For discussion PWSC(2017-18)37 on 28 March 2018 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 707 – NEW TOWNS AND URBAN AREA DEVELOPMENT Support – Others 188GK – Government Flying Service Kai Tak Division Members are invited to recommend to the Finance Committee the upgrading of 188GK to Category A at an estimated cost of $469.1 million in money-of-the-day prices for the establishment of the Government Flying Service Kai Tak Division. PROBLEM We need to establish a Kai Tak Division (KTD) for the Government Flying Service (GFS) in order to clear the North Lantau Expressway (NLE) flight route to enable timely construction of new housing units under the Tung Chung New Town Extension (TCNTE), and to maintain the effectiveness and efficiency of GFS’s emergency services under all-weather conditions. PROPOSAL 2. The Director of Civil Engineering and Development, with the support of the Secretary for Development and the Secretary for Security, proposes to upgrade 188GK (the Project) to Category A at an estimated cost of $469.1 million in money-of-the-day (MOD) prices to establish the KTD for GFS. /PROJECT …..

Upload: others

Post on 22-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

For discussion PWSC(2017-18)37 on 28 March 2018

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

HEAD 707 – NEW TOWNS AND URBAN AREA DEVELOPMENT Support – Others 188GK – Government Flying Service Kai Tak Division

Members are invited to recommend to the Finance

Committee the upgrading of 188GK to Category A at

an estimated cost of $469.1 million in

money-of-the-day prices for the establishment of the

Government Flying Service Kai Tak Division.

PROBLEM

We need to establish a Kai Tak Division (KTD) for the Government Flying Service (GFS) in order to clear the North Lantau Expressway (NLE) flight route to enable timely construction of new housing units under the Tung Chung New Town Extension (TCNTE), and to maintain the effectiveness and efficiency of GFS’s emergency services under all-weather conditions. PROPOSAL 2. The Director of Civil Engineering and Development, with the support of the Secretary for Development and the Secretary for Security, proposes to upgrade 188GK (the Project) to Category A at an estimated cost of $469.1 million in money-of-the-day (MOD) prices to establish the KTD for GFS.

/PROJECT …..

Page 2: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 2

PROJECT SCOPE AND NATURE 3. The site of the Project occupies an area of about 7 400 square metres (m2) at the tip of the Ex-Kai Tak Runway (EKTR). The proposed scope of works under 188GK includes –

(a) construction of an apron to provide a helicopter

take-off/landing pad, two helicopter parking pads and the associated safety/protection areas1;

(b) construction of an office building to accommodate an

Air Command and Control Centre, a Flight Planning Centre and ancillary facilities including offices for GFS’s aircrew, engineering and administration staff, a multi-purpose function room for mission planning, briefing, training and meeting, and an aircraft and mission equipment storage area;

(c) construction of a hangar to accommodate two helicopters and the associated maintenance equipment;

(d) provision of supporting facilities for helicopter

operation including radio and communication facilities, navigation, security and surveillance systems, helicopter refueling facilities and firefighting facilities; and

(e) associated civil, drainage, sewerage, water supply,

building and landscaping works, etc. 4. A layout plan and two architectural renderings showing the proposed works are attached at Enclosures 1 and 2 respectively. 5. Subject to funding approval of the Finance Committee (FC), we plan to commence the construction works of the Project in the fourth quarter of 2018 for completion by the first quarter of 2021. To meet the programme, the Civil Engineering and Development Department plans to invite tenders for the construction contract in May 2018 tentatively to facilitate timely commencement of the construction works, but the construction contract will only be awarded upon FC’s funding approval.

/JUSTIFICATIONS …..

1 The take-off/landing pad can be shared use by GFS and the future commercial operator(s) of a possible

cross-boundary heliport when it is pursued. There will be two parking pads, with one dedicated for GFS’s use and the other for use by the future commercial operator(s).

Page 3: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 3

JUSTIFICATIONS 6. GFS was established under the Government Flying Service Ordinance (Cap. 322) in 1993 to provide a wide range of flying services, including search and rescue, air ambulance, fire-fighting, aerial survey and support for law enforcement, for various departments of the Government and people in need. Currently, GFS deploys emergency flights from its Headquarters at the Hong Kong International Airport (HKIA) in Chek Lap Kok. The NLE (see Enclosure 3) is one of the four major helicopter flight routes2 used by GFS’s helicopters for transiting to and from its Headquarters. It is also the primary flight route used by GFS’s helicopters in response to emergency call-outs under unfavourable weather conditions. With developments under the TCNTE project coming up along the northern shore of Lantau, the NLE flight route would be hampered by new buildings below the flight path, making it difficult for GFS to continue using that route for supporting its emergency services under unfavourable weather conditions 3 . Hence, there is a need to establish an operational base for GFS outside its Headquarters at the HKIA in order to maintain the effectiveness and efficiency of GFS’s emergency services under all-weather conditions. 7. An extensive site search process, having regard to key factors such as GFS’s operational needs, compatibility with aviation safety requirements, land use planning, technical feasibility, optimal site utilisation and compliance with statutory requirements, etc., was conducted between 2015 and 2016. Following the site search and technical feasibility assessments, a site at the tip of the EKTR (the Site) was identified as the most suitable location for establishing an operational base for GFS outside its Headquarters. The Site has been zoned as “Other Specified Uses” annotated “Heliport” under the Kai Tak Outline Zoning Plan (OZP) S/K22/2 since 2007, taking into account the possible provision of an at-grade cross-boundary heliport. Co-location of the proposed GFS KTD with the possible cross-boundary heliport on the Site will maintain GFS’s performance commitments and emergency response effectiveness, as well as maximise the use of limited waterfront land resources.

/8. ….. 2 The other routes are the Silvermine Pass, Tung Chung Pass and western coastline of Lantau. 3 Under unfavourable weather conditions, other primary helicopter flight routes to and from the HKIA (i.e.

the Silvermine Pass and Tung Chung Pass) are often subject to low cloud level and poor visibility conditions and are unsafe for use. If the NLE is also hampered, GFS has to consider using the western coastline of Lantau as the last resort, but this route is subject to much higher risk factors such as little effective visual references for pilots, presence of high terrain and turbulence, rendering it unsafe for use under poor weather conditions or at night time. In addition, its longer travelling distance to any part of Hong Kong will adversely lengthen the flight time for all emergency response flights, further compromising GFS’s effectiveness in responding to emergency call-outs.

