`,,\ \ Corrigenda for Sut)DLv. ImtaJhtion. Te3tlnE. CommlaeioninE and Procurement of DWDM Transmission Equipment /ROADM. OI.A. etcl SerialNo Clause/Sub-Clause Corrigenda I 6.7.2 Service Clause 6.7.2 Service (Traffic) requirements will be replaced by (Traffic) "DWDM network service demands are defined at loG/10GbE/100GE requirements client service rate level and mentioned in Annex-2 (Requirements of different Line and client interfaces of different sites) of Section 8. Bidder must equip and quote necessary SFP/XFP/CFP/optical interface module according to the service requirement. Optical module of client side should be minimum 10 KM of length." 2 7.7.9 Please replace text in clause 7.7.9 "08 (Eight) years" by "05 (five) years". 3 7.5.3 Battery Please replace text in clause 7.5.3 "No. of Battery sets required at each site : 2 mos" by "No. of Battery sets required at each site : 1 no„ 4 GCC 23.2 GCC 23.2 clause will be replaced by "Upon shipment, the Supplier shall notify by a Shipment Advise to the Purchaser and the Insurance Company by telex or fax or email or hand delivery (Within 7/3 days of shipment), the full details of the shipment, including Contract number, description of Goods along with the followings: For Sea shipment Invoice No., Invoice Value, Container No., Total Boxes/Cartoon/Palette, Grand Total Gross Weight, Grand Total Net Weight, Bill of Lading No., Vessel Name and Voyage No., Port of Loading Place & Date, ETD From Port of Loading, ETA to Chittagong Seaport For Air shipment Invoice No., Invoice Value, Total Boxes/Cartoon/Palette, Grand Total Gross Weight, Grand Total Net Weight, AWE No. and date, Flight No and Date, Port of Loading Place & Date, ETD From Port of Loading, ETA to Dhaka Airport "For Goods sul}Dlied from abroad as Der INCOTERM CPT or en:Theshipping documents will consist of i) The Supplier's 3 (Three) original invoice showing goods description, quantity, unit price and total price & 3 (Three) original bill of exchange. ..,.`'-;.. (ir ri - fry

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

`,,\\

Corrigenda for Sut)DLv. ImtaJhtion. Te3tlnE. CommlaeioninE and Procurement of DWDMTransmission Equipment /ROADM. OI.A. etcl

SerialNo Clause/Sub-Clause Corrigenda

I 6.7.2 Service Clause 6.7.2 Service (Traffic) requirements will be replaced by

(Traffic) "DWDM network service demands are defined at loG/10GbE/100GE

requirements client service rate level and mentioned in Annex-2 (Requirements ofdifferent Line and client interfaces of different sites) of Section 8.Bidder must equip and quote necessary SFP/XFP/CFP/optical interfacemodule according to the service requirement. Optical module of clientside should be minimum 10 KM of length."

2 7.7.9 Please replace text in clause 7.7.9 "08 (Eight) years" by "05 (five)years".

3 7.5.3 Battery Please replace text in clause 7.5.3 "No. of Battery sets required at eachsite : 2 mos" by "No. of Battery sets required at each site

: 1 no„

4 GCC 23.2 GCC 23.2 clause will be replaced by"Upon shipment, the Supplier shall notify by a Shipment Advise to

the Purchaser and the Insurance Company by telex or fax or email orhand delivery (Within 7/3 days of shipment), the full details of theshipment, including Contract number, description of Goods alongwith the followings:

For Sea shipmentInvoice No., Invoice Value, Container No., TotalBoxes/Cartoon/Palette, Grand Total Gross Weight, Grand Total NetWeight, Bill of Lading No., Vessel Name and Voyage No., Port ofLoading Place & Date, ETD From Port of Loading, ETA toChittagong Seaport

For Air shipmentInvoice No., Invoice Value, Total Boxes/Cartoon/Palette, Grand TotalGross Weight, Grand Total Net Weight, AWE No. and date, FlightNo and Date, Port of Loading Place & Date, ETD From Port ofLoading, ETA to Dhaka Airport

"For Goods sul}Dlied from abroad as Der INCOTERM CPT or

en:Theshipping documents will consist of

i) The Supplier's 3 (Three) original invoice showing goodsdescription, quantity, unit price and total price & 3 (Three) originalbill of exchange.

