ips1000 for tmic project.10
TRANSCRIPT
-
7/27/2019 IPS1000 for TMIC Project.10
1/20
HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
Huawei Confidential
Security Level:2009-8-15
IPS1000 Power Distribution
Installation and Connection(For TMIC project P02)
-
7/27/2019 IPS1000 for TMIC Project.10
2/20
HUAWEI TECHNOLOGIES CO., LTD. Page 2Huawei Confidential
BMU
ATS
ACDB
IPS1000
INTERNAL FUNCTION OF IPS1000:
-
7/27/2019 IPS1000 for TMIC Project.10
3/20
HUAWEI TECHNOLOGIES CO., LTD. Page 3Huawei Confidential
Work Principle of 1+0 Energy System
D.G Starts to
powers the BTS
and charges the
Battery
D.G. stops and
Battery discharges
to power the BTS
About 6hrs
Battery is
fully charged
Battery discharges to
a setting residualcapacity(40%)
Depended on the consumptionof the site and batterys age.
Remark: For some 1+0 sites which have EDC, the site will use the EDC first , if the EDC is off , the DG and battery wil l cycle
like the sites which have no EDC, anytime the EDC is available, the system will switch to EDC to supply for the site.
-
7/27/2019 IPS1000 for TMIC Project.10
4/20
HUAWEI TECHNOLOGIES CO., LTD. Page 4Huawei Confidential
SITE POWER CONNECTION CHART FOR OUTDOOR GREEN FIELD:
Power cableAlarm cable
ACDB Guard Room
Lighting
SocketBY CIVIL WORK SUB-CON
IPS1000
BTS
Battery (-48V)
(Mini shelter)
TE
equipment
Gen-set
Mains
(DG2)
optional
Done by CW Sub-con
Done by TE Sub-con
Done by DG Supplier
-
7/27/2019 IPS1000 for TMIC Project.10
5/20
HUAWEI TECHNOLOGIES CO., LTD. Page 5Huawei Confidential
DGS BATTERY CABLEDG START SIGNAL
CABLE
DGS POWER CABLE
EDCSee next for the connection
DETAIL CONNECTION FOR IPS
ACDB
L1 L2 L3 N
From IPS
-
7/27/2019 IPS1000 for TMIC Project.10
6/20
HUAWEI TECHNOLOGIES CO., LTD. Page 6Huawei Confidential
+
-
Current transformer DC power connection at APM30
Alarm connector
for Mini shelterFrom Mini sheltersdoor fan
From Temperature
sensor in Mini shelter
Connect to Batt. temp
in APM30
From Door sensor of
Mini shelter
Connect to APM30
door sensor
(see next page)
1
2
3
4
5
67
98
1110
12
Mini Shelter
SETAIL CONNECTION OF MINI SHELTER AND IPS
-
7/27/2019 IPS1000 for TMIC Project.10
7/20
HUAWEI TECHNOLOGIES CO., LTD. Page 7Huawei Confidential
Take this short connector out and connect
the door alarm cable from Mini shelter
BTS
CONTROL CONNECTION AT IPS
(Done by DG supplier)
M G + -
From Current transformer
(at min i shelter)
-48V
PGND
To DG start
To DG Battery
+ -
BMU Fail SPD Fail
(To APM30H)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
To mini shelter
Bus bar
-
7/27/2019 IPS1000 for TMIC Project.10
8/20
HUAWEI TECHNOLOGIES CO., LTD. Page 8Huawei Confidential
DG Installation(1.2)---EDC AC Power Cable
-
7/27/2019 IPS1000 for TMIC Project.10
9/20
Instruction to change the AC power input from 1 to 3 phases
-
7/27/2019 IPS1000 for TMIC Project.10
10/20
HUAWEI TECHNOLOGIES CO., LTD. Page 10Huawei Confidential
N
L1
L2
L3From
ACDB
Take this out from the connector board
APM30 Panel
AC power input
connector
Instruction to change the AC power input from 1 to 3 phases
supply for Green field BTS outdoor site
-
7/27/2019 IPS1000 for TMIC Project.10
11/20
HUAWEI TECHNOLOGIES CO., LTD. Page 11Huawei Confidential
Battery Cabinet Installation(1)---Summay
Chart
-
7/27/2019 IPS1000 for TMIC Project.10
12/20
HUAWEI TECHNOLOGIES CO., LTD. Page 12Huawei Confidential
Battery Cabinet Installation(3)---
Connection Between Battery and
IPS/Power System
Power System Battery Input PortIPS
RTN -48V
Fan Power Input
M G
1-2
-
7/27/2019 IPS1000 for TMIC Project.10
13/20
HUAWEI TECHNOLOGIES CO., LTD. Page 13Huawei Confidential
Battery Cabinet Installation(2)---Install Current
Sensor
! Make sure the connector is faced down to the floorotherwise the current transformer doesnt work.
