damage suffered by the owner on account of such shortfall or excess:

A: Damages for shortfall in guaranteed output

If the rake loading time is more than the period mentioned in the clause 10 of the technical specifications, for every increase in loading time of half an hour or part thereof the contractor/ supplier shall pay 5 % of the total contract / PO value.

In case loading time of full rake is more than 8 hours, the modification shall not be acceptable. The contractor will have to again replace/ modify the equipment to make good the system so that the guaranteed loading time is achieved.

The loading time during GTR shall be the average of loading time of eight rakes on continuous basis or intermittent basis, as decided by the both parties before the GTR

B. The obligation of the CONTRACTOR/Supplier under the various above sub-clauses are independent of each other and accordingly the maximum limits of pre-estimated mutually agreed damages set out under each of the said sub-clauses are separate provided however the aggregate of liability of the CONTRACTOR/Supplier under above mentioned clauses shall be limited to 15% (fifteen percent) of the total of the CONTRACT/ PURCHASE ORDER price .

C. The contractor liability for reviewing the defects as well as making good any short

coming shall be unlimited. The contractor shall be liable for reviewing the defects as

well as making good any shortcomings as set forth in performance guarantee

parameters as detailed in technical specification.

D. For making good the plant, the duration & Schedule of shut down of unit, if so desired by

the contractor for making modification / replacement etc, shall be on the sole

discretion of the owner.

24.0 REJECTIONS, REMOVAL OF REJECTED EQUIPMENT AND REPLACEMENT 24.1 Preliminary inspection at CONTRACTOR/ SUPPLIER's work by inspector shall not

prejudice OWNER's claim for rejection of the equipment on final inspection at site or claims under warranty provisions.

24.2 If the equipment’s are not of specification or fail to perform specified duties or otherwise

not satisfactory, the OWNER shall be entitled to reject the equipment/ material or part thereof and ask for free replacement within reasonable time failing which obtain his requirements from elsewhere at CONTRACTOR/ SUPPLIER's cost and risk.

Page 59: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 24 of 31

NFVP/BAGGING/2016 General Conditions

24.3 In the event of such rejection the OWNER shall be entitled to the use of the equipment in a reasonable and proper manner for a time reasonably sufficient to enable him to obtain replacement.

24.4 Nothing in this article shall be deemed to deprive the OWNER and/or affect any rights under the CONTRACT/ PURCHASE ORDER which he may otherwise have in respect of such defects or deficiencies or in any way relieve the CONTRACTOR/ SUPPLIER of his obligations under the CONTRACT/ PURCHASE ORDER.

24.5 Equipment rejected by the OWNER shall be removed by the CONTRACTOR/

SUPPLIER at his cost within 14 day s of notice after repaying the amounts received against the supply. The OWNER shall in no way be responsible for any deterioration or damage to the equipment under any circumstances whatsoever.

24.6 In case of rejection of equipment, OWNER shall have the right to recover the amounts

paid, if any, from any of CONTRACTOR/ SUPPLIER`s invoices pending with OWNER or by alternative method.

25.0 TERMINATION OF CONTRACT/ PURCHASE ORDER

25.1 Termination for Default 25.1.1 The OWNER may without prejudice to any other remedy for breach of CONTRACT/

PURCHASE ORDER, by written notice of default send to the CONTRACTOR/ SUPPLIER, terminate the CONTRACT/ PURCHASE ORDER in whole or in part:

a) If the CONTRACTOR/ SUPPLIER fails to complete any or all the jobs within the time period(s) specified in the CONTRACT/ PURCHASE ORDER, or

b) If the CONTRACTOR/ SUPPLIER fails to perform any other obligation(s) under the

CONTRACT/ PURCHASE ORDER,

c) If the CONTRACTOR/ SUPPLIER, in either of the above circumstances does not rectify his failure within a period of 30 day s (or such longer period as the OWNER may authorize in writing) after receipt of the default notice from the OWNER.

25.1.2 In the event the OWNER terminates the CONTRACT/ PURCHASE ORDER in whole or

in part, pursuant to para 25.1 the OWNER may take alternative action upon such terms and in such manner as it deems appropriate similar to those provided in the CONTRACT/ PURCHASE ORDER for incomplete portion and the CONTRACTOR/ SUPPLIER shall be liable to the owner for any excess costs for such similar jobs. However, the supplier shall continue performance of the CONTRACT/ PURCHASE ORDER to the extent not terminated.

25.2 Termination For Insolvency

The OWNER may at any time terminate the CONTRACT/ PURCHASE ORDER by giving written notice to the CONTRACTOR/ SUPPLIER, without compensation to the CONTRACTOR/ SUPPLIER, if the CONTRACTOR/ SUPPLIER becomes bankrupt or otherwise insolvent, provided that such termination will not prejudice or affect any right of action or remedy which has occurred or will accrue thereafter to the OWNER.

25.3 Termination Of Convenience 25.3.1The OWNER may, by written notice send to the CONTRACTOR/ SUPPLIER, terminate

the CONTRACT/ PURCHASE ORDER, in whole or in part, at any time for his

Page 60: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 25 of 31

NFVP/BAGGING/2016 General Conditions

convenience. The notice of termination shall specify that termination is for the OWNER's convenience, the extent to which performance of work under the

CONTRACT/ PURCHASE ORDER is terminated and the date upon which such termination becomes effective.

25.3.2The GOODS that are complete and ready for handover, within 30 days after the

CONTRACTOR/ SUPPLIER's receipt of notice of termination shall be paid by OWNER at the CONTRACT/ PURCHASE ORDER terms and prices. For the remaining jobs, the OWNER may opt:

a) To have any portion completed at the CONTRACT/ PURCHASE ORDER terms

and prices; and/or

b) To cancel the remainder and pay to the CONTRACTOR/ SUPPLIER an ag reed amount for partially completed jobs and f or materials and par ts previously procured by the CONTRACTOR/ SUPPLIER, in which event such goods shall be the property of the OWNER.

26.0 FORCE MAJEURE

26.1 Neither the CONTRACTOR/ SUPPLIER nor the OWNER shall be considered in default in the performance of their CONTRACTUAL obligations under the CONTRACT/ PURCHASE ORDER, as long as such performance is prevented or delayed for reasons, by such act of god, as severe earthquake, typhoon or cyclone (except monsoon) floods, lightning, landslide, fire or explosions, plague or epidemics, strike of a whole national category of workers and concerted act of workmen or other industrial disturbances (lasting more than 14 consecutive calendar days), lockouts, sabotage,

blockade, war, riots, invasion, act of foreign enemies, hostilities (whether war be declared or not), civil war, rebellion, revolution, insurrection or confiscation of power by military or trade embargoes of destruction or requisition by order of any government or any public authority.

CONTRACTOR/ SUPPLIER shall within one ( 1) week notify OWNER about the occurrence of the force majeure event and provide OWNER details of the arising and ceasing of the impediment. The time for performance of the respective obligations suspended by the force majeure shall stand extended by the period(s) for which such conditions of force majeure last. C ONTRACTOR/ SUPPLIER shall provide justification by documentation countersigned by the local chamber of commerce.

26.2 Should one or both the parties be prevented from fulfilling the CONTRACTUAL

obligations by a state of force majeure lasting continuously for a period of six (6) weeks, the two parties shall consult each other regarding the future execution of the CONTRACT/ PURCHASE ORDER.

The mere shortage of labour, materials or utilities shall not constitute force majeure unless caused by circumstances which are themselves force majeure. I f, due to force majeure delay caused exceeds more than three (3) months, OWNER shall have the right to cancel the CONTRACT/ PURCHASE ORDER at no charge to OWNER in CONTRACTOR/ SUPPLIER's favour and OWNER shall be entitled to the reimbursement of any amount already paid to CONTRACTOR/ SUPPLIER.

Page 61: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 26 of 31

NFVP/BAGGING/2016 General Conditions

26.3 CONTRACTOR/ SUPPLIER shall endeavour to prevent, overcome or remove the cause of force Majeure.

26.4 No ground for exemption can be invoked if CONTRACTOR/ SUPPLIER has failed to

give timely notice by registered letter and subsequently supported it by documentary evidence.

27.0 RESOLUTION OF DISPUTES/ARBITRATION

27.1 The OWNER and the CONTRACTOR/ SUPPLIER shall make every effort to resolve

amicably by direct informal negotiations any disagreement or dispute arising between them under or in connection with the CONTRACT/ PURCHASE ORDER.

27.2 if, after thirty (30) days from the commencement of such informal negotiations, the

OWNER and the CONTRACTOR/ SUPPLIER have been unable to resolve amicably a CONTRACT/ PURCHASE ORDER dispute, either party may require that the dispute, be referred for resolution to the formal mechanisms as specified hereunder.

27.3 LEGAL CONSTRUCTION

Subject to provision of article 27.4, the CONTRACT/ PURCHASE ORDER shall be, in all respects, construed and operated as an Indian CONTRACT/ PURCHASE ORDER and in accordance with Indian laws as in force for the time being and i s subject to the jurisdiction of the District court GUNA (M.P).

27.4 ARBITRATION

a) Except where otherwise provided in the contract, all matters ,questions ,disputes or

differences whatsoever, which shall at any time arise between the parties hereto, touching the construction, meaning, operation or effect of the contract, or out of the matters relating to the contract or breach thereof, or the respective rights or liabilities of the parties, whether during or after completion of works or whether before or after termination shall after written notice by either party to the contract be referred to the Chairman & Managing Director, National Fertilizers Limited for appointment of arbitrator. The arbitration proceedings shall be governed by the Arbitration and conciliation Act, 1996,The Arbitration and conciliation (Amendment Act 2015) or any further statutory modification or re- enactment thereof and the rules made there under. If the arbitrator to whom the matter is referred, vacates his office by any reason whatsoever then the next arbitrator so appointed by the authority referred above may start the proceedings from where his predecessor left or at any such stage he may deem fit

b) Further, it is agreed by and between the parties that in case is reference is made to

the arbitrator or the arbitrate tribunal for the purpose of resolving the disputes/differences arising out of the contract by and between the parties hereto, the arbitrator or the arbitrate tribunal shall not award interest on the awarded amount more than the rate of SBI PLR/ base rate applicable to NFL on the date of award of contract.

Page 62: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 27 of 31

NFVP/BAGGING/2016 General Conditions

28.0 GOVERNING LANGUAGE

28.1 CONTRACT/ PURCHASE ORDER shall be written in English language as specified by the OWNER in the instructions to bidders. A ll literature, correspondence and other documents pertaining to the CONTRACT/ PURCHASE ORDER which are exchanged by the parties shall be written in English language. Printed literature in any other language shall only be considered, if it is accompanied by English translation. For purpose of interpretation, English translation shall govern and be binding on all parties.

29.0 NOTICES

29.1 Any notice given by one party to the other, pursuant to this CONTRACT/ PURCHASE

ORDER shall be sent in writing or by cable/telegram or telex and confirmed in writing to the address specified for that purpose in the special conditions of purchase.

29.2 A notice shall be effective when delivered or on the effective date, notified in such

notice, whichever is later.

30.0 TAXES AND DUTIES

30.1 A CONTRACTOR/Supplier shall be entirely responsible for all taxes, duties, license fees

etc. Incurred until delivery of the Contracted goods and services to the owner.

30.2 Any income tax payable in India in respect of supervisory services rendered by contractor/supplier shall be paid and borne by the Supplier/Contractor.

30.2.1 The Contractor/Supplier shall provide all information, documents etc as may be

required by the Owner in connection with determination and discharge of income tax liabilities, if any in respect of consideration for the supervisory services..

30.2.2 Personal income tax payable, if any, in respect of salary of the CONTRACTOR/

SUPPLIER's personnel shall be pay able by the individual deputed by CONTRACTOR/ SUPPLIER. The CONTRACTOR/ SUPPLIER shall, however, consider that the personnel who are to be deput ed in India for the rendering of the supervisory services satisfy the following conditions:

1) The stay of such personnel should not exceed 90 days in a financial year.

2) The personnel so deputed should not be a resident of India and the stay should not exceed 365 days in any of the four (4) financial years immediately preceding the financial year in which he arrived in India.

.

30.3.3 As per the existing definition of resident in India, as contained in section 6 of the income tax act (Act 1962), an individual is stated to be a "Resident" in India in any financial year, if a) he is in India in that year for a period or periods amounting in all to 182 days

or more; or

b) He is in India for 60 days or more during the relevant previous year and has been in India for 365 day s or more during four previous years immediately preceding the relevant previous year.

Page 63: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 28 of 31

NFVP/BAGGING/2016 General Conditions

Note: Financial year referred to in this article means the year beginning on 1st April and ending on 31st March.

31.0 PATENT INDEMNITY

31.1 CONTRACTOR/ SUPPLIER hereby warrants that the use of the materials

delivered under the CONTRACT/ PURCHASE ORDER will not infringe claims of any patent covering such material (to the extent the design for such materials is not furnished by OWNER.). And CONTRACTOR/ SUPPLIER agrees to be responsible for and to defend at its sole expense all suits and proceedings against OWNER based on any such alleged patent infringement and to pay all costs, expenses, judgments and dam ages which OWNER may have to pay or incur by reason of any such suit or proceedings. Notwithstanding the foregoing, CONTRACTOR/ SUPPLIER does not warrant against and shall not be responsible for, claims of patent infringement based solely on the use of such material by the OWNER in combination with other materials or equipment or in the operation of any process other than such process as may be inherent in the use of such materials.

32.0 INDEMNIFICATION

32.1 CONTRACTOR/ SUPPLIER does hereby agree to indemnify and hold harmless the

OWNER from all claims, losses, demand causes of action or suit arising out of the services, labour, equipment, and materials furnished by CONTRACTOR/ SUPPLIER hereunder.

33.0 PERMITS AND CERTIFICATES

CONTRACTOR/ SUPPLIER shall procure, at its expenses, all necessary permits, certificates and licenses required by virtue of all applicable laws, regulations, ordinances and other rules in effect at the place where any of the work is to be performed, and CONTRACTOR/ SUPPLIER further agrees to hold OWNER harmless from liability or penalty which might be imposed by reason of any asserted or established violation or such laws, regulations, ordinances or other rules. OWNER will provide the necessary permits for CONTRACTOR/ SUPPLIER's personnel to undertake any work in India in connection with the CONTRACT/ PURCHASE ORDER.

34.0 INSTRUCTION FOR INVOICING AND PAYMENT DOCUMENTATION

34.1 INVOICING

Invoicing shall be in compliance with the stipulations of the CONTRACT/ PURCHASE ORDER and the following instructions CONTRACTOR/ SUPPLIER is liable for all costs arising from non-compliance with the instructions.

As far as possible description of goods jobs done in invoice and dispatch document shall match the description in CONTRACT/ PURCHASE ORDER. The invoices shall be issued in the name of

EXECUTIVE DIRECTOR NATIONAL FERTILISER LIMITED VIJAIPUR UNIT P.O. NFL TOWNSHIP DISTRICT GUNA, MADHYA PRADESH INDIA

Page 64: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 29 of 31

NFVP/BAGGING/2016 General Conditions

The invoice shall contain the following information:

i) CONTRACT/ PURCHASE ORDER no.

ii) Item no., quantity and complete description

iii) Item wise net price (unit and total) of the equipment when applicable.

iv) Net amount payable by deducting advance payment if any already invoiced, if

any, and the guarantee retention amount, if any , from the total value of the equipment being invoiced

v) Statement that the equipment are meant for

NATIONAL FERTILIZER LIMITED, FOR “INSTALLATION OF BAG LOADING

SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM OF BAGGING

PLANT PROJECT” , AT VIJAIPUR DISTT. GUNA, MADHYA PRADESH, INDIA.

vi) Marking, number and quantity of packages as well as contents of each package. vii) Statement that the equipment are exempted from certain specified duties

and taxes in CONTRACTOR/ SUPPLIER's country (in c ase of foreign CONTRACT/ PURCHASE ORDER).

viii) Partial Shipment or Final shipment .

The country of origin is stated in the separate certificate of origin.

The signed invoices, original and copy shall be made on CONTRACTOR/ SUPPLIER's letter head and shall be duly signed.

Invoices for advance or progress payment(s) shall state the information under (i),(ii), and (iii). Invoices for guarantee retention money shall state the information under (i) to (viii).

34.2 PAYMENT DOCUMENTATION

The following documents shall be presented by CONTRACTOR/ SUPPLIER to CONTRACTOR/ SUPPLIER's bankers to draw payment(s) against letter of credit where such payment(s) is (are) stipulated in the CONTRACT/ PURCHASE ORDER.

34.2.1 Advance Payment

1) Invoice for in original and two (2) copies.

2) Written, unconditional acceptance of the CONTRACT/ PURCHASE ORDER in one (1) original plus two copies.

Page 65: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 30 of 31

NFVP/BAGGING/2016 General Conditions

3) Bank guarantee in the prescribed proforma of the amount equal to the advance payment in one ( 1) copy of original bank guarantee valid up to issued or counter guaranteed/confirmed by Scheduled bank.

4) one (1) copy of the original performance guarantee in the prescribed proforma for

10% CONTRACT/ PURCHASE ORDER value valid up to completion period plus defect liability period issued or counter guaranteed/ confirmed by a Scheduled bank . The charges for counter guarantee/confirmation, if any, will be to CONTRACTOR/ SUPPLIER's account.

34.2.2 Progressive Payment

1. Invoice for progress payment in original and two (2) copies duly certified by

OWNER.

2. Performance certificate from the beneficiary to the effect that progress achieved is equal to progress invoiced, duly certified by OWNER.

Certificate in one (1) original plus two (2) copies.

34.2.3 Shipment Payment (total payment to be made)

1. Contractors/Supplier’s invoice in original and two copies duly certified by Owner 2. Packing list in 3 copies 3. Inspector’s release note -3 copies 4. Certificate of origin -3 copies 5. Full set of on boar d clean ocean Bill of Lading/ Air way bill as the case may be

and 2 copies or FCR(Forwarding Agents Certificate of Receipt) in original and 2 copies

6. 3 copies of letter/cable to Owner’s insurance company 7. Freight bill in one original plus 2 copies showing gross and net freight and freight

rebate if any 8. Test certificate including mill test certificate in 3 copies 9. 3 copies of the registered letter transmitting documents to Owners Clearing agent 10. 3 copies of the letter transmittals transmitting documents to other addresses. 11. Certificate from owner that Performance Bank Guarantee has been received by

Owner.

35.0 SPECIFICATIONS 35.1 CONTRACTOR/ SUPPLIER agrees that all equipment or materials furnished will be in

strict accordance with the specifications, provided however, that any apparent omission or error in the specifications will be met by the CONTRACTOR/ SUPPLIER if such omission is necessary for the functioning of the equipment or material to be supplied and that the CONTRACTOR/ SUPPLIER, prior to proceeding with the work under

CONTRACT/ PURCHASE ORDER, will call to the attention of OWNERany such omission or error or ambiguity in the specifications requiring clarification.

Page 66: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

GENERAL CONDITIONS

ATTACHMENT -II

NFVP/BAGGING/2016 0

REV

Page 31 of 31

NFVP/BAGGING/2016 General Conditions

36.0 GENERAL INFORMATION 36.1 In the event that terms and conditions stipulated in the general conditions of

CONTRACT/ PURCHASE ORDER should deviate from technical specifications stipulated in the CONTRACT/ PURCHASE ORDER, the latter shall prevail.

36.2 LOSSES DUE TO NON-COMPLIANCE OF INSTRUCTIONS

Losses or damages occurring to the OWNER owing to CONTRACTOR/ SUPPLIER's failure to adhere to any of the instructions given by the engineer/OWNER in connection with CONTRACT/ PURCHASE ORDER execution shall be recoverable from the CONTRACTOR/ SUPPLIER.

36.3 RECOVERY OF SUMS DUE

All costs, damages or expenses which the OWNER may have paid for which under the CONTRACT/ PURCHASE ORDER, CONTRACTOR/ SUPPLIER is liable, may be recovered by the OWNER (he is hereby irrevocably authorized to do so) from any money due t o or becoming due to the CONTRACTOR/ SUPPLIER under this CONTRACT/ PURCHASE ORDER or other CONTRACT/ PURCHASE ORDERs and/ or may be recovered by action at law or otherwise. If the sums due to the supplier be not sufficient to recover the recoverable amount, the CONTRACTOR/ SUPPLIER shall pay to the OWNER, on demand, the balance amount.

36.4 PAYMENT ETC. NOT TO AFFECT RIGHTS OF THE OWNER No sum paid on account by the OWNER nor any extension of the date for completion granted by the OWNER shall effect or prejudice the rights of the OWNER against the

CONTRACTOR/ SUPPLIER or relieve the CONTRACTOR/ SUPPLIER of his obligation for the due fulfilment of the CONTRACT/ PURCHASE ORDER.

36.6 CUT OFF DATES

No claims by CONTRACTOR/ SUPPLIER on this CONTRACT/ PURCHASE ORDER shall be entertained by the OWNER after three (3) months after expiry of the performance guarantee.

36.7 PARAGRAPH HEADING

The paragraph heading in these conditions shall not affect the construction thereof.

36.8 ENTIRE AGREEMENT

All the terms and conditions of CONTRACT/ PURCHASE ORDER shall supersede any understanding, promise and presentation, warranty or conditions which conflicts with terms of CONTRACT/ PURCHASE ORDER. No waiver alternation or modification of any provision here to shall be binding on either party unless approved in writing by the parties to CONTRACT/ PURCHASE ORDER.

36.9 ACCEPTANCE With the acceptance of CONTRACT/ PURCHASE ORDER with all its terms and conditions, seller waives and considers as void any and all of seller's general sales conditions.

