ISAGANI M. PORCINA E-mail Address: [email protected] Mobile Phone No.: +971-50-708-8934 U.A.E. Drivers License No. : 1534523 PERSONAL DATA Gender : Male Date of Birth : February 11, 1967 Citizenship : Filipino Profession : Registered Electrical Engineer CAREER HISTORY Employer : Position : Project : JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI Dubai, UAE E &M Construction Manager & Preventive Maintenance Manager (June 2013 - Present) Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. Responsibili ties: -Does review and ensures that sub-contractor’s maintenance report is in line with Maintenance Periodic Task requirements. -Issuing monthly W.O. to sub-contractor which is generated from MMS for their PM activity. -Conducts regular meeting with subs-contractor for the schedule of some parts that requires rectification or replacement, information update and queries. -Ensures and monitor task are executed in a proper manner and in accordance to task plan. -Collecting all PM reports and upload to the MMS. Employer : Position : Project : JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI Dubai, UAE E&M Construction Manager (April 2010 – May 2013) Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. Employer : Position : Project : JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI Dubai, UAE E&M Deputy Construction Manager (April 2008 to March 2010) Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. Responsibili ties: Project Management for MEP works - Construction Planning and Detailed site activities. - E&M Design coordination and shop drawing production, with coordination

Upload: isagani-porcina

Post on 09-Aug-2015

70 views

Category:

Documents


0 download

TRANSCRIPT

ISAGANI M. PORCINAE-mail Address: [email protected] Phone No.:  +971-50-708-8934U.A.E. Drivers License No. : 1534523

PERSONAL DATA Gender    : MaleDate of Birth   :  February 11, 1967Citizenship  :  FilipinoProfession    : Registered Electrical Engineer

CAREER HISTORY

Employer :

Position :Project :

JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZIDubai, UAE

E&M Construction Manager & Preventive Maintenance Manager (June 2013 - Present)Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes.

Responsibilities: - Does review and ensures that sub-contractor’s maintenance report is in line with Maintenance Periodic Task requirements.

- Issuing monthly W.O. to sub-contractor which is generated from MMS for their PM activity.

- Conducts regular meeting with subs-contractor for the schedule of some parts that requires rectification or replacement, information update and queries.

- Ensures and monitor task are executed in a proper manner and in accordance to task plan.

- Collecting all PM reports and upload to the MMS. Employer :Position :Project :

JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZIDubai, UAE

E&M Construction Manager (April 2010 – May 2013)Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes.

Employer :Position :Project :

JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZIDubai, UAE

E&M Deputy Construction Manager (April 2008 to March 2010)Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes.

Responsibilities: Project Management for MEP works- Construction Planning and Detailed site activities.- E&M Design coordination and shop drawing production, with coordination of MEP with other trades.- Reviewed the design drawings and shop drawings for Power Single Lines Diagram for Low Voltage

power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like Fire Alarm System, ECS-OCS & TVS-OCS. Ventilation and Plumbing Systems.

- Attend Meeting with the Designer for the queries and Drawing Coordination.- Attend Meeting with the different trades for site coordination.- Conduct Sub-con meeting for proper site coordination and site work monitoring.- Prepare work schedule and target date of completion.- Checked the Detailed Shop Drawing prior to site implementation.- Prepared manpower report and safety program. - Review E&M Construction Methodology.- Ensure of sub-contractor compliance with project quality plan and HSE policy.- Attended site inspection by the Consultant.- Monitored the status of punch-list and rectification works.- Review the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents.

Employer :

Position :Project :

KHI-Gtech (Kawasaki Heavy Industries-G Technology Joint Ventures) Ho Chi Minh City, Vietnam.

Electrical Construction Manager (October 2007-April 2008)Saigon East & West Tunnel Highway Project

Employer :

Position :Project :

TAISEI Vietnam (VINATA)Ho Chi Minh City, Vietnam. Electrical In-Charge ( Aug. 2007 to Oct. 2007)Intel Plant.Vietnam.

Responsibilities: - Site Management.- Office Documentation and checking of Electrical Design Drawing, Contract and Specification.- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and Low Voltage

power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable Antenna Television (CATV)

- Review the documents and samples of Materials for Approval.- Prepared work schedule and target date of completion.- Checked the Detailed Shop Drawing prior to site implementation.- Prepared manpower report and safety program. - Review Electrical Construction Methodology for roughing-ins materials like Cable tray, conduit piping,

boxes setting, wiring devices, lighting fixtures, LV panel board.- Attended site inspection by the Consultant.- Monitored the status of punch-list and rectification works.- Review the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents.

Employer :

Position :Project :

KTOM JV (Kajima,Taisei,Obayashi & Maeda Joint Venture)Tan Son Nhat Airport, Hong Ha St.,Ward 2, Tan Binh Dist.Ho Chi Minh City,

VietnamCHIEF ELECTRICAL ENGINEER December 2005 to Aug. 2007TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL

Responsibilities: - Project Managements- Office Documentation and checking of Electrical Design Drawing,Contract and specification.- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and Low Voltage

power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable Antenna Television (CATV), Master Clock System, Flight Information Display System ( FIDS ) and other telecommunication system in the Airport.

