irvine ranch water district michelson water recycling plant phase 2 expansion
DESCRIPTION
Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion. SCAP Water Quality Committee Meeting. Randy Lee, P.E. , Assistant Director of Recycling Operations September 23, 2014. Presentation Overview. IRWD Background MWRP Existing Processes Overview - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/1.jpg)
Irvine Ranch Water DistrictMichelson Water Recycling PlantPhase 2 Expansion
SCAP Water Quality Committee Meeting
Randy Lee, P.E. , Assistant Director of Recycling Operations
September 23, 2014
![Page 2: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/2.jpg)
2
1. IRWD Background
2. MWRP Existing Processes Overview
3. MWRP Phase II Expansion
4. Biosolids Project Status Update
Presentation Overview
![Page 3: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/3.jpg)
3
IRWD Serves 20% of Orange County
![Page 4: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/4.jpg)
4
Water, Wastewater, Water Recycling, and Urban Runoff
California Special District governed by a publicly-elected Board
IRWD customer base:• Residential population: 330,000• Daytime population: >500,000• Service connections: 102,380
IRWD service area:• 181 square miles (20% of Orange County)• All or part of six cities and unincorporated county:
About the Irvine Ranch Water District
IrvineTustin
Orange
Lake ForestNewport Beach
Costa Mesa
![Page 5: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/5.jpg)
5
IRWD Services Drinking Water
Sewage Collection
Recycled Water
Urban Runoff Treatment
![Page 6: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/6.jpg)
Phase 2 Expansion Project
6
ASCE OC
Water Treatment Project
of the Year - 2013
![Page 7: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/7.jpg)
7
• Produces 18 MGD of Title 22 recycled water.
• Phase 2 Expansionincreases capacity to 28 MGD.
• Scheduled completion June 2014.
Michelson Water Recycling Plant
![Page 8: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/8.jpg)
MWRP Aerial View
![Page 9: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/9.jpg)
9
Michelson Water Recycling Plant
NORTH IRVINE INTERCEPTOR
SOUTH IRVINE INTERCEPTOR
INFLUENT GRINDERS
PRIMARY SEDIMENTATION
TANKS
FLOW EQUALIZATION
BASINS
ACTIVATED SLUDGE BASINS
SECONDARY SEDIMENTATION
TANKS
DUAL MEDIA
FILTERSCHLORINE
CONTACT TANKS
RECYCLED WATER CUSTOMERS
OCSD
Treatment Process Prior to Expansion
![Page 10: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/10.jpg)
10OCSD
NORTH IRVINE INTERCEPTOR
SOUTH IRVINE INTERCEPTOR
HEADWORKS
PRIMARY SEDIMENTATION
TANKS
FLOW EQUALIZATION
BASINS
ACTIVATED SLUDGE BASINS
SECONDARY SEDIMENTATION
TANKS
DUAL MEDIA
FILTERS
CHLORINE CONTACT TANKS RW
CUST.
HIGH RATE CLARIFIER
UV DISINFECTIONMEMBRANE BIOREACTOR
PRIMARY EFFLUENT
PUMP STATION
Phase 2 Overall Process Train
![Page 11: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/11.jpg)
11
Phase 2 Expansion Overview
`
HEADWORKSNEWPSTs
EXISTINGPSTs
PEPS
MEMBRANE BIOREACTOR
FLOWEQUALIZATION
BASINS
EXISTINGBLOWER
ROOM
HIGH RATE
CLARIFIER
UV DISINFECTION
SPENT BACKWASH TANK
CHLORINE CONTACT TANK
EFFLUENT PUMPS
NEW TREATMENT FACILITIES
MODIFIED EXISTING TREATMENT FACILITIES
NEW CHEMICAL FACILITIES
NEW ELECTRICAL FACILITIES
SPENT BACKWASH TANK
![Page 12: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/12.jpg)
12
New Headworks
![Page 13: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/13.jpg)
13
New Primary Sedimentation Tanks
![Page 14: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/14.jpg)
14
New Primary Effluent Pump Station
![Page 15: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/15.jpg)
15
Membrane Bioreactor
FINESCREENS
DE-OX ZONE
DE-OX ZONE
ANOXIC ZONE
ANOXIC ZONE
AERATION BASIN
AERATION BASIN
MLP.S.
RASBOX
RA
S C
HA
NN
EL
MEMBRANETANKS
DIPTANK
B.P.TANK
PE
RM
EA
TE
PU
MP
RO
OM
BL
OW
ER
RO
OM
![Page 16: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/16.jpg)
16
MBR Process Flow
10 MGD
5 MGD
5 MGD
30 MGD
30 MGD
10 MGD
![Page 17: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/17.jpg)
17
MBR Fine Screens & Aeration Basins
![Page 18: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/18.jpg)
18
MBR Mixed Liquor Pump Station
![Page 19: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/19.jpg)
19
Loading MBR Membrane Cassettes
![Page 20: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/20.jpg)
20
MBR Air & Permeate Piping
![Page 21: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/21.jpg)
21
Permeate Pump & Blower Rooms
![Page 22: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/22.jpg)
22
MBR Photos
![Page 23: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/23.jpg)
23
Ultraviolet Disinfection Facility
![Page 24: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/24.jpg)
24
New Phase 2 Buildings
High Rate Clarifier Electrical Bldg.
Headworks Membrane Bioreactor
![Page 25: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/25.jpg)
25
MWRP Phase 2 Overview
![Page 26: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/26.jpg)
26
Floodwall – 200 Yr Flood Protection
![Page 27: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/27.jpg)
27
Treatment Process $83
Million
Floodwall
$ 5 Million
Overall Construction Cost: $88 Million
Change Orders:
$ 4 Million 4.5%
Total
$92 Million
Construction Management $14 Million
15%
Phase 2 Construction Cost
![Page 28: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/28.jpg)
Biosolids & Energy Recovery Facilities Project
28
![Page 29: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/29.jpg)
29
Project Objectives
• Beneficially reuse Biosolids and Biogas produced during the treatment process.