-
7/27/2019 IPS1000 for TMIC Project.10
14/20
HUAWEI TECHNOLOGIES CO., LTD. Page 14Huawei Confidential
DG Alarm Connection for (1+1) site
APM30H
LOW FUELGEN2 RUNGEN2 FAULT
GEN1 RUN
GEN1 FAULT
1..81
.
.
.
.
8
1..8
1
.
.
.
.
8
APM30H
-
7/27/2019 IPS1000 for TMIC Project.10
15/20
HUAWEI TECHNOLOGIES CO., LTD. Page 15Huawei Confidential
APM30H
BMU FAIL
GEN1 RUN
GEN1 FAULT
1..8
1
.
.
.
.
8
APM30H
LOW FUEL
DG Alarm Connection for (1+0) site
BMU Fail
IPS SET(2)
-
7/27/2019 IPS1000 for TMIC Project.10
16/20
HUAWEI TECHNOLOGIES CO., LTD. Page 16Huawei Confidential
IPS SET(2)
Note: During the commissioning, we only set:
1. Batteries capacity (as the installed batteries)
2. The date and t ime
IPS St t U
-
7/27/2019 IPS1000 for TMIC Project.10
17/20
HUAWEI TECHNOLOGIES CO., LTD. Page 17Huawei Confidential
When the power supply is coming the RUN led is blinked, if
the power reached the terminals but the RUN light not
ON:
1. Check Switch (1) toAuto or not if not switch it toAuto
2. Check the fuses (2) whether they are loose or not
properly connected (take it out and check then put it inagain and check the RUN light if the light is OK wait
about 10s the transfer switch will ON then the light on
the front door is ON).
1
3
Set to 0000 if site (1+0) means
DG+Battery
Power Indicator (front door)
IPS Start Up
Instruction
-
7/27/2019 IPS1000 for TMIC Project.10
18/20
HUAWEI TECHNOLOGIES CO., LTD. Page 18Huawei Confidential
IPS SET(3)
1Set the power switch of the BMU to OFF, disconnect the EDC
inputif EDC is available, set the diesel generator to the
automatic mode, then the diesel generator will start automatically.
2Set the power switch of the BMU to ON, set the diesel
generator to the Test Mode, selectATS Control, press the ENT
button of control panel, select Close and press ENT button to
stop the diesel generator.
3Exit the Test Mode and the diesel generator will start to supplypower 3 automatically.
4Connect the EDC inputif EDC is available, the IPS will
start the EDC to supply power and the diesel generator will stop
work a moment later automatically.5After the test, close the door of each cabinet and give the key
to the person in charge for proper management.
-
7/27/2019 IPS1000 for TMIC Project.10
19/20
HUAWEI TECHNOLOGIES CO., LTD. Page 19Huawei Confidential
Accessories for IPS1000 (in the box)
CT sensor
Fire proofing Mud (use to close the hole of PG
socket after finishing the installation)
Control cables terminals
Grounding Terminal
(Note: dont forget to
connect this cable)
All the accessories in IPS1000s box
-
7/27/2019 IPS1000 for TMIC Project.10
20/20
Thank youwww.huawei.com