- Review the documents and samples of Materials for Approval.- Prepared work schedule and target date of completion.- Checked the Detailed Shop Drawing prior to site implementation.- Prepared manpower report and safety program. - Review Electrical Construction Methodology for roughing-ins materials like Cable tray, conduit piping,

boxes setting, wiring devices, lighting fixtures, LV panel board and other auxiliary system at different building in the airport like Passenger Terminal Bldg

- Attended site inspection by the Consultant.- Monitored the status of punch-list and rectification works.- Review the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents.

Employer :

Position :Project/s :

SUMISETSU PHILIPPINES, INC. (SPI)6F The Pearl Bank Centre. 146 Valero St. Salcedo Village, Makati CityE&M SITE MANAGERNEW ILOILO AIRPORT DEV’T PROJECT Barangay Duyan-Duyan, Cabatuan, IloiloJan. 2005- December 2005

SANYO SEMICONDUCTOR MANUFACTURING

Luisita Industrial Park, San Miguel, TarlacMay 2004- December 2004

AJINOMOTO BULACAN Barangay Tabang, Guiguinto, BulacanSeptember 2003-April 2004 

NANOX PHASE II Clarkfield, PampangaMarch 2003-August 2003 

ESTABLISHMENT OF LABORATORY FACILITIES FOR ADVANCED AQUACULTURE TECHNOLOGIES IN THE REPUBLIC OF THE PHILIPPINES.SEAFDEC, Tigbauan, IloiloApril 2002-March 2003 

TEXAS INSTRUMENT PHASE 3C EXT. BUILDING Loakan Road, Baguio City August 2000-March 2002

BENGUET GENERAL HOSPITAL (BGH)- JICA PROJECTBenguet, Baguio CityJanuary 1999 – June 2000

Responsibilities: - Project Managements- Office Documentation and checking of Electrical Design Drawing, Contract and specification.- Preparing Budget Plan for Project site expenses.- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and Low Voltage

power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable Antenna Television (CATV), Master Clock System, Flight Information Display System ( FIDS ) and other telecommunication system in the Airport.

- Review the documents and samples of Materials for Approval.- Prepared work schedule and target date of completion.- Checked the Detailed Shop Drawing prior to site implementation.- Prepared manpower report and safety program. - Prepared Electrical Construction Methodology for roughing-ins materials like Cable tray, conduit piping,

boxes setting, wiring devices, lighting fixtures, LV panel board and other auxiliary system at different building in the airport like Passenger Terminal Bldg., Control Tower and Operation Bldg., Administration Bldg. Cargo Terminal Bldg, Central Plant Electrical, Central Plant Mechanical, Maintenance Bldg., Fire Station Bldg., Sewage Treatment Plant, Underground Service Link, VOR, Glide Slope, Localizer Bldg. and other Airport facilities included in the contract.

- Reviewed the Voltages Drop Calculation and revised the Single line diagram.- Prepared materials Take-off for Procurements, both local and imported base in Specification, Approved

materials and Quantities.- Reviewed the Suppliers and Sub-con quotation and progress billing.- Prepared progress billing.- Prepared quotation for any additional works.- Attended site inspection by the Consultant.- Monitored the status of punch-list and rectification works.- Prepared the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents.

Employer :

Position :Project :

EEI CONSTRUCTION CORPORATIONBagumbayan Libis, Quezon Cit ELECTRICAL SITE ENGINEER  (January 1998-December 1998): PACIFIC PLAZA TOWER Fort Bonifacio, Makati City 

Responsibilities: - Direct supervision of Mechanical and Electrical contractors.

- Identify and solving conflicts in plans and actual construction. - Cost control, assessment of contractor’s progress payments. - Implement and follow-up on installation of electrical system at site.- Directs and performs at-site electrical construction inspections and records management.- Performs miscellaneous job-related duties as assigned.-Report to Project Manger.

Employer :

Position :Project :

PHILIPPINE COMPAK BOARDS INC. Lapasan, Clarin, Misamis Occidental

PRODUCTION SUPERVISOR June 1, 1995-October 15, 1997

Employer :

Position :Project :

EDISON ELECTRIC INTEGRATED INC. 25 Pacific St., T.S. Cruz Subd. Baesa, Quezon City

COMMISSIONING & SERVICE ENGINEER October 1990-December 1993CONCORD TEXTILE Calamba, Laguna 

ASIA BREWERY GLASS PLANT II Cabuyao, Laguna 

EVER DEPARTMENT STORE Las Pinas, Metro Manila

ISETANN DEPARTMENT STORE C. M. Recto Ave., M. M. 

 HONDA CARS PHILIPPINESSta. Rosa Industrial Park, Laguna 

TOYOTA AUTO PARTS Sta. Rosa, Laguna 

EDUCATION

SILLIMAN UNIVERSITY Dumaguete City Bachelor of Science in Electrical Engineering 

EAST VISAYAS SCHOOL OF ARTS AND TRADEDumaguete City Secondary Education-

WEST CITY ELEMENTARY SCHOOL Dumaguete City Elementary Education-

  

GOVERNMENT EXAMINATION TAKEN AND PASSED 

(June 1990) Registered Electrical Engineering Licensure Examination (September 1996) National Telecommunications Commission Amateur Examination

CAREER HIGHLIGHTS

Recipient: Special Perfomance Award – Roads and Transport Authority , Dubai , UAE (May 2010)