Page 67: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 1 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

SPECIAL CONDITIONS OF CONTRACT & PURCHASE

Page 68: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 2 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

TABLE OF CONTENTS

SL.NO DESCRIPTION

1.0 DEFINITIONS

2.0 SCOPE OF CONTRACT/WORK

3.0 CONTRACTOR’S OBLIGATIONS

4.0 INSURANCE

5.0 OWNER’S OBLIGATIONS

6.0 WORKS AND CONTRACT TAX

7.0 TIME SCHEDULE

8.0 PRICES AND TAXES

9.0 BILLING SCHEDULE

10.0 MATERIALS SUPPLIED BY PURCHASER

11.0 GUARANTEE FOR TIME OF COMPLETION

12.0 LABOUR AND STAFF

13.0 FINAL ACCEPTANCE

14.0 WORK SCHEDULE AND COOPERATION

15.0 CONTRACT CONDITIONS

16.0 MODE OF CONTRACT

Page 69: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 3 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

1.0 DEFINITIONS

Wherever used in the contract and unless inconsistent with or otherwise indicated by the context, the following terms shall have the meaning as defined hereunder:

1.1 "Commercial Use" shall mean that use of the Plant, which the contract contemplates

or of which it is commercially capable.

1.2 "Commissioning And Guarantee Runs" shall mean complete erection, testing

and providing guarantees as per the contract within stipulated time .

1.3 "Date of Completion" And " Final Acceptance" shall mean the date on which

the plant has been commissioned and the guarantees as set forth in the contract have been proved by the contractor and a certificate to that effect is issued by the Owner.

1.4 "Indian Agent" shall mean the person, firm or company nominated as such by

the contractor to represent the contractor for this contract in India.

1.5 "Mechanical Completion" shall mean completion of erection when:

a) The equipment capable of producing to rated capacities is installed in

accordance with drawings, specifications and in accordance with all applicable codes, and laws.

b) Instruments are installed, inspected and such non-operating checks are made as to ensure operability in the manner required for the process application.

c) Instrument air lines are checked for correct hook up. Airlines are leak tested. d) The electric system is installed and tested in accordance with and to the

extent required by electrical specifications. All wiring is checked for correct hook up. Motor rotation is checked. All power system protective devices are set.

e) drying out is completed to the extent necessary to permit start of commissioning and start up.

f) Painting is completed

1.6 "Month" shall mean calendar month.

1.7 "Plant/Equipment" shall mean the entire assembly of the equipment’s/equipment with

specified battery limits stated in the contract.

1.8 "Purchaser" shall mean Owner

1.9 "Precommissioning” shall mean preparation of plant so that it is capable of operating

on a continuous basis for carrying out commissioning activities.

1.10 "Site” shall mean the project location, where the Plant shall be located and f or which

this contract has been issued.

1.11 “Performance And Guarantee Test” shall mean all operational checks and

tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the contract documents.

Page 70: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 4 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

1.12 The Term ‘'Final Acceptance”/ “Taking Over'’ shall mean the Owner's written acceptance of the works performed under the contract, after successful completion of performance and guarantee tests, as specified in the accompanying technical specification or otherwise agreed in the contract.

1.13 “Commercial Operation” shall mean the conditions of operation in which the

complete equipment covered under the contract is officially declared by the Owner to be available for continuous operation at different loads up to and including rated capacity. Such declaration by the Owner, however, shall not relieve or prejudice the contractor any of his obligations under the contract.

1.14 “Defects Liability Period” shall mean the TWELVE months period commencing

from the successful completion of erection and commissioning and during which the contractor shall remain liable to repair or replacement of any defective part of the works performed under the contract. Words ‘guarantee period’ and ‘ maintenance period’ wherever used shall also have the same meaning.

2.0 SCOPE OF CONTRACT/WORK

2.1 The scope of work is for supply of plant, machinery, equipment, accessories,

auxiliaries, spares and other related items but not limited to manufacturing, packing, supplying, arranging shipping and marine insurance, primary protection and testing of individual items and in assembly w here necessary construction, assembly, erection, testing, commissioning etc.

2.2 Clearance of imported equipment, transportation to site, unloading, transportation,

handling, site assembly, fabrication, insulation, painting, arranging commissioning spares, performance and guarantee test runs as per contract specifications.

2.3 Any additional equipment whether mentioned or not, but which is necessary for the

satisfactory operation and maintenance of plant and for achieving the guaranteed performance of the plant shall be supplied, erected and commissioned by contractor at no additional cost to The Owner as though such equipment’s were originally specified and formed part of scope of work.

2.4 The scope of contract shall include spare parts necessary for two years satisfactory operation and maintenance of the plant and s hall be supplied along with the main equipment and all special tools and tackles required for the maintenance of plant. Owner shall specify in the contract the spares to be purchased and total price shall be adjusted accordingly.

2.5 Handing over all two year spare parts to Owner item- wise with item tags with

information and in the manner desired by Owner either after receipt or after acceptance of plant at option of Owner. Contractor shall also give such drawings, catalogues, sketches and literature that the Owner shall specify in the contract.

3.0 CONTRACTOR'S OBLIGATIONS

The Contractor shall execute the order leading to handing over the Equipment/Plant to Owner/Purchaser in a fully satisfactory working condition after commissioning and guarantee test run. Some of the major items which are only indicative to be performed by Contractor are stated below:

Page 71: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 5 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

3.1 Arrange for dispatch of equipment by rail/road to rail head destination, site, follow up delivery of equipment and be responsible f or all losses and demurrages including at the port.

3.2 Unload the equipment from rail/truck and transport thereafter to the storage or at site check

and arrange for proper receipt and storage. 3.3 Owner shall provide crane for material handling to the Contractor at site on chargeable

basis subject to availability. 3.4 Install and maintain additional light and power points, from one point at battery limit to

be provided by Owner in conformity with the Indian electricity rules in force. 3.5 Arrange for proper storage and security of equipment/materials.

3.6 Make own postage, telephones and telegram arrangement and bear such expenditure.

3.7 Provide all consumables, tools, tackles, scaffolding etc. during testing and commissioning

till final acceptance. 3.8 Provide all civil drawing, plant illumination drawings and foundation bolts and sleeves

drawing in accordance with contract specifications. 3.9 The Contractor shall be responsible for obtaining necessary approvals from the

various statutory authorities. 3.11.1 Hiring charges*

S.No Equipment Hire charges Rs per hour 1 8 Te crane 1050 2 18 Te crane 3700.00 3 35 Te crane 5330.00 4 75 Te crane 5650.00 5 120 Te crane 32050.00 6 400 Te crane 33800.00 7 20 Te trailor 1690.00 8 Fork lifter 720.00 9 Diesel Air

compressor 1500.00

10 Road roller 1100.00

*The above rates are applicable w.e.f 01/04/2010 which are due for revision. Accordingly the latest revised

rates on the day of hiring shall be applicable.

Page 72: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 6 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

3.11.2 TERMS AND CONDITIONS FOR THE USING OF NFL MOBILE CRANES AND HEAVY EARTH MOVING EQUIPMENTS

1) The equipment will be charged for a minimum period of one hour; part of an hour will be counted as full one hour.

2) The time will be counted from the time the machine is taken from its normal place of parking and back to the same place irrespective of the fact that machine is kept working or idle by the contractor.

Explanations:

• Normally the machines are parked in the specified parking yard and shall be available from there.

The hours to be charged shall be counted from the time the machine leaves the yard to the time

the machine comes back to the yard

• In case the machine is parked in a particular plant and comes back to the yard after doing the

contractor’s work, the hours shall be counted from the time the machine leaves the plant till it comes

back to the yard.

• In case the equipment is parked in a plant and after doing the contractor’s work is again sent back

to the plant, the hours charged shall be from the time the equipment leaves the plant to the time it

comes back there.

3. The requisition shall be submitted by the contractor in the prescribed format, signed by the authorized representative of the contractor and countersigned by the concerned officer of NFL, well in advance.

4. Normally the equipment shall be made available only during normal working hours i.e 0800 hrs to 1700 hr s, but in case the equipment is required to work beyond normal hours the overtime payable to the workmen of NFL shall be to the contractor’s account. The security / safety of the machine will be the responsibility of the contractor during the time it is working for him.

5. The logbook shall be signed by the Operator and the authorized representative of the contractor immediately after the work is over. It shall also be countersigned by the requisitioning officer of NFL or his representative.

6. In case there is a breakdown on the machine while it is with the contractor, the time during which the machine is under breakdown shall not be charged. The breakdown will be reported to the NFL Engineer immediately and the effective time of breakdown shall be counted from the time the breakdown is reported to the NFL Engineer till the machine is made available in running condition to the contractor. This down time shall be recorded in the logbook and counter signed by the NFL Engineer.

7. The machine can be withdrawn by the NFL from the contractor for repair maintenance and for any other reasons at the discretion of NFL.

8. The contractor will not attempt overloading beyond the capacity of the machine.

9. The machine will be operated only by the operators, assigned for this purpose by NFL.

10. For taking the equipment outside the factory boundary wall special permission will be needed to do so.

11. In case of any accident on the machine the same will be reported to the NFL Engineer immediately.

Page 73: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 7 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

12. The equipment’s are made available to the contractor with the clear understanding that in case of any loss due to the failure of the NFL equipment, while it is working with the contractor, NFL shall not be responsible for the same and all losses and claims shall have to be borne by the contractor himself. The contractor’s liability shall also include the loss to the equipment.

13. The equipment shall be made available to the contractor subject to their availability.

14. Extension / Shortening of the crane boom-length, if required by the contractor for facilitating execution for his job, shall be Contractor’s responsibility. However, no hiring charges shall be leviable during the execution of the extension/shortening of boom-length

4.0 INSURANCE

4.1 The Contractor at his cost shall arrange, secure and maintain all insurance as

may be pertinent to the works and obligatory in terms of law to protect his interest and interest of Owner, against all perils detailed herein. The Form and the limit of such insurance as defined herein together with the under-writer in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the responsibility to maintain adequate insurance coverage at all times including third party liability during the period of contract shall be as of Contractor alone. The contractor’s failure in this regard shall not relieve him of any of his contractual responsibilities and obligations. The insurance covers to be taken by the contractor shall be in the joint names of Owner and the Contractor. The Contractor shall, However, be authorised to deal directly with insurance company or companies and shall be responsible in regard to maintenance of all insurance covers .Further the insurance should be in freely convertible currency.

4.2 Any loss or damage to the equipment during handling, transportation, storage,

erection, putting the equipment into satisfactory operation and all activities to be performed till the successful completion of trial operation of the plant shall be to the account of the contractor. The contractor shall be responsible for reference of all claims and make good the damages or loss by way of repairs and/or replacement of the equipment,

damaged or lost. The transfer of title shall not in any way relieve the contractor of the above responsibility during the period of contract. The contractor shall provide the Owner with copies of all insurance policies and documents taken out by him in pursuance of the contract. Such copies of documents shall be submitted to the Owner immediately after such insurance coverage. The contractor shall also inform the Owner in the writing at least sixty (60) days in advance regarding the expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc. as may be necessary well in time.

4.3 License /facilities, to the extent it remains the responsibility of the Owner, in respect of supplies to be made by the foreign supplier from outside India required for purposes of replacement of equipment lost in transit and /or during erection and /or during storage shall be made available by the Owner. Contractor shall however, be required to follow the procedure as may be laid down by the Owner to facilitate him arranging such license /facilities. The perils required to be covered under the insurance shall include, but not be limited to fire and al lied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit, theft, pilferage, riot

Page 74: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 8 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

and strikes and malicious damages, civil commotion, weather conditions, accidents of all kinds, war risks (during ocean transportation only) etc. The scope of such insurance shall be adequate to cover the replacement/reinstatement cost of the equipment for all risks till the equipment is taken over by the Owner. The Owner will have no objection to Contractor’s taking two insurance policies; one towards marine insurance covering all risks up to and including completion of Goods on C IF Indian port basis and other towards handling at Port , Custom duty, inland transportation, storage, erection and performance of all activities till the equipment are taken over by the Owner. The insurance policies to be taken should be on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of insurance cover and the amount of claim available from the underwriters, the contractor shall be liable to make good the full replacement/rectification of all equipment/materials and to ensure their availability as per project requirements without additional financial liability to the Owners.

4.4 All cost on account of insurance liabilities covered under the contract will be

to the contractors account and will be included in the contract price. The contractor, while arranging the insurance, shall ensure to obtain all discounts on premia, which may be available for higher volume or for reason of financing arrangement of the project.

4.5 Contractors shall cover insurance from reputed IRDA approved insurance companies.

4.6 The Contractor shall take in the joint name of “Contractor” and "Owner"

comprehensive insurance cover to cover all risk, workmen compensation, 3rd

part insurance, Employees State Insurance (ESI) under ESI Act 1948 for Contractor’s personnel, Contractor’s vehicles, Equipment / plant fire risk policy etc. till handing over of Equipment / Plant to Owner duly commissioned and tested.

4.7 The Contractor shall be fully responsible for pursuing and settling all claims with the

underwriters. I n t he event of accident, injury, damage or loss likely to form a claim under the above insurance policies, the Contractor s hall as quickly as possible submit such details as are necessary for settling such c laims to underwriters and shall also provide information and assistance necessary to settle the claim. The Contractor shall also keep Owner/purchaser fully informed about progress of each such case.

4.8 Owner shall be shown as beneficiary in the policy.

5.0 OWNER'S OBLIGATIONS

5.1 Owner's obligations under this contract shall be limited to the following:

5.2 Owner shall make arrangement to provide the following at one point:

a) Water required for construction free of charges at one point. b) Power required for construction free of charges at one point. c) Space to be provided to contractor, Contractor’s will arrange their own covered office and storage

5.3 Make available area for erection of Plant.

5.4 Make available at one point at site bench mark reference coordinates as may be

necessary. It shall be the responsibility of the Contractor to transfer correctly

Page 75: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 9 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

the levels and coordinates to the Battery Limit for locating equipment within the battery limits.

5.5 Make available to Contractor space (open) for uncovered storage at site.

Contractor shall make own arrangement for constructing covered space for storage of instrument etc.

6.0 WORKS CONTRACT TAX

The prices shall be quoted with a provision of quoting works contract tax / trade tax separately. Owner will deduct tax at sources as per prevailing rules and issue necessary certificates to this effect to the Contractor. The Contractor shall be entirely responsible for getting their accounts settled with sales tax authorities & shall submit no dues certificate from the competent sales tax authority before clearance of their final bill.

6.2 For Contractors who have to bring equipment and material from outside, Owner

shall issue appropriate Form for which the vendor has to inform at least 15 days in advance. However, The Contractor has to get registered with Excise / sales tax authorities at the territorial state of the project site, if any manufacturing activity to be carried out at site and obtain his own Form as the requirement may be.

6.3 Owner will not reimburse any amount paid by Contractor as excise duty or any

other taxes / duties for any job including fabrication etc. if not quoted separately in contract price.

7.0 TIME SCHEDULE

7.1 Contractors shall give a complete time schedule activity- wise to meet the

completion time quoted months from the date of letter of intent.

7.2 The time for completion and phased time schedule shall be subject to and in accordance with the provision of sub-article below.

7.3 Neither Owner/Purchaser nor Contractor s hall be considered in default

in performance of their obligations if such performance is prevented or delayed by Force Majeure conditions as stated in General Conditions of Contract.

7.4 In case the progress of work is unduly and unreasonably delayed by the

Contractor without sufficient cause, the Owner at the Contractors risk and cost and without prejudice to any of the rights under the contract reserve the right to;

a) Terminate the contract wholly or partially and complete it by the Owner or reassign it to others after giving 30 days’ notice in writing to the Contractor to remedy the cause complained of.

b) Make any modifications, deletions, additions to the contract as the Owner may consider necessary to ensure its satisfactory execution after giving 7 day s notice to Contractor to remedy the cause complained of.

7.5 Should the Contractor's preparation for the commencement of the work or any

portion of it or its subsequent rate of progress be from any cause whatsoever,

Page 76: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 10 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

so slow that in the opinion of the Owner, the Contractor will not be able to complete the work or any portion thereof within the stipulated time for completion, the provisions of sub-article 7.4 above shall apply.

7.6 In case of delay in completion beyond stipulated time, notwithstanding the grant

of formal extension of time for completion of work by the Owner, all extra costs, on account of changes in statutory regulations/acts or increase in prices on any other account during the extended time, shall be borne by Contractor unless delay is due to the fault of the Owners/purchaser.

8.0 PRICES & TAXES

8.1 The price quoted shall be firm and fixed without any escalation whatsoever on any

account. The prices indicated for spare parts in the item wise lists shall be fixed and not subject to any escalation.

8.2 The Contractor shall ship the material as per shipping instructions in General conditions of contract.

8.3 Contractor shall be entirely responsible for all taxes, duties, license fees etc.

incurred until completion and handing over of the Plant to the Owner.

8.4 All taxes/levies as may be levied/ leviable including income tax in respect of payment to be made to the contractor under this agreement shall be borne and paid by contractor. The Owner however shall provide all assistance to the contractor/supplier in connection with the same. Any amount which the owner may be required by law to deduct at source towards income tax shall be deducted by the Owner out of the amount payable to the contractor and the balance amount shall be paid by the owner to the contractor .The Owner shall however provide the contractor receipts evidencing the payment.

8.5 As regards Indian income tax, surcharge, CESS on income tax, fringe benefit tax any other corporate tax etc., the Owner shall not bear any tax liability what so ever irrespective of the mode of contract. The bidder (Whether domestic or foreign) shall be liable and responsible for payment of such tax if attached under the provision of the law.

8.6 All taxes, duties, license fees and other such levies as may be applied to the

contract both i n Contractor's country and i n India, including sales tax on bought out items, service tax, excise duty, octroi, corporate income tax in respect of the performance of the contract as well as income tax on the personnel deputed by the Contractor to India in connection with the contract, are t o t he account of the Contractor along with variation thereof during the contract or in extended period, if applicable.

9.0 BILLING SCHEDULE

The Contractor s hall provide a provisional billing schedule within 30 days from the effective date of contract. A finalized payment schedule s hall be furnished by Contractor for approval of owner on completion of placements of orders by Contractor for all raw materials, components, other parts of equipment payment will be released by Owner based on payment schedule approved by Owner

Page 77: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 11 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

10.0 MATERIALS SUPPLIED BY OWNER

In no case material shall be issued by NFL, the contractor shall arrange the same from his own source. However in case the situation so warrants, NFL may consider issue of material subject to charging the material cost plus departmental charges @ 25 %.

11.0 GUARANTEE FOR TIME OF COMPLETION

11.1 The Contractor shall guarantee the dates of completion calculated from the date of

issuance of Notification of Award (Letter of intent). For the purpose of determining price reduction on account of delay in completion the date shall be either the date of completion of commissioning and guarantee runs or the period calculated on the expiry of six months from the actual date of mechanical completion if testing and commissioning is delayed due to reasons not attributable to Contractor.

11.2 Levy of pre-determined charges against price reduction clause for delay in

supplies or completion guarantee runs leading to delay in acceptance or delay in handing over all necessary document specified in technical conditions shall be as per the provision in General Terms and Conditions of contract

11.3 The Contractor shall undertake immediate repair or replacement of the

equipment damaged or lost in transit or during storage assembly, erection and commissioning of plant pending settlement of claim thereafter by the underwriters.

12.0 LABOUR AND STAFF

12.1 The Contractor shall make his own arrangement for labour, erection and commissioning engineers and all other staff required for carrying out the contract

12.2 The Contractor shall make his own arrangements for providing canteen service to

his labour and staff. Open space for this purpose may be provided by Owner.

12.3 The Contractor shall at his own cost provide office and other accommodation for his staff and workmen. The contractor shall also provide transport and medical facilities to his staff and workmen.

12.4 The Contractor shall be responsible for all liabilities and statutory obligations

and any other laws in this regard i n force from time to time regarding the employment or conditions of service of Contractor's workmen or employees and indemnify Owner / consultant for any claim put forth by authorities.

12.5 The Contractor shall observe all safety rules as required under various statutes in

India and shall also strictly adhere to safety regulations of Owner

13.0 FINAL ACCEPTANCE

13.1 After the successful commissioning and guarantee runs the final acceptance

and taking over certificate shall be issued by Owner within 30 days.

Page 78: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SPECIAL CONDITIONS OF

CONTRACT & PURCHASE

ATTACHMENT III

NFVP/Bagging/2016 0

REV

Page 12 of 12

NFVP/BAGGING/2016 Special Conditions of contract & Purchase

14.0 WORK SCHEDULE & COOPERATION

14.1 The Contractor shall draw well in advance detailed schedule of work to be

carried out at site and submit the same to the consultant for approval of the Owner.

14.2 The Contractor shall not object to the execution of the work by other Contractors

or tradesmen and offer them every facility for the execution of their several works simultaneously with Contractors work. Contractor shall at all times provide sufficient fencing, notice boar ds, lighting and watchmen to protect and warn the public and guard the works and in default there of Owner m ay provide such facilities at Contractor's cost.

14.3 Owner shall be at liberty to object to employment of any person at work site

and the objection shall be communicated in writing and Contractors s hall make immediate arrangements for removal of such person.

15.0 CONTRACT CONDITIONS

15.1 Wherever the terms & conditions in Special Conditions Of Contract are at

variance with General Conditions of Contract and any provision of contract elsewhere, special conditions shall prevail.

15.2 Instructions to Bidders (Attachment-I), General Conditions of Contract (Attachment- II), Site Working and Safety Conditions (Attachment-VII) shall also be applicable and form part of Contract.

16.0 MODE OF CONTRACT

16.1 Notwithstanding anything stated elsewhere in the bi d documents, i n the

case of domestic bidder the contract to be awarded shall be on the basis of supply-cum- erection contract on s ingle source responsibility. The supply portion of the contract will relate to the supply of equipment and materials and the erection portion will relate to transportation, storage erection / construction, testing, commissioning, etc.

