BID B20.002 CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS PHASE II - SCOREBOARD ADDENDUM NO. 2 DATE ISSUED: MARCH 11, 2021 Page 1 of 3 The following clarifications, amendments, additions, deletions, revisions and/or modifications form a part of the CONTRACT DOCUMENTS, and change the original or previous documents only in the manner and to the extent stated. THE CONTRACT PRICE SHALL REFLECT ALL ADDENDUM CHANGES. ITEM # PAGE/DRAWING DESCRIPTION Bid Package Changes / Corrections / Additions: 1.01 Bid opening date and time has been changed to Tuesday, March 23, 2021 at 2:00 p.m. at Grossmont College District Annex South Building. 1.02 NARRATIVE OF REVISIONS for attached drawings. The following changes, additions, deletions, or corrections shall become a part of the Contract Documents for the project named above and all other conditions shall remain the same. The bidders shall be responsible for reviewing and transmitting listed and non- listed information/revised documents as a whole to all affected subcontractors and suppliers prior to the closing of bids. Acknowledge receipt of this Addendum in spaces provided on the Bid Form. Failure to acknowledge will subject Bidder to disqualification. DRAWINGS Item No. A-002: Reference Revised Drawings (drawings). Please note that Addendum #2 is referenced on the drawings as delta 1. A. The following new full-sized drawings are hereby issued: A1.10 SITE PLAN – DEMOLITION Scope added to relocate existing storage bin and contents for the duration of the project. Contents to be moved by the College. E1.2 ENLARGED PLANS Notes revised to clarify contractor responsibilities. E1.3 ONE-LINE DIAGRAM AND DETAILS Removed aluminum from feeder schedule. E1.4 SCOREBOARD/CONTROL STATION COMM./CONTROL WIRIING DIAGRAM Revised notes to clarify scope. E1.5 ELECTRICAL DETAILS

Upload: others

Post on 16-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

BID B20.002

CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS

PHASE II - SCOREBOARD

ADDENDUM NO. 2

DATE ISSUED: MARCH 11, 2021

Page 1 of 3

The following clarifications, amendments, additions, deletions, revisions and/or modifications form a part of the

CONTRACT DOCUMENTS, and change the original or previous documents only in the manner and to the

extent stated. THE CONTRACT PRICE SHALL REFLECT ALL ADDENDUM CHANGES.

ITEM # PAGE/DRAWING DESCRIPTION

Bid Package Changes / Corrections / Additions:

1.01 Bid opening date and time has been changed to Tuesday, March 23, 2021 at 2:00 p.m. at

Grossmont College District Annex South Building.

1.02 NARRATIVE OF REVISIONS for attached drawings.

The following changes, additions, deletions, or corrections shall become a part of the

Contract Documents for the project named above and all other conditions shall remain

the same. The bidders shall be responsible for reviewing and transmitting listed and non-

listed information/revised documents as a whole to all affected subcontractors and

suppliers prior to the closing of bids. Acknowledge receipt of this Addendum in spaces

provided on the Bid Form. Failure to acknowledge will subject Bidder to

disqualification.

DRAWINGS

Item No. A-002: Reference Revised Drawings (drawings). Please note that

Addendum #2 is referenced on the drawings as delta 1.

A. The following new full-sized drawings are hereby issued:

A1.10 SITE PLAN – DEMOLITION

• Scope added to relocate existing storage bin and contents for the

duration of the project. Contents to be moved by the College.

E1.2 ENLARGED PLANS

• Notes revised to clarify contractor responsibilities.

E1.3 ONE-LINE DIAGRAM AND DETAILS

• Removed aluminum from feeder schedule.

E1.4 SCOREBOARD/CONTROL STATION COMM./CONTROL

WIRIING DIAGRAM

• Revised notes to clarify scope.

E1.5 ELECTRICAL DETAILS

BID B20.002

CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS

PHASE II - SCOREBOARD

ADDENDUM NO. 2

DATE ISSUED: MARCH 11, 2021

Page 2 of 3

• Revised notes to explicitly indicate ‘or equal’ provision for selected

items.

1.03 CLARIFICATIONS

1. Question: How/where will the new drinking fountain drain to?

a. Answer: Existing drinking fountain is to be demolished. Connect new drinking

fountain drain to existing drinking fountain drain line.

2. Question: Does the campus have stockpiled material for our use to fill the existing

bioswale?

a. Answer: The College does not have stockpiled soil material that is suitable for use on

this project.

3. Question: In pursuing qualified bidders for the Cuyamaca Track and Field

Improvements Phase II Scoreboard, “The Information Required by Bidders” (page 4-5) refers to qualifications of bidders, of installation related to score boards and commissioning. Beyond the site work preparation, structural installation and electrical connectivity for the scoreboard- the actual scoreboard, integration thereto and commissioning will be performed by a scoreboard specialty installer, subcontracted to a GC. Will the district consider for qualification experience, a subcontractor installer with experience in the scoreboard installations, as part of the General Contractor’s overall experience requirement?

a. Answer: In order to meet the qualification requirements set forth in The Information

Required of Bidders, the General Contractor (Contractor) must have managed at least

one project in the last (5) years where a scoreboard has been installed and

commissioned. Please refer to the project Specification section 11 68 45 for additional

qualification requirements.

4. Question: Confirm aluminum feeder conductors are allowed. Spec 26 05 19 2.1.2 allows per the feeder schedule if shown. Schedule in detail 4/E1.3 includes aluminum.

a. Answer: Aluminum conductors are not permitted.

5. Question: In reference to drawing E1.2 detail 4 states Scoreboard by others. Please

clarify.

a. Answer: Note revised in Addendum 002.

6. Question: In reference to drawing E1.2 detail 4 states Climate Controlled Enclosure by

others. Please clarify.

a. Answer: Note revised in Addendum 002.

BID B20.002

CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS

PHASE II - SCOREBOARD

ADDENDUM NO. 2

DATE ISSUED: MARCH 11, 2021

Page 3 of 3

7. Question: Per Specification 321216 Asphalt Concrete I did not see anywhere on plans

that this is shown. Please clarify.

a. Answer: No asphalt concrete required for current scope.

8. Question: Per Specification 034800 Precast Concrete Specialties part 3.07 Schedule it

refers to splash blocks. Please provide where these are shown on plans.

a. Answer: No concrete specialties required for current scope.

9. Question: Per Specification 055000 Metal Fabrications part 3.6 Schedule items C, D, E,

F, G, H, I are not shown anywhere on plans. Please clarify.

a. Answer: Specifications indicated for ferrous metal items are not applicable if such

items are not indicated in the drawing set.

10. Question: Per Specification 055214 Site Metal Fabrications part 1.01 Work Included

talks about handrails and miscellaneous metal items from landscape drawings. None are shown. Please clarify.

a. Answer: No site metals are required for current scope.

1.04 BID DOCUMENTS

The following document sections of the Bid Documents to be re-issued, replaced, or added in Addendum No. 2:

DOCUMENT DESCRIPTION

Exhibit E: Master Schedule (re-issued)

1.05 Reminder: Acknowledge receipt of Addendum 1 on your bid form.

Reminder: Acknowledge receipt of Addendum 2 on your bid form.