Page 4: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 4

8. Upon the establishment of the proposed KTD, the existing GFS Headquarters at Chek Lap Kok will continue to provide support for other scheduled flying services and routine training, as well as emergency responses depending on the call-out location, resources (including helicopters, aircrew and equipment) available for deployment during the specific situation, weather conditions, etc. 9. In undertaking the design of the proposed GFS KTD, every care has been taken to ensure the feasibility of the co-location with the cross-boundary heliport when it is pursued in future. The proposed works at the apron area (item (a) under paragraph 3 above) will be able to meet the operational needs of both GFS and the possible cross-boundary heliport, thereby minimising the need for carrying out additional works after the GFS KTD has started operation. 10. The TCNTE is one of the major initiatives to increase land supply to meet housing and other development needs of Hong Kong. The timely commissioning of the proposed GFS KTD is thus crucial to ensure that the supply of over 40 000 new housing units (with over 60% for public housing) in Tung Chung East under the TCNTE project would be made available starting from 2023-24 to meet the strong demand for housing in the short to medium term. To enable construction of the housing units in a timely manner and to maintain GFS’s emergency services at its current level, we need to commence the construction works of the Project in the fourth quarter of 2018 for commissioning of the KTD in 2021, in order to allow construction of the superstructure of the housing blocks in Tung Chung East which falls within GFS’s NLE flight path. GFS will endeavor to gear up the required manpower, including aircrew and engineering professionals, to cope with the proposed commencement of the KTD. FINANCIAL IMPLICATION 11. We estimate the capital cost of the Project to be $469.1 million in MOD prices (see paragraph 13 below), broken down as follows –

/$ million …..

Page 5: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 5

$ million (in MOD prices)

(a) Construction of an apron

62.2

(b) Construction of an office building

56.5

(c) Construction of a hangar4

161.3

(d) Provision of supporting facilities

54.7

(e) Associated civil, drainage, sewerage, water supply, building and landscaping works

45.4

(f) Consultants’ fee for (i) contract administration (ii) management of resident site

staff (RSS)

6.5 5.1 1.4

(g) Remuneration of RSS

37.7

(h) Contingencies

44.8

Total 469.1

12. A breakdown of the estimates for the consultants’ fees and RSS costs by man-months is at Enclosure 4. 13. Subject to approval, we plan to phase the expenditure as follows –

/$ million …..

4 Construction of the hangar includes foundation, reinforced concrete and steel structures, green roof,

facade, etc.

Page 6: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 6

Year $ million (MOD)

2018 – 2019 24.2

2019 – 2020 178.7

2020 – 2021 202.2

2021 – 2022 38.6

2022 – 2023 25.4

469.1

14. We have derived the MOD estimates on the basis of the Government’s latest forecast of trend rate of change in the prices of public sector building and construction output for the period from 2018 to 2023. Subject to funding approval, we will deliver the proposed works under a re-measurement contract because the quantity of works described in paragraph 11(a), (b), (c) and (e) may vary depending on the actual ground conditions. The contract will be prepared in the New Engineering Contract (NEC) form5 with the provision of price adjustments. 15. We estimate the annual recurrent expenditure arising from the Project to be $69.7 million. PUBLIC CONSULTATION 16. We consulted the Housing and Infrastructure Committee of the Kowloon City District Council (DC), the Food and Environmental Hygiene Committee of the Wong Tai Sin DC and the Environment and Hygiene Committee of the Kwun Tong DC on 15 June, 27 June and 20 July 2017 respectively. Members of the three DCs generally supported the Project.

/17. …..

5 NEC is a suite of contracts developed by the Institution of Civil Engineer, United Kingdom. It is a

contract form that emphasises cooperation, mutual trust and collaborative risk management between contracting parties.

Page 7: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 7

17. We also consulted the Task Force on Kai Tak Harbourfront Development (KTTF) of the Harbourfront Commission on 8 September and 1 November 2017. Members of the KTTF generally supported the Project. 18. We consulted the Panel on Security on the Project on 9 January 2018, with members from the Panel on Development invited to join the discussion. Members supported the submission of the funding proposal of the Project to the Public Works Subcommittee for consideration. ENVIRONMENTAL IMPLICATIONS 19. The Project is not a designated project under the Environmental Impact Assessment Ordinance (Cap. 499). We have carried out a Preliminary Environmental Review (PER) under the technical feasibility study and revealed that the Project, together with the planned cross-boundary heliport to be co-located at the Site, will not cause long-term adverse environmental impacts. The Project will be designed and implemented in accordance with the requirements of the Hong Kong Planning Standards and Guidelines. GFS will also adopt specific flight paths and procedures to minimise potential helicopter noise impact. 20. We will also incorporate into the relevant works contract the mitigation measures recommended in the PER to control the environmental impacts arising from the construction works within established standards and in accordance with relevant guidelines. These include use of silencers, mufflers, acoustic linings or shields and building of temporary barriers for noisy construction activities, frequent cleaning and watering of the site, and provision of wheel-washing facilities. We have included in the project estimates the cost to implement these mitigation measures. 21. We have considered the site formation arrangement in the planning and design stages to reduce generation of construction waste where possible. In addition, we will require the contractor to reuse inert construction waste (e.g. excavated materials) on site or in other suitable construction sites as far as possible, in order to minimise disposal of inert construction waste to public fill reception facilities6. We will encourage the contractor to maximise the use of recycled or recyclable inert construction waste, as well as the use of non-timber formwork to further minimise generation of construction waste.

/22. …..

6 Public fill reception facilities are specified in Schedule 4 of the Waste Disposal (Charges for Disposal of

Construction Waste) Regulation (Cap. 354N). Disposal of inert construction waste in public fill reception facilities requires a licence issued by the Director of Civil Engineering and Development.