16.2 In case of two contracts or where the Owners hands over his equipment to

the Contractor for executing the contract, then the Contractor shall at the time of taking delivery of the equipment through bill of lading or other dispatch documents be required to execute an indemnity bond in favour of Owner in the form acceptable to Owner for keeping the equipment in safe custody and to utilize the same exclusively for the purpose of the said contract

16.3 The contract shall be in all respects be construed and governed in accordance with the Indian laws.

16.4 It is clearly understood that the total consideration for the contracts has

been broken up into various components only f or the convenience of payment in advance under the contract and for the measurement of deviation or modification under the contract(s)

Page 79: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 1 of 9

NFVP/Bagging/2016

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

BID FORM , PRICE

SCHEDULES

AND

SUMMARY OF TERMS AND CONDITIONS

Page 80: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 2 of 9

Table of contents

SL. NO.

DESCRIPTION

1.0

Bid Form

Form - A

2.0

Indian Bidder

2.1

Price Schedule for Indian Bidders

Form C.1

2.2

Summary of Terms and Conditions Quoted (Indian Bidder)

Form C.2

Page 81: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 3 of 9

Bid Form -A

Offer No. :

Sub: - ITB No. for Supply of Due for closing at reference to your subject Invitation to Bid (ITB) we are pleased to submit our Bid for the Supply of :

Part-I Bid Security and Pre-qualification Criteria Part-I Technical and Unpriced Commercial Bid

i)

ii) iii)

Part-II Priced Bid

i)

ii) iii)

We undertake that in the event of acceptance of our Bid within the validity period of days, this Bid as modified by our written changes/ amendments till date of notification of award, together with your written notification of award shall constitute a binding contract between us until a formal Contract / Purchase Order is prepared and executed.

We understand that you are not bound to accept the lowest or any Bid that may be received.

Dated this day of 2016.

Authorized Signatories

Page 82: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 4 of 9

PRICE SCHEDULE FOR BIDDER – FORM C.1

(To be completed by Bidder)

ITB NO BID REF. NO.

NAME OF BIDDER

PART A : SUPPLY OF MATERIALS

Item

Description

Quantity

FOT * Works basis Unit Price(Rs.)

Total FOT Works

Price(4X3) (Rs.)

Trans- portation

charges to Site (Rs.)

Total price FOT SITE (5+6) (Rs.)

1 2 3 4 5 6 7

Discount, if any

Total Cost after Discount

i) Total as at Column 5

ii) Packing and Forwarding Charges Included*

iii) Testing Charges as per ITB requirement Included*

iv) Third party inspection charges Included*

v) Total cost FOT Works (i to iv)

vi) Excise duty @ on (v) above

vii) VAT/Sales Tax @ , against form ‘C’, if applicable, on (v + vi) above

viii) Transportation Charges up to site

ix) Cost of commissioning spares (FOT site)

x) Cost of spares for 2 years operation (FOT site)

xi) Any other Taxes and Duties, if applicable (please specify)

xii) PART A: TOTAL FOR SUPPLY OF MATERIALS (i to xi) (Total FOT Site)

Page 83: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 5 of 9

PRICE SCHEDULE FOR BIDDER – FORM C.1

(To be completed by Bidder)

PART B : SUPPLY OF SERVICES

Item Description Unit Total Amount (Rs.)

i) Design & Engineering for complete package

L.S

ii) Unloading, handling, Storage, Assembly/fabrication and Erection

L.S

iii) Allied Civil Construction work

L.S

iv) Commissioning & Guarantee test f or Final acceptance

L.S

v)

Comprehensive Insurance till duly erected and commissioned plant

L.S

vi) Service Tax @ on Item Nos. ……….. above (Please indicate % and Items Nos for which service tax is applicable)

L.S

vii) Any other Taxes and Duties, if applicable (please specify)

L.S

PART B: TOTAL FOR SUPPLY OF SERVICES (i to vii)

L.S

SL NO.

DESCRIPTION

TOTAL AMOUNT (Rs.)

1 TOTAL FOR SUPPLY OF MATERIALS – PART A

2 TOTAL FOR SUPPLY OF SERVICES – PART B

3 TOTAL COST OF ERECTED AND COMMISSIONED PLANT (PART A+ PART B)

B. Completion Period duly commissioned at site Months from Issuance of of Notification of Award

C. CIF Value of Import Content Rs Rate of Custom Duty Considered

D Domestic Value added to manufacturing cost as % of works price

E Estimated weight of the consignment

F Estimated Volume

SIGNATURE & SEAL OF BIDDER DATE:

Page 84: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 6 of 9

PRICE SCHEDULE FOR SPARES PARTS

(To be completed by bidder) ITB NO BID REF. NO.

NAME OF BIDDER

Main Equipment

Description

Quantity FOT Works

For

Commiss ioning Spares

For 2 years

Operatio n

Minimum Spares

For 2 years Operation Additional

Spares

Total No.

Unit Rate (Rs.)

Total (Rs.) (6x7)

1 2 3 4 5 6 7 8

Discount, if any

Total Cost after Discount

Sl. No.

Description

For Commissioning

Spares (Rs.)

For 2 years Operation

Minimum (Rs.)

For 2 years Operation

Additional (Rs.)

A Excise Duty @

B Sales tax @

C

Any other taxes and duties : Quoted / Not Applicable

D Transportation Charges up to site

E DULY DELIVERED PROJECT SITE PRICE (FOT SITE)

SIGNATURE & SEAL OF BIDDER DATE:

Page 85: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 7 of 9

Summary of Terms & Conditions- Form C.2 (Bidder must Confirm/ Comment Point by Point)

ENQUIRY (ITB) NO: OFFER NO:

ITEM: _BIDDER:

We confirm/clarify as follows:

SL.NO DESCRIPTION BIDDER'S CONFIRMATION/ ACCEPTANCE

1.0 PRICE QUOTED AS PER THE PRICE SCHEDULE

2.0 QUOTED FIRM PRICES TILL HANDING OVER OF THE ERECTED & COMMISIONED EQUIPMENT/

3.0 TAXES & DUTIES ALL TAXES, DUTIES AND LEVIES, LAWFULLY ASSESSED AGAINST THE OWNER AND THE CONTRACTOR IN PURSUANCE OF THIS CONTRACT, WILL BE TO CONTRACTOR’S ACCOUNT. IF REQUIRED, THE CONTRACTOR SHALL HAVE HIMSELF TO GET REGISTEREDWITH LOCAL SALES TAX AND SERVICE TAX AUTHORITIES AT SITE.

3.1

EXCISE DUTY: THE EXCISE DUTY PAYABLE MAY NOT BE INCLUDED IN THE BID PRICE AND THE AMOUNT THEREOF MAY BE INDICATED SEPARATELY ALONG WITH THE BASIS AS EXCISE DUTY AND ANY STATUTORY VARIATION IN THE RATE OF EXCISE DUTY WILL BE TO OWNER’S ACCOUNT. (ONLY IF CONTRACTOR / SUPPLIER IS ELIGIBLE FOR SUCH EXEMPTION UNDER TEC)

3.2

CENTRAL SALES TAX: CST (CURRENT RATE IS 2%) ON FINISHED GOODS ONLY. SALES TAX ON RAW MATERIALS, COMPONENTS AND DIRECTLY DISPATCHED SUB-BIDDER ITEMS INCLUDED IN THE QUOTED BASE PRICE.

3.3

OTHER TAXES: THE APPLICABLE TAX MAY BE INCLUDED IN THE BID PRICE AND DETAILS THEREOF MAY BE INDICATED SEPARATELY.

4.0 COMPOSITE INSURANCE THE INSURANCE COVERS SHALL BE IN THE JOINT NAMES OF THE OWNER AND THE CONTRACTOR TO COVER ALL RISKS TILL HANDING OVER OF UNIT (PLANT). (REF.ARTICLE 4.0 OF A03 OF ITB)

5.0

TERMS OF PAYMENT AS PER ITB,

6.0

BID SECURITY

Page 86: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 8 of 9

7.0

DRAFT OF BANK GUARANTEE FOR

- ADVANCE PAYMENT

- PERFORMANCE SECURITY

8.0

DISCOUNT, IF ANY

- COMMERCIAL DISCOUNT

- REPEAT ORDER DISCOUNT

9.0 SCOPE

- SPARES WITH ITEMIZED PRICE LIST

- THIRD PARTY INSPECTION CHARGES

10.0 COMPLETION PERIOD A) MECHANICAL COMPLETION

_ MONTHS

B) COMMISIONING AND HANDING OVER _ MONTHS

C) EFFECTIVE DATE OF COMPLETION SHALL BE FROM NOTIFICATION OF AWARD BY FAX / LETTER OF INTENT.

11.0 PRICE REDUCTION FOR DELAY : AS PER ITB

12.0 FORCE MAJEURE CONDITIONS : AS PER ITB

13.0 GUARANTEE / WARRANTIES : AS PER ITB

14.0 VALIDITY: 180 DAYS FROM BID CLOSURE DATE

15.0 TECHNICAL CONFORMITY WITH TECHNICAL SPECIFICATIONS (STRIKE OUT WHICHEVER IS NOT APPLICABLE)

1. THE OFFER IS AS PER ITB SPECIFICATIONS WITHOUT ANY DEVIATION

2. THE OFFER IS AS PER ITB SPECIFICATIONS WITH ONLY DEVIATIONS ARTICLE BY ARTICLE AS PER ENCLOSED SHEET

16.0 ALL OTHER TERMS AND CONDITIONS AS PER ATTACHMENT-I AND II OF ITB. BIDDER’S PRINTED GENERAL CONDITIONS OF SALE, IF INCORPORATED IN THE OFFER ARE HEREBY WITHDRAWN.

17.0 BAR-CHART FOR MANUFACTURE AND DELIVERY COVERING MAIN ACTIVITIES

18.0 NAME AND ADDRESS OF BANKER

19.0 PLACE OF MANUFACTURE & DESPATCH

20.0 IMPORT LICENCE FOR BOUGHT OUT ITEMS IF REQUIRED TO BE ARRANGED BY BIDDER

21.0 CUSTOMS DUTY ON IMPORT COMPONENTS (INCLUDING

SPARE PARTS) SHALL BE BORNE AND PAID BY BIDDER. TO BE INDICATED SEPARATELY.

Page 87: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID FORM, PRICE SCHEDULES AND SUMMARY

OF TERMS & CONDITIONS

ATTACHMENT-IV

NFVP/BAGGING/2016 0

REV

Page 9 of 9

23.0 TURNOVER FOR LAST THREE YEARS

i) 2015-16

ii) 2014-15

iii) 2013-14

24..0 NAME(CONTACT PERSON )

DESIGNATION:

TELEPHONE NO:

MOBILE NO:

FAX NO:

E MAIL (2 E-Mail IDs to be furnished)

25.0

IT IS CONFIRMED THAT IN CASE ANY OF THE TERMS AND CONDITIONS MENTIONED IN THIS SUMMARY ARE AT VARIANCE WITH THOSE INDICATED ANYWHERE ELSE IN OUR OFFER; THE CONDITION INDICATED IN THIS SUMMARY SHALL PREVAIL.

SIGNATURE & SEAL OF BIDDER WITH DATE

Page 88: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 1 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

BID SECURITY FORM, PERFORMANCE BANK GUARANTEE FORM & ADVANCE BANK

GUARANTEE FORM

Page 89: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 2 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

BID SECURITY FORM

DRAFT OF BANK GUARANTEE FOR BID SECURITY DEPOSIT

IN CONSIDERATION OF NATIONAL FERTILIZERS LIMITED (NFL), H AVING IT S REGISTERED OFFICE AT SC OPE COMPLEX, CORE-III, 7 INSTITUTIONAL AREA, LODHI ROAD, NEW DELHI-110003 (HERE IN AFTER CALLED NFL WHICH EXPRESSION SHALL UNLESS REPUGNANT TO THE SUBJECT OR CONTEXT INCLUDES ITS SUCCESSORS AND ASSIGNS) HAVING AGREED TO EXEMPT (HEREINAFTER CALLED THE, THE SAID TENDERER(S)’ WHICH EXPRESSION SHALL UNLESS REPUGNANT TO THE SUBJECT OR CONTEXT INCLUDES HI S SUCCESSORS A ND ASSIGNS) FROM THE DEMAND UNDER THE TERMS AND CONDITIONS OF TENDER NO FOR HEREINAFTER CALLED “THE SAID TENDERER’ O F SUCH BID SECURITY DEPOSIT FOR THE DUE FULFILMENT BY THE SAID TENDERER(S) OF THE TERMS AND CONDITIONS CONTAINED IN THE SAID TENDER FOR ON P RODUCTION O F B ANK GUARANTEE FOR RS/ . (RUPEES/ ONLY)

1. WE BANK HEREINAFTER REFERRED TO AS ‘THE BANK’ DO HEREBY U NDERTAKE T O PAY TO NFL AN A MOUNT NO T EXCEEDING R S/ . (RUPEES/ ONLY) AGAINST ANY LOSS OR DAMAGE CAUSED TO OR SUFFERED BY ‘NFL’ REASON OF ANY BREACH BY THE SAI D T ENDERER(S) OF ANY OF THE TERMS AND CONDITIONS CONTAINED IN THE SAID T ENDER (THE DECISION OF THE COMPANY AS T O ANY SUCH BREACH HAVING BEEN COMMITTED AND LOSS SUFFERED SHALL BE BINDING ON US.

2. WE BANK DO HEREBY UNDERTAKE TO PAY THE AMOUNTS

DUE AND PAYABLE UNDER THIS GUARANTEE WITHOUT ANY DEMUR MERELY OR A DEMAND FROM ‘NFL' STATING THAT THE AMOUNT CLAIMED IS DUE BY WAY OF LOSS OR DAMAGE CAUSED T O O R WOULD CAUSE TO OR SUFFERED BY ‘NFL’ BY R EASON O F AN Y BREACH BY THE SAID TENDERER(S) OF ANY OF THE TERMS OR CONDITIONS CO NTAINED IN T HE SAID TENDER OR BY REASON OF THE SAID TENDERER’S FAILURE TO KEEP THE TENDER OPEN. AN Y SU CH DEMAND MADE ON THE BANK SH ALL BE CONCLUSIVE AS REGARDS THE AMOUNT DUE AND PAYABLE BY THE BANK UNDER T HIS G UARANTEE. HO WEVER, OUR LIABILITY UNDER THIS GUARANTEE SHALL BE RESTRICTED TO AN AMOUNT NOT EXCEEDING RS/ . (RUPEES/ ONLY)

3. WE BANK F URTHER AGREE THAT T HE G UARANTEE

HEREIN CONTAINED SHALL REMAIN IN FULL FORCE AND EFFECT DURING THE PERIOD THAT WOULD BE TAKEN FOR THE FINALISATION OF THE SAID TENDER AND THAT IT SHALL CONTINUE TO BE ENFORCEABLE TILL THE SAID TENDER IS FINALLY DECIDED AND ORDER P LACED ON T HE S UCCESSFUL TENDERER AND/ OR TILL ALL THE DUES OF NF L UNDE R/OR B Y VIRTUE O F

Page 90: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 3 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

THE SAID TENDER HAVE BEEN FULLY PAID AND ITS CLAIMS SATISFIED O R DISCHARGED OR T ILL A DULY AUTHORISED OFFICER O F NFL CE RTIFIED THAT THE TERMS AND CONDITIONS OF THE SAID TENDER HAVE BEEN FULLY AND PROPERLY CARRIED OUT B Y T HE SAID TENDERER(S) AND ACCORDINGLY DI SCHARGES T HE G UARANTEE. UNLESS A DEMAND OR CLAIM UNDER THIS GUARANTEE IS MADE ON US IN WRITING ON OR BEFORE THE TO INCLUDE 6 M ONTHS CLAIM OVER AND ABOVE THE PERIOD MENTIONED I N T HE PARAGRAPH FOR THE VALIDITY OF THE BANK GUARANTEE I N T HE TENDER W E SH ALL BE D ISCHARGED FROM ALL LIABILITY UNDER THIS GUARANTEE THEREAFTER.

4. WE BANK, LASTLY UNDERTAKE NOT TO

REVOKE THIS GUARANTEE DURING ITS CURRENCY EXCEPT WITH THE PREVIOUS CONSENT OF ‘NFL’ IN WRITING.

DATED DAY OF 200

CORPORATE SEAL FOR BANK.

Page 91: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 4 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

PROFORMA FOR BANK GUARANTEE AGAINST ADVANCE PAYMENT (On Stamp Paper issued in the Name of the Bank)

Guarantee No………………………… Dated………………

In consideration of the National Fertilizers Limited, Vijaipur, Dist. Guna (MP), PIN: 473 111, a Company incorporated under the Indian Companies Act and having its registered office at SCOPE Complex, Core-III, Institutional Area, Lodhi Road, New Delhi 110003 (hereinafter called "NFL") having agreed to advance a sum of Rs……………. (Rupees…………………………… only) to M/s………………………………….. (Hereinafter called "SUPPLIER") as ………..% advance against supplies against Purchase Order No………………….. Dated……………. for Rs………. (Rupees………………. only) at a simple interest of SBI PLR+1% (presently SBI PLR is 14.05%), per annum. We, ……………………….(Bank), having its registered office at ………………….. (Hereinafter referred to as the "BANK") do hereby undertake to pay immediately on demand by NFL an amount not exceeding Rs………………….. (Rupees…………………. only) [i.e. Rs………….. as Principal Amount and Rs………………………. as Interest for …………. Months].

2. Bank Do hereby undertakes to pay the amounts due and payable under this

guarantee without any demur immediately on a demand by NFL. Any such demand made on the Bank shall be conclusive as regards the amount due and payable and the Bank will make the payment immediately without referring to Supplier.

3. The Bank further agrees that the guarantee herein contained shall remain or

shall be released to the Supplier when the deliveries are completed, with prior certification by NFL.

4. We………………….. (Bank) further agree with the NFL that NFL shall have the

fullest liberty without the Bank's consent and without effecting in any manner or obligations hereunder to vary any of the terms and conditions of the Purchase Order or to extend time of performance by the Supplier from time to time or to postpone for any time or from time to time any of the powers exercisable by NFL against the Supplier and to forebear or enforce any of the terms and conditions relating to the Purchase Order No…………….. dated………. and the Bank shall not be relieved from our liability by reasons of any such variation or extension being granted to the Supplier or for any forbearance, act or omission on the part of NFL or any indulgence by the NFL to the Supplier or by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision, have effect of so relieving Bank.

5. We……………. (Bank) further agree that it shall not revoke this guarantee

during its currency of Guarantee except with the previous consent of NFL in writing.

Page 92: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 5 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

6. This guarantee will not be di scharged due to the change in constitution of the Bank or the Contractor(s)/Supplier(s). Also the guarantee will not be discharged due to change in the constitution or Management of NFL.

7. We……………. (Bank) agree to extend the validity of the guarantee for the

period(s) as asked for by M/s ………………………….

8. Notwithstanding anything contained herein before, our total liability under this guarantee is restricted to Rs………………… (Rupees……………………………. only) and s hall remain in force until………………….. Unless a demand or claim to enforce a claim under this guarantee is made against us in writing on or before the date i.e……………….. all rights of NFL, under this guarantee shall be forfeited and the Bank shall be released and di scharged from all liabilities hereunder.

Dated:…………………… Bank……………………………

(Corporate Seal of Bank)

Page 93: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 6 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

SECURITY DEPOSIT-CUM-PERFORMANCE BANK GUARANTEE FORMAT (To be prepared on Stamp paper issued in the name of Bank)

This BANK GUARANTEE No. made this day of between

a bank incorporated and hav ing its r egistered office at (hereinafter called BANK) which expression shall unless repugnant to the context or contrary to the meaning thereof include its successors and assigns on the one par t and N ATIONAL FERTILIZERS LIMITED, a Company registered in India under Companies Act, 1956 and having its registered office at Core - III, Scope Complex, 7, Institutional Area, Lodhi Road, New Delhi - 110 003, India to the context or contrary to the meaning thereof include its Successors and assigns on the other part.

WHEREAS in pursuance to the agreement dated

(hereinafter called CONTRACT) entered into between National Fertilizers Limited (hereinafter called OWNER and a Company i ncorporated i n

(hereinafter called C ONTRACTOR) which expression shall unless repugnant to the context or contrary to the meaning thereof include its successors and as signs, for supply of

As envisaged in the Contract, Contractor has to submit a Security Deposit-cum-Performance Bank Guarantee for Currency of Contract. .

CONTRACTOR accordingly agrees to furnish the Security cum performance Bank

Guarantee as hereinafter contained towards fulfilment of all of its obligations under the contract.

NOW THIS DEED WITNESSETH AS FOLLOWS: 1. In pursuance of the Contract, the Bank hereby guarantees as a direct responsibility to OWNER that the BANK is holding the amount of Rs. Currency of Contract at Owner's disposal and hereby promises and shall be bound to pay to OWNER, forthwith at Owner's written notice stating that the contractor has failed to fulfil its obligations under the contract for reasons f or which contractor is liable and without any protest or demur and without recourse to contractor and without asking for any reasons as to whether the amount if lawfully asked for by Owner or not , the entire amount or the portion thereof as mentioned by Owner in the Notice.

The decision of the Owner as to whether the terms and conditions of this Security

Deposit-cum-Performance Bank Guarantee have been observed or not shall be f inal and binding on the BANK. I n any case, however the Bank’s responsibility under this

Page 94: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

BID SECURITY FORM , PERFORMANCE BANK

GUARANTEE FORM , ADVANCE BANK GUARANTEE

FORM

ATTACHMENT-V

NFVP/BAGGING/2016 0

REV

Page 7 of 7

NFVP/Bagging/2016 Forms: BID SECURITY , PBG , ADVANCE BANK GUARANTEE

Security Deposit-cum-Performance Bank Guarantee is limited to Rs.

. 2. This Security Deposit-cum-Performance Bank Guarantee shall be valid for an initial period of months from the date of this Bank Guarantee No. dated given by the Bank to Owner become effective. Upon issuance of Commissioning / Erection / Completion certificate according to terms of contract on expiry of months after the issuance of the above mentioned certificate of commissioning / erection / completion certificate, or 24 months from the date of delivery whichever is earlier the Security Deposit-cum-Performance Bank Guarantee shall become null and void.