..,.`'-;.. (ir ri - fry

Page 2: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

ii) 1 (One) original and 3 (Three) photocopies of the "FreigbtPrepaid"airwaybill/billoflading.

iii) 1 (One) original and 3 (Three) photocopies of packing list withweightandmeasurement,identifyingthecontentofeachpackage.iv)1(One)and3(Three)photocopiesofManufacturer's/Supplier'swarrantycertificate.

v) 1 (One) and 3 (Three) photocopies ofFactory Test Certificate (ForDWDMEquipmentandRectifierOnly).

vi) 1 (One) and 3 (Three) photocopies of certificate of origin.vii)1(One)and3(Three)photocopiesofShipmentAdvise.

viii) PSI document or other document if purchaser deploys PSIagent.

The above documents must be received within 3 days if sent by airand7daysbeforeifsendbysea.

INote: The above requirements may be reviewed by a Purchaser on acase-by-case basis, with amendments being made as necessary.]

For Goods from within the Purchaser's country as perINCOTERM EXW:

The shipping documents will consist of

i) The Supplier's 3 (Three) original invoice showing goodsdescription,quantity,unitpriceandtotalprice&3(Three)originalbillofexchange.

ii) 1 (One) original and 3 (Three) photocopies of the "FreightPrepaid"deliverynote,railwayreceiptortruckreceipt.iii)1(One)originaland3(Three)photocopiesofpackinglistwithweightandmeasurement,identifyingthecontentofeachpackage.iv)1(One)and3(Three)photocopiesofManufacturer's/Supplier'swarrantycertificate.

v) 1 (One) and 3 (Three) photocopies ofFactory Test Certificate (ForDWDMEquipmentOnly).

vi) 1 (One) and 3 (Three) photocopies of certificate of origin.

The above documents must be received before arrival of the goods atsiteandoriginaldocumentmustbesubmittedthroughbankwithin21(Twenty-One)daysofactualshipment"

56 Clause 6.7.1a)1)Clause7.2.2v) Clause 6.7.1 a) 1) w-ill be replaced by"Flexigrid Och AddDrop Mux with at least No. of ports according toTrafficMatrixateachnodeexpandableuptominimum80/96

Channels"Clause 7.2.2 v) will be replaced by"The DWDM network shall be based on minimum 100G line percharmelwithFlexigridOchAddmropMuxwithrequiredNo.of Ports

REF

Page 3: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

` `,-,,- ``.,

•,,. \, ,`\

according to Traffic Matrix at each node, expandable up to minimum80/96Channelspernode"

789101112 Clause 7.2.18a)7.2.47.2.4(I)7.2.14(I,)7.2.2vii7.2.2xi Clause 7.2.18 a) will be replaced by"Flexigrid Och Add/Drop Mux with at least No. of Ports according toTrafficMatrixateachnode,expandableuptominimum80/96

Channels"Please replace text in clause 7.2.4 "OUT" by "OTU""10 GbE on VLAN and ODU-Flex on OTN GMP" is removed from

clause 7.2.4(I)"The system shall support transparent transpoil of IEEE 1588V2" is

removed from clause 7.2.14(b)Clause 7.2.2 vii will be replaced by"The Client ports and line (Transponder) ports may be on separate

cards and shall be connected through backplane or line port and client

poilmaybeinsamecardprovidedalltechnicalrequirementoflineportand client port stated in tender document is/are complied."

Please replace "G.697.1" in clause 7.2.2 xi) by "G 6941"131415 7.2.4 d) Pleasereplace"G.697.1"inclause7.2.4d)by"G.g94 .1"

7.1.I7.2.1 j) Please replace "G.697. I " in clause 7. I .1 by "G.694.1 "

Please replace "G.697.1" in clause 7.2.1 j) by "G.694.1"16 Form C.3,Sub-totalInvertermaterials Not Required

17 6.3 Clause 6.3 will be replaced by"The Total Scope of Goods (equipment) are as follows:

Type of Equipment Number and Location Must meet

Reconfigurable Optical 23 (Twenty Three) TechnicalAdd Drop Multiplexer S ites : Moghbazar, specifications(ROADM) DWDM Gazipur, Savar, Kabirpur, are given inequipment w ith Tangail, Mymensingh, Section 7.Protection and Kishorgonj , B hairab,Restoration facil ity Ashugonj, Narshingdi,using Layer 0 (LO)- Brahmanbaria, Cumilla,ASON/GMPLS/Optical Cumilla (South) PGCB,ASON along with Bhulta, Chandpur,Optical Time Domain Laxm ipur, Noakhal i,Reflectometer (OTDR) Feni, Sylhet, Chottogram,Facility. Hathazari, Dohazari andCox'BazarSMW-4.

