irc-ccc presentation - march 2010
TRANSCRIPT
-
8/7/2019 IRC-CCC Presentation - March 2010
1/21
NRC-IRC
Canadian Codes CentreReport
Frank LohmannTRC Spring Meeting
March 3rd, 2010
-
8/7/2019 IRC-CCC Presentation - March 2010
2/21
2
Outline
Code Process UpdateCCBFC Meeting
2010-2015 Code Cycle
Codes Centre Update
-
8/7/2019 IRC-CCC Presentation - March 2010
3/21
3
Code Process Update
CCBFCSCSCSCCCR PCF
CCBFCSCSC PCF
SCPublicReview
2007
PublicReview
2009
Public
Review
2008
Oct 2008 Apr 2009
Sep 22-23
Nov 12-13
Feb 21-22
Dec 2010
-
8/7/2019 IRC-CCC Presentation - March 2010
4/21
Apr 28/29
Code Process Update
4
Fall 2010
Task
s
- On-line
- Off-line (PDF)
- Books
-
8/7/2019 IRC-CCC Presentation - March 2010
5/21
5
CCBFC Agenda
Technical Changes to Part 9 Climbability of Guards
Radon
Residential Care
Definition of Range (Cooktop) approved
New Tasks approved for Part 9 all SC Work Plans to be balloted
Basements
ICF Construction
Policy Guidance Farm Building Code
Shared Accommodation
Application to Existing Buildings
-
8/7/2019 IRC-CCC Presentation - March 2010
6/21
6
CCBFC - Radon
Proposed Changes All Part 9 Buildings
Appendix information will go into Users Guide
Heated crawl spaces are exempted
where accessible for service Unheated crawl spaces are exempted
No general exemption until cross-Canada data allows
risk-based approach
-
8/7/2019 IRC-CCC Presentation - March 2010
7/21
7
CCBFC - Climbable Guards
9.8.8.6. Design to PreventNot Facilitate Climbing(See Appendix) (See A-3.3.1.18.(4)(a))
Proposed Change:
1. required guards shall be designed so that no member,
attachment or opening will facilitate climbing
except for
industrial occupancies
where location and size of openingsdo not present a hazard to pre-school aged children
less than 1.8 meter drop between surfaces
inside dwelling units
2. No deemed-to-comply specs
Under review by CCBFC
NRC-IRC Housing report not correct!
-
8/7/2019 IRC-CCC Presentation - March 2010
8/21
8
CCBFC - Care Occupancies
B-3 Light (Part 9)=
C Occupancy + 2 or less not capable of self-preservation and
sleeping accommodation for maximum 10 persons and single housekeeping unit
CCBFC Decision for Part 9
Defer + back to status quo Solicit policy advice from P/T before continuing
-
8/7/2019 IRC-CCC Presentation - March 2010
9/21
9
2010-2015 Code Cycle
Scheduled Meetings
Standing Committee on Housing and Small Buildings
April 28/29, 2010, Montreal
Executive Committee of CCBFC
May 2010, tbd
CCBFC June 2010, tbd
-
8/7/2019 IRC-CCC Presentation - March 2010
10/21
10
SC-HSB April 28/29
Standing Committee on Housing and Small Buildings Meeting Agenda
TG Energy Efficiency
TG Illustrated Guide
Grab Bars in all dwelling units
Masonry Standards Consistent Terminology TG updates & approvals
Snow Loads (SD/HSB)
EIFS (ES/HSB/EEB)
Airborne Sound Transmission (ES/HSB)
Roofing, Waterproofing, Dampproofing Standards
Low Permeance Materials Protection of Foam Plastics
-
8/7/2019 IRC-CCC Presentation - March 2010
11/21
11
Implementation
of New ObjectivesProtocol
Energy Efficiency
Water Conservation
Public
ReviewOE & FS
OW & FS
CCBFC
Energy Efficiency
Objectives and Functional Statements
You
areHere
Voustesic
i
-
8/7/2019 IRC-CCC Presentation - March 2010
12/21
12
Energy Efficiency
12
Scope of Energy Efficiencyfor Houses (JTG)
Project
Plan
CCBFC
Scope
SC-EEB
SC-HSB
JTG-EEAcceptable
Solutions
Public
Review
Joint Task Group
You
areHere
Voustesici
Youare
Here
Voustesici
-
8/7/2019 IRC-CCC Presentation - March 2010