Page 8: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 8

22. At the construction stage, we will also require the contractor to submit for approval a plan setting out the waste management measures, which will include appropriate mitigation means to avoid, reduce, reuse and recycle inert construction waste. We will ensure that the day-to-day operations on site comply with the approved plan. We will require the contractor to separate the inert portion from non-inert construction waste on site for disposal at appropriate facilities. Besides, we will control the disposal of inert construction waste and non-inert construction waste to public fill reception facilities and landfills respectively through a trip-ticket system. 23. We estimate that the Project will generate in total 17 000 tonnes of construction waste. Of these, we will reuse 1 500 tonnes (9%) of inert construction waste on site and deliver 14 900 tonnes (88%) of inert construction waste to public fill reception facilities for subsequent reuse. In addition, we will dispose of 600 tonnes (3%) of non-inert construction waste at landfills. The total cost for disposal of construction waste at public fill reception facilities and landfill sites for the Project is estimated to be $1.2 million (based on a unit charge rate of $71 per tonne for disposal at public fill reception facilities and $200 per tonne at landfills as stipulated in the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N). HERITAGE IMPLICATION 24. This Project will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded heritage site or buildings, sites of archeological interest and Government historic sites identified by the Antiquities and Monuments Office. LAND ACQUISITION 25. The Project does not require any land acquisition. BACKGROUND 26. We engaged consultants in May 2015 to undertake a technical feasibility study (at a cost of about $10.8 million in MOD prices) to identify a suitable site and to ascertain the technical feasibility of establishing on that site a GFS Division outside the HKIA. Upon confirming the technical feasibility of the Site, we engaged consultants in June 2017 to carry out the detailed design and site investigation works for the Project (at a cost of about $9.4 million in MOD prices). These pre-construction tasks were funded under block allocation Subhead 7100CX “New towns and urban area works, studies and investigations for items in Category D of the Public Works Programme”.

/27. …..

Page 9: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

PWSC(2017-18)37 Page 9

27. We upgraded 188GK to Category B in September 2016. 28. No old and valuable trees have been identified in the Site. The proposed works will not involve any tree removal. While no tree planting is proposed due to operational constraints, a green roof of approximately 1 500 m2 is proposed at the office building and hangar for environmental and amenity benefits. 29. We estimate that the proposed works will create about 190 jobs (160 for labourers and 30 for professional or technical staff), providing a total employment of 4 000 man-months.

-------------------------------------- Security Bureau Development Bureau March 2018

Page 10: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

排水

Outfall

H LT

A

A

A5.6

4.9

5.4

drawing title圖則名稱

A4 297MM X 210MM

Q

'

'

')

6

6

6

Z

Z

Z

M

M

M

:

:

[

]

K

K

K

K

j

retlehS noohpyT gnoT nuwK

心中試考駛駕

頭碼眾公塘觀

頭碼

頭碼

輪渡

車汽

頭碼輪渡塘觀

rtC tseT gnivirD

reiP yrreF

gnoT nuwK

reiP cilbuP

gnoT nuwK

reiP

reiP yrreF raluciheV

la

nimr

eT

esi

urC

kaT i

aK

塘觀

GNOT NUWK

號一

底橋

天轉

房泵

水污

163

168

N

SHELTER

TYPHOON

KWUN TONG

CRUISE TER

MINAL

KAI TAK

N

停車場

CAR PARK

升降坪

LANDING PAD

TAKE OFF /

停機坪

PARKING PAD

停機坪

PARKING PAD

下洗氣流屏障

DOWNWASH WALL

直升機庫

(PHASE 1)

RUNWAY PARK

KAI TAK

第一期

啟德跑道公園

840200 E

840250 E

818300 N

818250 N

840250 E8

18350 N

入口

ENTRANCE

HELICOPTER HANGAR

CRUISE TERMINAL

KAI TAK

啟德郵輪碼頭

安全網

SAFETY NET

救護車待命處

STANDBY AREA

AMBULANCE

KEY PLAN索引圖

圖例

LEGEND

屋頂綠化

GREEN ROOF

ANCILLARY FACILITIES

FLIGHT PLANNING CENTRE AND OTHER

AIR COMMAND AND CONTROL CENTRE,

其他輔助設施

飛行指揮和控制中心、航空策劃中心及

附件

一E

NCL

OS

URE 1

工務計劃項目第188GK號 — 政府飛行服務隊啟德分部 — 平面圖

P.W.P. ITEM NO. 188GK - GOVERNMENT FLYING SERVICE KAI TAK DIVISION - LAYOUT PLAN

Page 11: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

drawing title圖則名稱

A4 297MM X 210MM

附件

二 (兩

頁中

的第

一頁)

ENCL

OS

URE 2 (P

AGE 1

OF 2)

工務計劃項目第188GK號 — 擬建政府飛行服務隊啟德分部建築效果圖 — 從高空俯瞰

AERIAL VIEW

P.W.P. ITEM NO. 188GK - ARCHITECTURAL RENDERING OF PROPOSED GOVERNMENT FLYING SERVICE KAI TAK DIVISION -

Page 12: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

drawing title圖則名稱

A4 297MM X 210MM

附件

二 (兩

頁中

的第

二頁) ENCLOSURE 2 (PAGE 2 OF 2)

drawing title圖則名稱

FRONT VIEW

P.W.P. ITEM NO. 188GK - ARCHITECTURAL RENDERING OF PROPOSED GOVERNMENT FLYING SERVICE KAI TAK DIVISION -

工務計劃項目第188GK號 — 擬建政府飛行服務隊啟德分部建築效果圖 — 正視圖

Page 13: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

drawing title圖則名稱

A4 297MM X 210MM

Pip

elin

e

Brothers Point

¤jÆ

Ka Loon Tsuen

¹ÅÀ

( Tai Lam Kok )

±s®Vista Cove

±s¤Vista Cliff

ªÅ¶l

CentreAir

Mail

±±¨

Caterin

g Services

Cathay Pa

cific

¥R¹»W¹

¾÷³õº

Þ²

¦a¶Ô³

]´äÀs

GSE Servic

esDra

gonair

Airport

´äÀs

¨®½øÀË

­»´ä­¸

Engineering

Hong Kong Aircraft¿¯

­¹¨Î¬ü

Sky Ch

efsLSG

TowerDra

gonair

CentreVeh

icle Ins

pection

¨tºÊ¶]