END OF DOCUMENT

GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT

B20.002 – CUYAMACA COLLEGE TRACK AND FIELD

IMPROVEMENTS PH. II – SCOREBOARD

EXHIBIT E

EXHIBIT E

Master Schedule CUYAMACA COLLEGE TRACK AND FIELD IMPROVEMENTS

PH. II – SCOREBOARD

Advertisement #1 Tues., February 09, 2021

Advertisement #2 Tues., February 16, 2021

Non-mandatory Pre-Bid Meeting and Job

Walk Mon., February 22, 2021 @ 2:00 p.m.

Last Day for DVBE Advertisement Tues., March 02, 2021

Deadline to Submit Request for Substitutions Fri., March 05, 2021

Last Day for Questions Tues., March 16, 2021

Last Day for Addendum Thurs., March 18, 2021

Bid Opening Tues., March 23, 2021 @ 2:00 p.m.

Notice to Bidders of Intent to Award Tues., March 30, 2021

Award Letter (anticipated) Tues., April 13, 2021

Signed Contract/Insurance/Contractor Bond to

GCCCD Purchasing Fri., April 23, 2021

Notice to Proceed (anticipated) Fri., May 07, 2021

Pre-Construction Meeting (anticipated) Mon., May 10, 2021

Start of Construction (anticipated) Tues., May 11, 2021

Project Completion (including all punch list items)

Fri., October 08, 2021

Note #1: Non-mandatory Pre-Bid Meeting and Job Walk is required for all prospective

bidders to attend. Costs associated with on-time delivery and installation of all

construction items including any long lead items in order to comply with the above

schedule are to be included in the bid. The overall project duration shall be for 155

consecutive calendar days. The calendar days specified herein includes 5 calendar day(s)

for anticipated inclement weather.

TRACK/SOCCER FIELDDSA #04-051197

BUSINESS & SCIENCE BLDG

CENTRAL PLANT

BLDG OVERHANG

BUSINESS & SCIENCE BLDG

ACCESSIBLE RESTROOMS A# 04-109108

A1.10

2

TENNIS COURTSDSA #04-051197

TYP.

02.40

02.15

02.01

02.42

02.43

ACCESS ROAD

ACCESS ROAD

TYP.

02.53

TYP.

02.54

PARKING LOTDSA #04-051197

SLOPED WALK

02.48

TYP.

02.56

TYP.

02.21

RAMP

21

' -

7"

Legend:

AREA OF DEMOLITION

(E) BUILDINGS / STRUCTURES

1. REFER TO SHEET G0.11 FOR TYPICAL SYMBOLS AND ABBREVIATIONS

02.01

02.56

PARKING LOT

02.01

02.06

02.40

02.47

02.40

02.20

02.22

02.17

02.21

Notes:

BR

AD

LEE LASS

I

NO. A-32437

LI C

E NS ED A RCH I T

EC

T

REN . 02 - 28 - 21

ST

A

TE

O F CA L I F OR

NI A

CK

Y G

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5028009000

Keynotes:

Agency

Approval:

File No.: 37-C5

Facility:

ISSUE:

CONSTRUCTION DOCUMENTS

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 909 989 9979 / www.hmcarchitects.com

3546 Concours Street / Ontario, CA 91764

CUYAMACA COLLEGE SCOREBOARD

SITE PLAN - DEMOLITION

10/29/2020 5028014100

A1.10

GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT

CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYEL CAJON, CA 92019

N:\Projects\5028 Grossmont-Cuyamaca CCD\013_Student Center Renovation\06 BIM CAD\03 REVIT

1" = 30'-0"

1SITE PLAN - DEMO

NO. Note - Detail

02.01 (E) CONCRETE PAVING

02.06 (E) LANDSCAPING TO REMAIN

02.15 (E) SHED

02.17 (E) DRINKING FOUNTAIN TO BE REMOVED

02.20 (E) LIGHT POST - PROTECT IN PLACE

02.21 (E) CONC. CURB TO REMAIN - PROTECT IN PLACE

02.22 (E) UTILITY PANEL ON PEDESTAL - PROTECT IN PLACE

02.40 (E) CONCRETE PAVING TO BE REMOVED

02.42 (E) CHAINLINK FENCE AND FOOTING TO BE REMOVED

02.43 (E) RETENTION BASIN TO BE REMOVED. SEE CIVIL DWG C3.01FOR ADDITIONAL INFO

02.47 (E) LANDSCAPE, ROCK, ETC TO BE REMOVED FOR (N)CONCRETE PAVING

02.48 REMOVE (E) TRUNCATED DOMES

02.53 (E) PARKING STRIPING TO REMAIN

02.54 (E) WHEEL STOP TO REMAIN

02.56 (E) CHAINLINK FENCE TO REMAIN

N

1/4" = 1'-0"

2ENLARGED SITE PLAN - SIDEWALK

N

11/4/2020

DSAD E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECT

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT

APP: INC:REVIEWED FOR

SS FLS ACS

DATE:

✔ ✔ ✔

04-119355

11/12/2020

CUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD

STORAGE CONTAINER NOTES

1. RELOCATE (E) 40-FT STORAGE CONTAINER AND

CONTENTS PRIOR TO START OF CONSTRUCTION

ACTIVITES TO ALTERNATE TEMPORARY LOCATION

ON CAMPUS.

2. TEMPORARY LOCATION OF STORAGE CONTAINER

TO BE COORDINATED WITH COLLEGE.

3. UPON COMPLETION OF CONSTRUCTION

ACTIVITES, (E) STORAGE CONTAINER AND

CONTENTS SHALL BE RETURNED TO ORIGINAL

LOCATION.

1 03/11/2021ADDENDUM 002

1

1. RELOCATE (E) 40-FT STORAGE CONTINER PRIOR

TO START OF CONSRUCTION ACTIVITIES TO

ALTERNATE TEMPORARY LOCATION ON CAMPUS.

CONTENTS TO BE REMOVED BY COLLEGE PRIOR TO

RELOCATION.

2. TEMPORARY LOCATION OF STORAGE CONTAINER

TO BE COORDINATED WITH COLLEGE.

3. UPON COMPLETION OF CONSTRUCTION

ACTIVITES, (E) STORAGE CONTAINER SHALL BE

RETURNED TO ORIGINAL LOCATION. CONTENTS OF

STORAGE CONTAINER, OFOI.

1

E

CO

TRENCH

CENTRAL PLANT

ACCESS ROAD

J

J

J

SEE E1

.1

FIRE ALARM

POWER

COMM.

(EX) DUCT WORK

(EX) MAIN DISTRIBUTION SWITCHBOARD 'MSB'

(EX) IDF CABINET

(EX) FIRE ALARM TERMINAL CABINET(1) 1-1/4''C. (FIRE ALARM)

(1) 1-1/4''C. (FUTURE FIRE ALARM)

(2) 1-1/4''C. (FUTURE COMM.)