\:*. i:--:`.i: REi

Page 4: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

~ `{- -I ,.--, < ..

f'`,1.-.-.:',,'``,:`-.+```.`,`,.`\``

\. ``. ``

Optical Line Amplifier7 (Seven)Manikgonj, Daudkandi,Hobigonj,Moulovibazar,Srimongol,MirsaraiandChiringa.

Techn ical -

(OLA) equipment specificationsalong with Optical are given inTime DomainReflectometer (OTDR)Facility Section 7.

Redundant Equ ipment(Spare)1 (One)

Technicalspecifications

Sylhet are given inSection7.

Rectifier System

Any of the 11 sites: TechnicalSrimongo I ,Bhulta, specificationsKabirpur, Ashugonj , are given inHathazari, Mirsharai,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7.

Battery Any of the 11 sites: TechnicalSrimongol ,Bhulta, specificationsKabirpur, Ashugonj, are given inHathazari, Mirsharai,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7.

Air-Conditioner Any of the 11 sites: TechnicalSrimongol ,Bhulta, specificationsKabirpur, Ashugonj, are given inHathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7.

In order to achieve the intended goal of the purchaser, Bidder duringdesigning and con figuring the equipment at each site shall follow thefollowing fundamental rules;-FixedOpticalAdd Drop Multiplexer (FOADM) is not

allowed in the network.- For line side, Optical Channel (Och) of only looG lamda

will be used.

• „ ran

Page 5: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

7.2.2 xiii.28.1 I

- Line signal Protection and Restoration facility must be

rmplemented.- Automatically switched optical Network (ASON) must be

implemented using Layer 0 (LO)-ASON/GMPLS/OpticalASON for Restoration.

- Regeneration of line signal in between Source and

destination node (Anywhere in between the Main,Protection and restoration paths) is not allowed.

- Use of external Dispersion Compensation module is not

allowed.- The client port and line port may be on separate cards or in

same card.- Inbuilt OTDR functionality must be provided for all fiber

connectivity between all nodes.

Any disagreement/deviation will be treated as "Material Deviation"and/or "Reservation". This Clause 6.3 will prevail on rest of theclauses mentioned in Section 6 and Section 7 of this TenderDocument."

18 ause . . xiiiwi ereplacedby"The DWDM system shall have the modularity and scalability of at

least 80/96 ch ( system architecture for Point-to-Point, ring and meshnetwork application). From day one flexigrid add/drop MUX withrequired number of ports according to the traffic matrix of the nodemust be conflgured which is expandable up to minimum 80/96charmels per node."Pld

I20 7.2.2 (i) The equipment shall implement 100GB/100GBE on line side and100GB/100GBEor10GB/10GBEonclientsideaccordingtothetrafficmatrix.

21 6.8.1 Please read "Main Server and Standby Server" instead of "1 (One)server"

22

I

GCC 27.1 In clause GCC 27.1 "All payments shall be made through irrevocable,confirmedandtransferrableLetterofcredit(L/C)"willbereplacedby"Allpaymentsshallbemadethroughirrevocable,confirmedandtransferrableLetterofCreditopenedinfavouroftheSupplierinbankinitscountry."

GCC 27.1 A) clause will be replaced by"A) Payment for Goods supplied from abroad:

:-`: `i\`` RE

Page 6: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

i) On shipment: Eighty (80) percent of the contract price of Goodsshipped shall be paid upon submission of documents specified inGCC clause 23 .2.

ii) On Provisional Acceptance: Fifteen (15) percent of the contract

price of Goods received shall be paid upon submission of claimsupported by the Provisional Acceptance Certificate (PAC). PACshall be issued by Project Director/ General Manager(Development Co-ordination) of BTCL upon completion ofrelevant contractual liabilities by the supplier, subject to theconditions and provisions mentioned in GCC 32.1.