¿¯º~²

ï

¶¼­¹°ê

®õ

­»´ä

AFSC

Àô

Worldwid

e

¯]¦¿®ü

Union TransportationChu Kong Air-Sea

¤¤¯è

CNAC Towe

r

¦è

«n

«

¦è¥_«

¥_

«È

«n

«È

Airport

Authority Bldg

TowerControl

½X®ü¾÷

House

Pump

­»´

ä¾

÷³

õ¤

@

¦æ

¬F

Passenger T

erminal 1

HK Internatio

nal Airp

ort

¤G¸¹

«È

World Tra

de

¥@

¶T

Airp

ort T

ower

Terminal 2

Passenger

·|

ªF®ü¤W

¾÷³õ®

China Aircraft

¦³­­¤¤°ê­¸

¥_

½Ã

¬P

Concourse

North Satellite

¤Ñ½

FarmAntenna

ºÞ¨î¤¤¯èªÅ

¿ì¤½³

]¬I

¯èª

Å¥

æ³

q

Air T

raffic C

ontrol C

om

plex

1

2

3

4

15

16

17

1819

2122

2324

2526

2728

30

29

31

32

34

33

3536

70

7169

68

66

6764

65

6362

6061

40

41

42

43

44

45

47

49

48

50

46

521 - 524

511 - 5

13

20

501

504

510

508

66

ĵ¾÷

¯è¼Ð¡]

Navigation Beacon

Aeronautical

Navigation Beacon

Aeronautical

¯è¼Ð¡]

¥|¸¹

°

Car P

ark 4

¤@¸¹°

Car P

ark 1

Regal Airport H

otel

AsiaWorld

-Expo

B

A

´I»¨

¾÷

³ÕĨȬw

µ¾

¤

SkyPla

za

°±¨©¹¤º¦a

­»´ä¤Ñ»ÚHK SkyCity Marriott Hotel

Golf Course

SkyCity Nine Eagles

°±¨

¤T

¤G¸¹°Car Park 2

Car P

ark 3

®È¹C¨

®

°ªº¸¤¯è¤

UA IM

AX

¥Á¯è³

Headquarters

CAD

Area

Coach

Stagin

g

ÀÀ

©w

¤§

Proposed Limit of Reclamation

ÀÀ©w¤§¶

Proposed Limit of Reclam

ation

CHEK LAP KOK

¨ªž

¤j¿

©ì¨¾÷º

PlantTre

atmentWast

ewater

¦³­­¦a

¶Ô³]

LimitedEn

gineering

Ground Su

pport

WEST BROTHER

( TAI MO TO )

¾÷

AIR

PO

RT

³ÕÄASIAWORLD-E

XPO

Airport

Expre

ss

¾÷³

õ

CH

EO

NG YIP R

D

Lawn

¯ó

Lawn

¯ó

Runwa

y

¶]

Runway

¦a­

±º

û­¸

¾®ü

¤W

±Ï

¾÷³

õ®

³]³

Æ­¸

¾÷

¤Á¹

55

17

56

55

17

56

¯è¼Ð¡]

Navigation BeaconAeronautical

¤Ñ¦¨F

´çJetty

¨FSHA CHAU

¤¤¹B­x

¤¤³t

Centre

Express

¶W¯Å¤@

Super T

erminal 1

ªF°

ªF® ±Òª

·sª

ªF²³ßª

¶Pª

¦Vª

Forwar

ding Ce

ntreAirp

ort Frei

ght

9

8

76

5

3

2

1

¾÷¹q

°ê

®

12356

Buildin

gAirport

Store­Ü®w¾÷

Cathay Pacific City

¤¤°ö­¸

1

2

3

5

©â¤

HousePump

¦a¤U

5

2

1 ·|

3

Club House

¦í«È

º®

ªï

¸S

ºÖ

¨É

¦à¤Ó

¥­

¹l

¦Ü

µ½

²M

±d

®ð¶

·|

­åªR®ð

6

8

¬¦¦Ã

¶Ô

³Ç

¼w

Á¾

«H

·ç

»A

Ä_

9

1112

½¬µ

°Ó¶T´äª

Centre

Tradep

ort Logisti

cs

©~

º¡

Ÿ

²Ä¤

ªFîOne Citygate

16

La Rossa

®®

°V½mÂåÀø»