• Manage residuals (Biosolids) at reduced costs to IRWD’s customers.
• Construct project to meet IRWD’s future Biosolids handling needs.
• Minimize environmental impacts:Drying and pelletizing reduces export truck loads by factor of four.
• Reduces greenhouse gas effects by beneficially using pellets locally as a fertilizer or e-fuel.
Biosolids & Energy Recovery Project
![Page 30: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/30.jpg)
30
Project Description
• IRWD to construct facilities at MWRP for:
• Biosolids digestion, dewatering and drying
• Biogas management and energy recovery
• Odor control systems
• IRWD would no longer export solids to Orange County Sanitation District (OCSD).
• Project would also accept Biosolids trucked in from IRWD’s Los Alisos Water Recycling Plant (LAWRP).
Biosolids & Energy Recovery Project
![Page 31: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/31.jpg)
31
Biosolids Facilities Site Location
MWRP
Biosolids and Energy
Recovery Facilities
![Page 32: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/32.jpg)
32
EXISTING PRIMARY CLARIFIER
EXISTING SECONDARY CLARIFIER
ACID-METHANE PHASE ANAEROBICDIGESTION
DEWATERINGCENTRIFUGE
DIGESTED SLUDGE STORAGE
MICROTURBINES
BIOGAS ELECTRICITY
CAKESTORAGE & LOADOUT
CLASS BCAKE HAUL(BACKUP)
ROTARYDRUMDRYER
PELLET STORAGE & LOADOUT
CLASS A PELLET HAUL
FATS, OILS & GREASE
CENTRATETREATMENT
TO LIQUID TREATMENT
RECYCLED WATER
PS
WAS
THICKENINGCENTRIFUGE
THICKENINGCENTRIFUGE
DIGESTER GAS CLEANING
Simplified Process Schematic
![Page 33: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/33.jpg)
33
Air Permit Process Diagram
33
![Page 34: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/34.jpg)
34
Heat Drying System
Furnace
Mixer
ID Fan
Pellet Cooler
To Storage Silos
Cake from dewatering
Cake BinRecycle Bin
RTO
Venturi Scrubber
Condenser
Furnace
Triple Pass Drying Drum
Gas Recirculation
Pneumatic Transporter
Atmosphere
Preseparator Baghouse
![Page 35: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/35.jpg)
35
• Produces a pellet suitable for local beneficial reuse
• Nitrogen for fertilizer
• Btu content for e-fuel
• Dryers in CA:
• Encina (Carlsbad)
• Sacramento
• Corona
Heat Drying System
![Page 36: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/36.jpg)
3-D Model Renderings
36
![Page 37: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/37.jpg)
37
Digestion Facilities
37
Egg-Shaped DigestersSludge Holding Tanks
Acid Phase Digesters
Digester Control Bldg.
FOG Foodwaste Receiving.
![Page 38: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/38.jpg)
38
Biosolids Handling BuildingDryer and Odor Control
Discharge Stacks
Polymer Storage
Solids Receiving Pellet Loadout
![Page 39: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/39.jpg)
3939
Biosolids Handling Building
Centrate Treatment
Polymer Storage
Centrifuge Area
Dryer Area
![Page 40: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/40.jpg)
40
Biogas Treatment & Microturbines
Biogas Storage
Biogas Conditioning Microturbines
![Page 41: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/41.jpg)
4141
Centrifuge Room
Thickening Centrifuges
Dewatering Centrifuges
![Page 42: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/42.jpg)
4242
Dryer System – Lower Level
Dryer Drum
Pellet Screen
![Page 43: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/43.jpg)
4343
Dryer System – Upper Level
Dryer Drum
Solids/Off Gas Separation
Pellet Mixer
Recycle Bin
![Page 44: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/44.jpg)
44
Sub-Surface View of 3,028 Piles
![Page 45: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/45.jpg)
Construction Photos
45
![Page 46: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/46.jpg)
46
Construction Photos
Pile Installation – Digester Area
Completed:• Construction of
structure and
![Page 47: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/47.jpg)
47
Construction Photos
Pile Installation – Basement of Solids Handling Building
![Page 48: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/48.jpg)
48
Installation of Piles in Methane Digester Area
May 2014 Quarterly Report
![Page 49: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/49.jpg)
49
Installation of Piles in Solids Handling Facility
May 2014 Quarterly Report
![Page 50: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/50.jpg)
Project Schedule
50
![Page 51: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/51.jpg)
51
Project Schedule
DATE ACTIVITY
April 29, 2013 Notice of Award
June 3, 2013 Notice to Proceed
Sept. 2013 – March 2014 Pile Driving
January 17, 2016 Anaerobic Digestion Facilities Online
March 2, 2016 Produce Class B Biosolids (Cake)
June 30, 2016 Microturbine Power Generation Online
August 29, 2016 Produce Class A Biosolids (Pellets)
October 28, 2016 Project Completion
![Page 52: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion](https://reader035.vdocument.in/reader035/viewer/2022062422/5681378e550346895d9f2b87/html5/thumbnails/52.jpg)
52
Pile Driving $
10 Million 6%
Digesters $
45 28%
Dryer
$ 13 8%
Biogas & Microturbines $ 8
5%
Sitework $
14 9%
Other
$ 73 45%
Total Bid Amount $ 163
Million
Biosolids Construction Cost