On Final Acceptance: Five (5) percent of the contract price of Goodsreceived shall be paid upon submission of claim supported by the FinalAcceptance Certificate 07AC). FAC shall be issued by the ProjectDirector/General Manager (Development Co-ordination) of BTCLupon completion of relevant contractual liabilities by the supplier,subject to the conditions and provisions mentioned in GCC 32.1."

23 6.23.1 b) In clause 6.23.1 b) number of working days will be 10 (Ten) days24 6.7.1 a) 9) Clause 9.7.1 a) 9) will be replaced by

"Line and client ports may be in separate or same card but in any case,

main and protection channel (Och) must be connected throughminimum two distinct optical add-drop facility at each node i.e. Onefor Main and one for protection path."

25 ITT21.1(o) In clause ITT 21.I(o) Please read I (One) year instead of 3 (Three)years.

26 ANNEX-D "DECLARATION OF JOINT LIABILITY" is omitted.

27 21.I(q) I. Sub-clause 21.1 (q) 2 "Forwarding of the bid (as per "Annex A"attached, duly filled up and properly signed)" is omitted.

28 ITT 61. I In TDS clause ITT 61.1 will be replace by

"The maximum percentage by which quantities per item may be

increased is 50% (Fifty Percent).

The maximum percentage by which quantities per item may bedecreased is 20% (Twenty Percent)."

29 GCC 24.1 In clause GCC 24.1 please read 14 (Fourteen) days instead of7 (Seven)days.

30 New clause7.15 Requirement of Maintenance Support after warranty period :

Tenderer must agree to provide Maintenance Support for one yearafter the end of warranty Period at the same price with the sameservice scope as mentioned for warranty period. This service may be

REz]

Page 7: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

`. ;``\```

procured and included in the contract to be signed or may be procuredunder separate contract at a later date.

Any disagreement/deviation will be treated as "Critical Deviation"individually for each sub-clause.

31 7.2.19 Requirement of Encryption facility at Client PortBidder shall offer price for encryption facilities of 100G client portand10Gclientporttotheclientportasoptional

323334 6.23.1ITT13.1ITT14.1(a) Factory Premises Acceptance Test arpAT)

Detail of the FPAT team for DWDM equipment and facilities to be

provided is as follows:a)TotalNumberofBTCL engineers : 5 (Five)

b) No. of working days : 10 (Ten) Working daysc)Per diem : US$ 150 (One Hundred Fifty)

per person per calendar dayd)Other facilities : Both way air ticket,Comfortable, Accommodation including, breakfast, localtransportation, medical facility (if required).

Detail of the FPAT team for Rectifier equipment to be provided isas fo]]ows:a)TotalNumber ofBTCL engineers : 2 (Two)

b) No. of working days : 3 (Three) Workingdaysc)Per diem : US$ 150 (One Hundred Fifty)

per person per calendar dayd)Other facilities : Both way air ticket,Comfortable, Accommodation including, breakfast, localtransportation, medical facility (if required).

Clause ITT 13.1 will be replaced byThe maximum 3 (Three) number of arbitrations against the Tendererover a period 5(Five) years.Clause ITT 14.1(a) will be replaced by"The Tenderer shall have a minimum of 5 years of overall experienceinthesupplyofgoodsandrelatedservices"

35 ITT 14.1(b) Clause ITT 14.I(b) will be replaced by

Page 8: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

"The satisfactory completion of supply of similar goods of minimum 02

(two)contractinthelast05(Five)yearsbyTenderer(i.e.yearscountingbackwardfromthedateofpublicationofIFTinthenewspaper).

36 GCC 27.5 Clause GCC 27.5 will be replaced by"The payment-delay period after which the Purchaser shall pay interest

to the supplier shall be 60 (Sixty) days after submission of an invoiceor request for payment by the Supplier, and after the Purchaser hasaccepted it.The interest rate that shall be applied is 0% (Per Year)."