U

A

2930

15

21

88

¼v©¤

°·±dªF

1

DHL Central

Asia H

ub

´°»¨

¤¤¨È

57

6199

1

28

383965

¬¦

¹q̧Ü

¾i

¤@¸¹

¤G¸¹

Termin

al 1

Termin

al 2

¾÷³õª

Å

³f¹°ê®õ

Cargo

Termin

alCat

hay Pa

cific

Hangar 1

­¸¾¤@

­Ô¾÷

­¸¾¤T

Hangar 3

85

152

751

479493

400

77

324

338

749

722

574

287

482

529

75

869

463

320

554

625

492

522

585

506

311

85

152

751

479493

400

77

324

338

749

722

574

287

482

529

75

869

463

320

554

625

492

522

585

506

311

¤Ñ¾Â

Buddha Statue

Tian Tan

BatteryTung ChungªF¯F¤

ªF¯F

FortTung Chung

MonasteryPo Lin

¼s´I

B

A

D

«J¤

¬F©²­¸¦

Service

Government Flying

ùº

¤Ñ¦

UAªFî

¤á¥~±ªF

Recreation Camp

Outdoor

Tung Chung

½¬¦Ä_ªL

§â´ä

¤Ñ¦

¥È¾Â

©e­ªF¯F

®ø¨ªF

ªF¯FËü

Management Centre

Tung Chung Au

®ø¨¨ªž

6B

6A

C

¤åªF¸

Park

Man Tung Road

¯ë­

ªª

ªFî¿Õ´

Citygate

Novotel

¬MÆ

ªkµ

µØÄ

©ù©W3

Ping 360

Ngong

Terminal

Ngong Ping©ù©W²

¦xªk

Car Park 1

¤ß¸gWisdom Path

¦P»P

ÁIªk

µØÄ

ĵ

¶ø¹Olympic Green

¤¤¦Û

«C¦¹D

¹FªF¸

©ù

©W

Ngong Ping Villa

ge

Å騤åª

¥«¬FªF

·|ªÀ

ªF¯FÆ

Cable Car Terminal

Tung Chung

¦ËªL

®ü¼é

ºî¦XªÀ°Ï

ªF¯

Tung C

hung N

orth Park

Ä_½¬

ÃĤ¤Tat Tung Road Garden

¶éªÀ

ĵ¤jÀ¬

ÆF®ü

Ling Tap ¤¤¹

ªF¯F´

Swimming Pool

Tung Chung

¥jª¾÷

¥jŽP¾÷

«C¦~À¹º

Youth Hostel

Car Park 2

¬ö©À±³¯°¨

Memorial Camp

Chan Ma Mee York

´çJetties

Tin Sam

¥Ð

Kau Liu¸û

San Tau

HAU HOK WAN

ÆM´

SHA LO WAN

¨FÁ

POR KAI SHAN

±CÀ

ªF¯Ma Wan Chung

°¨Æ

´Iª ¸Îª

Wong Nai Uk

¶Àª

POK TO YAN

TUNG CHUNG

ªF

Sha Tsui Tau

¨F©

Wong Lung Hang

¶ÀÀ

Hang

New Tung Chung

·sªF

New Village

Tei Po

§C®H

New Village

Ma Wan

°¨ÆW

New Village

Chek Lap Kok

¨ªžP¨

Fui Yiu Ha

¦ÇŽ

Sheung Ling Pei

¤WÀ

Ha Ling Pei

¤UÀ

Wong Ka Wai

¶À®

Lung Tseng TauÀs¤

Ngau Au

¤û

Tung Hing

ªF

Lam Che

ÂÅ

Nim Yuen

¸Z

Shek Lau Po

¥Ûº

Mok Ka

²ö

Chap Mun Tau

¹hª

Shek Mun Kap

¥Ûª

Fong Yuen

ªÚ

WO LIU TUN

¥Ý¼

SHEUNG TUNG AU

Âùª

SHEK SZE SHAN

¥Û·

LANTAU ISLAND

¤jÀ

San Keng

·s

Shek Pik Au

¥Û¾

NEI LAK SHAN

À±°

YI TUNG SHAN

¤Gª

SUNSET PEAK

¤jª

·à¤l

Ϯ

Žg¤

¨FÁ³Æ

ªF³ö

Crescent

Tung Chung

¥Õ¨Pak Sha Tsui

¯èªÅ³

Æ[´SCENIC HILL

­»´äª

Å

Air Ca

rgo Te

rminals

Hong K

ong

¨FÁ³Æ

ÂŤÑCoastal Skyline

TUNG CHUNG BAY

( TAI TUNG SHAN )

¨FÁ³

Tsuen

Sha Lo Wan

Fu Tung Estate Yu Tung Court

­¸¾÷¿U®

Tank Farm

Aviation Fuel

¬MÆCaribbean Coast

®®À

½àÀ

¤@

¤G

Phase 1

Phase 2

Sha Lo Wan Chung Hau

Sha Lo Wan San Tsuen

®ü³ö

Crescent

Seaview

¤Ú¤

Bus

Depot

Cove

Monterey

¬MÀ

ºû­¤g¤ì

Depot

Civil Work

Albany Cove

Carmel Cove

¹L¸ôÆW¾÷³õº

Kwo Lo Wan Office

Airport Authority

ť
¤ôÂ

³B²¦Ã

Crystal Cove

¨È¬wªÅ

Asia

Airfreight T

erminal

Le Bleu

¤ôÂÅ¡Le Bleu Deux

®ü¬ÄLa Mer

¦Û°Ê®¤Ñ¤å¥

(¤G)¶h

¶hªF(¤

Yat Tung ( 1 ) Estate

( 2 )Yat Tung

©ù©Ngong Ping Tsuen

¤s

Shan Ha

¡]Åò

( Pa Mei )

°t¤Ser Res

ªF¯

Tung C

hung Ser Res

¤jªF¤s

Ser Res

Tai Tung Shan

¿³«Ø¤¤

under construction

Public Rental Housing

­»´ä°Ó¥Î

Aviation Centre

Hong Kong Business

ª@

The Visionary

ªF

TUN

G C

HU

NG

Airport Express

Airport Exp

ressTung C

hung L

ine

Tung C

hung Line

ªF¯

ªF¯

¾÷³

õ

¾÷³õ

HIN

G T

UN

G S

T

CHUNG YAT ST

CH

UNG W

AI S

T

¤À¤ª¹¢

ª¯

ˬ

CH

UN T

UN

G S

T

¶]

8

8

BODHI PATH

µÐ´

»ñ°

¦a¶í¥J

©ù©W©

WONG LUNG HANG COUNTRY TRAIL

¶À

Às

§|

NGONG PING FUN WALKLA

NTAU

TR

AIL

¾÷³

õ½

AIR

PO

RT T

RAIL

¾÷³

õ½

AIR

PO

RT T

RAIL

©ù

©W360

±

NG

ON

G PIN

G 36

0 R

ESC

UE TRAIL

LANTAU TRAIL

»ñ°

»ñ°

TEI TO

NG TSAI COUNTRY TRAIL

©

©¾

¤ì

‹

NEI L

AK S

HA

N C

OU

NT

RY T

RAIL

À±°

­¥¹

LANTAU

TRA

IL¿é¤ô

Water Tunnel

ªø

108

449

167

412

108

449

167

412

¯è¼Ð¡]