(1) 1''C. (FUTURE SCOREBOARD COMM.)(1) 1-1/4''C. (FUTURE FIRE ALARM)

(2) 1-1/4''C. (FUTURE COMM.)

(1) 1''C. (FUTURE SCOREBOARD COMM.)

(1) 1-1/2''C. (XFMR 'TSB' POWER)

(1) 2''C. (FUTURE POWER)

(1) 1-1/4''C. (FUTURE FIRE ALARM)

(2) 1-1/4''C. (FUTURE COMM.)

(1) 1''C. (FUTURE SCOREBOARD COMM.)

(1) 1-1/2''C. (XFMR 'TSB' POWER)

(1) 2''C. (FUTURE POWER)

NOTE:

1. CORE DRILLING REQUIRED THROUGH

CONCRETE WALLS AT THIS BUILDING.

MIN. (3) LOCATIONS. ALL OPENINGS

SHALL BE PROPERLY SEALED.

CENTRAL PLANT

BUILDING

MOUNT J-BOX AS HIGH

AS POSSIBLE (TYP.)

SCOREBOARD

KEYNOTES:

1-1/2''C. (POWER TRANSFORMER 'TSB')

1-1/4''C. (POWER CONTROL STATION), 3 #2, 1 #8 GND.

(1) 1''C. (FIBER CONTROL STATION)

(1) 1''C. (SOUND CONTROL STATION)

(1) 1''C. (FUTURE SCOREBOARD COMMUNICATIONS)

(1) 1-1/4''C. (POWER), 3 #4, 1 #8 GND.

(1) 1''C. (FIBER CONTROL STATION)

(1) 1''C. (SOUND CONTROL STATION)

EXTEND POWER CONNECTION TO SCOREBOARD AS REQUIRED.

VIDEO BOARD A3,B3,C3,D3,E3,F3: 3/4''C., 3 #12, 1 #12 GND. ('SB'-2,4)

VIDEO BOARD F2,G2,G3,C2,D2,E2: 3/4''C., 2 #12 (HOT), 1 #10 (NEUTRAL), 1 #12 GND. ('SB'-6,8)

VIDEO BOARD A1,A2,B2,B1,C1,D1,E1,F1,G1: 3/4''C., 3 #12 (HOT), 1 #10 (NEUTRAL), 1 #12 ('SB'-10,12,14)

SCOREBOARD: 3/4''C., 2 #12, 1 #12 GND. ('SB'-16)

3/4"C. (SPARE)

VERIFY VIDEO BOARD AND SCOREBOARD POINT OF CONNECTIONS WITH SCOREBOARD VENDOR

PRIOR TO INSTALLING CONDUITS AND CONDUCTORS. EXTEND ALL POWER CONNECTIONS TO

SCOREBOARD AND VIDEO BOARD AS REQUIRED.

3/4''C., 4 #12 (HOT), 2 #10 (NEUTRAL), 1 #12 (GROUND)

('SB'-1,3 @ QUAD RECEPTACLE #1)

('SB'-5,7 @ QUAD RECEPTACLE #2)

(2) 1''C. (CAT-5E)

(1) 2''C. (SPEAKER CABLE)

EXTEND CAT-5E AND SPEAKER CABLE CONNECTION TO SCOREBOARD AS REQUIRED.

QUAD RECEPTACLE SHALL BE INSTALLED INSIDE THE ENCLOSURE.

PROVIDE 3/4"X10'-0" COPPER GROUND ROD AND GROUND THE SCOREBOARD AS REQUIRED. FIELD

VEIRFY EXACT LOCATION OF GROUND LUG AT THE SCOREBOARD AND EXTEND MIN. #4 SOLID COPPER

GROUNDING CONDUCTOR IN 3/4" GRC. TO GROUND ROD AS REQUIRED.

1

2

3

4

T

SEE E1.1

TRANSFORMER 'TSB'

TRANSFORMER PRIMARY

DISCONNECT SWITCH

SEE E1.1

PANEL 'SB'

1

3

2

CLIMATE CONTROLLED SCOREBOARD

OUTDOOR ENCLOSURE

3''C.

1-1/2''C.

1-1/2''C. (XFMR 'TSB' POWER)

1''C. (SCOREBOARD FUTURE COMM.)

(2) 1''C. (CONTROL)

'SB'-1,3,5,7

5

6

1

E1.6

6

7

7

8

4

HOUSEKEEPING PAD5

E1.5

8

(2) 1''C. (CONTROL)

1,35,7

1-1/4''C. (CONTROL STATION POWER),

3 #4, 1 #8 GND.

1-1/4''C. (CONTROL STATION POWER),

3 #2, 1 #8 GND.

9

9

9' -

3"

3' - 7"

1

1

1

1-1/4''C. (POWER), 3 #4, 1 #8 GND

(1) 1''C. (FIBER)

(1) 1''C. (SOUND)

SEE E1.1

4

E1.5

KEYNOTES:

FIELD VERIFY EXACT LOCATION PRIOR TO ROUGH-IN.

COORDINATE WITH ARCHITECT AND DISTRICT STAFF.

ALL CONDUITS SHALL STUB INTO PEDESTAL DESIGNATED

CONDUIT STUB UP AREA.

1

1

PEDESTAL

2

M F

2

9 11

1

SEE E1.1

4

E1.5

1-1/4''C. (POWER), 3 #2, 1 #8 GND.

(1) 1''C. (FIBER)

(1) 1''C. (SOUND)

KEYNOTES:

FIELD VERIFY EXACT LOCATION

PRIOR TO ROUGH-IN. COORDINATE

WITH ARCHITECT AND DISTRICT STAFF.

ALL CONDUITS SHALL STUB INTO

PEDESTAL DESIGNATED CONDUIT

STUB UP AREA.

1

1

PEDESTAL

MF15

13

2 2

21

1

E1.3

1

E1.4

S

M

NO.E 14781

Exp. 6-30-2021

R

E

TATE 0F CA LIF0RN

IA

LECT

EG

ISTER

ERPR0FESSI0NAL

ENG

INE

ER

0N

ICA

G0ESE -HANS

EN

#20012

LACIR

N

BR

AD

LEE LAS

SI

NO. A-32437

LIC

ENS E D A RCH

I T

EC

T

R

EN. 02 - 28 - 21

ST

A

TE

O F CA L I F OR

NIA

CK

Y G

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5028009000

Keynotes:

Agency

Approval:

File No.: 37-C5

Facility:

ISSUE:

CONSTRUCTION DOCUMENTS

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 909 989 9979 / www.hmcarchitects.com

3546 Concours Street / Ontario, CA 91764

ENLARGED PLANS

09/18/2018 5028013000

E1.2

GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT

CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019

1/8" = 1'-0"1

CENTRAL PLANT BLDG. PLAN

1/4" = 1'-0"4

SCOREBOARD PLAN1/4" = 1'-0"

3SOCCER CONTROL PLAN

1/4" = 1'-0"2

TRACK AND FIELD CONTROL PLAN

GENERAL NOTES:

1. SEE ONE-LINE DIAGRAM FOR FEEDER SIZE

2. SEE SCOREBOARD/CONTROL WIRING DIAGRAM FOR

COMMUNICATIONS WIRING REQUIREMENTS.