3. This Security Deposit-cum-Performance Bank Guarantee shall be in addition t o and shall not affect or be affected by any other security now or hereafter held by Owner on account of money hereby intended to secure and Owner at its discretion and without any further consent from the Bank, and without affecting its rights against the Bank, may compound with, give time or other indulgence to or make any other arrangement with Contractor and nothing done or omitted to be done by Owner in pursuance of any authority or permission contained in this guarantee, shall affect of discharge the liability of the Bank.

4. UNLESS PREVIOUSLY CANCELLED BY THE OWNER, this Security Deposit- cum- Performance Bank Guarantee will remain in force initially up to months from the effective date of Bank Guarantee No. dated given by the Bank to the Owner and subject to provisions of paragraph 2 above will stand automatically cancelled on the expiry of the said period. Unless demand or claim under this Bank Guarantee is made on Bank in writing within six months from the date of expiry of this Bank Guarantee, all the rights of Owner against the Bank shall be forfeited and Bank shall be relieved and discharged from all the liabilities hereunder.

5. Any notice by way of request, demand or otherwise hereunder may be sent by post to the Bank, addressed as aforesaid, and i f sent by post, it shall be deemed to have been given at the time when it would be delivered in due course of post, and in proving such notice, when given by post, it shall be sufficient to prove that the envelope containing the notice was posted and a certificate, signed by an officer of the owners, to the effect that the envelope was so posted, shall be conclusive.

6. The Security Deposit-cum-Performance Bank Guarantee is to be returned to the Bank after its expiry in terms of Paragraph 4 above.

7. The Bank declares that it has the power to issue this guarantee and the undersigned have full power to do so. Dated this day of .

( Indicate the name of the Bank with stamp)

Page 95: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

FORMAT FOR EXCEPTIONS AND DEVIATIONS

ATTACHMENT VI

NFVP/Bagging/2016 0

REV

Page 1 of 2

NFVP/Bagging/2016 Exceptions & Deviations

INVITATION TO BID FOR

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

FORMAT FOR EXCEPTIONS AND DEVIATIONS

Page 96: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

FORMAT FOR EXCEPTIONS AND DEVIATIONS

ATTACHMENT VI

NFVP/Bagging/2016 0

REV

Page 2 of 2

NFVP/Bagging/2016 Exceptions & Deviations

ITB NO. ITEM .

BIDDER REF NO NAME OF BIDDER

SL.

NO

BIDDING DOCUMENT

REFERENCE

SUBJECT

DEVIATION DOCUMENT

NO.

PAGE NO. CLAUSE NO.

NOTE: 1. If unavoidable, Bidder may stipulate deviations to the requirements of the Bidding Document only in this format.

2.

Bidder shall furnish Technical and Commercial deviations, if any, separately.

3.

Any deviations stated elsewhere in the bid shall not be taken into account and may render the bid non-responsive and liable to be rejected.

STAMP & SIGNATURE OF THE BIDDER WITH DATE

Page 97: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 1 of 8

NFVP/Bagging/2016

INVITATION TO BID FOR

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

SITE WORKING AND

SAFETY CONDITIONS

Page 98: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 2 of 8

NFVP/Bagging/2016 Site Working and safety conditions

TABLE OF CONTENTS

SL.NO DESCRIPTION

1.0 PROJECT SYNOPSIS

2.0 SITE ESTABLISHMENT

3.0 SUPERVISION OF WORK

4.0 INSPECTION

5.0 EMPLOYMENT OF LABOUR

6.0 REPORTING

7.0 COMPLETION OF WORK

8.0 INSURANCE CLAIM FOR DAMAGES

9.0 WORKING AND SAFETY REGULATIONS

10.0 ELECTRICAL SAFETY REGULATIONS

11.0 STATUTORY REQUIREMENTS

Page 99: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 3 of 8

NFVP/Bagging/2016 Site Working and safety conditions

1.0 PROJECT SYNOPSIS

NFL has revamped its plants recently enhancing the capacity of existing Urea plant from 2x1310 MTPD(U-I) to 2x1515 MTPD (U-I) and 2x1310 MTPD(U-II) to 2X1615.5 MTPD(U-II).The product Urea is dispatched to various consumption centers through Rail & Road. The annual average quantity of Urea dispatched during the last three financial years (2013-16) was 2137094 MT, out of which 93.51 % (1998429 MT) was dispatched through rail. To reduce rake loading time NFL wants qualified parties for detailed design, engineering, manufacture, inspection, painting, supply, packing, forwarding , erection, testing & commissioning of BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM for 13 No’s loading stations of Urea Bagging Plant at VIJAIPUR UNIT. To start with the modification shall be carried out in two stations only remaining 11 stations shall be modified subject to the vendor successfully demonstrating the performance of the first two stations as per the performance parameters to the full satisfaction of NFL.

2.0 SITE ESTABLISHMENT

2.1 The Contractor shall provide all huts, stores, tarpaulins and other c overs for the

accommodation of his staff, workmen and materials. All materials likely to deteriorate in the open shall be stored under suitable cover.

2.2 The Contractor shall advise the Owner within 15 days of the placement of LOI his space

requirement which shall include for office, mess rooms, covered storage, open storage, fabrication space, lavatories etc. Depending on availability and requirement, space shall, for the duration of this contract, be allotted to the contractor but he will not be permitted to make use of any other space without the sanction of the Owner. The use of this space shall strictly be made for the execution of this Contract only. The sanitary conditions of the ground in or around such structures shall, at all times be maintained by the Contractor in a manner satisfactory to the Owner.

2.3 The security of the Contractor's equipment and m aterials is his own responsibility. H e

will ascertain what security arrangements are made on site by the Owner and take further steps/Precautions he may think necessary. The Owner accepts no liability for loss or damage to the Contractor's plant, tools or materials.

2.4. The material issued to the Contractor, by the Owner will remain under the custody of

the Contractor as a trustee. However, title on the same will remain with the Owner. The Contractor will be responsible for loss or damage to such materials and shall preserve them in good working condition as required for the contract and g ood construction practices till such time that they are erected, aligned and fully installed in position and handed over t o t he Owner. I n case the Owner feels t hat arrangements made by the Contractor are not adequate he s hall so advise the contractor and the Contractor shall promptly take corrective action. In case the Contractor fails to take corrective action within a reasonable time, the Owner on advice of the consultant shall take such corrective actions and recover the cost thereof from the Contractor's bills. Account of such material on completion of work, shall be rendered and surplus materials returned to the Owner as per instructions of Owner.

2.5 The Contractor shall clear away immediately any rubbish, scrap materials, etc. and

dump the same in the area indicated by the Owner. All construction material shall be neatly stacked in an orderly manner as directed by the Owner and care shall be taken to allow proper access to workmen and easy movement of men, vehicles, cranes and materials.

Page 100: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 4 of 8

NFVP/Bagging/2016 Site Working and safety conditions

2.6 The Contractor shall maintain all the dr awings c arefully m ounted on t he board of appropriate size and well protected from the ravages of termites and other insects.

2.7 The Contractor shall not permit the entry to the site of any person not di rectly

connected / concerned with the work without first having obt ained the written permission of Owner.

2.8 The Contractor shall submit a list of tools, tackles, etc. which he w ill use, to perform the work. T he C ontractor shall submit a l ist i n duplicate of all materials, tools and t ackles et c. brought inside the plant site duly signed by Owner's security s taff as per r ules l aid by O wners at site Project. These tools, etc. shall not be r emoved from the Site till the completion of the job. A gate pass must be obt ained from the Owner in order to remove from Site any tools, materials and equipment.

2.9 All items such as keys, instructions and ot her pertinent data regarding

erection/commissioning and m aintenance should be tagged and c lassified f or transmittal in a manner approved by the Owner.

2.10 All employees of the Contractor shall conform to the rules of conduct, etc.

established by Owners. Failure to do so will be sufficient cause for removal of such person from the Site.

2.11 The Contractor will be responsible for providing all plant, tools and tackles,

consumable and scaffolding required for the execution of his work as per the best engineering practices.

2.12 The receipt, off-loading, movement and storage at Site of the entire Contractor's

plant, tools and materials are his responsibility. T he receipt, movement and storage, if required, of material issued by Owners shall be the responsibility of the Contractor.

2.13 Electricity:

The Contractor shall advise the Owners/Consultant within 7 days of the placement of LOI his electrical power requirements to allow the planning of the temporary el ectrical distribution. P ower, subject to availability, will be made available at one point. Contractor shall make his own arrangement at his cost for drawing power from the Owner's distribution board to his own distribution board. The power supply shall be made available at 415 V, 3 phase 50 Hz, four wire system. Electricity will be made available to the Contractor free of charge. Contractor may be required to use his diesel driven Generator sets at site. In his t ender, contractor s hould i ndicate t he no. of di esel Gen. sets t hat c an be deployed by him. All temporary wiring from the supply point for either Power or lighting will be the responsibility of the Contractor. Contractor's Distribution Board temporary wiring shall be GOI approved/

done by certified electrician and must comply with local regulations and is subject the Owner's inspection and approval before connection t o supply. Owner shall provide some flood lights at site. Additional lights if required by Contractor shall be arranged by Contractor.

2.14 (a) Water: The Contractor shall advise the Owner within 7 days of the placement of LOI, his water requirement for hydraulic testing and other requirements. A free supply of water will be made available at one point on the site. Any further distribution will be the responsibility of the Contractor.

Page 101: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 5 of 8

NFVP/Bagging/2016 Site Working and safety conditions

(b) Plant Air

The Contractor shall advise the Owner within 7 days of the placement of LOI, his plant air requirement for pneumatic chipping devices and other requirements. A free supply of plant air will be made available from the existing plant air header at utility points available in plant. Any further requirement will be the responsibility of the Contractor.

2.15 Messing & Accommodation:

The Contractor will make his own arrangements. No accommodation shall be provided by Owner.

2.16 First-Aid:

The Contractor may have access to the Owner's qualified first-aid personnel and ambulance, in case of accidents, if available. The Contractor will, however, provide a first-aid post for minor injuries to their staff.

2.17 Safety Equipment: All necessary personal safety equipment like safety belts, helmets,

protective face and eye shields, hand-gloves, overall etc. as required should be made available for the use to the person employed on the site. It is contractor's responsibility to maintain all safety equipment in good working condition.

3.0 SUPERVISION OF WORK:

3.1 The Contractor shall submit t o t he Owners / Consultant a r esume of hi s s ite-

supervisors f or approval prior to c ommencement of t he work. O nce approved, the Contractor shall not remove his site-supervisors without prior concurrence of the Owners/Consultant.

3.2 The entire work is to be completed as per the Project time schedule. The programme

of the work in details shall be submitted by the Contractor before commencement of the work. The detailed programmes prepared by the contractor shall conform to the targets set forth in the Time Schedule and w ill be s ubject to t he approval of the Owners/Consultant. All the work shall be carried out in such a manner that the work of other agencies operating at site is not hampered due to any action of the Contractor.

4.0 INSPECTION:

The work of the Contractor is subject to Inspection by the owner at a l l t imes.

5.0 EMPLOYMENT OF LABOUR

5.1 The Contractor will be expected to employ on t he work only his regular skilled

employees with experience of this particular work. The permission of the Owners/Consultant must be obtained before tradesmen are recruited locally for the work. This rule does not apply to un-skilled labour. No person below the age of eighteen years shall be employed. The contractor shall pay, to his employees / workers the minimum wages as per latest State Government notification issued time to time.

5.2 All travelling expenses including provision of all necessary transport to and f rom Site, lodging allowances and other payments to the Contractor's employees are his own responsibility.

Page 102: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 6 of 8

NFVP/Bagging/2016 Site Working and safety conditions

5.3 The hours of work on the Site shall be decided by the Owners/Consultant and Contractor shall adhere to it Monday to Saturday minimum working hours will be 8 (eight) hours per day excluding lunch break etc.

5.4 Contractor's employees shall wear identification badges while on work site. 5.5 All notices displayed on t he Site and any instructions issued by the Owner must

be strictly adhered to by the Contractor's and/or his sub-contractor's employees. 5.5.1 Contractor shall arrange labour licenses as per rules from concerned authorities at his

own cost. 5.5.2 Contractor will take insurance cover for all his employees against accident etc. 5.6 Contractor will arrange ration cards and permits, if required. 5.7 In case the Owner becomes liable t o pay any wages or dues to the labour of the

Contractor or his Sub-contractor or to any Government Agency under any of the provision of the Minimum W ages Act, Workmen Compensation Act or any other law due t o act of omission of the Contractor, t he Owner shall promptly make such payment and shall recover the same from the Contractor's bills.

5.8 The Contractor shall be required to produce documentary evidence to the effect that he has discharged his obligations under the Employees Provident Fund Act, 1952, for his / subcontractor’s employees working at site.

5.9 The OWNER shall allocate only space to the Contractor for his labour colony. I t shall be the responsibility of Contractor to provide suitable accommodation including all necessary facilities. However, subject to availability, electricity and w ater shall be provided at one place on chargeable basis. Further distribution, as required, shall be done by Contractor.

6.0 REPORTING

(a) The Contractor must report the following information to the Owner in writing each Friday:- i) Number of employees, trades-wise;

ii) Progress achieved;

iii) Expected dates of completion of work;

iv) Any actual or potential delay in programme caused by the action or inaction of

Owner and other Contractor working at site.

(b) If during excavation any materials such as but not limited to precious materials or treasure etc. are found, the same shall be reported to Owner immediately and shall be the property of Owner.

7.0 COMPLETION OF WORK:

Before finally leaving site, al l t he Contractor's huts, plant, tools and rubbish must be removed and the site left clean and tidy.

8.0 INSURANCE CLAIM FOR DAMAGES

On receipt of material at site, the Contractor shall promptly check for damages if any and notify the Owner and s hall t ake necessary action for lodging insurance claim for damages.

9.0 WORKING AND SAFETY REGULATIONS:

9.1 The Contractor will observe all statutory and l egal r equirements of Central and

State Governments applying to the work as well as any local regulations applying to the site issued by the Consultant or any other authority.

Page 103: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 7 of 8

NFVP/Bagging/2016 Site Working and safety conditions

9.2 Particular attention is drawn to the following:-

i) In case of accident, the Owner shall be informed in writing forthwith. The

Contractor shall strictly follow regulations laid down by Factory Inspector, Government and state authorities in this regard.

ii) Fencing all Contractor's plant, platforms, excavations etc.

iii) Compliance with all electricity regulations.

iv) Compliance with statutory requirements for inspection and t est of all lifting appliances and auxiliary lifting gear.

9.3 Staircases, door s and g angways m ust not be obs tructed in any way that will

interfere with means of access or escape.

9.4 No excavation will be started without t he per mission of t he Owner, who will inform the Contractor of the position of any pipes or cables known to be buried in the area. All excavations must be effectively railed off at all times, or completely broaded ov er and pr operly marked during the hours of darkness by red warning lamps, using flameproof warning l amps in non-smoking areas. Debris or material which cannot be immediately removed must be heaped in such a way as to leave adequate passage way. Any finds such as r elics or antiques c oins or fossils, etc. shall be promptly handed over to the Owner.

9.5 The Contractor will notify the Owner of hi s i ntention t o bring on t he site any

equipment, such as space heating or welding appar atus or any container holding liquid or gaseous fuel or other substance which might create a hazard. The Owner will have a right to prohibit the use of such equipment or to prescribe the conditions under w hich such equipment m ay be us ed. The Consultant will have the right to inspect any construction plant, and t o forbid its use if in his opinion it is unsuitable or unsafe. No claim arising there from shall be made by the Contractor. The Contractor or any one acting on his instructions will not bring on t o t he site any radio-active substance or any apparatus using s uch substances or any X -ray appar atus until written permission and direction r egarding t he us e of such equipment has been received from the Consultant/ Owner.

9.6 The Contractor will meet all requirements, and act on the instructions of the Owner

where it is necessary to operate a 'permit-to-work' system.

9.7 Where it is necessary to provide any/ or s tore petroleum products or petroleum mixtures and explosive, the Contractor shall be responsible for carrying out such provision and/ or s torage i n ac cordance w ith the rules and r egulations l aid down in Petroleum Act, 1934, Explosive Act, 1948 and Petroleum and Carbide of Calcium Manual publ ished by t he C hief I nspector of Explosives of India. All such storage shall have prior approvals of the Consultant. In case any approval is necessary from the Chief Inspector of Explosives or any statutory authorities, the Contractor shall be responsible for obtaining the same.

9.8 The Contractor shall have his own fire fighting extinguishers and equipment.

9.9 The Contractor shall be responsible for the provision of all safety notices and

safety equipment required by both t he r elevant legislation and s uch as the Owner/ Consultant may deem necessary.

Page 104: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

SITE WORKING AND SAFETY CONDITIONS

ATTACHMENT VII

NFVP/Bagging/2016 0

REV

Page 8 of 8

NFVP/Bagging/2016 Site Working and safety conditions

9.10 The Contractor shall be r esponsible for the safe storage of the radio-graphic sources or those of his sub-contractors.

10.0 ELECTRICAL SAFETY REGULATIONS:

10.1 In no c ircumstances will t he Contractor interfere with fuses and electrical

equipment belonging to the Owner or other Contractors.

10.2 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other Contractor or Owner, he will -

i) Satisfy the Owner/ Consultant that the appliance is in good working

conditions; ii) Inform the Owner of the maximum current r ating, voltage and phase of

the appliance; iii) Obtain permission of the Owner dealing the sockets to which the appliances

may be connected.

10.3 The Owner will not grant permission to plug in until he is satisfied that –

i) The appliance is in good condition and is fitted with a suitable plug; ii) The appliance is fitted with a s uitable cable having two earth conductors,

one of which shall be an earthed metal sheath surrounding the cores.

10.4 No electric cable in use by the other Contractor / Owner will be distributed without prior per mission. N o weight of any description will be imposed on any such cable and no ladder or similar equipment will rest against or be attached to it.

10.5 The voltage for all portable equipment e.g. dr illing machines, temporary lighting

etc. will not exceed 240 volts.

10.6 No work must be carried out on any l ive equipment. T he equipment must be made safe and a 'permit-to-work ' issued before any work is carried out.

10.7 Contractor shall employ authorised electrician to maintain his temporary electrical

installation.

11.0 STATUTORY REQUIREMENTS:

The contractor shall conform to the provisions of Acts of Parliament or State Legislatures and to any bye-laws, rules, orders or notifications of any Government, Municipal or local authority for the time being in force affecting the work undertaken by him and w ill give a ll necessary notices to and obtain requisite sanction and permits of and from the Municipal and any other authority in respect of the said work of the materials to be used threat and generally will comply with building and other regulations of s uch aut horities and w ill k eep the Owner indemnified ag ainst all claims, penalties and losses that may be incurred by it by reason of any breach by the contractor of any statute , bye laws, rules, regulations , notifications etc.

Page 105: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

APPLICABLE INDIAN ACTS RULES AND

REGULATIONS

ATTACHMENT –VIII

NFVP/Bagging/2016 0

REV

Page 1 of 3

NFVP/Bagging/2016 Applicable Indian Acts ,Rules & Regulations

INVITATION TO BID FOR

INSTALLATION OF

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM

OF

BAGGING PLANT

FOR

M/S NFL (VIJAIPUR- UNIT)

APPLICABLE INDIAN ACTS RULES AND REGULATIONS

Page 106: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

APPLICABLE INDIAN ACTS RULES AND

REGULATIONS

ATTACHMENT –VIII

NFVP/Bagging/2016 0

REV

Page 2 of 3

NFVP/Bagging/2016 Applicable Indian Acts ,Rules & Regulations

Applicable Indian Acts, Rules & Regulations

1. Indian Electricity Act (Modified) 1952 (Act IX, 1910) 2. The Electricity Supply Act (LIV) of 1948

3. Factories Act, 1948

4. Indian Explosives Act, 1948

5. Indian Boiler Act, 1884

6. The Petroleum Act, 1934

7. Industrial Disputes Act, 1947

8. Income Tax Act

9. Central Sales Tax Act

10. Madhya Pradesh Sales Tax Act

11. Madhya Pradesh Transfer of Property Act

12. Indian Customs Act

13. Service Tax Act

14. Central Excise Act

15. The Indian Electricity Rule

16. Regulations for the Electrical Equipment of Buildings, 1958

17. IS-5572-1978: Classification of Hazardous Area

18. IS-2148-1968: Flame Proof Enclosures of Electrical Equipment

19. IS-5571-1970: Guide for Selection of Electrical Equipment for Hazardous Area

20. Fire Insurance Regulation

21. National Electrical Code (NEC) of National Fire Protection Association (NEPA) USA

22. Fire Protection Manual (Red-Book)

23. The Petroleum and Carbide of Calcium Manual

24. Explosive Rules, 1940

Page 107: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

APPLICABLE INDIAN ACTS RULES AND

REGULATIONS

ATTACHMENT –VIII

NFVP/Bagging/2016 0

REV

Page 3 of 3

NFVP/Bagging/2016 Applicable Indian Acts ,Rules & Regulations

25. Indian Boiler Regulations 26. Indian Power Alcohol Rules

27. IS-875-1987: Part 1,2,3,4 and 5 Codes of Practice for Design Loads for Buildings and

Structures. 28. IS-1893-1987: Criteria for Earthquake Resistance Design of Structure IS-4326: Code of

Practice for Earthquake Resistance Design and Construction of Building 29. The Water (Prevention and Control Pollution) Act, 1974, as amended up to date

30. The Water (Prevention and Control Pollution) Rules, 1975

31. The Water (Prevention and Control Pollution)

(Procedure for Transaction of Business) Rules, 1975

NOTIFICATIONS

(i) Constitution of Appellate Authority (ii) Delegation of Powers as State Board by the Central Board to various Union

Territory Administrations.