Navigation Beacon

Aeronautical

©µ¼

MonasteryYin Hing

³À´ò¦ò¬

¤T¤s°

´¼¿

Catc

hwater

¤Þ

¤

¤Þ

¤

Catchwater

San Shek Wan

Nam Tin

«n

San Chau

·s

Tit Tak Shue

ÅK¼

Sai Tso Wan

Ó}¯SHAM WAT WAN

²`©

Sham Wat

²`

CHEUNG SHAN

¶H

¤j­

œÆ¥

¬õ¯Hung Fan Shek

ISLA

NDS N

AT

UR

E H

ERIT

AG

E T

R

A

IL-T

AI

O S

ECTIO

N

®¦

µ¾

¥®

¢¤

¿¬

¿é

¤ô

¬F©²º¤pÄ

Skyline

Crestline

¤Ñ

®ü

ÀÜ

½«

Ûp

¶h

®m

©É

»A

Ȉ

¹t

Greenbelt

Greenmont

Greenwood

Greendale

Greenland

Greenish

Greenfield

Greenburg

Greenery

ViewSunrise

ViewMountain

ViewSea

ViewStar

Club Siena

¶¢Graceful±y

Celestial¦wJoyful

¶hPeaceful

Æ[ Æ[

Æ[

Æ[

¤ÎÀË·Ñ®ð

1

2

Pavilion

Barion

Hemex Lustre Premier

ºÑ

€

º¬ »A ¬M

©â¤

©â¤

·|

¬¦

¤p¥@

ºû­·s¤jÀ¬

1

3

L20

L16L10

L1

L6

15

9

13

2

1

104

2

90

86

19

2937

49

5767 75

83

5040

30

20

219

201

229

60

91

6876

97 103

86

263259

243

83

81

77

73

95

91

87

269

5070

3822

7

9

13

17

22

2238

48

505835

2515

20

9

1

2

2

12

28

40

1

17

202

232

92

88

82

96

186

291

302

378

125

30

263

6

6

67

172

159

176

108

186

291

302

378

125

30

263

6

6

67

172

159

176

108

Toll Plaza

¤¤¥¡Central Park

6

6

¦Ë¿®ø¨

¦Ë¿Äµ

­}¤h¥§¦nDisney's Hollywood Hotel

­}ªY´ò¬Inspiration Lake

A

­»´ä­}¤

Hong Kong Disneyland

ªÀ°Ï

5

5

¦Ì©_­µ¼ ©¯

¥v­

¦¬

¶O

Toll P

laza

¦¬¶O

Community Hall

´Î²Baseball Field

Bay

Discovery

Auberge

Tsing Chau Tsai

«C¬¤p¿

THE BROTHERS

¤j¤p

Ha Kok Tsui

¤U¨

Cheung Sok

Tsui

ªø¯

CHEUNG SOK

ªø

LUK KENG BAY

³ÀÀ

TAI YAM TENG

¤j³

Tai Tsing Chau

¤j«

YAM TSAI WAN

³±¥

Yam Tsai

³±

Ngong Shuen Au

©ù²

Mong Tung

Hang

±æª

Wan Tuk

ÆW

TSZ KAN CHAU

°ÍÃ

Ta Pang Po

¥´´

Sham Shui Kok

²`¤ªF¸

SAM PAK AU

¤T¥

LAI PIK SHAN

²p¾

SZE PAK AU

¥|¥

TAI SHAN

¤j

Sze Pak

¥|

SZE PAK WAN

¥|¥Sam Pak

¤T

TAI CHE TUNG

¤jà

YI PAK AU

¤G¥

YI PAK WAN

¤G¥

ÃɹHai Kam Tsui

DISCOVERY BAY

¤j¥

( TAI PAK WAN )

Wu Ying Pai

¯QÃ

SAM PAK WAN

¤T¥ Sze Pak Tsui

¥|¥

LAU FA TUNG

ºhª À[

©ú»

½«

®ÉNeo Horizon

TSING CHAU WAN

«C¬

¤pSiu Ho

Penny's Bay

Power Station

Village

Parkridge

Tung Yip Hang

®ü¼áSiena

®ü¼á´òSiena Two

®ü¼á´òSiena One

Headland Village

©ú

Village

Parkland

¦Ë¿tÆW

Greenvale Village

¤pÄ®ÆW

Treatment Works

Siu Ho Wan

¤pÄ®ÆW¦Ã

Treatment Works

Siu Ho Wan Sewage

¬ü°ê¤p

Main Street

USA

©ú¤éTomorrowland

Fantasyland

¤Û·Q

Chianti

©|

ªY¿YAN O WAN

±´ÀI

¥Õ³·³\Ä

®õ¾ð

´äÅK¤pÄMTR Siu Ho Wan Depot

Adventureland

³ÀÀLuk Keng Tsuen

and E

xa

mination C

entre

Vehicle D

ete

ntion P

ound

¤Î

Åç¨

ĵ°

ȳ

®

¬zAmalfi

²G´âÂ

¤Ï¤æ¤j¥

Toy Story Land

ªY¿Yan O Tuk

EAST BROTHER

( SIU MO TO )

¤Ú¤Bus Depot

¼oª«Â

StationRefuse Transfer

¦ÇºµGrizzly Gulch

ªY¿D°Sunny Bay Ser Res

°gÂ÷Mystic Point

®®Positano

²V¾®

PlantConcrete

SU

NN

Y B

AY

ªY

Airp

ort E

xpress

ªF¯

Dis

neyla

nd R

esort L

ine

Tung C

hung Li

ne

­}¤h

¾÷³

õ

©ú

»

