IRMIS3 Status and PlansGabriele Carcassi

10/11/2010

Page 2: IRMIS3 Status and Plans

IRMIS3 modules

Module name Goal StatusInfrastructure

Components

(Lightweight) inventory

Cabling

eLog

Lattice

Save Restore

Magnet measurement

PV Crawler

Epics DB generation

Nothing Prototype Alpha Beta Production

Page 3: IRMIS3 Status and Plans

Infrastructure

Requirements• Build/packaging – production• Logging – production• Security (AuthZ/AuthN) – prototype

TBD• Improve logging

Not covered• Nothing that we are aware

Available in the distribution with general support• Maintainer: Gabriele Carcassi

Page 4: IRMIS3 Status and Plans

Component module

Requirements• Ability to edit component types – production• Ability to edit components (installations) in hierarchy –

production TBD

• Final UI touches Not covered

• Nothing that we are aware Available in the distribution with general support

• Maintainer: Gabriele Carcassi

Page 5: IRMIS3 Status and Plans

Cabling module

Requirements• Ability to edit cable types – production• Ability to edit cable tray/partition/paths – production• Ability to edit cables – production

TBD• Load test (missing data)• UI consolidation

Not covered• Nothing that we are aware

Available in the distribution with general support• Maintainer: Gabriele Carcassi

Page 6: IRMIS3 Status and Plans

Lightweight inventory module

Requirements• Ability to track parts – production• Ability to install/uninstall parts – production

TBD• Installation/uninstallation history – will export to the eLog

Not covered• Shipping and receiving – not planned• Components lifecycle – not planned• Travelers – not planned

Available in the distribution with general support• Maintainer: Gabriele Carcassi

Page 7: IRMIS3 Status and Plans

eLog module

Requirements• Data model – prototype• UI – prototype• API – nothing

TBD• Requirement verification and implementation

Not covered

Not available• Maintainer: Don Dohan

Page 8: IRMIS3 Status and Plans

Lattice module

Requirements• Data model – prototype• PVAccess service/API – prototype

TBD• Requirement verification and implementation

Not covered• Multiple lattices using different “as-built” parameters

Not available• Maintainer: Don Dohan

Old version available in the distribution as is• Maintainer: Gabriele Carcassi

Page 9: IRMIS3 Status and Plans

Save restore module

Requirements• Data model – prototype• PVAccess service/API – prototype

TBD• Requirement verification and implementation

Not covered

Not available• Maintainer: Don Dohan

Page 10: IRMIS3 Status and Plans

Magnetic measurement module

Requirements• Data model – prototype

TBD• Requirement verification and implementation

Not covered

Not available• Maintainer: Don Dohan

Page 11: IRMIS3 Status and Plans

PV Crawler module

Requirements• PV Crawler – production in IRMIS2• API – alpha• UI – nothing

TBD• Test and bundle the crawler with IRMIS3, finalize API and

implement UI Not covered

• Nothing that we are aware Not available

• Maintainer: ?

Page 12: IRMIS3 Status and Plans

EPICS db generation module

Requirements• Channel description for component types – prototype• Control hierarchy can be mined to guide/validate db• ?

TBD• ??

Not covered• ???

Not available• Maintainer: ????