32. The Water (Prevention and Control Pollution) Cess Act, 1977, as amended by

Amendment Act, 1991 33. The Water (Prevention and Control Pollution) Cess Rules, 1978

34. The Air (Prevention and Control Pollution) Act, 1981, as amended by amendment act,

1987 35. The Air (Prevention and Control Pollution) Act, 1982 36. The Air (Prevention and Control Pollution) (Union Territories) Rules, 1983

NOTIFICATIONS (I) The date from which the Act came into Force. (II) Declaration of Air Pollution areas. (iii) Constitution of Appellate authority

37. The Environmental laboratories and Analysis

NOTIFICATIONS

(I) Environmental laboratories and Analysis Officers authorized for taking cognizance of offences.

Page 108: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 1 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

INSTRUCTIONS FOR EXECUTION OF THE INTEGRITY PACT

a. The accompanying 'Integrity Pact' is to be executed in two (02)

originals on a plain paper and submitted along with technical bid /

tender documents.

b. All the pages of the integrity pact are to be signed by the Bidder. If

the Bidder is a partnership or a consortium, the Integrity Pact shall

be signed by all the partners or consortium members.

Bidders are required to clearly indicate the name and designation

of the signatory (ies) as well as the name and address of the

witnesses.

c. The Bidder shall not change the contents of the Integrity Pact.

d. Bidder may note that Bidder's failure to submit the Integrity Pact

duly signed along with the Bid shall lead to outright rejection of

the Bid.

(These are instructions for execution and does not form part of the Integrity Pact)

Page 109: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 2 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

INTEGRITY PACT

Between

“National Fertilizers Limited (NFL)”

hereinafter referred to as

" PRINCIPAL",

and

(___________________________________________________________________

_________________________________________________________________)

hereinafter referred to as

"The Bidder/Contractor"

Preamble

THE PRINCIPAL intends to award, under laid-down organisational procedures, contract(s) for __________________________________________________________

__________________________________________. The principal values full

compliance with all relevant laws and regulations, and the principles of

economical use of resources, and of fairness and transparency in its relations with

its Bidders/ Contractors.

In order to achieve these goals, the Principal and the above named

Bidder/Contractor enter into this agreement called 'Integrity Pact' which will

form a part of the bid.

It is hereby agreed by and between the parties as under:

Section I - Commitments of THE PRINCIPAL

(1) THE PRINCIPAL commits itself to take all measures necessary to prevent

corruption and to observe the following principles :

a) No employee of THE PRINCIPAL, personally or through family

members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or

Page 110: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 3 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

third person, any material or other benefit which he/she is not legally entitled to.

b) THE PRINCIPAL will, during the tender process treat all Bidder(s)

with equity and fairness. THE PRINCIPAL will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an

advantage in relation to the tender process or the contract execution.

(c) THE PRINCIPAL will exclude from evaluation of Bids its such

employee(s) who has any personnel interest in the

Companies/Agencies participating in the Bidding/Tendering

process (2) If THE PRICIPAL obtains information on the conduct of any employee of

THE PRINCIPAL which is a criminal offence under the relevant IPC/PC Act, or if there be a substantive suspicion in this regard, he will inform its

Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.

Section II - Commitments of the Bidder/Contractor

(1) The Bidder/Contractor commits himself to take all measures necessary to

prevent corruption. He commits himself to observe the following

principles during his participation in the tender process and during the

contract execution:

a) The Bidder/Contractor will not, directly or through any other

person or firm, offer, promise or give to THE PRINCIPAL, or to any of THE PRINCIPAL's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.

b) The Bidder/Contractor will not enter into any illegal agreement or

understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices,

specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.

c) The Bidder/Contractor will not commit any criminal offence under

Page 111: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 4 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

the relevant IPC/PC Act; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by THE PRINCIPAL as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.

d) The Bidder/Contractor of foreign origin shall disclose the name and

address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding. All the payments made to the Indian agent/ representative have to be in Indian Rupees only.

e) The Bidder/Contractor will, when presenting his bid, disclose any

and all payments he has made, or committed to or intends to make

to agents, brokers or any other intermediaries in connection with the

award of the contract and/or with the execution of the contract. (2) The Bidder/Contractor will not instigate third persons to commit offences

outlined above or be an accessory to such offences.

Section III- Disqualification from tender process and exclusion from future

contracts

(1) If the Bidder, before contract award, has committed a serious transgression

through a violation of Section II or in any other form such as to put his

reliability or credibility as Bidder into question, THE PRINCIPAL may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.

Section IV – Compensation for Damages

(1) If THE PRINCIPAL has disqualified the Bidder from the tender process

prior to the award under Section III, THE PRINCIPAL is entitled to

demand and recover the damages equivalent to earnest money deposit/

Bid security (2) If THE PRINCIPAL has terminated the contract under Section III,or if THE

PRINCIPAL is entitled to terminate the contract according to section III, THE PRINCIPAL shall be entitled to demand and recover from the

Page 112: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 5 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

contractor the liquidated damages of the contract value opr the amount equivalent to the Performance Bank Guarantee.

Section V- Previous Transgression

(1) The Bidder shall declare in his Bid that no previous transgressions

occurred in the last 3 years with any other Public Sector Undertaking or

Government Department that could justify his exclusion from the tender

process. (2) If the Bidder makes incorrect statement on this subject, he can be

disqualified from the tender process or the contract, if already awarded,

can be terminated for such reason.

Section VI - Equal treatment to all Bidders / Contractors

(1) THE PRINCIPAL will enter into agreements with identical conditions as

this one with all Bidders. (2) THE PRINCIPAL will disqualify from the tender process any bidder who

does not sign this Pact or violate its provisions.

Section VII – Criminal Charges against violating Bidders / Contractors

If THE PRINCIPAL obtains knowledge of conduct of a Bidder or a Contractor or

his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if THE

PRINCIPAL has substantive suspicion in this regard, THE PRINCIPAL will

inform the Chief Vigilance Officer (CVO).

Section VIII - Independent External Monitor/Monitors

(1) THE PRINCIPAL appoints competent and credible Independent External

Monitors (IEMs) for this Pact . The task of the monitor is to review

independently and objectively, whether and to what extent the parties

comply with the obligations under the agreement. (2) The IEM is not subject to instructions by the representatives of the parties

and performs his functions neutrally and independently. It will be

obligatory for him to treat the information and documents of the bidder/

contractors as confidential. He reports to the Chairman-cum-Managing

Director, NFL.

Page 113: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 6 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

(3) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of THE PRINCIPAL related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.

(4) THE PRINCIPAL will provide to the IEM sufficient information about all

meetings amont the parties related to the project provided such meetings

could have an impact on the contractual relations contractual relations

between THE PRINCIPAL and the Bidder/Contractor related to this

contract. The parties offer to IEM the option to participate in such

meetings. (5) As soon as the IEM notices, or believes to notice, a violation of this

agreement, he will so inform the Chairman-cum-Managing Director, THE PRINCIPAL and request the Chairman-cum-Managing Director, THE PRINCIPAL to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action.

(6) The IEM will submit a written report to the Chairman-cum-Managing

Director, NFL within 8 to 10 weeks from the date of reference or intimation

to him by THE PRINCIPAL and, should the occasion arise, submit

proposals for correcting problematic situations.

(7) The monitor shall be entitled to compensation on the same terms as being

extended to/ provided to the independent directors of NFL Board.

(8) If the IEM has reported to the Chairman-cum-Managing Director, THE PRINCIPAL, a substantiated suspicion of an offence under relevant IPC/PC Act, and the Chairman-cum-Managing Director, NFL has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.

(9) The word ‘IEM’ would include both singular and plural.

Section IX - Pact Duration

This Pact begins when both parties have legally signed it. It expires for the Contractor 12 month after the last payment under the contract and for all the

Page 114: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROFORMA FOR INTEGRITY PACT BETWEEN

NATIONAL FERTILIZERS LIMITED AND BIDDER

ATTACHMENT-IX

NFVP/BAGGING/2016 0

REV

Page 7 of 7

NFVP/BAGGING/2016 INTEGRITY PACT

other bidder 6 months after the contract has been awarded. Section X - Other Provisions

(1) This agreement is subject to Indian Law. Place of performance and

jurisdiction is the Registered office of THE PRINCIPAL i.e New Delhi. The

Arbitration clause provided in the main tender document / contract shall

not be applicable for any issue / dispute arising under Integrity Pact. (2) Changes and supplements as well as termination notices need to be made

in writing.

(3) If the Contractor is a partnership firm or a consortium or Joint Venture,

this agreement must be signed by all partners, consortium members and

Joint Venture partners. (4) Should one or several provisions of this agreement turn out to be invalid,

the remainder of this agreement remains valid. In this case, the parties will

strive to come to an agreement to their original intentions.

____________________________ ___________________________________

(For & On behalf of THE PRINCIPAL) (For & On behalf of Bidder/Contractor)

(Office Seal) (Office Seal)

Place: _________________ Witness 1 :________________________________

(Name & Address) ________________________________

Date: _____________ ________________________________

________________________________

Witness 2 : ________________________________

(Name & Address) ________________________________

________________________________

________________________________

Page 115: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROVISIONS AS PER MSMED ACT

ATTACHMENT-X

NFVP/BAGGING/2016 0

REV

Page 1 of 4

NFVP/BAGGING/2016 MSMED PROVISIONS

FOR Micro & Small Enterprises

PUBLIC PROCUREMENT POLICY FOR MICRO AND SMALL ENTERPRISES:

Government of India, vide Gazette of India No. 503 dated 26.03.2012 has proclaimed the

Public Procurement Policy on procurement of goods and services from Micro and Small

Enterprises (MSEs) by all central Ministries/Departments/PSUs for promotion and

development of Micro and Small Enterprises. Accordingly, following provisions are

incorporated:

i) Issue of Tender Documents to MSEs free of cost.

ii) Exemption to MSEs from payment of EMD/Bid security.

iii) In Tender, participating Micro and Small Enterprise quoting price within price band of

L1+15% shall also be allowed to supply a portion of requirement by bringing down

their prices to L1 price in a situation where L1 price is from someone other than a

micro and small enterprises and such micro and small enterprises shall be allowed to

supply up to 20% of the total tendered value. In case of more than one such Micro and

Small Enterprises, the supply shall be shared proportionately (to tendered quantity).

Further out of above 20%, 4% (20% of 20%) shall be from MSEs owned by SC/ST

Entrepreneurs. This quota is to be transferred to other MSEs in case of non-

availability of MSEs owned by SC/ST entrepreneurs.

iv) The quoted prices against various items shall remain valid in case of splitting of

quantities of the items as above.

v) In case bidder is a Micro or Small Enterprise under the Micro, Small and

Medium Enterprises Development Act, 2006, the bidder shall submit the

following:

a) Documentary evidence that the bidder is a Micro or Small Enterprises

registered with District Industries Centers or Khadi and Village Industries

Commission or Khadi and Village Industries Board or Coir Board or National

Small Industries Corporation or Directorate of Handicrafts and Handloom or

any other body specified by Ministry of Micro, Small and Medium Enterprises.

b) If the MSE is owned by SC/ST Entrepreneurs, the bidder shall furnish

appropriate documentary evidence in this regard.

vi) In case tendered item is non-split able or non-dividable, MSE quoting price

within price band L1 (other than MSE) +15%, may be awarded for full /

complete value of supplies / contract subject to matching of L1 price.

vii) The MSEs owned by SC/ST entrepreneurs shall mean:

a) In case of Proprietary MSE, Proprietor(s) shall be SC/ST.

b) In case of Partnership MSE, the SC/ST partners shall be holding at least 51%

share in the unit.

Page 116: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROVISIONS AS PER MSMED ACT

ATTACHMENT-X

NFVP/BAGGING/2016 0

REV

Page 2 of 4

NFVP/BAGGING/2016 MSMED PROVISIONS

c) In case of Private Limited Companies, at least 51% share is held by SC/ST. If

the MSE is owned by SC/ST Entrepreneurs, the bidder shall furnish

appropriate documentary evidence in this regard.

viii) The Public Procurement Policy for MSEs is meant for procurement of only

Goods produced & Services rendered by MSE and hence shall not be

applicable for works contracts.

The above documents submitted by the bidder shall be duly certified by the Statutory

Auditor of the bidder or a practicing Chartered Accountant [not being an employee or a

Director or not having any interest in the bidder’s company/firm) where audited accounts

are not mandatory as per law.

If the bidder does not provide the above confirmation or appropriate document or

any evidence, then it will be presumed that they do not qualify for any preference

admissible in the Public Procurement Policy (PPP), 2012.

Page 117: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROVISIONS AS PER MSMED ACT

ATTACHMENT-X

NFVP/BAGGING/2016 0

REV

Page 3 of 4

NFVP/BAGGING/2016 MSMED PROVISIONS

Format F

‘PROFORMA’ FOR CONFIRMATION ON APPLICABILITY OF “MICRO,

SMALL AND MEDIUM ENTERPRISES DEVELOPMENT ACT, 2006 [MSMED

ACT 2006)”

NIT No.:

_________________________________________________________________

Name of Contract:

_________________________________________________________

1. You may aware that “Micro, Small and Medium Enterprises Development Act

2006” (‘MSMED’) has been come into force w.e.f. 2nd October 2006, which has

repealed the provisions of the old Act regarding Small Scale Industrial

undertakings.

2. As per the MSMED Act, Enterprises engaged in the manufacture / production of

goods or rendering / providing of services are to be classified into Micro, Small

and Medium enterprises based on the investment in plant and

machinery/equipment.

3. Such Enterprises are required to file a memorandum in the prescribed form to the

appropriate authority as mentioned in the MSMED Act.

4. The term Enterprises stated in the above paragraph includes Proprietorship, Hindu

undivided family, Association of persons, Cooperative Society, Partnership firms,

undertaking or any other legal entity.

5. For your ready reference, the definitions of Micro, Small and Medium enterprises

are given below:

Classification of enterprises engaged in: (a) Manufacture or production of goods pertaining to any industry specified in the

First Schedule to the Industries (Development and Regulation) Act 1951 as:

Nature of Enterprise Investment in Plant & Machinery (#)

Micro Does not exceed Rs. 25 Lakh

Small More than Rs. 25 Lakh but does not exceed Rs. 5 Crores

Medium More than Rs. 5 Crores but does not exceed Rs. 10 Crores

(b) Providing or rendering services:

Nature of Enterprise Investment in Equipment

Micro Does not exceed Rs. 10 Lakh

Small More than Rs. 10 Lakh but does not exceed Rs. 2 Crores

Medium More than Rs. 2 Crores but does not exceed Rs. 5 Crores

(#) In calculating the investment in plant & machinery, the cost of pollution control,

research and development, industrial safety devices and such other items as may be

specified will be excluded.

6. You are therefore requested to fill the “Format” [proforma attached] and submit

the same along with proof of valid document/ certificate [indicating registration

no.] in your offer. In case same is not submitted along with your offer, it will be

presumed that your organization is not a micro, small or medium enterprises as per

the provisions of MSMED Act 2006 and consequently you will not be eligible to

the benefits admissible under the MSMED Act 2006.

Page 118: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

PROVISIONS AS PER MSMED ACT

ATTACHMENT-X

NFVP/BAGGING/2016 0

REV

Page 4 of 4

NFVP/BAGGING/2016 MSMED PROVISIONS

Format - __ (A)

CONFIRMATION ON APPLICABILITY OF “MICRO, SMALL AND MEDIUM

ENTERPRISES DEVELOPMENT ACT, 2006 (MSMED ACT 2006)

NIT No.:

_________________________________________________________________

Name of Contract:

_________________________________________________________

1. We confirm that provisions of “Micro, Small and Medium Enterprises

Development Act 2006” (‘MSMED’) are applicable to us and our organization

falls under the definition of:

a. Micro Enterprise - [ ]

b. Small Enterprise - [ ]

c. Medium Enterprise - [ ] (Please put a tick in the appropriate box)

2. Copy of proof of valid document/ certificate [indicating registration no.] of being a

Micro/ Small/ Medium Enterprises is enclosed.

Place: ____________ Signature of Authorised Signatory

Date: ____________ Name: _____________________

Designation: ________________

Seal:

Note: In case above Format along with proof of valid document/ certificate [indicating

registration no.] is not submitted in offer, it will be presumed that your

organization is not a micro, small or medium enterprises as per the provisions of

MSMED Act 2006 and consequently you will not be eligible to the benefits

admissible under the MSMED Act 2006.

Page 119: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

DECLARATION FORM I & II

ATTACHMENT-XI

NFVP/BAGGING/2016 0

REV

Page 1 of 2

NFVP/BAGGING/2016 Declaration form I & II

DECLARARTION-FORM-I

Ref. No; Dated :

___________

To,

Issuing Authority

National Fertilizers Ltd.

……….Unit/CO

I/We _________________________________________have read

the conditions of tender attached hereto and agree to abide by such conditions. I/We

offer to do the job of_____________________________________________________

_______________________________ work at the rates quoted in the attached Schedule

of Rates and in accordance with the specifications, standards and instructions in writing

of the Engineer-in-charge of M/s. National Fertilizers Limited and hereby bind

myself/ourselves to complete the work schedule and progress of work.

I/We further agree to abide by the conditions of contract and to carry out all work within

the specified time in accordance with specifications of materials and workmanship and

instructions referred to in the Notice Inviting Tenders.

In case of acceptance of the tender by National Fertilizers Limited, I/We bind

myself/ourselves to execute the contract as per the conditions mentioned in the tender

documents, failing which, I/We shall have no objection to the forfeiture of the Earnest

Money lodged with National Fertilizers Limited………..(Unit/CO).

Thanking you

Yours faithfully

For M/s ____________________________

(Signature of Contractor/Tenderer with SEAL)

Address : _____________________________

Page 120: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

DECLARATION FORM I & II

ATTACHMENT-XI

NFVP/BAGGING/2016 0

REV

Page 2 of 2

NFVP/BAGGING/2016 Declaration form I & II

DECLARATION FORM-II

The following declaration to be signed by Contractor and to be submitted along with

required documents which would be duly self certified:

Sr.

No. DESCRIPTION

YES / NO

(If Yes, give the following details)

1 If a Tenderer has relations whether

by blood or otherwise with any of

employees of NFL (Owner), the

Tenderer must disclose the relation

at the time of submission of Tender,

failing which, NFL shall reserves the

right to reject the Tender or rescind

the Contract.

Name and

Designation of the

Employee

Place of Posting Relation

with the

Employee

2. P.F. Registration No of the Contractor to be intimated along with

Documentary proof thereof.

P.F. Registration

Number

3 PAN No of the Contractor to be intimated along with Documentary

Proof thereof.

PAN No

4 Service Tax Registration No. with Documentary Proof.

Accounting Code No.

S.T.Code No.

……………………

……………………

……………………

5 ESI Registration No. Along with documentary proof thereof. ESI Regd. No.

6 If the party is registered as Micro/Small/Medium Enterprises as per

MSMED Act,2006, the same may be confirmed by the party and

submit a photocopy (Self certified) of the registration certificate in

support thereof. Otherwise it will be construed that the party is not

registered as per MSMED Act, 2006.

7 The bidder shall submit the name and address of the firm/company

along with its constitution giving status of the same such as sole

proprietorship/partnership or limited/private firm etc. Along with its

copies duly attested by Notary Public as evidence.

Signature of the Contractor/ Tenderer with SEAL

PLACE : ______________

Dated : ________________

Page 121: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INDEMNITY BOND

ATTACHMENT-XII

NFVP/BAGGING/2016 0

REV

Page 1 of 2

NFVP/BAGGING/2016 INDEMNITY BOND

INDEMNIFICATION

The contractor shall have to furnish indemnity bond for a value of

Rs............................................towards the material being sent for repair (This shall be

applicable for repair of materials).

Page 122: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

INDEMNITY BOND

ATTACHMENT-XII

NFVP/BAGGING/2016 0

REV

Page 2 of 2

NFVP/BAGGING/2016 INDEMNITY BOND

Proforma for Indemnity Bond

This DEED OF INDEMNITY made between M/s ……………

…………..………………………having its registered office at ……………………and place of

business at……………………… The Contractor, which expression shall include its successor

and assigns of the one part and M/s National Fertilizers Limited, a company incorporated

under the Indian Companies Act and having its registered Office at SCOPE Complex, Core-III,

Institutional Area, Lodhi Road, New Delhi (hereinunder called 'the Owner') which expression

shall include its successors and assigns of the other part

WHEREAS the Owner has placed a Work Order No. ……………………………….on the

Contractor for …….. …………….and whereas one of the conditions of the said Contract, is

that the Owner will supply to the contractor free issue Material for……………………………….

As specified in the said Contract for the purpose of ………………………….…

…………………..and WHEREAS the Owner has agreed to send the said Free issue Material in

the terms of the said Contract upon the terms that the Contractor should enter into covenants

hereinafter contained.

NOWTHIS DEED WITNESSETH AS FOLLOWS

1. In pursuance of the said agreement and in consideration of the promises the Contractor

hereby permits and acknowledges that the Contractor holds and shall always hold the

said Free Issue Materials (which will from time to time be sent by the Owner to the

Contractor) under the said contract, in trust for to the order of and on account of the

Owner.

2. The Contractor hereby assume full responsibilities for the said Free Issue Materials

shall keep the said Free Issue Materials free of charge to the Owner in the safe place

and in good condition.

3. The Contractor hereby agrees to indemnify and keep the Owner indemnified at all

times hereafter against all claims, demands, proceedings, losses, damages, costs

charges and expenses which may be or brought against the owner of which the Owner

may suffer or incur by reason of any loss or damage to the Contractor or its employees

caused by the default or negligence of the Contractor or its employees or agent and/or

by reasons of breach by the Contractor or its covenants obtained in clause 1 and/or

clause 2 hereof.

4. NOTWITHSTANDING anything stated herein above, Contractor's liabilities under this

Guarantee is restricted to Rs……………….. (Rs……………………………. only) and it

will remain in force till…………………unless an action to enforce claim under the

guarantee is filed against Contractor before the aforesaid date all Owner's rights under

the said guarantee shall be forfeited and Contractor shall be relieved and discharged

from all the liabilities thereunder.