3. SEE E1.5 FOR TYPICAL TRENCH DETAIL AND CONDUIT

INSTALLATION DETAIL.

1 03/11/2021ADDENDUM 002

ARD

1

CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD

1

600V FEEDER SCHEDULE LEGEND

T75 "T" INDICATES TYPICAL TRANSFORMER FEEDER

REFERENCE. THE NUMBER INDICATES

TRANSFORMER TYPE.

REFER TO SCHEDULE ON SHEET

FOR SIZE REQUIRED.

1. ALL CONDUCTOR SHALL BE PROVIDED WITH TYPE THWN-2 INSULATION.REFERENCE SPECIFICATION SECTION 26 05 19 (16120) FOR ADDITIONALREQUIREMENTS.

PROVIDE 60 DEGREE COPPER/ALUMINUM RATED TERMINATION FOR ALLFEEDERS SIZED WITH #2 OR SMALLER CONDUCTORS. PROVIDE 75 DEGREECOPPER/ALUMINUM RATED TERMINATIONS FOR ALL FEEDERS SIZED WITH #1OR LARGER CONDUCTORS.

CONTRACTOR SHALL BE RESPONSIBLE FOR ORDERING LUG CONFIGURATIONAN ALL EQUIPMENT, BREAKER OF DISCONNECTS TO MATCH FEEDERCONFIGURATIONS INDICATED.

WHERE MULTIPLE CONDUIT QUANTITIES ARE INDICATED, CONDUCTORQUANTITIES AND SIZES SHOWN IN SCHEDULE SHALL BE PROVIDED IN EACHCONDUIT.

2.

3.

4.

I.D.

2A

2B

3A

3B

4A

4B

5A

5B

6A

6B

7A

7B

8A

8B

9A

9B

10A

10B

12A

12B

15A

15B

17A

17B

20A

20B

22A

22B

25A

25B

30A

30B

35A

35B

40A

40B

45A

45B

50A

50B

60A

60B

70A

70B

80A

80B

100B

120B

160B

200B

250B

300B

350B

400B

600Volt Feeder ScheduleType

.

.

Ampacity

20

20

30

30

40

40

50

50

60

60

70

70

80

80

90

90

100

100

125

125

150

150

175

175

200

200

225

225

250

250

300

300

350

350

400

400

450

450

500

500

600

600

700

700

800

800

1000

1200

1600

2000

2500

3000

3500

4000

Copper

Conduit

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(3)

(3)

(3)

(3)

(4)

(4)

(5)

(6)

(7)

(8)

(12)

(12)

3/4"

3/4"

3/4"

3/4"

1"

1"

1"

1"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

2"

2"

2"

2"

2"

3"

3"

3"

3"

3"

3"

3"

3"

2"

2"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

4"

4"

4"

4"

4"

4"

4"

Conductors

3 # 12, 1# 12 Gnd

4 # 12, 1# 12 Gnd

3 # 10, 1# 10 Gnd

4 # 10, 1# 10 Gnd

3 # 8, 1# 10 Gnd

4 # 8, 1# 10 Gnd

3 # 6, 1# 10 Gnd

4 # 6, 1# 10 Gnd

3 # 4, 1# 8 Gnd

4 # 4, 1# 8 Gnd

3 # 4, 1# 8 Gnd

4 # 4, 1# 8 Gnd

3 # 3, 1# 8 Gnd

4 # 3, 1# 8 Gnd

3 # 2, 1# 8 Gnd

4 # 2, 1# 8 Gnd

3 # 1, 1# 6 Gnd

4 # 1, 1# 6 Gnd

3 # 1, 1# 6 Gnd

4 # 1, 1# 6 Gnd

3 # 1/0, 1# 6 Gnd

4 # 1/0, 1# 6 Gnd

3 # 2/0, 1# 6 Gnd

4 # 2/0, 1# 6 Gnd

3 # 3/0, 1# 4 Gnd

4 # 3/0, 1# 4 Gnd

3 # 4/0, 1# 4 Gnd

4 # 4/0, 1# 4 Gnd

3 # 250, 1# 4 Gnd

4 # 250, 1# 4 Gnd

3 # 350, 1# 4 Gnd

4 # 350, 1# 4 Gnd

3 # 2/0, 1# 2 Gnd

4 # 2/0, 1# 2 Gnd

3 # 3/0, 1# 2 Gnd

4 # 3/0, 1# 2 Gnd

3 # 4/0, 1# 2 Gnd

4 # 4/0, 1# 2 Gnd

3 # 250, 1# 2 Gnd

4 # 250, 1# 2 Gnd

3 # 350, 1# 1 Gnd

4 # 350, 1# 1 Gnd

3 # 4/0, 1# 1/0 Gnd

4 # 4/0, 1# 1/0 Gnd

3 # 300, 1# 1/0 Gnd

4 # 300, 1# 1/0 Gnd

4 # 250, 1# 2/0 Gnd

4 # 350, 1# 3/0 Gnd

4 # 400, 1# 4/0 Gnd

4 # 500, 1# 250 Gnd

4 # 500, 1# 350 Gnd

4 # 500, 1# 350 Gnd

4 # 350, 1# 400 Gnd

4 # 400, 1# 400 Gnd

Aluminum

Conduit

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(2)

(3)

(3)

(3)

(3)

(4)

(4)

(5)

(6)

(7)

(8)

(12)

(12)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

2"

2"

2"

2"

2"

2"

3"

3"

3"

3"

3"

3"

3"

3"

2"

2"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

4"

4"

4"

4"

4"

4"

4"

Conductors

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

3 # 2/0, 1# 3 Gnd

4 # 2/0, 1# 3 Gnd

3 # 3/0, 1# 3 Gnd

4 # 3/0, 1# 3 Gnd

3 # 4/0, 1# 3 Gnd

4 # 4/0, 1# 3 Gnd

3 # 250, 1# 2 Gnd

4 # 250, 1# 2 Gnd

3 # 300, 1# 2 Gnd

4 # 300, 1# 2 Gnd

3 # 350, 1# 2 Gnd

4 # 350, 1# 2 Gnd

3 # 500, 1# 2 Gnd

4 # 500, 1# 2 Gnd

3 # 4/0, 1# 1 Gnd

4 # 4/0, 1# 1 Gnd

3 # 250, 1# 1/0 Gnd

4 # 250, 1# 1/0 Gnd

3 # 300, 1# 1/0 Gnd

4 # 300, 1# 1/0 Gnd

3 # 350, 1# 1/0 Gnd

4 # 350, 1# 1/0 Gnd

3 # 500, 1# 2/0 Gnd

4 # 500, 1# 2/0 Gnd

3 # 300, 1# 3/0 Gnd

4 # 300, 1# 3/0 Gnd

3 # 500, 1# 3/0 Gnd

4 # 500, 1# 3/0 Gnd

4 # 400, 1# 4/0 Gnd

4 # 500, 1# 250 Gnd

4 # 600, 1# 350 Gnd

4 # 600, 1# 400 Gnd

4 # 750, 1# 600 Gnd

4 # 750, 1# 600 Gnd

4 # 500, 1# 600 Gnd

4 # 600, 1# 750 Gnd

1.