37 ITT 21.1 (o) Clause 21.1 (o) will be replaced by"As Documentary evidence, the bidder will be required to submit

following certificates issued by telecom operators/carriers.

a) Certificate certifying that the Bidder have completed I (one)work (supply, install, commission) of optical transmission equipmentincluding 100G or higher DWDM Optical Transmission Equipment ora composite project which includes supply, installation andcommissioning of looG or higher DWDM transmission equipment. Ifit is not clear from the certificate that the project includes any 100G orhigher DWDM optical transmission system the certificate will not beacceptable to Purchaser.

b) User's Certificates of satisfactory working record of themanufacturer's offered model of DWDM loo Gbps or higher per AOptical Transmission Equipment with Layer 0 (LO)-A S ON/GMPL SRestoration/Optical A S ON.

Quantitative and Qualitative aspects of user's certificates will be asfollows:

1. User's Certificates of satisfactory working record ofmanufacturer's offered model of DWDM 100 Gbps or higher per AOptical Transmission Equipment for at least 1 (One) year in at least 2(Two)operators,1(One)ofwhichmustbeoutsidetheCountryoforiginof the equipment.

2. Out of above 2 (Two) user certificate at least 1 (One) must befor manufacturer's offered model ofDWDM loo Gbps or higher per AOptical Transmission Equipment with Layer 0 (LO)-A S ON/GMPL SRestoration/Optical A S ON,

3. Factory test, Provisional Acceptance test, Laboratory testand/or Pilot Project test Certificates are not acceptable.

4. C ertificate mentioning on ly"with/using/supplyAmplementation" of WSS / ROADM or

.;.:`1-

Page 9: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

"with/using/supplyAmplementation" of Electrical ASON will not be

adequate and will not be considered.

5. All these certificates must contain the issue date, period ofsatisfactory operation (Either mentioned specifically or the certificateissuedatemustbeatleast1(one)yearaftertheequipmentbecame

commissioned/operational/in service), name and contact number of theissuing authority and must be in the letter head pad.

6. The certificate issuing authority must be a TelecomOperator/Carrier of the respective Country. If a telecomoperator/carrieroperatestelecomnetworksinmorethanoneCountry,thentheymayissuedifferentusercertificatesfromdifferentcountries

where they operate.

7. Such user certificates shall be in English or originally in anyother language accompanied by "legally authorized translation inEnglish".Certificatesinanyotherlanguage,butnotaccompaniedby

such translation, shall be disregarded.

C) If the manufacturer is not the tenderer then the manufacturer'sexperiencewillbetreatedasBidderexperienceifandonlyifthemanufacturerwilltaketheresponsibilityofinstallation,

commissioning and testing by its own supervision. In such casetenderermustsubmitmanufacturer'sassuranceletter/contractual

document between them. The successful Bidder will submit a bilateralcontract agreement signed with the manufacturer before making thecontract with the purchaser."

38 GCC 32.3 New clause added GCC 32.3 by"The Purchaser reserves the right to engage any external agents for the

purpose of conducting inspection or pre-shipment inspection of DWDMandrelatedequipment,providedthatthePurchasershallbearallofits

costs and expenses. The Purchaser also reserves the right to appointexternal Surveyor for inspection of DWDM and related equipment atarrival."

39 ITT 14.1(c)7.9.1 Not Applicable.40 Clause 7.9.1 will be replaced by

"Factory Premises Acceptance Test a]PAT)Testingonmanufacturer'spremises,tobetermed as "Factory PremisesAcceptanceTest(FPAT)",shallbecarriedoutonatleastone-thirdofalltypesofDWDM(DWDM/ROADM/OLA)equipmenttobesuppliedunderthispurchase,tobeconnectedbyopticalfibercoreasperproposednetworktopologyshowninAnnex-1includingonepossiblelongestpath.RestoftheDWDMequipmentwillalsobeinspectedphysically.AllDWDM/ROADM/OLAinthiscontractmustbemanufacturedbeforeFPAT.Biddermustarrangeallkindof