Page 123: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

NFVP/Bagging/2016

NATIONAL FERTILIZERS LIMITED

Page 1 of 11

TECHNICAL SPECIFICATIONS

FOR

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING

LOADING SYSTEM

OF

BAGGING PLANT

FOR

NATIONAL FERTILIZERS LIMITED, VIJAIPUR (M.P.)

PART-2 Technical (ITB NO- NFVP/Bagging/2016)

NFL VIJAIPUR

DISTT. GUNA (MP) - 473111

PROJECT: DESIGN, MANUFACTURE, SUPPLY, ERECTION, TESTING

COMMISSIONING OF BAG LOADING SYSTEM COMPATIBLE

WITH EXISTING LOADING SYSTEM AT BAGGING PLANT FOR

REDUCING RAKE LOADING TIME

Page 124: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 2 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

SL. NO.

DESCRIPTION

SHEET NO.

1.0 INTENT 4

2.0 SCOPE 4

3.0 EXCLUSION 6

4.0 TECHNICAL REQUIREMENTS 6

5.0 DELIVERY PERIOD & PROGRESS REPORT 6

6.0 INSPECTION & TESTING 8

7.0 PAINTING 8

8.0 PREPARATION FOR DESPATCH 9

9.0 ERECTION, COMMISSIONING & ACCEPTANCE 10

10.0 GUARANTEE 10

11.0 DRAWINGS & DOCUMENTS 11

CONTENTS

Page 125: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 3 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

SL. NO. DESCRIPTION DOCUMENT NO. NO. OF SHEETS

1

Existing bag loading

system

3

2

Equipment specifications

and vendor List.

(Mechanical)

8

3

Electrical Specification and

vendor list

12

4 Electrical Specification

(Cables)

10

LIST OF ATTACHMENTS

Page 126: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 4 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

1.0 INTENT 1.1 To reduce rake loading time NFL intends to invite bid for detailed design, engineering,

manufacture, inspection, painting, supply, packing, forwarding and supervision of erection, testing & commissioning of BAG LOADING SYSTEM COMPATIBLE WITH

EXISTING LOADING SYSTEM for 13 No’s loading stations of Urea Bagging Plant at

VIJAIPUR UNIT. To start with the modification shall be carried out in two stations

only (Phase-I) remaining 11 stations (Phase-II) shall be modified subject to the

vendor demonstrating the gains from the first two stations (phase-I) to the

satisfaction of NFL.

1.2 After erection & commissioning of the first two stations NFL shall evaluate the gains from

the modified system vis-a-vis the old system. If the results are satisfactory the modification shall be carried out in the remaining 11 stations or else the project shall be shelved off.

2.0 SCOPE

2.1 Complete Design, Manufacture, Supply, Erection, Testing, Commissioning OF BAG

LOADING SYSTEM for 13 No’s stations on platform A and B, compatible with existing loading system and demonstration at site of bag loading/Conveying system along with existing loading system as per the performance parameters. Bidder/Contractor shall

under-take the Guarantee as mentioned in the guarantee clause 10.0.

2.2 Perform Adequacy check of the present system w.r.t the modified system. 2.3 The system is to be designed in such a fashion that in the event of failure of old loading

system of any station, the loading can be resumed seamlessly from any of the adjacent stations without shunting of the partly filled wagon.

2.4 Engineering is to be done, for complete system including supply of engineering data and two year spares for all the accessories.

2.4 Suitable reversible modifications to the existing bag loading system and infrastructure to make it work in sync with the new system. All the modification cost for existing system is to be borne by the bidder.

2.5 The scope of supply of Bag loading system shall include but not be limited to the

following:

Inclined flat belt conveyor

Belt conveyor with adjustable height

Blower / ventilation system for each station.

Motor operated Bag Diverters

Drive Motors, Gears Cooling blower

First charge of lubricants

Rail Track (Rails to be installed over grouted sheet metal)

All Civil Work

Page 127: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 5 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

2.6 Electrical & Instrumentation Control with Panel Motor module with starter, power & control cables, LCS, safety devices, bag counters, interlocks along with necessary hardware & software for instrumentation & control shall be in scope of the bidder. All the hardware & software for hooking up the new system with the existing PLC / SCADA system shall be in bidder’s purview. The details of the same shall be furnished to Owner for review.

2.7 Documentation 1. General Plant lay out 2. Electrical & Instrumentation documentation complete with functional diagram,

terminal list, cable list, control panel component list, panel and drive data sheets etc. 3. Operation and maintenance manual complete with data sheet of gears,

electromechanical components and lubrication schedule. 4. Details of Utilities consumptions such as instrument air, electrical power etc

2.8 List of maintenance spares for two years operation of Bag loading system shall Include but not limited to followings:

2.9 Supply of commissioning spares & spare parts required for two years trouble free normal operation for complete package shall also form Tenderer’s scope of supply. A list of spare parts with unit price break-up must be furnished along with the bid.

SN Items Qty.

1 Belt Spares :

a) Idlers 20% of installed quantity

b) drive and tail end pulley 20% of installed quantity or minimum one No’s each

c) Bead, take up and snub pulley One pulley each

d)Rollers and self-aligning rollers 20% of installed quantity

e) Bearings 20% of installed quantity or minimum one No’s each

f)Complete set of plumber block with bearings 20% of installed quantity or minimum one No’s each

g) Gear Box of each type with complete coupling set 20% of installed quantity or One complete set for each type

h) Belt of each type One complete replacement for each type

2 Motor for each rating :

Spare Motor of each type and rating 2

Spare module for Motor of each type and rating 2

Bearing (DE) 2

Power cable of each type and rating -- m

Control cable of each type and rating ---m

Bearing (NDE) 2

Cooling Fan 2

Inner and outer cover of DE & NDE Bearing 2 set of each type & Rating

Power contactors 2 of each type & Rating

Actuator & elements of LCS 06 of each type & Rating

Control Contactor 2 of each type & Rating

Overload relays 2 of each type & Rating

Power Fuse 12 of each type & Rating

Control Fuse 12 of each type & Rating

3 Rails

Page 128: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 6 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

3.0 EXCLUSION: 3.1 Fire protection and lighting.

4.0 TECHNICAL REQUIREMENTS

4.1 MATERIAL OF CONSTRUCTION Material of construction shall be as mentioned below:-

a) Conveyor Belts Nylon fabric M-24 GRADE as per IS 1891 Part-I ( Latest Ed)

4.2 Vendor shall furnish complete specification for Drive Motor, Gear Box, Actuators & other

accessories as required for successful operations of the bag loading system.

4.3 Tenderer should note that their bids without Equipment Layout will not be considered.

Elevation of Inlet & discharge point of feed belt must be shown in elevation view . 4.4 Tenderer shall furnish civil scope drawing with load data . 4.5 All bolts / nuts / washers/Electrical panel shall be of SS 304 materials only. 4.6 Bag Loading System shall be designed to work under urea dust atmosphere suitable for

24 hours continuous duty. 4.7 All bought out items shall be supplied from reputed vendors only and for all such items

prior approval from NFL shall be mandatory before placing order. 4.8 It will be imperative on each Bidder to fully inform himself of all local conditions and

factors which may have any effect on the execution of the works. Bidder shall visit the site, examine and obtain at its cost and responsibility, all information required and satisfy

himself regarding all matters and things such as access to site, communications,

transport, right of way, the type and number of equipment and facilities required for the

work, availability of local labour, materials and their rates, local working conditions,

weather, flood levels and all other information that may be necessary for preparing its

Bid, performance of work and other obligations and related matters. By submitting the

BID the BIDDER shall be deemed to have acknowledged and agreed that ignorance of

the site and other said conditions shall not be basis for any claim for compensation or

extension of time or loss of profits etc. and the NFL shall not be liable on account thereof

in any manner whatsoever to the Bidder or any person claiming through or under the

Bidder.

5.0 DELIVERY PERIOD & PROGRESS REPORT 5.1(a) The Time period required for design & engineering of complete package and receipt of

full material on project site for modification in first two stations shall be within 180 days from the issue of Letter of Intent / Fax of Intent. For the manufacture, supply, transportation, erection and commissioning of complete package schedule given at

Page 129: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 7 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

5.1(b) shall be followed. For first six stations, at one point of time only two stations shall be handed over for modification. Thereafter four stations shall be handed over followed by remaining three. Next group of stations shall be handed over only after stabilisation of the previously modified group of stations. For reckoning project completion time, stabilisation time shall not be considered which will be to NFL’s count.

(b) The following Time Schedule shall be followed after award of LOI:

S.No Event / Milestone No of days

required

No of days from issue

of LOI

1 Design & engineering of complete package and receipt of full material on project site for modification in first two stations

180 180

2 Mech. Completion & Commissioning of 2/13 stations* 45 225

3 Stabilisation & performance evaluation of the modified system and confirmation by NFL for further modification in remaining eleven stations.

40 265

4 Mobilization period for carrying out the job on remaining eleven stations.

60 325

5 Mech. Completion & Commissioning of 4/13 stations 45 370

6 Stabilisation 10 380

7 Mech. Completion & Commissioning of 6/13 stations 45 425

8 Stabilisation 10 435

9 Mech. Completion & Commissioning of 10/13 stations 75 510

10 Stabilisation 15 525

11 Mech. Completion & Commissioning of 13/13 stations 60 585

12 Stabilisation 15 600

Table-I

*First two loading stations shall be handed over to the contractor on receiving written information that he is

ready for modification. Job of modification of loading stations will have to be completed within 45 days from the date of handing over the two stations.

5.2 The tenderer shall guarantee adherence to the time schedule at all stages, failing which

the purchaser shall have liberty to cancel the order at any stage. A detailed time bar chart covering the following aspects of scope of work shall be furnished by the tenderer along with his bid.

i) Design & Engineering. ii) Furnishing of civil scope data & drawings. iii) Taking approval of drawings from Owner. iv) Procurement of Raw Material. v) Taking approval of various sub-vendors for bought-out items (before placing order on

them). vi) Procurement of bought-out items. vii) Manufacture of equipment. viii) Fabrication at works. ix) Despatch.

Page 130: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 8 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

x) Site fabrication. xi) Erection. xii) Final Painting. xiii) Trial runs. xiv) Commissioning. xv) Guarantee Test Run (G.T.R.). 5.3 After placement of order, the supplier shall submit regular progress reports on fortnightly

basis. The formats and schedule of submission shall be mutually discussed and agreed to.

5.4 Any indication in the progress reports showing slippage in time schedule shall not

constitute waiver / extension of guaranteed completion period.

6.0 INSPECTION & TESTING 6.1 All components of the system shall be subjected to inspection and testing at different

stages of manufacture by the Vendor as per relevant standard.

After award of job a quality control plan shall be submitted by the bidder for

review & approval by Owner / Owner’s inspection agency. Owner may inspect the

material before despatch.

6.2 No inspection, test or acceptance during the course of manufacture or at final stages

shall relieve the contractor from his responsibility for any failure to conform to the contract specifications or for faulty design, material or workmanship which may subsequently develop up to the guaranteed period.

6.3 The contractor shall furnish necessary test certificates, drawings, radiographic examination

reports and other relevant data as may be required for NFL review.

7.0 PAINTING 7.1 The complete equipment / part / structural made of carbon steel shall be sand blasted

before painting to avoid corrosion due to urea dust. The scheme to be followed shall be as under:-

7.1.1 Surface Preparation The surface shall be cleaned to remove all dirt, rust and other contaminations. Oil &

grease shall be removed by use of suitable solvents. This shall be accomplished by sand blasting.

7.1.2 It shall be ensured that sand blasted surface is not contaminated with oil & grease and it

shall not be allowed to come in contact with water.

7.2 Painting Procedure 7.2.1 Paint shall not be applied in rain, fog or mist or where relative humidity is such as to

cause condensation on metal surfaces.

Page 131: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 9 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

7.2.2 All surfaces shall be perfectly dry before & while being painted. 7.2.3 All ingredients of paint shall be thoroughly mixed before use and shall be mechanically

agitated continuously during application to keep the paint in suspension. All pigments shall be uniformly blended into paints.

7.2.4 Thinner shall not be added to the primer or paint unless specified by the paint

manufacturer and that too only of the type and quantity recommended.

7.3 Painting Scheme 7.3.1 The painting scheme to be followed as:-

S.No.

DESCRIPTION PRIMER FINISH PAINT COLOUR

A. Steel structural, supports, conveyor props, stringers etc.

High Build Chlorinated zinc phosphate primer (1 coat) 50 microns

Chlorinated rubber base paint (2 coats) 80 microns.

Dark Grey

B. Stairs, tread, platforms, gratings.

one coat of High Build black bitumen paint thinned with 50 % thinner 50 microns

Two coat of High Build black bitumen paint 200 microns.

Black

C. Conveyor pulleys, idlers, chutes, tripper pulleys

Epoxy based primer, I coat, 50 microns

Epoxy paint, 2 coats, 80 microns

Dark Grey

7.4 Wherever the specifications of painting are not specified, contractor may follow his own

standards with prior approval of NFL.

8.0 PREPARATION FOR DESPATCH 8.1 All care shall be taken to ensure safe transport and protect the component parts from

such damages during transportation which may render them unsuitable for use at site. 8.2 Structural material, if any, may be supplied in knocked-down condition but secured

completely and placed on wooden slabs to avoid direct contact with vehicle. 8.3 All other machinery parts including electrical and minor components shall be supplied

packed in wooden crates suitably and match-marked to ensure correct assemble at site. 8.4 The cargo shall be marked with the name of consignee, purchase order number and

other necessary information as indicated by the purchaser before despatch.

9.0 ERECTION, COMMISSIONING & ACCEPTANCE

9.1 Tenderer has to submit procedures and steps required for erection of Bag Loading

Page 132: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 10 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

System as per site condition. 9.2 The complete package of Bag Loading system shall be commissioned in accordance

with the best engineering practice under the complete supervision of bidder’s representative.

10.0 GUARANTEE Bidder/Contractor shall guarantee rake loading time of 7 hrs with 12 modified stations for all type of rolling stock (inclusive of shunting time but exclusive of 1hr tea break) from modified Bag loading system with a crew consisting of 4 loaders, 2 fillers and one stitcher as per details given below.

Type of rake Rake having

closed wagons

Rake having

open wagons

BCN BCN HL Box-N

No of wagons in a rake 42 58 58

Capacity of wagon (MT) 62 52 45

No of bags 1240 1040 900

Rake Load , MT 2604 3016 2610

*Desired time (hr) required to

complete a rake load with Modified

Bag loading system (Incl of shunting &

excl of tea break time)

7 7 7

*For reckoning rake loading time average of eight rake loads shall be taken.

The Procedure for guarantee test run shall be submitted by the vendor for

review and shall be carried out on mutually agreed procedure. It may be noted

that although the modification shall be carried out In all the 13 (Thirteen)

stations however the guarantee test run shall be carried out with 12 (Twelve)

stations only.

10.1.0 Noise Pollution The equipment shall be guaranteed against excessive noise pollution. Noise should not

exceed 85 dBA measured at a distance of 1.0 metres from the noise emitting source. 10.1.1 The complete system and its equipment including its all accessories and auxiliaries shall

be guaranteed for satisfactory operation while handling the specified capacity continuously for 24 hours per day, 7 days per week and 365 days per year to ensure trouble free performance.

10.1.2 In case the equipment fails to show specified performance, the contractor shall carry out

modifications in design, provide materials and complete the equipment free of cost to the purchaser and show trial run to achieve the specified performance.

10.1.3 In case, the contractor fails to achieve the specified performance even after the

modifications within one month time of the trial runs, the Purchaser reserves the right to

Page 133: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

TECHNICAL SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 11 of 11

NFVP/BAGGING/2016 T E C H N I C A L S P E C S

make alternative arrangements for modification/rectifications at contractor’s cost & risk without any prejudice to any terms of the contract.

11.0 DRAWINGS & DOCUMENTS: 11.1 The Tenderer is required to furnish the following documents (four sets) along with their

offer. (The offers received without these drawings / documents shall be rejected without assigning any reason):

I. Layout of BAG LOADING SYSTEM (Plan & Elevation) with equipment list.

II. G.A drawing of major equipment with overall dimensions. Parts list, material of construction.

III. Catalogue for bought out items with offered equipment marked their in.

IV. Complete detail Specification of Bag Loading System and it’s accessories. V. List of spare parts (Commissioning + 2 years operation). VI. List of similar jobs / Supply Completed earlier along with performance certificate of

the same from the owners.

VII. Data & documents along with specification & electrical drawings required for electrical & instrument items

11.2 The contractor, after placement of order, shall also furnish the required drawings and

data as per the following: 6 copies for NFL’s approval within 2 weeks from L.O.I., 08 final copies and 2 soft copies

of final documents on CD for the following:

I. Layout of BAG LOADING SYSTEM (Plan & Elevation) with equipment list. II. G.A drawing of major equipment with overall dimensions, parts list, material of

construction, motor rating, RPM, absorbed power etc. III. Completely detail specification of BAG LOADING SYSTEM and it’s accessories. IV. List of spare parts. V. Data & documents along with specification required for electrical & instrument items.

11.3 The contractor shall also furnish the following, at least 15 days before despatch of

equipments. a) 06 copies of operating instructions, erection and maintenance Manual of complete

system and its individual equipments. b) 06copies of Lubrication schedule. c) 06 copies of Guarantee/Test certificates of Bought-out equipments. d) 06 copies of inspection certificates. e) 06 copies of material test certificates purchased from other source. 11.4 The contractor shall also have to furnish 2 copies of all the Purchase Orders of the

bought-out items (Sub-ordered items) before placement of order.

Page 134: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

Existing Bag Loading System NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 1 of 3

NFVP/Bagging/2016 Existing bag loading System

EXISTING BAG LOADING SYSTEM

The following paragraphs describe in brief the problems being encountered with

the existing bag loading system. Prospective bidders are advised to peruse through

it and visit the onsite bagging facility for proper understanding of the project

before designing a suitable bag loading system. With intended modification to the

existing Bag loading system comprising of 13No’s station on A & B side we

intend to improve our loading efficiency.

1. Introduction:

The Vijaipur Unit comprises of two plants, Vijaipur-I and Vijaipur-II with

common Bagging Plant. The product urea is bagged and dispatched through rail

and road. In case of Non Availability of rolling stock of trucks, the product urea is

diverted and stored in Silos of 50000 MT capacity each. Silo-I and Silo-II are

provided to collect and store product urea from Urea-I & Urea-II. The provision is

such that we can divert product urea of both plant in any one of the silo-I or silo-II

as per requirement.

Vijaipur-I and Vijaipur-II plants have been revamped and commissioned in 2012

(Apr to July). After revamp, the capacity of Urea-I & Urea II has increased to

3030 & 3231 MTPD respectively. Thus, total revamp capacity is now 6261

MTPD. However, we can produce average 6300 to 6400 MTPD on daily basis

and maximum of 6500 MTPD if the condition is favorable.

2. Loading and dispatch of urea:

Urea is packed in 50 Kg HDPE bags with the help of weighing & tipping

machines and loaded & dispatched by Rail and / or Road. A fix loading pattern is

being followed to load correct numbers of bags in different types of wagons

(BCN, BCN HL and Box-N) and trucks and thus to avoid loading of less / more

Nos. of bags during loading.

90 to 93% of urea is dispatched by railway rakes and remaining 7 to 10% is

through road.

Each station has one bunker and two weighing cum tipping machines.

Page 135: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

Existing Bag Loading System NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 2 of 3

NFVP/Bagging/2016 Existing bag loading System

3. Present scenario of rake loading system with existing infrastructure:

We have three platforms, namely “A”, “B” and “C” for loading & dispatch of

urea through rail & road. Platforms “A” and “B” are used for rake loading, having

6 and (6+1) Nos. of stations respectively. We, normally run 12 stations per

placements with one station as standby.

Table: 1 Details of rake loading time with existing loading system:

Type of rake Rake having

closed wagons

Rake having

open wagons

BCN BCN HL Box-N

No of wagons in a rake 42 58 58

Capacity of wagon (MT) 62 52 45

No of bags 1240 1040 900

Approx. time (hr) required to

complete a rake load presently (Incl

of shunting & tea break time)

11 to 12 12 to 14 11 to 12

4. Limitations of existing loading system:

In existing loading system, we have following limitation:

1) The first / fresh placement of the new rake takes 45 to 60 minutes due to

change over of rake and de-shunting of each wagon during placement of each

wagon in front of loading station.

2) After completion of half wagon loading through first gate , the wagon has to

be pushed manually to reposition the second gate of the wagon exactly in

front of feed belt. This operation takes about 5 to 10 minutes resulting in a

loss of 15-30 minutes during three placements. In the event of the wagon

breaks being found partially jam, the wagon is positioned with the help of a

locomotive which further hampers loading.

3) After completion of first placement loading, the loaded wagons are shunted

and the empty wagons are placed and de-shunted in front of loading stations.

This takes minimum 15 to 20 minutes per placement. Thus, for remaining two

placements of that particular rake it takes 30 to 40 minutes.

4) As the loading of complete rake cannot be completed in a single shift due to

shortage of time, the remaining left over wagons loading is being done in next

shift. This period of shift change of about 30 to 40 minutes is loss of time.

Page 136: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

Existing Bag Loading System NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 3 of 3

NFVP/Bagging/2016 Existing bag loading System

5) During loading, sometimes wagon(s) remain under load due to some technical

problem for the reason what so ever. During taking of next fresh placement,

these wagons have to be removed from the loaded wagons and the placement

of these wagons has to be taken again with next fresh placement. Thus,

removal of under load wagons & placement it again in next fresh placement

delays the next fresh placement. Sometimes, these also results in additional

demurrage.

6) Due to space constraint at some of the loading stations, the wagon cannot be

pushed till the half loading of adjacent wagon does not get completed. Thus,

the loading at some of the loading stations are inter dependent on adjacent

wagons.

Because of above limitation / drawbacks:

The average loading time to complete one rake is about 12 to 13 hrs. The

details of completion of rake loading of different types of rake and

intended loading time is given at Table-I.

NFL has to pay demurrage on almost all the BCN rakes as we can load 36

BCN wagons in a shift leaving 6 wagons and hence we cannot complete

loading of BCN rake in a single shift.