13/21
13
CCBFC
SC-EEB
SC-HSB
JTG-EEAcceptable
Solutions
Public
Review
JTG Energy Efficiency
Scope & Application
Building envelope
Heating, Ventilation, A/C
Service Water Heating
Housing AND Small Buildings
Study
Determine Baseline:
current construction practice
current level of performance
-
8/7/2019 IRC-CCC Presentation - March 2010
14/21
14
JTG Energy Efficiency
Sub-Task Groups Performance Compliance
Small Buildings
Building Envelope (Housing)
HVAC & Service Water Heating (Housing)
Code Coordination
Approach prescriptive path + trade-offs / performance path
consideration for energy targets depending on baseline
Affordability, P/T does and targets, Council of Federations,Simple Payback costing,
separate section in Part 9
Continuous communication with EC/CCBFC & PTPACC
-
8/7/2019 IRC-CCC Presentation - March 2010
15/21
15
TG Illustrated Guide Part 9
Project Plan 2005 Update of Users Guides - CCBFC Priority 2006
2006 User Survey: Combine IG and UG in code order
Phase 1a: Re-order the 1998 Illustrated Guide into code-order
Phase 1b: Move content from the 1995 User's Guide into
reordered IG document, Phase 1c: Delete duplicate text and illustrations, simple revisions
Phase 2: Technically Update IG to 2005 & 2010 Code
Phase 3: Final revisions, bring document into structure &format
Progress Phase 1: Complete, Phase 2: 40%, End date: Summer 2010
-
8/7/2019 IRC-CCC Presentation - March 2010
16/21
16
Illustrated Guide Part 9
What will the Guide contain? Organized generally in code order
Applies to Housing and Small Buildings
Supplements Appendix Information
Assists in the Use of the Code
Is Not a How-to Guide Explains Intentions of the Committees Developing the reqs
Describes Approaches for the Application of Requirements
Illustrates Important Principles of Minimum Accepted Practice
How will the guide look?
Soft cover book (8 x 11-1/2 in.). Downloadable as .pdf (off-line).
On-line viewing on a subscription basis Illustrations: 1 colourand grey shades
-
8/7/2019 IRC-CCC Presentation - March 2010
17/21
17
Illustrated Guide Part 9
Editorial Principles for The Guide is not a stand-alone document
is to be used in conjunction with the code
does not repeat information provided in the code
cross-reference rather than duplicate code tables
provides supplemental information
addresses cross-sectional subjects in separate chapters (e.g.lateral loads, secondary suites)
will be updated in sync with future code editions
-
8/7/2019 IRC-CCC Presentation - March 2010
18/21
18
Illustrated Guide Part 9
Working Groups: January May 2010
Task Group complete: Summer 2010
Standing Committee review and approval: Fall 2010
Editing and Translation: 2011
Publication: 2012
Project Plan where are we now?
-
8/7/2019 IRC-CCC Presentation - March 2010
19/21
19
Codes Centre Update
Staff Technical Advisor Fire Protection Vacant
Meeting Support
2010/2011
more tele-/web-conferencing where applicable face-to-face meetings in MTL-OTT-TOR area
2010 Code Seminars
no road shows planned
likely web-based delivery documents Whats New in the 2010 Codes opportunity to develop material for lateral loads, spatial separation,
-
8/7/2019 IRC-CCC Presentation - March 2010
20/21
20
Codes Centre Update
Studies Stair geometry Sprinkler statistics Possibly: climbability of guards Energy: benchmark studies
IRC representation on TRC Some retirements IRC has to re-establish its support to TRC
-
8/7/2019 IRC-CCC Presentation - March 2010
21/21
21
www.nationalcodes.ca