2.

GENERAL NOTES:

UNLESS WHERE OTHERWISE NOTED. ALL WORKINDICATED ON THESE DRAWINGS SHALL BECONSIDERED NEW WORK.

ALL ELECTRICAL GEAR AND EQUIPMENT SHOWN ON ONE-LINEDIAGRAM SHALL BE NEMA 1 UNLESS OTHERWISE NOTED.

NO

T A

PP

LIC

AB

LE

600V FEEDER SCHEDULE GENERAL NOTES:

M

(EX) 2500A, 277/480v, 3PH,4W, 'SQUARE D' SWITCHBOARD 'MSB', 65 kAIC,

PANEL

DISTRIBUTION SECTION

2500/3PMAIN

NEMA 3R

75 KVA, 480v-208/120v

TRANSFORMER 'TSB'

3P125A

T75

T75

(250 AMP)

'SB'

4

E1.3

200A/3P/3R

W/ 125A FUSES

KEY NOTES:

PROVIDE (1) 125A/3P BREAKER IN EXISTING SPACE.1

1

(EX)

(EX)

2

E1.3 4

E1.3

T75

(EX)

3

E1.3

10 kAIC

NEMA 4X

PRIMARY SUPPLY

XON

GROUNDING ELECTRODE SEE 250-30 (a) (3)

PROVIDE TYPE (1) OR (2) GROUNDING

ELECTRODE IF AVAILABLE WITHIN 20'-0", OR

PROVIDE A 3/4"x10'-0" COPPER GROUND ROD

CONNECTION TO ELECTRODE. CONNECT

GROUNDING ELECTRODE CONDUCTOR TO

GROUNDING ELECTRODE WITH LISTED

GROUND CLAMP. SEE 250-70.

BONDING JUMPER. SEE 250-92 (a) (2) AND

250-30 (a) (1).

GROUNDING ELECTRODE CONDUCTOR. SEE

250-62 FOR MATERIAL, 250-64 FOR

INSTALLATION, AND 250-66 FOR SIZE WHERE

250-30 (a) (3) ELECTRODE TYPE (1) OR (2) IS

USED, OR #4 CU. WHERE GROUND ROD IS

PROVIDED.

TRANSFORMER SEE ONE-LINE DIAGRAM FOR

SIZE AND TYPE.

PRIMARY FEEDER

GROUNDING CONDUCTOR

SEE ONE-LINE DIAGRAM FOR

SIZE

(D)

TYPICAL PLAN VIEW TRANSFORMER

(W)

ANCHOR BOLT

(TYP)

CONCRETE PAD PER

DETAIL

1/2" HILTI KB-TZ SS ANCHORS

W/ 3 5/8" MIN. EMBED IN EACH

CORNER OF TRANSFORMER.

TOTAL OF (4)

TRANSFORMER

NEOPRENE PAD.

LESS THAN 1/2" THICK.

T75 75 KVA (1) 2"C. 3 #1, 1 #6 GND (1) 3"C. 4 #250, 1 #4 GNDCOPPER

TRANSFORMER SIZING

75 32''KVA

WIDTH (W)

33''25''

HEIGHT

630 LBS.

WEIGTHDEPTH (D)

RATING CONDUCTOR PRIMARY SECONDARY

THREE PHASE TRANSFORMER FEEDER SCHEDULE

ID

5

E1.5

5" MIN. CONCRETE

EDGE DIST

1

GROUND BUS

SERVICE ENTRANCE DISCONNECTOR PANELBOARD

2" MIN

2" MIN

20'-0" MIN

GROUNDING CONDUCTOR SIZEEQUIPMENT AMPACITY

2001 - 4000 AMPS

1201 - 2000 AMPS

0 - 200 AMPS

201 - 400 AMPS

801 - 1200 AMPS

401 - 800 AMPS

#1/0 CU.

#4 CU.

#350 CU.

#250 CU.

#3/0 CU.

#2/0 CU.

GROUND SIZING SCHEDULE

MAIN AND EQUIPMENTBONDING JUMPER PERC.E.C. 250-80

SEE GROUNDING CONDUCTOR

SCHEDULE FOR SIZING

GROUNDING CONDUCTOR TO

TRANSFORMER.

GROUNDING CONDUCTOR

FROM MAIN SWITCH BOARD.

METAL UNDERGROUND WATER

PIPE C.E.C. 250-52(A)1

C.U. BOND TO METALLIC COLD

WATER PIPE, GAS PIPING,

STRUCTURAL STEEL AND FIRE

SPRINKLER SYSTEM PIPING PER

C.E.C. 250-104

#4 CONCRETE ENCASED COPPER

ELECTRODE PER C.E.C. 250-52(3).

SEE FEEDER SCHEDULE FOR SIZING

S

M

NO.E 14781

Exp. 6-30-2021

R

E

TATE 0F CA LIF0RN

IA

LECT

EG

ISTER

ERPR0FESSI0NAL

ENG

INE

ER

0N

ICA

G0ESE -HANS

EN

#20012

LACIR

N

BR

AD

LEE LAS

SI

NO. A-32437

LIC

ENS E D A RCH

I T

EC

T

R

EN. 02 - 28 - 21

ST

A

TE

O F CA L I F OR

NIA

CK

Y G

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5028009000

Keynotes:

Agency

Approval:

File No.: 37-C5

Facility:

ISSUE:

CONSTRUCTION DOCUMENTS

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 909 989 9979 / www.hmcarchitects.com

3546 Concours Street / Ontario, CA 91764

ONE-LINE DIAGRAM AND DETAILS

09/18/2018 5028013000

E1.3

GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT

CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019

NO SCALE E1.3

1ONE-LINE DIAGRAM

NO SCALE E1.3

2THREE PHASE TRANSFORMER GROUNDING

NO SCALE E1.3

4TRANSFORMER ANCHORAGE DETAIL

NO SCALE E1.3

3SERVICE ENTRANCE GROUNDING AND BONDING DETAIL

1 03/11/2021ADDENDUM 002

CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD

1

2 SETS OF: 1"C. WITH (2) CAT-5E CABLES

2"C. WITH (3) 10 Ga. 2 CONDUCTOR

SPEAKER CABLES

6 STRAND MM FIBER

OPTIC CABLE IN 1''C.

6 STRAND MM FIBER

OPTIC CABLE IN 1''C.

XLR CABLE

IN 1''C.

SCOREBOARD

GENERAL NOTES:

1. ALL FIBER, XLR CABLES, CAT-5E AND SPEAKER CABLES ARE

FURNISHED AND INSTALLED BY CONTRACTOR.

2. ALL CONDUITS ARE FURNISHED AND INSTALLED BY

CONTRACTOR.

3. COORDINATE ALL CABLE TERMINATION LOCATION AND

REQUIREMENT WITH SCOREBOARD VENDOR.

4. SEE SPECIFICATION 27 10 00 FOR FIBER, XLR, CAT-5E AND

SPEAKER CABLE INSTALLATION REQUIREMENTS.