Though we can load few BCN HL rakes within the time stipulated by railways i.e.

11 hrs, but still we have to pay demurrage of about two hrs due the technical

problem faced during the loading.

Page 137: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION (Mechanical)

NFVP/Bagging/2016

BAG LOADING SYSTEM

REV

NATIONAL FERTILIZERS LIMITED Page 1 of 9

EQUIPMENT SPECIFICATION

(MECHANICAL)

FOR

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING

LOADING SYSTEM

OF

BAGGING PLANT

FOR

NATIONAL FERTILIZERS LIMITED, VIJAIPUR (M.P.)

PART-2 Technical (ITB NO- NFVP/Bagging/2016)

NFL VIJAIPUR

DISTT. GUNA (MP) - 473111

PROJECT: DESIGN, MANUFACTURE, SUPPLY, ERECTION, TESTING

COMMISSIONING OF BAG LOADING SYSTEM COMPATIBLE

WITH EXISTING LOADING SYSTEM AT BAGGING PLANT

FOR REDUCING RAKE LOADING TIME

Page 138: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 2 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

CONTENTS

SECTION NUMBER

DESCRIPTION SHEET NUMBER

1.0 Scope 3

2.0 Sub Vendor List 5

3.0 Technological Structural steel supply & Fabrication 6

4.0 Deviations 8

5.0 Drawing & Document schedule Annexure-I 9

Page 139: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 3 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

1.0 SCOPE

1.1 Belt Conveyors

The belt conveyors shall be complete with, but not limited to the following:-

a) Conveyor Belting

b) Drives, including gear boxes, input & output couplings, motor & coupling guards, wherever

required.

c) All Pulleys with pulley-guards

d) Bearings & Plummer Blocks

e) Belt take-up

f) Troughing /Carrying Idlers, Return Idlers, S.A. Carrying & Return Idlers, Self-cleaning Idlers,

Transition Idlers, Impact Idlers etc.

g) Chutes with Skirt Boards (TEGA Type),

h) External & Internal Belt Cleaners (Hosch Type)

i) Decking Plates, 1.5 mm thick SS-304 material.

j) Conveyor Hold Back of roller type

k) Other Safety Guards,

l) Belt sway switches, Pull Cord Switches and zero speed switches,

m) All required electrical & Instrumentation.

n) All technological steel structure / frames for supporting new/ modified conveyor system shall

be in vendors scope of supply.

o) All nuts, bolts, washers and /or other work or material required to guarantee good and safe

operation at the guaranteed capacity.

1.2 Belting

General Purpose Abration Resistant Nylon Fabric Conveyor Belts of Grade M-24, confirming

to IS-1891, Part –I (latest edition) shall be used. All belting shall be free of longitudinal and

transverse buckling, wavy cord or any other un-evenness that cause localized points of flexing when belt is in service. Width tolerances shall not exceed 1%. All plies shall be mildew inhibited. Belting with repaired carcass, blow-ups shall not be acceptable. All belting widths and constructions will be standardized as far as practically possible. The belt construction will be of nylon/nylon carcass with rubber covers of M-24 grade. Unless otherwise specified, belt splices shall be field vulcanized and the belt shall include sufficient length for the splice.

1.3 Drives

a) The Drives for the conveyor shall be provided normally at head end.

b) The reduction Gear Box used shall be helical gear/worm gear type completely enclosed having

splash lubrication.

c) Gear box shall be equipped with adequate heat dissipation arrangement and the temperature rise

permitted shall not exceed 50 Deg C.

d) Gears shall be designed as per B.S.S., DIN or AGMA specifications and shall be tested as per

accepted standards.

Page 140: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 4 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

e) The gear shaft shall be supported on ball/roller bearings of sufficient capacity.

f) The gear box housing shall be so split as to enable easy maintenance without disturbing the

assembly.

g) All the drives shall be consisting of electric motor, gear box, couplings etc.

h) Service factors for all mechanical power transmission equipment shall be 1.5 to 1.6 of the

absorbed power.

i) The coupling provided shall be flexible type and Service factor for all flexible couplings shall

be 2.0 times the installed motor power.

1.4 Idling Pulleys & shafts

a) All pulleys and shafts are to be designed for worst conveyor loading conditions and should be

standardized as far as practically possible.

b) Pulleys shall be of welded steel, continuous rim, two end disc type. Pulleys shall be balanced

and concentric about the shafts.

c) Head and tail pulleys shall have 12 mm thick smooth neoprene lagging with a Durometer

hardness of 60 to 70 shore “A” scale.

d) All the pulleys including Head & Tail pulleys shall be Parallel Face Pulleys.

e) Pulley faces shall be at least 100 mm greater than belt width.

f) Shaft deflection shall be limited to 0.066% of bearing centres. All shafts shall be provided with

accurately machined key seats.

g) Shaft end shall be flush with bearings edge, unless the extension is required for mounting

components.

1.5 Bearings and plummer Blocks

h) All bearings shall be normally double row spherical roller type and shall have a minimum life

rating or 30,000 hours under the total loads imposed.

i) All Plummer Blocks shall be fully self –aligning with one fixed end and one expansion type for

each shaft assembly. They shall include enclosures caps where non drive shafts terminate at

bearings.

j) All Plummer Blocks/Bearings shall have provision for greasing during running.

k) Grease seals shall be triple labyrinth type to effectively exclude micron size dust, dirt and girt.

l) Grease fitting shall be “buttoned type”

m) All Plummer Blocks shall be Dust Proof Axially Split type suitable for Double Row Spherical

Roller Bearings.

1.6 Belt Tensioning Device (Take ups) To ensure adequate tension of the belt and to avoid any slippage of the belt, all Belt Tensioning Device (Take ups) shall be Manual Screw take-up type with heavy-duty protected screw. The amount of travel for take-ups shall be based on belt manufacture’s recommendations but shall not be less than 4.0% of pulley centre distance.

Page 141: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 5 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

1.7 Idlers

a) All conveyor idler carrying & return rollers shall be made of either seamless or ERW tubes confirming to IS:1239 medium / heavy series and shall be lagged by lining material. The lining shall be effectively bonded to the surface of the idler.

b) Idlers shall be permanently lubricated & sealed for life. Anti-friction ball bearings of ample capacity and dust proof seals shall be used on all idlers, selected for life of 40,000 hours minimum.

c) All conveyors shall be equipped with a deck plates to be installed under the carrying side of conveyor.

1.8 Chutes The chutes shall be made from stainless steel SS 304 plates of minimum 6 mm thickness adequately stiffened.

1.9 Safety Guards Safety guarding shall be provided for operating equipment. Guards shall completely enclose moving parts so that physical contact with the moving parts cannot be made with the guard in place. Guards shall be constructed of steel wire net casing / anti-static aluminium plate. Design and construction of guards shall permit easy removal and shall be of the hinged type.

2.0 SUB VENDORS LIST (MECHANICAL) Make of the items shall be from any of the following as indicated:

1. Conveyor Belting: a) M/s Oriental Rubber Industries Ltd. b) M/s Sempertran Nirlon. c) M/s MRF Ltd.

2. Worm Gear Reducer & Gear Boxes: a) Radicon b) New Allenbury works. c) F M G d) Elecon e) Flender

3. Flexible couplings: a) Fenner b) New Allenbury c) David Brown d) Hi-Cliff e) Elecon f) Flender g) Voith Germany

4. Bearings: a) S K F b) F A G c) N T N d) Timken (For tapered roller bearings only)

5. Conveyor Idlers: a) Elecon b) Masyc c) Tecpro

Page 142: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 6 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

d) IGP e) Shree Conveyor f) Indiana g) Mahindra Engg. h) Arudra Engineers k) Industrial Chain Concern j) Indcon Projects & Eqpt. k) Mannesman Dematic (India) Pvt.Ltd. l) Stallion Engg. m) VVN Mfg. n) Vinar Systems o) Spacechem Enterprises p) J.S. Engg. q) Rolcon Engineers

6. Actuators: a) Hein Lenman b) Electric Actuator Co. U.K. c) Technomec Engineers.

7. Skirt boards: a) TEGA India Ltd. b) Kaveri ultra –polymer Ltd.

8. External Belt Cleaner: a) Hosch equipment India Ltd b) Kaveri Ultra-polymer India Ltd.

9. Nuts, Bolts etc.: a) G K W b) Sundaram Fasteners c) Nireka d) Fix & Fits

3.0 TECHNOLOGICAL Structural steel supply & Fabrication

a) Complete design and Engineering including preparation of design and fabrication drawings

based on the scope drawings, procurement of materials supply, fabrication, delivery at site of

work and erection of structural steel work and other connection civil and structural items

including painting and supply of holding down bolts, pipe sleeves and anchorages etc.,

complete in all respects as per technical specifications.

b) Owner reserves the right to check the design calculations, design drawings and fabrication

drawings and may approve the same before actual fabrication work starts. This shall not

absolve the contractor of its responsibility for the design and proper safety of the structures.

The contractor must guarantee about the stability of the structures.

c) All structural steel work shall be designed in strict accordance with the latest relevant Indian

standard code of practice.

d) The contractor has to design the structures for a live load of 300 Kg/m2 on conveyor gantry

walkways and take-up tower platform in addition to the dead and live load of conveyor

Page 143: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 7 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

system and its drive. Seismic loads shall be taken as per IS: 1893 and wind load as per

IS:875.

e) All structural steel shall conform to IS: 2062

f) A Corrosion allowance 2 mm shall be taken over the designed thickness of all structural steel

work.

g) All welding shall conform to IS: 816.

h) All fasteners shall conform to IS: 1363 and IS1367.

i) All steel structures shall be painted with two coats of Red Oxide Primer and two final coats of

Chlorinated rubber base paint (2 coats) 80 microns.

j) The contractor shall keep one copy of all approved drawings and specifications of the works in

good order, which will be made available to the Engineer in-charge or his representative,

whenever required.

k) Preparation and supply of designs, drawings and subsequent revisions/ changes thereof shall

be made at no extra payment.

l) Any fabrication done before final approval of the drawings shall be of contractor’s

responsibility.

m) Grouting of Holding down bolts and grouting below base plates are under contractor’s scope.

n) Contractor shall ensure that the fabrication works are carried out in a sequential order as per

their requirements during erection at site i.e. the items required first for erection are

fabricated first and dispatched to site in the order.

o) The contractor shall adhere to the overall construction schedule for commissioning for the

plant and shall adjust the time required for completion of the work will within the stipulated

period.

3.1 The design, manufacture, testing and installation of the equipment shall comply with the latest

issue of relevant Indian Standard Specification and codes of practices. In the absence of IS for any particular equipment or in case of imported equipment, relevant IEC shall be complied with.

3.2 The equipment and installation shall also comply with the provisions of latest issue of Indian Electricity Rules and other Statutory Acts and Regulations.

Page 144: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 8 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

4.0 DEVIATIONS

4.1 Deviations, if any from this standard (clause wise) shall be clearly indicated in the offer with reasons thereof. Deviations from the data indicated in Specification Sheet shall be shown clearly by encircling it and indicating the revised data in Specification Sheet. In the absence of any such activities the compliance to the clauses shall be deemed automatically.

4.2 The bidder shall submit the duly signed & stamped copies of all the NIT documents as a token of compliance to NIT.

Page 145: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

EQUIPMENT SPECIFICATION P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 9 of 9

NFVP/BAGGING/2016 Equipment specification (Mech)

Annexure-1

Drawings and Documents Schedule

SL.No

Description With

bid

Y/N

Delivery Time in Weeks from

placement of letter of Intent (LOI)

For

approval

For

Information

Final /

Approved/

As built

01. Specification Sheets, duly completed

Y 4 -- 8

02. Technical Particulars, duly filled in

Y 4 -- 8

03. GA Drawing of N 4 -- 8

04 Operating maintenance and instruction manual

N -- 8 8

05. Catalogue of bought out items

Y -- 8 8

06. List of spares with Value

Y 4 -- 8

07. Test certificates N -- -- 8

08. Guarantee Certificates N -- -- 8

Note: Y = Yes, N = No

Page 146: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/Bagging/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 1 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

ELECTRICAL SPECIFICATIONS

FOR

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING

LOADING SYSTEM

OF

BAGGING PLANT

FOR

NATIONAL FERTILIZERS LIMITED, VIJAIPUR (M.P.)

PART-2 Technical (ITB NO- NFVP/Bagging/2016)

NFL VIJAIPUR

DISTT. GUNA (MP) - 473111

PROJECT: DESIGN, MANUFACTURE, SUPPLY, ERECTION, TESTING

COMMISSIONING OF BAG LOADING SYSTEM COMPATIBLE

WITH EXISTING LOADING SYSTEM AT BAGGING PLANT

FOR REDUCING RAKE LOADING TIME

Page 147: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 2 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

CONTENTS

SECTION NUMBER

DESCRIPTION SHEET NUMBER

1.0 Scope 3

2.0 Codes & Standards 3

3.0 Service conditions 3

4.0 System Details 3-4

5.0 General Design & Constructional requirements 4

6.0 Equipment specification 4

7.0 Mounting structures for LCS 5

8.0 Earthing 5

9.0 Painting 6

10.0 Drawings & Documents 6

11.0 Make of electrical items 6-7

12.0 Deviations 7

-- Annexure-1 (Drawings and Documents Schedule) 8

-- Specification Sheet - Induction Motor 9

-- Specification Sheet - Local Control Station 10

-- Technical Particulars – Motors (Blank) 11

-- Technical Particulars - Local Control Stations (Blank) 12

Page 148: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 3 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

1.0 SCOPE

1.1 The scope shall include design, engineering, manufacture, testing at works, delivery to site ,erection & successful commissioning on site of complete electrical system required for Bag Loading system at NFL, Vijaipur.

1.2 This specification shall be read in conjunction with all drawings, documents, data sheets and other relevant reference as specified herein.

1.3 The scope shall include but not limited to the followings: - Motors

- 415 V Switch Gear

- Power and control cables

- Local Control Station (LCS)

- Supporting arrangement for power and control cables on the skid and cable trays

- Mounting structures for LCS

- Earthing of electrical equipment

1.4 Any other items not specified but required for the safe operation of the system are also

included in bidder’s scope of work.

2.0 CODES & STANDARDS

2.1 The design, manufacture, testing and installation and commissioning of the equipment shall comply with the latest issue of relevant Indian Standard Specification and codes of practices. In the absence of IS for any particular equipment or in case of imported equipment, relevant IEC shall be complied with.

2.2 The equipment and installation shall also comply with the provisions of latest issue of Indian Electricity Rules and other Statutory Acts and Regulations.

3.0 SERVICE CONDITIONS The equipment shall be designed for the following site conditions:- Max./Min./Design Ref Temp. 46.1/-2.2/46

0C

Relative humidity 100%

Altitude above sea level Less than 1000 M

Atmospheric pollution Ammonia Vapour & Urea dust

4.0 SYSTEM DETAILS Electrical systems details shall be as follows: a. Nominal Voltage : 415V+10%

b. Highest System Voltage : 457V

c. Number of phases : Three + Neutral

Page 149: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 4 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

d. Frequency : 50Hz+5%

e. Combined Voltage & Frequency variation : +10%

f. Control Supply for LCS : 110V + 10%, 50Hz ±2W

g. Neutral Earthing : Solidly grounded

5.0 GENERAL DESIGN AND CONSTRUCTIONAL REQUIREMENTS

5.1 The electrical system and installation shall be designed as per latest practice to provide maximum reliability, flexibility, safety to personnel and equipment and ease of operation and maintenance.

5.2 All equipment shall have adequate and standard ratings.

5.3 All equipment shall be weatherproof and have IP55 protection and shall also be provided with canopy as far as practicable.

5.4 All live parts shall be adequately protected to prevent inadvertent or accidental contact.

5.5 All external hardware shall be of SS304 material.

5.6 All equipment shall be provided with stainless steel nameplates containing the particulars along with the description and Code Nos. of equipment.

5.7 All equipment’s rated above 110 V shall be provided with two nos. external earthing terminals and those rated upto 110V with one no. external earthing terminal.

5.8 All detailed drawings, equipment sizing make & type of equipment shall be subject to approval of owner/owner’s representative.

6.0 EQUIPMENT SPECIFICATION

6.1 Motor

6.1.1 Motor shall conform to Engineering Standard ES: 8102 enclosed and Specification Sheet of

Induction Motor of this specification.

6.1.2 The motor shall be energy efficient having efficiency class of eff 1 as per IS: 12615 and high

power factor type.

6.1.3 Filled in Specification Sheet and Technical Particulars for each type and rating of motors shall

be furnished.

6.1.4 The rating of the motor shall be as per the sizes in the ISS. The margin between the installed

power and absorbed power shall not be less than the following:

Motor Rating Margin above Driven M/C Absorbed power Less than 22KW 25%

22KW to 55KW 15%

6.1.5 The duty cycle of the motor shall meet the process and driven machine requirement.

Page 150: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 5 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

6.1.6 Motor shall be suitable for 415V, 3-phase AC supply.

6.2 Local Control Stations

6.2.1 For control of motor, Local Control Station shall be provided near the motor. Local Control Stations shall conform to the following specification and Specification Sheet of Local Control Station of this specification.

6.2.2 The enclosure for LCS shall be IP55 & material of construction- cast aluminium alloy (LM6) only. LCS shall be covered with a canopy.

6.2.3 The LCS shall be provided with ‘Start’ – ‘Stop’ push button, ammeter , indication lamp (LED type) & two point for external earthing. The Element & Actuators of LCS shell be of either Siemens or L&T make only.

6.2.4 The ammeter shall be flush mounting, moving iron spring controlled type, of accuracy class 1.5 as per IS: 1248, with square face of minimum size 72 mm x 72 mm having scale range 0-90

O. The ammeter for motor shall be provided with uniform scale upto CT primary current and

compressed end scale up to the 6 times the C.T. primary current. Adjustable red pointer shall be provided to indicate the full load current of the motors. Zero adjusters shall be provided for operation from the front of the meter. All ammeters shall be operated through 1 Amp. CTs only.

6.2.5 All the components shall be mounted on a base plate inside the enclosure. Necessary actuating system for control switches, non-yellowing acrylic/glass cover for ammeter and indication lamps shall be provided on the front cover. No wiring shall be carried out on the front cover.

6.2.6 Each control station shall be provided with minimum 2 mm thick stainless steel name plates indicating the code number and description of the equipment controlled by it. Similar labels shall be provided for all control switches and indication lamps. The name plate and labels shall be fixed with screws only.

7.0 MOUNTING STRUCTURE FOR LCS

7.1 Structures fabricated out of mild steel standard sections, i.e. channels, angels, flats etc conforming to IS: 266 shall be fixed on the skid at suitable locations for mounting of LCS.

8.0 EARTHING

8.1 For earthing of electrical equipment mounted on the skid, a G.I. earth bus fabricated out of 50mmx12mm flat having 14 Nos. of 16 mm dia. Holes for terminating the earthing conductors shall be provided on the skid at a suitable location.

8.2 Enclosures of motors and LCS shall be connected to the above mentioned G.I. earth bus through following sizes of earthing conductors:

Page 151: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 6 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

Motors upto 5.5 KW rating 2 nos. 1Cx16 mm2 Al, 1.1KV grade PVC cable

Motors rated above 5.5 KW and up to 30 KW

2 nos. 1Cx25 mm2 Al, 1.1KV grade PVC cable

LCS 2 no. 1Cx16 mm2 Al, 1.1KV grade PVC cable

9.0 PAINTING

9.1 The equipment surfaces to be painted shall be pretreated to remove all dust, scale and foreign adhering matter by suitable treatment.

9.2 All steel surfaces shall be painted with two coats of suitable anti-rust paint followed by two coats of anticorrosive epoxy paints.

9.3 All paints shall be carefully selected to withstand tropical heat and extremes of weather. The paint shall not scale off, crinkle or be removed by abrasion due to normal handling.

9.4 Unless otherwise specified, the finishing shade shall be light grey having No.631 as per IS-5.

10.0 DRAWINGS & DOCUMENTS

10.1 All drawings and documents shall have the following descriptions written boldly: -- Name of Client.

-- Name of Consultant i.e. PDIL.

-- Enquiry/Order Number with Project/Plant name.

-- Equipment Code No. and Description.

10.2 Drawings and documents shall be submitted as per Annexure-1 of this specification in number of copies as indicated below: i) For approval : 8 + 2 soft copies

ii) For information : 8 + 2 soft copies

iii) Final : 8 + 2 soft copies

11.0 MAKE OF ELECTRICAL ITEMS

11.1 Make of all electrical items shall be as follows:

A MOTORS

1 ABB LTD., INDIA

2 BHARAT BIJLEE LTD. , INDIA

3 CROMPTON GREAVES LTD., INDIA

4 SIEMENS, INDIA

5 ALSTHOM LIMITED, INDIA (AREVA T & D)

6 KIRLOSKAR ELECTRIC COMPANY LTD., INDIA

7 ANSALDO ROBICON, ITALY

8 SIEMENS AG, GERMANY

9 BHEL LTD., INDIA

Page 152: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 7 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

A MOTORS

10 FUJI ELECTRIC INTERNATIONAL CORPORATION, JAPAN

11 MITSUBISHI CORPORATION, JAPAN

12 TOSHIBA COPORATION, JAPAN

13 ASEA BROWN BOVERI, SWEDEN

14 ALSTHOM ALLANTIQUE, FRANCE

15 A.E.G. TELEFUNCUN, GERMANY

16 BRUSH ELECTRICALS M/C. LTD., U.K.

17 PEEBLES ELECTRICAL M/C., U.K.

18 WESTINGHOUSE ELECTRIC CORP., U.S.A

19 Laxmi Hydraulics Pvt Ltd (LHP) India

B Local Control Station

1. BALIGA Lighting Equipments Ltd.

2. FCG Flameproof Control Gears Pvt. Ltd.

3. FCG Power Industries Ltd.

4. Flameproof Equipments Pvt. Ltd.

5. Flexpro Electricals Pvt. Ltd.

12.0 DEVIATIONS

12.1 Deviations, if any from this standard (clause wise) shall be clearly indicated in the offer with reasons thereof. Deviations from the data indicated in Specification Sheet shall be shown clearly by encircling it and indicating the revised data in Specification Sheet. In the absence of any such activities the compliance to the clauses shall be deemed automatically.