SH

AM F

UN

G R

D

8

8

8

8

¤j©W

»È¬

»È¤»È¤

»È­

A

B

CD

«³Yick Yuen

»È

ª÷©

±J¬F

·|©x

T

S

M

N

R

P

Q

H

I

G

E

A

F

D

ED

C

C

B

A

§Ù¬

¥­

¥­

¥­ M

F

N

«n

Æ

®ü

±d¼

ClubResidents

©W

»A

¤s

¤j·|

Pine View

Island View

Marine View

Bay View

Clear ViewÆ[

Æ[

Æ[

Æ[

Æ[

Ä_Ä_

Ä_Woodland

WoodgreenWoodbury

Ä_

Ä_Coral

Crystal ±d ±d±dGlamour

BrillianceElegance

®üVista

®ü

®üOnda

Costa

ÄfTwilight

¦°

Áø

±mHaven

Verdant

Jovial

®x

Ä_

Cherish

Blossom

±´³

¤j¦æ

ªá

¹Å

«±´

Serene®ü

®a

ºÑ¥

´f°

ªá±ö

¾­û

Staff Quarters

©WÄ

Court

Peng Lai

¤s¤û¬

°ò

©â¤

Â×

ªá·s

D Deck

¼Â×

»¶¶

º±

Ä» ¦

º

´®

¥Û¦Ç

¤Ú¤

»È

1

2 8

15

100

56

48

16 10

15

7

42

46

38

34

30

26

22

18

1410

62

11

1

28

20

12

4

13

21

29

37

41 49

57

4840

32

1

9

1612

21

13

13

25

29

29

37

45

69

5337

33

9

1

1

3 5

9

13

7

13

32

29

26

22

19

16

11

8

7

5 1

45 61

15

19

23

1

3

5

7

8

111

35

7

9

11

6

2

1

9

12 18

22

15

19

21

27

33

47

39

53

61

1725

117

532

49

196

125

132

33

183

116

94

275

200

198

4981

67

465

283

227

299

215

465

766

14

194

383

183

117

532

49

196

125

132

33

183

116

94

275

200

198

4981

67

465

283

227

299

215

465

766

14

194

383

183

³ßÆF¬w

InstitutionCorrectional

Hei Ling Chau

½Ã²

»È•°Æ

´r´º

¸t¥À¯

Monastery

Trappist Haven

¹C¸Marina Club

Silvermine Beach

PlazaDiscovery Bay

°º±

¥_«

Às¥

¤åª

¬x¸

ª÷ª

¤Ñ¦

´r´ºÆW°ª

Discovery Bay Golf Course

Âr¥¬»È•

Ãg±Ày

®ü´º«×

Resort

Seaview Holiday

©e­¶m

¬F©²±ö

®ø¨±ö

´åª±ö

¥j¤Ñ¦Z

¶À¤j

¥¿µ½

§´¼¶

Cemetery

Lai Chi Yuen

¦ò®ç·

¤C¸t¥

¦w¸ÆF

©e­±öºÛ

®ø¨´r´

³ßÆF¬w

Treatment CentreHei Ling Chau Addiction

¥«¬F

©W

¾À²Åé¨

±ö

°ªº¸¤Golf Club

¤¤±d

ĵ

ĵ

¥È¤»

°V½m¥¿

Retreat Centre

Methodist

ºÞ²«n

¸ê·½ºñ®q

¤À°Ï¤jÀ¬¤j

°K

¼s»È

¤ôRESERVOIR

¤ôRESERVOIR

¯B´

Floatin

g Jettie

s

Floating Jetties¯B´

Tai Pak Tsui

¤j¥

WAN

TSOI YUEN

µæ¶

TAI HO WAN

¤jÄ

¦Ñª

HAI TEI WAN

Ãɦ

NIM SHUE WAN

¸Z¾

Village

Nim Shue Wan

¸Z¾ð

Tin Liu

¥Ð

¤û¬

Pak Mong

¥Õ

ªø¨

TAI LEI

¤j»AÀÜ

ª÷©¤s³

¤jÀ

TUNG WAN

ªF

San Tsuen

Nam Wan

«nÆW

«nÆW¤s

Wai Tsai Tsuen³ò¥

San TsuenWai Tsai Tseng³ò¥J¤

Tsai

Yuen Ling

¤¸À

PENG CHAU

©W

WO SHEUNG AU

¥Ý¤

MONG TO AU

±æ´

¶À¤

ºÛ

ªFÆ ª¯ª

Man Kok

¸U

Man Kok Tsui

¸U¨

SILVER MINE BAY

»È•

Court

Silver Waves»ÈÀ

Chung Hau

¯F

Ngan Wan Estate»ÈÆ

³À¦

Tai Tei Tong

¤j¦ Tsuen

Tsoi Yuen

µæ¶

½¹½

Wang Tong

¾î

Heung

Pak Ngan

¥Õ»

¤«ÀY

Às§

±öºÛ

LIN FA SHAN

½¬ª

Village

Round Table

¶ê®

Wan Tsai

ÆW

Tsuen

Lai Chi Yuen

¯ïªK

Mau Yuen

­T

¤ô¤

HEI LING CHAU

³ßÆ

¬F©²Ãz¬

ª¯ª

ºÑ

¯`

Ä_

±d¼Hillgrove Village

®ü¹

®ü³

­ÊÀ

ôÁPeninsula Village

ºÑÀCoastline Villa

Âz¦

ºÑ

ªFÆW

®üÂLa Serene

»È

RIVER

SILVE

R

WA

NG T

ON

G RIV

ER

´r´Discovery Bay

¤j°Tai Wai Yuen

¤¤»È

¦Ã¤ô³

Plant

Water Treatment

San TsuenNam Wan Shan Ting

¤jÄ®

Beach Village

Beach Village

Crestmont Villa

Treatment WorksSewage

Silver Mine Bay Beach

LO FU TAU

Sea View Villas®ü´º

´Iº½Regent Villa

ªá®ü

»ÈÄqÆ

Tung Wan Villa

Shan Ting TsuenEstate

Kam Peng

Sea Crest Villa

Bijou Hamlet

¨ôÀ

Tai Ho San Tsuen

Lung Mei Tsuen

Kau Tsuen

Mui Wo

Tseng Tau San Tsuen

Wong Kung Tin

Tung Wan TauKau Shat Wan

Ngau Kwu Long

Cheung Sha Lan

Tsuen

Tai Lung

Wo Tin

Luk Tei Tong

VillageMidvale

VillageParkvale

La Costa

La Vista

»È•°ÆW

¼oª«ÂàTransfer Facility

Government Explosives Depot

Kau Shat Wan

³Â¥Ma Po Tsuen

¸Z®Nim Po Tsuen

·sÀSun Lung Wai

À­©Ling Tsui Tau

¤ô°È³B²

¤¤±ö

Silver View

¯F¥

TsuenChung Tsai

¬ü°

Às§Lung Mei Hang

Facility

Refuse Transfer

»È•°ÆW

Ser ResSilver Mine Bay

Water Treatment WorksSilver Mine Bay

·s²Ä

San TsuenTai Yat

±yVilla Bay

WA

NG T

ON

G

RIVER

¾î

ª

¾î

ª

¦Ã¤ô³

Treatment Works

Sewage

¨®

­¹À

»ÈÄ

CaveSilver Mine

¤U§Ha Tsuen Long

º®¥

BUTTERFLY HILL

ªê±

SHAN

FU KONG

³]¼oª«

¼oª«Âà

¦n

§

¤Íº

¤Í

¥

¼Ö©´I

©Ä_

©

§Ó¤

©W

¬w

¥

¥Ãª

¥Ã

«

µ

¥

³

¤j

¥Ã

§

«e

µ´¹

¤B¶Q

²Ä¤

¥Ã¶

¥Ã

¥

¦n´

©W¬w¥Ã

¶Q

©

Ȗ

°

LANTAU TRAIL

LA

NT

AU T

RAIL

LANTAU TRAIL

©W

¬w

®

«n¤j

À¬

SO

UTH LA

NTA

U C

OU

NTR

Y TR

AIL

PENG CHAU

FAMIL

Y W

ALK

LANTAU TRAIL

»ñ°

Ȗ

°

»°

®

LANTAU TRAIL

»ñ°

PE

NG C

HA

U FA

MIL

Y WA

LK

LANTAU TRAIL

«n¾ð ¬ã²

­»´ä¶

­´

¶¹

®

HO

NG

KO

NG O

LY

MPIC TRAIL

¦ÑªêÀY

LO FU T

AU COUNTRY

TRAIL

¦ª

À­¹

®

©W´

PENG YU

PATH

¦Û

µM

¾

Â÷

®q¦

Ûµ

¢w

±ö

Pipeline¾É

Pipeline¾É

¿é¤ô

Water T

unnel

post

post

post

post

post

post

post

post

©â¤

40

95

96»ñµ

SIU KAU YI CHAU

¤p¥æ

NGAN CHAU

»È

Tai Wo

¤j

( CHAU KUNG TO )