KEY NOTES:

TERMINATE 6-STRAND MM FIBER OPTIC CABLE AT FIBER

OUTLETS AS REQUIRED. SEE SPECIFICATION 27 10 00 FOR

TERMINATION AND CONNECTOR TYPE.

TERMINATE XLR CABLE AT THE OUTLET AS REQUIRED.

FURNISHED AND INSTALLED BY CONTRACTOR.

PROVIDE 3/4" X 10'-0" COPPER GROUND ROD AND GROUND THE

SCOREBOARD AS REQUIRED.

TERMINATE (18) 2m WATERTIGHT ETHERNET CABLES AND (2) 4m

WATERTIGHT ETHERNET CABLES AT VIDEO MODULES ON BACK

OF THE SCOREBOARD AS REQUIRED. COORDINATE EXACT

TERMINATION LOCATIONS WITH SCOREBOARD VENDOR.

XLR CABLES AND FIBER OPTIC CABLES SHALL BE TERMINATED

AT THE DESIGNATED EQUIPMENT INSIDE THE REMOTE AMP RACK

AS REQUIRED.

TERMINATE ALL CAT-5E CABLES AND SPEAKER CABLES AT THE

SCOREBOARD VIDEO BOARD AND SOUND SYSTEM AS

REQUIRED. COORDINATE TERMINATION LOCATIONS WITH

SOOREBOARD VENDOR.

TERMINATE ALL CAT-5E CABLES AND SPEAKER CABLES AT AT

THE DESIGNATED EQUIPMENT INSIDE THE REMOTE AMP RACK AS

REQUIRED.

PROVIDE DUAL-GANG BOX AND FACEPLATE. SEE SPEC 27 10 00

FOR ADDITIONAL REQUIREMENTS.

1

2

3

CLIMATE CONTROLLED SCOREBOARD OUTDOOR

ENCLOSURE (BY SCOREBOARD VENDOR)

POWER RECEPTACLE

XLR OUTLETFIBER OUTLET

TRACK FIELD CONTROL STATION

PEDESTAL (NEMA 3R)

3

POWER RECEPTACLE

XLR OUTLET

SOCCER CONTROL STATION

PEDESTAL (NEMA 3R)

3

212

M P P M P P

8

E1.5

4

45

6

6

5

7

XLR CABLE

IN 1''C.

7

8

8

F

9

9FIBER OUTLET

1

F

9

1

1

1

1

1

1

1

OVERHEAD WHERE CONDUITS ENTER UNDERGROUND HANDHOLES, PROVIDE SIMILARTHIS DETAIL APPLIES TO ALL CONDUITS ENTERING BUILDINGS FROM UNDERGROUND OR

PROVIDE 'DYMO' LABEL ON CONDUITINDICATING CONDUIT ORIGINATION.

TOGETHER AND PROVIDE IDENTIFICATIONLABEL INDICATING TYPE OF SYSTEM AND

GROUP ALL COMMON CABLE TYPES

OTHER END LOCATION OF CABLE.

LABELING EXCEPT USE WATERPROOF LABELS.

HAND WRITTEN LABELS ARE2.

NOTE:

1.

NOT PERMITTED.

BLDG 'A'FROM

CONDUITS WHEN INSTALLINGCABLES BETWEEN BUILDINGS).

(PROVIDE (1) PULL ROPE INTO ALL

PROVIDE IDENTIFICATION LABELTO ALL PULL ROPES INDICATINGLOCATION OF OTHER END OF ROPE.SECURE LOOSE END TO CONDUIT.

DATABLDG 'A'

BLDG 'A'

TOGETHER AND PROVIDE IDENTIFICATIONGROUP ALL COMMON CABLE TYPES

OTHER END LOCATION OF CABLE.LABEL INDICATING TYPE OF SYSTEM AND

BLD

G 'A

'

USE WATERPROOF LABELS

BELL GUARDSCONDUIT

DAT

A

DAT

A

BLD

G 'B

'

CABLES SHALL NOT BE PULLED UNTIL CONDUIT BELL GUARDS HAVE BEEN PLACED.

TIE OFF PULL ROPES IN

AROUND INSIDE OF HANDHOLEPROVIDE CABLE SUPPORT

NOT PERMITTED

LOCATION OF OTHER END OF ROPE.

(PROVIDE (1) PULL ROPE INTO ALLCONDUITS WHEN INSTALLINGCABLES BETWEEN BUILDINGS).

TO ALL PULL ROPES INDICATINGPROVIDE IDENTIFICATION LABEL

HAND WRITTEN LABELS ARE

SECURE LOOSE END TO CONDUIT.

2.

NOTE:

1.

BLD

G B

AS SPECIFIED.

HANDHOLE

CONDUITS (TYP)UNDERGROUND

FIBER OPTIC BACKBONE CABLE

LABEL TO SHOWN QUANTITY OF MULTIMODE AND

SINGLE MODE FIBERS IN THE CABLE.

ROOM # MDF - ROOM # 'IDF' - 012MMF/012SMF

LABEL BOTH ENDS OF BACKBONE CABLES AND IN EACH ROOM IN WHICH THECABLE ROUTES THROUGH.

ROOM DESIGNATIONS SHOWN IN DETAIL ARE AN EXAMPLE AND MAY NOTREFLECT ACTUAL ROOM INFORMATION.

1.

NOTES:

2.

MINIMUM 14-PORT FONT, BOLD/ ALL

CAPS LETTERING

SIDE VIEWFRONT VIEW

IDF - 1300A3 A4

DO NOT EXCEED BENDRADIUS IN CONDUIT OR

CABLE IN BOX.MORE THAN 6'' OFSURFACE BOX. NO

PERMANENT LABEL INSTALLED

IDF - 1300A1 A2

WINDOW.UNDER IDENTIFICATION

FACEPLATE

WALL

ADHERED TO CABLE

TO REAR OF MODULARBRING CABLE JACKET

PERMANENT LABEL

TERMINATIONWITHIN 1'' OF

JACK

CONDUIT

ALL LABELING FORMATS

MUST BE APPROVED BY THE

DISTRICT IT DEPARMENT IN

WRITING PRIOR TO

INSTALLATION OF LABELS.

PROVIDE COLORED OUTLETSIN FACEPLATE

PROVIDE CAT-6 INSERTS TO

MATCH THE TYPE OF CABLE

INSTALLED.

GR

EEN

OR

ANG

E

BLUE

BLAC

K

SLATE

BR

OW

N

WHIT

E

RED

RO

SE

AQ

UA

VIO

LET

YELLO

W

FIBER CABLE

TAG

I.D.

CABLE

SHRINK WRAP

AT END OF

FIBER CABLE.

EXTERIOR OR

INTERIOR FIBER

STRAIN RELIEF

ATTACHMENT.

PROVIDE RUBBER GROMMET OR OTHER

TYPE OF PROTECTION FOR CABLE

WHERE IT ENTERS CABINET.

PROVIDE 24'' OF SLACK

BETWEEN END OF CABLE

AND FAN KIT.

FAN OUT KIT FOR ALL

STRANDS OF FIBER.