12.2 The bidder shall submit the duly signed & stamped copies of all the NIT documents as a token of compliance to NIT.

Page 153: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 8 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

Annexure-1

Drawings and Documents Schedule

SL.No

Description With

bid

Y/N

Delivery Time in Weeks from

placement of letter of Intent (LOI)

For

approval

For

Information

Final /

Approved/

As built

01. Specification Sheets, duly completed

Y 4 -- 8

02. Technical Particulars, duly filled in

Y 4 -- 8

03. Load List Y 4 -- 8

04 GA Drawing of motor N 4 -- 8

05. GA Drawing of LCS N 4 8

06. GA Drawing of control switches

N 4 -- 8

07. Block interconnection diagram

N 4 -- 8

08. Operating maintenance and instruction manual

N -- 8 8

09. Catalogue of bought out items

Y -- 8 8

10. List of spares Y 4 -- 8

11. Test certificates N -- -- 8

12. Guarantee Certificates N -- -- 8

Note: Y = Yes, N = No

Page 154: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 9 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

SPECIFICATION SHEET INDUCTION MOTOR

CLIENT: M/s NFL PROJECT: BAG LOADING SYSTEM PLANT: BAGGING PLANT

ISSUED FOR : PROPOSAL ENQUIRY ORDER FINAL

GENERAL Item No. : Ref. Stds. : IS IEC Quantity :

Description : Motors as required Make :

Code No. : Maker’s Type. :

TESTS: Routine Type Others

SERVICE CONDITIONS

SYSTEM DETAILS AMBIENT CONDITION

Rated Voltage with + % : 415 V 10% Temp. Max./Min./Design Ref. : 46.10C / -2.2 / 46

0C

No. of phases : 3 Relative Humidity : 100% Max. Alt. above sea : <1000 M

Rated Frequency With + % : 50 Hz 5% Atmospheric

Pollution

Dusts : Urea

Combined V & F variation : 10% Vapour :

Fault Level : 35 MVA (SYM) Area Safe Hazardous Space Heater Supply : Refer Cl. no. 7.1 of ES: 8102 Haz. Area class : Zone : Temp. class : Encl. Gr. : Low Voltage Heating Supply : Refer Cl. no. 7.1 of ES: 8102 Location : Indoor Outdoor

INSTRUMENT

CONTACT RATING

A.C. : COOLING WATER D.C. : Inlet Press. : kg/sq.m . Inlet Temp.

OC

Aux. Motor Supply : Fauling Factor : Outlet Temp. OC

BASIC DATA

RATING & DUTY DRIVEN M/C DATA Rated Output : Type :

Syn. Speed : Make :

Duty : Continuous Absorbed Power :

Rotor Type : Squirrel Cage Coupling :

Starting Method : DOL Torque-Starting / Max. :

Max I Start/I Rated : 6 times including IS/IEC tolerance GD2 at Motor Speed :

Min. V Start at Terms : 80% of rated voltage Thrust - Radial / Axial :

Min. Starting Torque at VR : Addl. Data :

EXECUTION ACCESSORIES Degree of Protection : IP 55 Foundation Bolt Space Heater Refer Cl. no.

7.1 of ES: 8102. Addl. Degree of Protection : Lifting Eye Bolt Drain Plug

Mounting Arrangement : Cable Glands Cable Lugs Direction of Rotation : Bi-directional Diff. C.T.s C.W. Flow Indicator Insulation Class : ‘F’ with temp. rise limited to class ‘B’ RTDs for Wdgs. Hot Air Bearings Cooling Method : IC 411 Thermometer For Hot Air Bearings Stator Connection : Delta Earthing Terminals On Body In T.B.

CABLING DATA Name Plate : Addl. name plate : Power cable : Shall be indicated at the time of drg. approval Rain Protecting Hood : Thermistor Heater cable : 3x2.5 sq. mm (Cu) subject to Cl. no. 7.1 of ES: 8102 SPARE PARTS

C.T. cable : Required For Period of 2 Years

R.T.D. cable : Bearings Cooling Fan Alarm cable : 1 Sample Stator Coil :

CABLE

GLAND

Type : Double Compression Grease Nipple & Plug : Material : Aluminium Terminal Block

PAINTING Type : Epoxy

Shade : 631 of IS : 5

Notes : i) Separate sheets shall be used for different services and ratings of motors. ii) All unfilled data shall be filled by the bidder and submitted with bid.

Page 155: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 10 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

SPECIFICATION SHEET LOCAL CONTROL STATION

CLIENT: M/s NFL PROJECT: BAG LOADING SYSTEM PLANT: BAGGING PLANT

ISSUED FOR : PROPOSAL ENQUIRY ORDER FINAL

GENERAL AMBIENT CONDITION Ref. Stds.: IS/ IEC Temp. Max./Min./Design Ref.: 46.1

0C / -2.2 / 46

0C

Encl. Docs. : Relative Humidity: 100% Alt. above sea : <1000 M Vendor : Atmospheric

Pollution

Dusts: Urea Vendor Ref. No. : Vapour : Area Safe : Hazardous : Sample : Reqd. : Not Reqd. : Hazardous

Area

Class

Zone : Encl. Gr. :

Tests : Routine : Type : Temp. Cl.: Others: Location : Indoor Outdoor

BASIC DATA Item No. For Conveyor Motor Quantity Equal to the no. of motors Rated Control Voltage with + % 240V 10% Rated Frequency with + 50Hz 5% Enclosure for Hazardous Area --

Provisions required in LCS

PUSH

BUTTON

Start Stop Reverse

Forward

CONTROL

SWITCH

TNC Lock / Service OFF / AUTO / ON Auto / Manual

INDICATION

LAMP

ON OFF Ready for Service Space Heater ON (Refer Cl. No. 7.1 of ES: 8102)

C.B. tripped

METERS

Ammeter Range To be indicated later

C.T. Sec. Current 1 Amp

RAIN HOOD Reqd. Not Reqd.

Control Cable Size PVCAPVC (Cu) 7 x 2.5 mm2 (Cu)/

10 x 2.5 mm2 (Cu) (subject to space heater ON indication lamp requirement)

Painting Type & Shade Epoxy, 631 as per IS: 5, Light grey Period For which Spares Reqd. 2 Years

MAKE OF COMPONENTS

Push Buttons L&T/Siemens/Alstom/Tecknic/Vaishnav TNC Switches Other Control Switch Ammeter AEP/IMP/Meco/Universal Indication Lamp L&T/Siemens/Teknic/Binay/GE Power Cable Gland Baliga/FCG Power Industries Ltd./FCG Flameproof Control Gears Pvt. Ltd./

Flexpro/Flameproof Equipments Pvt. Ltd./Power Engg./Electromech/Comet Terminal Box Elemex/Siemens/L&T

Notes: 1. All incomplete data shall be furnished by the bidder. 2. Code no. of the drive suffixed with LCS shall be marked on each LCS.

Page 156: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 11 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

TECHNICAL PARTICULARS INDUCTION MOTOR

CLIENT: M/s NFL PROJECT: BAG LOADING SYSTEM PLANT: BAGGING PLANT ISSUED FOR : PROPOSAL ENQUIRY ORDER FINAL

GENERAL Item No. Quantity Description Code No. Ref. Standard Make Maker’s Type

ELECTRICAL DATA Rated Output Rated Voltage No. of Starts - Hot / Cold Torque - Starting / Pull Up / Pull Out Starting Time at min. V Start (Hot / Cold) Safe Stall Time at VR / 1.1VR Stator Time Constant Temp. Rise at Full Load - Wdg. / Hot Air / Brg. TEMP. RISE OF STATOR

/ ROTOR AFTER

3 Starts From Cold 2 Starts From Hot

Current at FL / 0.85 FL Efficiency at FL / 0.85 FL Speed at FL / 0.85 FL Power Factor at FL / 0.85 FL / Start Push Pull Voltage withstand Capacity Max. V dip for 1 sec. / 10 sec. / 60 sec. Losses - Fixed / Copper / Total Space Heater Rating Suitable for Low Voltage Heating C.T. Ratio & Accuracy Class C.T. VK & Imag. at VK / 2 Heating Time Constant Cooling Time Constant

MECHANICAL DATA Frame Size / Ref. Dimensional Drg. Weight - Stator / Rotor / Total Heaviest Weight to be Lifted Rotor GD

2 in Kgm

2

REACTION AT

SUPPORTS FOR

S/C Condition Starting Condition Running Condition Push Pull Condition

Max. Vibration Limit Max. Noise Level Suitable for Outdoor Use Yes No Suitable for Bi-directional Rotation Yes No Material of Insulation Treatment of Insulation Winding Coils Replaceable at Site Type & Material of Fan Material & Thickness of Cooler Tube Cooling Water Required in M

3 / hr

Lubrication Type Lubricant Specn. Interval of Lubrication

BEARING

NOS. & TYPE

DE NDE GUIDE

On Line Lubrication Type & Rating of Main Cable Box No. of Cable Glands in Control Cable Box

Note: Technical Particulars for each rating and type of motor shall be furnished separately.

Page 157: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 12 of 12

NFVP/BAGGING/2016 ELECTRICAL SPECS

TECHNICAL PARTICULARS LOCAL CONTROL STATION

CLIENT: M/s NFL PROJECT: BAG LOADING SYSTEM PLANT: BAGGING PLANT

ISSUED FOR : PROPOSAL ENQUIRY ORDER FINAL

GENERAL

Item No. Type of LCS Make Maker’s Type

CONSTRUCTIONAL FEATURES Material of Construction Thickness of Enclosure IP Class of Enclosure Mounting Arrangement Door hinged or not Gasketing Material External Hardwares Rainhood reqd. or not

Component

Mounting

On Door On Base Plate

Provision of Padlocking provided with Dimensions LxBxH / Dimensional Drg. Ref. No.

Type Test Certificate No.

WIRING Wiring Material & Size External Cable Size

PUSH BUTTONS Make & Maker’s Type Ref. Standards Operating Principle Rated Voltage No. of Contacts N.O. / N.C. Contact Rating ( V / A )

AMMETER Make & Maker’s Type Ref. Standards Rated Current / VA Accuracy Class Scale Band Size

CONTROL SWITCHES Make & Maker’s Type Ref. Standards Rated Voltage No. of Contacts N.O. / N.C. Contact Rating ( V / A ) Utilization Category

INDICATION LAMPS Make & Maker’s Type Ref. Standards Rated Voltage / Watts Type of Holder Safety Resistor

CABLE GLANDS Material Type

TERMINAL BLOCK Make Type Current Rating

Page 158: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 1 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

ELECTRICAL SPECIFICATIONS

(Cables)

FOR

BAG LOADING SYSTEM COMPATIBLE WITH EXISTING

LOADING SYSTEM

OF

BAGGING PLANT

FOR

NATIONAL FERTILIZERS LIMITED, VIJAIPUR (M.P.)

PART-2 Technical (ITB NO- NFVP/Bagging/2016)

NFL VIJAIPUR

DISTT. GUNA (MP) - 473111

PROJECT: DESIGN, MANUFACTURE, SUPPLY, ERECTION, TESTING COMMISSIONING OF BAG LOADING SYSTEM COMPATIBLE WITH EXISTING LOADING SYSTEM AT BAGGING PLANT FOR REDUCING RAKE LOADING TIME

Page 159: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 2 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

CONTENTS

SECTION NUMBER

DESCRIPTION SHEET NUMBER

1.0 Scope 3

2.0 Codes & Standards 3

3.0 Service conditions 3

4.0 Operating Requirements 3

5.0 General Design & Constructional requirements 3

6.0 Special purpose cables 5

7.0 Cable Drum 5

8.0 Testing & Inspection 5

9.0 Drawings & Documents 6

10.0 Deviations 6

11.0 Make of electrical Cables 6-7

-- Annexure-1 (Documents Schedule) 8

-- Specification Sheet - Cables 9

Earthing Station Diagram 10

Page 160: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 3 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

1.0 SCOPE

1.1 This standard covers the technical requirements of design, manufacture, testing at works

and dispatch in well packed condition of power and control cables.

1.2 The standard shall be read in conjunction with relevant specification sheets and other

relevant references as specified therein.

2.0 STANDARDS TO BE FOLLOWED

2.1 The design, manufacture and testing of cables covered by this standard shall comply with

the latest issue of following Indian Standards, unless otherwise specified. Equipment

complying with equivalent IEC standards shall also be acceptable.

IS: 694

--

PVC insulated cables for working voltages upto and

including 1100 volts

IS: 5831

--

PVC insulation and sheath of electric cables

2.2 The design and operational features of the cables offered shall also comply with the

provisions of latest issue of the Indian Electricity Rules and other relevant Statutory

Rules & Regulations. The supplier shall, whenever necessary, make suitable

modification in the cables to comply with the above mentioned rules.

2.3 Wherever any requirement, laid down in this standard, differs from that in Indian

Standard Specifications, the requirement specified herein shall prevail.

3.0 SERVICE CONDITIONS

3.1 Ambient Conditions

These shall be as indicated in specification sheet.

3.2 System Details

These shall be as indicated in specification sheet.

4.0 OPERATING REQUIREMENTS

The cables shall be suitable for operating continuously at the rated capacity as specified

in relevant I.S. under the ambient conditions in specification sheet without exceeding the

permissible temperature rise and without any detrimental effect on any part.

5.0 GENERAL DESIGN AND CONSTRUCTIONAL FEATURES

5.1 The design, manufacture and workmanship of cables shall be in accordance with the

latest practice.

5.2 All materials to be used shall be new, unused and of the best quality.

Page 161: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 4 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

5.3 Conductors

The power cables shall be of stranded Aluminium / copper round or shaped conductors

and control cables shall be of annealed high conductivity stranded copper round

conductors. The conductors shall comply with the requirements of IS: 8130.

5.4 Insulation

The conductor insulation shall be type A/C as indicated in specification sheet and shall

comply with relevant IS.

5.5 Fillers

The cables shall have suitable fillers wherever required, laid up with conductors to

provide substantially circular cross section before the inner sheath is applied.

5.6 Inner Sheath

Inner sheath, wherever applicable shall be ST1/ ST2 type compound applied by

extrusion.

Armouring

All power and control cables shall be armoured as specified in specification sheet. The

single core cables shall be armoured with hard drawn Aluminium taps/ wires or any

other suitable nonmagnetic material. All other cables shall have galvanized steel wire /

strip armouring.

5.7 Outer Sheath

The outer sheath shall be ST2 type compound applied by extrusion process and suitable

to withstand atmospheric pollution, resistance to termites, fire retardant and coloured

black. Outer sheath shall be suitable for continuous exposure to sun and without cracking

or deformation during service.

5.8 Screening

Screening over conductor and insulation shall be provided on all conductor above 1000V

by non metallic semiconducting extrusion or tap as per relevant standard unless specified

otherwise. The screening for control cables if specified shall be of aluminium, mylor or

equivalent and provided with tinned drain wire which shall be continuous and

permanently connected to the screen. Screen shall also be provided above inner sheath

with metallic foil braid.

5.9 Identification

The individual cores of cables shall be coloured as per relevant IS. Where it is not

possible to distinguish the cores by colour, coloured strip shall be applied on the cores or

core nos. shall be marked on each core at regular intervals. All cables shall carry the

manufacturer’s name or trade mark, the cable size, voltage rating and year of

Page 162: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 5 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

manufacture at intervals not exceeding 100 meters. Running meter markings shall also

be provided throughout the length of the cable.

5.10 Dimension

The overall dia. and dia. under armour of the cables shall be indicated by the vendor in

the technical particulars. These shall be guaranteed with a tolerance of ± 5% but not

exceeding 2 mm.

5.11 The cut ends of the cables shall be sealed by means of non-hygroscopic materials.

6.0 SPECIAL PURPOSE CABLES

6.1 Flame Retardant Low Smoke Cables

Flame retardant low smoke cables, shall have outer sheath of PVC having following

values.

- Minimum oxygen index - 29%

- Minimum temperature index - 250ºC

- Maximum acid gas generation - 20%

- Maximum smoke density rating - 60%

7.0 CABLE DRUM

7.1 The cables shall be supplied in non-returnable wooden drums (or steel drums if

specified) of heavy construction. The wood used for construction of the drums shall be

properly seasoned, sound and free from defects.

7.2 Cables shall be supplied in specified drum lengths. Where no such indication is given,

standard drum lengths may be offered.

7.3 The tolerance on each drum of cable shall not exceed ± 2.5%. However, no negative

tolerance on HV cables is acceptable.

7.4 All cable drums shall have stencilled data as per relevant IS as well as the purchaser’s

order no., item no. & drum no.

8.0 TESTS AND INSPECTION

8.1 The following tests shall be carried out on the cables as per relevant IS.

i) Routine Tests - On all cables

ii) Acceptance tests - On representative length of each size

iii) Type tests - Wherever specified on one cable drum of each size

8.2 In addition, the following tests shall be carried out on all fire retardant low smoke cables

as per IS or as per the following standards:

Page 163: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 6 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

i) Oxygen and temperature index test as per ASTM-D-2863

ii) Acid gas emission test as per IEC-754 Part-I

iii) Smoke density test as per ASTM-D-2843

iv) Flammability test as per IEC-332 Part-I or IS-10810

8.3 All the above mentioned tests shall be carried out in the presence of purchaser’s

representative. In addition, the cables shall be subjected to stage inspection at works and

inspection at site for final acceptance.

8.4 These tests and inspections shall, however, not absolve the vendor from their

responsibility for making good any defect which may be noticed subsequently.

9.0 DRAWINGS AND DOCUMENTS

9.1 Drawings and documents as per Annexure-I shall be supplied, unless otherwise

specified.

9.2 All drawings and documents shall have the following descriptions written boldly.

- Name of client

- Enquiry / Order Number with plant / project name

- Code No. and Description

10.0 DEVIATIONS

10.1 Deviations, if any, from this standard shall be clearly indicated in the offer with

reasoning.

10.2 Deviations, if any, from the data furnished in specification sheet shall be indicated

therein beside the data by encircling it.

11.0 MAKE OF CABLES

LT (1.1 KV) Power Cables

1. Cable Corporation of India Ltd. India

2. Ravin Cables Limited India

3. RPG Cables Limited India

4. Finolex Cables Ltd. India

5. KEI Industries Ltd. India

6. Torrent Cables Limited India

7. Industrial Cables (I) Limited India

8 NICCO Corporation Limited India

9. Universal Cables Ltd. India

10 KEC International ltd.(Formerly RPG Cables Limited) India

11 Gemscab industries Limited India

Page 164: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 7 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

12 Special Cable Pvt. Limited India

13 Friends Cables Industries India

14 Polycab Wires Pvt. Limited India

LT (1.1 KV) Control Cables

1. Cable Corporation of India Ltd. India

2. RPG Cables Limited India

3. Finolex Cables Ltd. India

4. KEI Industries Ltd. India

5. Cords Cable Industries Ltd. India

6. NICCO Corporation Limited India

7. Universal Cables Ltd. India

8. KEC International ltd.(Formerly RPG Cables Limited) India

9. Gemscab industries Limited India

10. Special Cable Pvt. Limited India

11. Friends Cables Industries India

12. Polycab Wires Pvt. Limited India

Page 165: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) NFVP/BAGGING/2016 P

BAG LOADING SYSTEM REV

NATIONAL FERTILIZERS LIMITED Page 8 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

ANNEXURE - I

DOCUMENTATION FOR CABLES

Sl. No.

Document Description Documents Required (Y / N)

With Bid For Approval Final

1.

2.

3.

4.

5.

6.

Specification Sheet, duly completed

Technical Particulars, duly filled-in

Illustrative and Descriptive catalogues

Installation, Termination and Jointing

Instructions

Test certificates

a) Routine

b) Type

Guarantee Certificates

Y

Y

Y

N

N

Y

N

Y

Y

N

N

N

N

N

Y

Y

Y

Y

Y

Y

Y

Note: 1. 4 hard copies & 1 soft copy shall be supplied with bid.

2. 4 hard copies & 1 soft copy shall be supplied for approval after order within 4 weeks from

the date of LOI.

3. 8 hard copies & 2 soft copies in CD shall be submitted as final documents prior to

despatch of the equipment. These shall be made in sets and supplied in fine plastic coated

folder.

Y - Yes, N - No

Page 166: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 9 of 10

NFVP/BAGGING/2016 ELECT SPECS CABLES

SPECIFICATION SHEET CABLES

CLIENT: M/S NFL, VIJAIPUR

PLANT: BAGGING

Enclosed doc: ES: 8160

Ambient Condition

1. Temperature Max/Min/Design Ref 46.1/-2.2/46deg

2. Relative Humidity> 100%

3. Alt above Sea Level>1000M

Atmospheric Pollution: Urea Dust

BASIC DATA:

1. Reference standard : IS: 1554 (Pt-I)

2. Voltage Grade : 1.1KV

3. System Earthings : Solidly Earthed

4. Conductor

- Material : Copper

- Construction : standard

5. Insulation Type : HRPVC

6. Inner sheath type : Extruded PVC

7. Armouring

- Required – YES

- Material – Gal Steel strip

- No of layer – single

8. Outer Sheath Type : Extruded PVC Type- ST2

9. Special Requirement : Outer sheath of FRLS type

Page 167: INVITATION TO BID FOR INSTALLATION OF BAG · PDF fileNATIONAL FERTILIZERS LIMITED ... Venue of Bid opening NFL Vijaipur Type of Bid Two Stage ... 1310 MTPD at NFL, Vijaipur. The plants

ELECTRICAL SPECIFICATION (CABLES) P

BAG LOADING SYSTEM DOCUMENT NO REV

NATIONAL FERTILIZERS LIMITED Page 10 of 10