Analyzer/Test gear and optical fiber cable for this test. BTCL Engineer

• drr9 k,„

Page 10: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

will check all requirementsPremises Acceptance Test Certificate will not be issued if any failureof desired function mentioned in this document. The Bidder mustsubmit "Factory Premises Acceptance Test (FPAT)" procedure toProject Director for approval. After getting approval of "FactoryPremises Acceptance Test (FPAT)" procedure from Project Director,Bidder will invite purchaser for "Factory Premises Acceptance Test(FPAT)". All test results must be attached with "Factory PremisesAcceptance Test (FPAT)" report. "Factory Premises Acceptance Test(FPAT)" report will be signed by BTCL engineers mentioningcommittee' s recommendation regarding issuance of "Factory PremisesAcceptance Test Certificate". Based on "Factory Premises AcceptanceTest" report and commendation Project Director will take necessaryaction. Following Task/tests should be done at least (not limited to)

mentioned in this document. Factory

a) All equipment under this contract should be manufacturedbefore FPAT so that physical verification is done.

b) At least one-third of all types of DWDM(DWDM/ROADM/OLA) equipment to be supplied under thispurchase, to be connected by optical fiber core as per proposed networktopology shown in Annex-1 (The length of the flber of each hop willbesameasmentionedtoensurenon-linearpropertyofopticalfiberandon top to match with dB loss (Total Loss in dB for design in Annex-3)additional attenuator to be connected with optical fiber) including onepossible longest path including Moghbazar and Cox's Bazar Nodes.

c) Checking of Bill of Quantity aspercontract.

d) The following will be tested

1. Line and clientports may be in separate orin same card but inany case, it will be checked that main and protection channel (Och) isconnected through minimum two distinct optical add-drop facility ateach node i.e. One for Main and one for protection path.

2. 100G line per charmel lamda(A) will be tested with spectrumanalyzer.

3. 1+1+Restoration with optical layer ASON will be thoroughlychecked.

a) It will be checkedthatthe DWDM system does Active path toProtection path switching using Optical Protection switch (OPS) orOIN switch within 50ms excluding the detection time in 1 st Fiber Cutscenario (by breaking Active path).

fa, dr flo tr

Page 11: (ir ri - fryold.btcl.gov.bd/files/tender/15803811892581__Corrigendum...Hathazari, Mirsharai ,Daudkandi,Bhairab,Chiringa,ComillaSouthPGCB,Duhazari Section 7. In order to achieve the

b) It will be checked that 3rd path (Restoration path) is created byOptical ASON after 1 st Fiber cut scenario.

c) On creation of 3rd path (Restoration path), Protection path toRestoration path switching at 2nd Fiber cut scenario (by breakingActive path at that time) using Optical Protection switch (OPS) or OTNswitch within 50ms excluding the detection time.

d) And same way it will be checked for consecutive creation ofrestoration path and switching thereafter on 3rd/4th/.. flber cut scenarioas long as last path is available between source node and destinationnode. OSNR will be checked at receiver end in each test.

4. OTDR functionality will be checked to ensure measurementwithout impacting traffic while DWDM system is in service.

e) Checking of optical Line Amplifier (OLA) property includinggain, etc.

f) Checking ofNMS system according to Technical specification.

g) Any other property specifies in this Tender Document ifrequired.

If Bidder fails to perform satisfactorily first time "Factory PremisesAcceptance Test", Bidder will be allowed to arrange another "FactoryPremises Acceptance Test" within 45 days following same procedurementioned above. If 2nd FPAT is required, Bidder have to bear all costregarding FPAT including Per diem, Both way air ticket, comfortable,accommodation including breakfast, local transportation,medical facility (if required) for the whole FPAT Team. In this caseBidder will get FPAT payment only for one FPAT when FPATCertificate will be issued by Project Director. If Bidder fails to performsatisfactorily "Factory Premises Acceptance Test", contract betweenPurchaser and Bidder will be cancelled, no payment will made forFPAT. Purchaser will take necessary action against Bidder as perPPR'2008 and Purchaser will also forfeit performance guarantysubmitted by Bidder.

A certificate shall be signed by Project Director upon completion offactory Premises Acceptance test at site of manufacturer's premises,which will be termed as "Factory Premises Acceptance TestCertificate".

A team of BTCL engineer (Not bellow Assistant Manager) will joinfactory premises Test for Rectifier equipment."

N.B:. Queries from different bidders with BTCL's response (28 pages) are attached herewith.