SUNSHINE ISLAND

©P¤

¤â«FINGER HILL

©W¬w°

Ser Res

Peng Chau

©W¬w®

Pip

elin

e

¾É

¾É Pipeline

10

11

12

13

15

16

17

18

ºñ·|

¦Ã¬¦

¦Ã¬¦

°¨¦æ¤j

19

20

21

22

23

25

ÂŦâBlue Blue Club

5

3

2

8

9

7

6

1

­}¤¦æ¬F

26 27

28

2930

31

¤½¸ê¤¤

·|

¥«·|

32

33

35

273

120

69

32

50

187

36

115

±Ï¥°¨ÆW«

°Æ°

¿OÅ¢¬Tang Lung Chau

Lighthouse

¤EÀ¥Û

Youth Camp

°¨®ø¨

4C

post

Hong Kong Disneyland Hotel

­»´ä­}¤h¥

A

¤Ñ¥j

Ma Wan Park°¨ÆW

ĵ

¦¬¼s

°ÊÃÀ³

¨©¼s

°¨¯èTEEN

°¨ÆW¤Ó¶

Noa

h's

Ark

ª¶

®¿¨

È

´çJetty

TUNG WAN

ªF

MA WAN

°¨

Tin Liu

¥Ð

PAK WAN

TENG

¥_Æ

²H¤

SHEK TSAI WAN

¥Û¥

Ma Kok Tsui

°¨¨

PAK NAI SHAN

¥Õª

NAM WAN

«n

¬hª

TAI LENG TAU

¤jÀ

Tai Pai Tsui

KUNG TSAI WAN

¤½¥

KAP S

HUI M

UN

¨V

¤

San Po Tsui

·sç

Yi Chuen

¤G

NG KWU LENG

¤­¹

Kwai Shek

©ä

FA PENG TENG

ªá²

Sam Chuen

¤T

Tso Wan

¯ó

TANG LUNG CHAU

¿OÅ

Ngam Hau Shek

©¥¤Fa Peng

ªá

¥¶ÀY¹

ªFÆ

TUNG WAN TSAI

¥¶ÀY¹

¤j±

°¨ÆW¤

Às½

¥_PAK WAN

LUNG HA WAN

PA TAU KWU

PAK WAN

°¨ÆWªF

Lau Fa Tsuen

¬ÄÄ

Ma Wan

Tung Wan Beach

PA TAU KWU

NAM WAN

¥Ð¼dTin Liu

New Village

Åé¨Tai Yuk Road

­Ë¦TO KAU WAN

Ma Wan Main Street

Village

Park Island

°¨ÆW¤jMa Wan Main Street Village North

°¨¤jµó

Ma Wan

Main Street

Village Central

Main Street

Village South

Main Street

Village East

°¨ÆW¤j

°¨¤jµó

°¨º®¥Á

°¨ÆWÁ×­

Ma Wan O MeiTyphoon Shelter

TAM SHUI WAN

®üAna Capri

²Ä¤

²Ä¤

²Ä¤Phase 2

Phase 5

Phase 3

²Ä¤

Phase 1

°¨ÆW°Ma Wan Ser Res

Ma WanFishermen's

Village

­}¤ DISNEYLAND RESORT

Airport Ex

press

¾÷³õ

¾ôBridge

Tower

¾ôBridge

Tower

8

東涌新市鎮擴展

EXTENSION

NEW TOWN

TUNG CHUNG

在不利天氣情況下的直升機飛行路線

北大嶼航道 –

政府飛行服務隊總部

SERVICE HEADQUARTERS

GOVERNMENT FLYING

SOUTH RUNWAY

南跑道

UNFAVOURABLE WEATHER CONDITIONS

HELICOPTER FLIGHT PATH DURING

NORTH LANTAU EXPRESSWAY -

附件

三 ENCLOSURE 3

北大嶼航道 – 在不利天氣情況下的直升機飛行路線

NORTH LANTAU EXPRESSWAY - HELICOPTER FLIGHT PATH DURING UNFAVOURABLE WEATHER CONDITIONS

Page 14: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE … · PWSC(2017-18)37 Page 5 $ million (in MOD prices) (a) Construction of an apron 62.2 (b) Construction of an office building 56.5

Enclosure 4 to PWSC(2017-18)37

188GK – Government Flying Service Kai Tak Division

Breakdown of the estimates for consultants’ fees and resident site staff costs (in September 2017 prices) Estimated

man-months

Average MPS* salary point

Multiplier (Note 1)

Estimated fee

($million)

(a) Consultants’ fees for

contract administration (Note 2)

Professional Technical

-- --

-- --

-- --

2.6 1.8

Sub-total 4.4# (b) Resident site staff (RSS)

cost (Note 3) Professional Technical

135 393

38 14

1.6 1.6

17.0 17.3

Sub-total 34.3 Comprising - (i) Consultants’ fees for

management of RSS 1.2#

(ii) Remuneration of

RSS 33.1#

Total 38.7

∗ MPS = Master Pay Scale Notes 1. A multiplier of 1.6 is applied to the average MPS point to estimate the cost of RSS

supplied by the consultants (as at now, MPS point 38 = $78,775 per month and MPS point 14 = $27,485 per month).

2. The consultants’ staff cost for contract administration is calculated in accordance with

the existing consultancy agreement for the design and construction of 188GK. The construction phase of the assignment will only be executed subject to the Finance Committee’s approval to upgrade 188GK to Category A.

3. The actual man-months and actual costs will only be known after completion of the

construction works.

Remarks The cost figures in this Enclosure are shown in constant prices to correlate with the MPS salary point of the same year. The figures marked with # are shown in money-of-the-day prices in paragraph 11 of the main paper.