ATTACH KEVLAR TO

STRAIN RELIEF

POST.

VELCRO TIE WRAP AT

LEAST 9'' OF INDIVIDUAL

STRANDS.

NEATLY WRAP 24'' OF

INDIVIDUAL FIBERS

AROUND ROUTING

GUIDES.

MULTIMODE AND

SINGLE MODE BINDERS

TO BE INDENTIFIED AND

COLOR CODED INSIDE

FIBER PATCH

PANEL-BLUE FOR

SINGLE MODE AND

AQUA FOR MULTIMODE

FIBER TAG TO BE

WITHIN 12" OF

PANEL

INDIVIDUAL STRAND COLOR

AND NUMBER SHALL BE

SHOWN ON PANEL FRONT

LABEL FOR ALL CABLES

LABEL SHALL BE

MINIMUM 18

POINT FONT,

BOLD, ALL CAPS

AND MIN.

3 1/2" W x 2"H

S

M

NO.E 14781

Exp. 6-30-2021

R

E

TATE 0F CA LIF0RN

IA

LECT

EG

ISTER

ERPR0FESSI0NAL

ENG

INE

ER

0N

ICA

G0ESE -HANS

EN

#20012

LACIR

N

BR

AD

LEE LAS

SI

NO. A-32437

LIC

ENS E D A RCH

I T

EC

T

R

EN. 02 - 28 - 21

ST

A

TE

O F CA L I F OR

NIA

CK

Y G

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5028009000

Keynotes:

Agency

Approval:

File No.: 37-C5

Facility:

ISSUE:

CONSTRUCTION DOCUMENTS

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 909 989 9979 / www.hmcarchitects.com

3546 Concours Street / Ontario, CA 91764

SCOREBOARD/CONTROL STATION COMM./CONTROLWIRING DIAGRAM

09/18/2018 5028013000

E1.4

GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT

CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019

NO SCALE E1.4

1SCOREBOARD/CONTROL STATION COMM./CONTROL WIRING DIAGRAM

NO SCALE E1.4

2COMMUNICATION CABLE TYPICAL LABELING DETAIL

NO SCALE E1.4

3COMMUNICATION HANDHOLE LABELING DETAIL (TYP)

NO SCALE E1.4

4TYPICAL BACKBONE LABELING DETAILNO SCALE E1.4

5TYPICAL FACEPLATE LABELING DETAILNO SCALE E1.4

6TYPICAL FIBER TERMINATION DETAIL

1 03/11/2021ADDENDUM 002

CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD

1

17 1/

4'' (MIN)

12''(MIN.) SIDE KNOCK OUTS.

NOTE:

DOWN ASSEMBLY.

(1) PIECE STEEL CHECKER PLATELID WITH STAINLESS STEEL BOLT

10 5/8'' (MIN)

LIGHTING

ANCHORED INTO CONCRETE.ETCHED POLYETHYLENE FACE

HIGH DENSITY REINFORCEDCONCRETE WITH END AND

PROVIDE DESCRIPTION LABEL

"POWER",

"LIGHTING", "SIGNAL" OR "FIRE ALARM"

TO

MATCH CABLING SYSTEM INSTALLED

AT

EACH LOCATION.

WHERE LOCATED IN DRIVEABLE ARES USE:

"CHRISTY" #B1017 SERIES

"BES CONCRETE # C1017 SERIES

ALL OTHER AREAS USE:

"CHRISTY" #N9 SERIES

"BES CONCRETE" # C9E SERIES

2' X 3' ONE PIECE BOLT DOWN STEEL

COVER (GALV.) (SEE NOTE #1)

6'' MIN.

LIFTING HANDLE

2 PLCS.

6" TOP INCLUDES FRAME

HEIGHT

IDENTIFICATION SPOT PROVIDE LABEL

"POWER", "LIGHTING", "SIGNAL" OR "FIRE

ALARM" TO MATCH CABLING SYSTEM

INSTALLED AT EACH LOCATION.

12'' RISER

2 TON SWIFTLIFTS

2 EA. SIDE WALL

4 TOTAL (TYPICAL)

4" X 10" KNOCKOUTS

1 EA. SIDE WALL

2 TOTAL

8" X 11" KNOCKOUTS

1 EA. SIDE WALL

2 TOTAL

3'-0"2'-0"

1'-6"

"OLDCASTLE" - 3313 SERIES.

"SAN DIEGO PRECAST" - 3313 SERIES

"JENSEN PRECAST" - 2436 SERIES

OR EQUAL

NOTE:

1'-6"

PROVIDE "HS 20-44 TRAFFIC RATED" COVER

WITH LABEL INDICATING TRAFFIC RATING

WHEN HANDHOLE 15 LOCATED IN

DRIVEABLE AREA ALL OTHER "AREA SHALL

BE PARKWAY RATED"1

TOP OF BOX TO BE FLUSH

WITH FINISHED GRADE

24"

6"

KEY NOTES:

WHERE CONDUITS SERVE INCOMING AND OUTGOING CIRCUITSKEEP RISERS SEPARATED INSIDE PULLBOX TO ALLOW FORSLACK CONDUCTORS.

TOPS OF CONDUITS MUST NOT EXTEND INTO PULLBOX MORETHAN 1/3 OF THE TOTAL AVAILABLE INSIDE BOX HEIGHT. INORDER TO ALLOW ADEQUATE SPACE FOR CABLE SLACK.

3/8"-3/4"

COMPACTED

GRAVEL

PROVIDE 6" DIA

PERFORATED

DRAIN

PIPE EXTEND 6'-0"

BEYOND BOX IN

TWO DIRECTIONS IN

TRENCH.

BOTTOM

OF

TRENCH

2

1

1

2

2''

18''X18"

16''

10 1/2''

5 3/4'' INSIDE DIMENSION

13''

TRIM

22 1/2'' ADA

6''

(2) GFI RECEPTACLES

20 AMP, 120v

(2) FIBER OUTLETS

(1) XLR OUTLET

SEE SITE

PLAN

COLE LIGHTING#TL410-WCS-PED/ADA-CCPOWER PEDESTALCOLOR TO BE SELECTED BY ARCHITECTAT TIME OF SUBMITTAL

3000 PSI CONCRETE

#4 (V) NARS EA CORNER

(TOTAL 4) W/ #3 TIES @ 8" O.C.

1/2'' DIA. HILTI KB-TZ SS ANCHORS

@EA. CORNER W/3-5/8'' EMBED PER

ICC ESR-1917

4'' MIN. CONCRETE

EDGE DIST (TYP.)

3'' CLR (TYP.)

2"

12"

TO BE LEVELTOP OF PAD GRADE

#4 REINFORCING BARS 12" 2"

TYPICAL SECTION ELEVATION

TYPICAL (TYP.) GENERAL NOTES

(TYP.)

1.

5.

6.

4.

3.

2.

EQ.

EQ.

ALL CONCRETE SHALL ATTAIN A MINIMUMCOMPRESSIVE STRENGTH OF 3000 PSI AT 28DAYS. AS PER 1905A METHOD 'A' AND TABLE19A-A-8. BATCH PLANT INSPECTIONS AND TESTSOF CEMENT AND REINFORCING BARS MAY BEWAIVED PER CBC TITLE 24 SECTION 1705A.3.3.1 &1705A.3.3.2

CONCRETE MIX DESIGNS SHALL COMPLY WITHTITLE 24 SECTION 1905A.2.

PORTLAND CEMENT SHALL CONFORM TO (ASTMC-150) TYPE I OR II

CONCRETE AGGREGATES SHALL CONFORM TOASTM C-33

CONCRETE PLACEMENT SHALL CONFORM TOTITLE 24 SECTION 1905A.7.

ALL REINFORCING BARS SHALL CONFORM TOTITLE 24 SECTION 1903A AND ASTM A-615 GRADE60.

6" M

IN. 6''

POWER CONDUITS ON BOTTOM

(EA. SIDE)

2'' SAND BASE

3'' MIN.

18''MIN.

12"

MIN.6''

UNDISTURBED EARTH

WARNING TAPE

MIN. 3'' DEEP (2) SACK CONCRETE SLURRY.

BACKFILL WITH SAND OR

(2) SACK CONCRETE SLURRY.

PROVIDE MIN. 6''

SEPARATION BETWEEN

POWER AND ALL

OTHER CONDUITS AT

ALL HORIZONTAL AND

CROSSING LOCATIONS

COMMUNICATION

AND CONTROL

CONDUITS ON TOP

OR ON SIDE OF

POWER CONDUITS

PROVIDE "CARLON" SNAP-LOC DUCT

SPACER SYSTEM (OR EQUAL), FOR

VERTICAL AND HORIZONTAL CONDUIT

SPACING. PROVIDE AT MAXIMUM 10'-0" ON

CENTER.

ELECTRICAL CONDUITS SEE SITE

PLAN FOR QUANTITY.

SELECTED BACKFILL FREE OF LARGE

DEBRIS AND COMPACTED TO 90%

RELATIVE DENSITY

NEW ASPHALT OR CONCRETE PAVING

MATCH EXISTING. (WHERE

APPLICABLE.)

PAVING BASE (WHERE APPLICABLE.)

BACKFILL TO MATCH

EXISTING GRADE AT

LANDSCAPED AREAS.

24"

MIN.

IN

VEHICULAR

AREA

1

BOTTOM PLATE

FINISH FLOOR

PVC

PVC

PVC

PV

C

PV

C

PV

C

12'' M

IN.

PR

GS

PULL ROPE

MAX.18''

LC

EM

T

PVC = SCHEDULE 40 P.V.C. CONDUIT

PRGS = PVC COATED RIGID STEEL CONDUIT

EMT = ELECTRICAL METALLIC CONDUIT

PVC OR FLEXIBLE METAL CONDUIT MAY

NOT BE SUBSTITUTED FOR EMT, FROM

AN UNDERGROUND FEEDER TO THE

FIRST WIRING DEVICE WHERE THAT

DEVICE EXCEEDS +18'' A.F.F.

ALL EXTERIOR

EXPOSED

LOCATIONS.FINISHED

GRADE

BRANCH CIRCUIT

OR COMMUNICATION

CONDUIT

CONC. BLDG.

SLAB OR

FOOTING

FEEDER OR SITE

CONDUITS

PROVIDE METAL

SUPPORT TO KEEP

CONDUITS

VERTICAL UNTIL

FRAMING IS

COMPLETE.

ALL SPARE CONDUITS TO BE

PROVIDED WITH PVC CAP.

PROVIDE EYE BOLT SECURED

THRU TOP OF CAP TO TIE OFF

PULL ROPE.

CONDUIT I.D. PER

SPECIFICATIONS

DEV

ICE

BO

X

DEV

ICE

BO

X

DEV

ICE

BO

X

PROVIDE ''CPI # 10622-010'' GROUND BAR ASSEMBLY OR EQUAL.

GROUNDING LUG ORTERMINAL CONNECTION

3/8" LOCK WASHER

3/8" NC x 3/4" HHCS

COPPER BAR

4''

10''

TO ADDITIONAL

CABINET OR

RACKS AS

EQUIPMENT

# 6 GROUND

FRAME.

PROVIDE PLASTIC SURFACE MOUNTBOX ''HUBBELL'' # WT-DEEP SERIES OR EQUALSINGLE OR DOUBLE GANG TO MATCHOUTLET. MOUNT OVER EXISTING

REMOVE SIDE KNOCKOUT FORFOR GROUNDING CONDUCTOR ACCESS.

NOTE:

INSULATOR

SUPPORTBRACKET

RECESSED OUTLET BOX.

1/4"

CONNECT TO EXISTING GROUNDINGCONDUCTOR AT RECESSED BOX

RECEPTACLESRECONNECT TO EXISTINGCIRCUIT AS REQUIRED.

''HUBBELL'' FACEPLATE (OR EQUAL).PROVIDE NEW MATCHING

LOCAL POWER

# 8 GROUNDINGCONDUCTOR

AS REQUIRED.

ALL EQUIPMENT AND LABOR SHOWN TO BE

FURNISHED AND INSTALLED BY SCOREBOARD

VENDOR COORDINATE WITH PROJECT

ELECTRICAL CONTRACTOR AS REQUIRED.

REQUIRED.

NOTE: MOUNT GROUND BUS BAR TO PLYWOOD BACKBOARD

WITH (4) 1'' X 1/4'' WOOD SCREWS AT MOUNTING HOLES IN

SUPPORT BRACKETS.

1

1

1

S

M

NO.E 14781

Exp. 6-30-2021

R

E

TATE 0F CA LIF0RN

IA

LECT

EG

ISTER

ERPR0FESSI0NAL

ENG

INE

ER

0N

ICA

G0ESE -HANS

EN

#20012

LACIR

N

BR

AD

LEE LAS

SI

NO. A-32437

LIC

ENS E D A RCH

I T

EC

T

R

EN. 02 - 28 - 21

ST

A

TE

O F CA L I F OR

NIA

CK

Y G

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5028009000

Keynotes:

Agency

Approval:

File No.: 37-C5

Facility:

ISSUE:

CONSTRUCTION DOCUMENTS

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 909 989 9979 / www.hmcarchitects.com

3546 Concours Street / Ontario, CA 91764

ELECTRICAL DETAILS

09/18/2018 5028013000

E1.5

GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT

CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019

NO SCALE E1.5

1UNDERGROUND PULLBOX STYLE 'A'NO SCALE E1.5

2UNDERGROUND PULLBOX STYLE 'B'NO SCALE E1.5

3UNDERGROUND PULLBOX STYLE 'A' OR 'B' TYP. INSTALLATION

NO SCALE E1.5

4POWER PEDESTALNO SCALE E1.5

5TYPICAL HOUSEKEEPING PAD DETAILNO SCALE E1.5

6TYPICAL TRENCH DETAIL

NO SCALE E1.5

7TYPICAL CONDUIT DETAILNO SCALE E1.5

8CABINET GROUNDING DETAIL

1 03/11/2021ADDENDUM 002

CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD

1