BID B20.002
CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS
PHASE II - SCOREBOARD
ADDENDUM NO. 2
DATE ISSUED: MARCH 11, 2021
Page 1 of 3
The following clarifications, amendments, additions, deletions, revisions and/or modifications form a part of the
CONTRACT DOCUMENTS, and change the original or previous documents only in the manner and to the
extent stated. THE CONTRACT PRICE SHALL REFLECT ALL ADDENDUM CHANGES.
ITEM # PAGE/DRAWING DESCRIPTION
Bid Package Changes / Corrections / Additions:
1.01 Bid opening date and time has been changed to Tuesday, March 23, 2021 at 2:00 p.m. at
Grossmont College District Annex South Building.
1.02 NARRATIVE OF REVISIONS for attached drawings.
The following changes, additions, deletions, or corrections shall become a part of the
Contract Documents for the project named above and all other conditions shall remain
the same. The bidders shall be responsible for reviewing and transmitting listed and non-
listed information/revised documents as a whole to all affected subcontractors and
suppliers prior to the closing of bids. Acknowledge receipt of this Addendum in spaces
provided on the Bid Form. Failure to acknowledge will subject Bidder to
disqualification.
DRAWINGS
Item No. A-002: Reference Revised Drawings (drawings). Please note that
Addendum #2 is referenced on the drawings as delta 1.
A. The following new full-sized drawings are hereby issued:
A1.10 SITE PLAN – DEMOLITION
• Scope added to relocate existing storage bin and contents for the
duration of the project. Contents to be moved by the College.
E1.2 ENLARGED PLANS
• Notes revised to clarify contractor responsibilities.
E1.3 ONE-LINE DIAGRAM AND DETAILS
• Removed aluminum from feeder schedule.
E1.4 SCOREBOARD/CONTROL STATION COMM./CONTROL
WIRIING DIAGRAM
• Revised notes to clarify scope.
E1.5 ELECTRICAL DETAILS
BID B20.002
CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS
PHASE II - SCOREBOARD
ADDENDUM NO. 2
DATE ISSUED: MARCH 11, 2021
Page 2 of 3
• Revised notes to explicitly indicate ‘or equal’ provision for selected
items.
1.03 CLARIFICATIONS
1. Question: How/where will the new drinking fountain drain to?
a. Answer: Existing drinking fountain is to be demolished. Connect new drinking
fountain drain to existing drinking fountain drain line.
2. Question: Does the campus have stockpiled material for our use to fill the existing
bioswale?
a. Answer: The College does not have stockpiled soil material that is suitable for use on
this project.
3. Question: In pursuing qualified bidders for the Cuyamaca Track and Field
Improvements Phase II Scoreboard, “The Information Required by Bidders” (page 4-5) refers to qualifications of bidders, of installation related to score boards and commissioning. Beyond the site work preparation, structural installation and electrical connectivity for the scoreboard- the actual scoreboard, integration thereto and commissioning will be performed by a scoreboard specialty installer, subcontracted to a GC. Will the district consider for qualification experience, a subcontractor installer with experience in the scoreboard installations, as part of the General Contractor’s overall experience requirement?
a. Answer: In order to meet the qualification requirements set forth in The Information
Required of Bidders, the General Contractor (Contractor) must have managed at least
one project in the last (5) years where a scoreboard has been installed and
commissioned. Please refer to the project Specification section 11 68 45 for additional
qualification requirements.
4. Question: Confirm aluminum feeder conductors are allowed. Spec 26 05 19 2.1.2 allows per the feeder schedule if shown. Schedule in detail 4/E1.3 includes aluminum.
a. Answer: Aluminum conductors are not permitted.
5. Question: In reference to drawing E1.2 detail 4 states Scoreboard by others. Please
clarify.
a. Answer: Note revised in Addendum 002.
6. Question: In reference to drawing E1.2 detail 4 states Climate Controlled Enclosure by
others. Please clarify.
a. Answer: Note revised in Addendum 002.
BID B20.002
CUYAMACA COLLEGE TRACK & FIELD IMPROVEMENTS
PHASE II - SCOREBOARD
ADDENDUM NO. 2
DATE ISSUED: MARCH 11, 2021
Page 3 of 3
7. Question: Per Specification 321216 Asphalt Concrete I did not see anywhere on plans
that this is shown. Please clarify.
a. Answer: No asphalt concrete required for current scope.
8. Question: Per Specification 034800 Precast Concrete Specialties part 3.07 Schedule it
refers to splash blocks. Please provide where these are shown on plans.
a. Answer: No concrete specialties required for current scope.
9. Question: Per Specification 055000 Metal Fabrications part 3.6 Schedule items C, D, E,
F, G, H, I are not shown anywhere on plans. Please clarify.
a. Answer: Specifications indicated for ferrous metal items are not applicable if such
items are not indicated in the drawing set.
10. Question: Per Specification 055214 Site Metal Fabrications part 1.01 Work Included
talks about handrails and miscellaneous metal items from landscape drawings. None are shown. Please clarify.
a. Answer: No site metals are required for current scope.
1.04 BID DOCUMENTS
The following document sections of the Bid Documents to be re-issued, replaced, or added in Addendum No. 2:
DOCUMENT DESCRIPTION
Exhibit E: Master Schedule (re-issued)
1.05 Reminder: Acknowledge receipt of Addendum 1 on your bid form.
Reminder: Acknowledge receipt of Addendum 2 on your bid form.
END OF DOCUMENT
GROSSMONT–CUYAMACA COMMUNITY COLLEGE DISTRICT
B20.002 – CUYAMACA COLLEGE TRACK AND FIELD
IMPROVEMENTS PH. II – SCOREBOARD
EXHIBIT E
EXHIBIT E
Master Schedule CUYAMACA COLLEGE TRACK AND FIELD IMPROVEMENTS
PH. II – SCOREBOARD
Advertisement #1 Tues., February 09, 2021
Advertisement #2 Tues., February 16, 2021
Non-mandatory Pre-Bid Meeting and Job
Walk Mon., February 22, 2021 @ 2:00 p.m.
Last Day for DVBE Advertisement Tues., March 02, 2021
Deadline to Submit Request for Substitutions Fri., March 05, 2021
Last Day for Questions Tues., March 16, 2021
Last Day for Addendum Thurs., March 18, 2021
Bid Opening Tues., March 23, 2021 @ 2:00 p.m.
Notice to Bidders of Intent to Award Tues., March 30, 2021
Award Letter (anticipated) Tues., April 13, 2021
Signed Contract/Insurance/Contractor Bond to
GCCCD Purchasing Fri., April 23, 2021
Notice to Proceed (anticipated) Fri., May 07, 2021
Pre-Construction Meeting (anticipated) Mon., May 10, 2021
Start of Construction (anticipated) Tues., May 11, 2021
Project Completion (including all punch list items)
Fri., October 08, 2021
Note #1: Non-mandatory Pre-Bid Meeting and Job Walk is required for all prospective
bidders to attend. Costs associated with on-time delivery and installation of all
construction items including any long lead items in order to comply with the above
schedule are to be included in the bid. The overall project duration shall be for 155
consecutive calendar days. The calendar days specified herein includes 5 calendar day(s)
for anticipated inclement weather.
TRACK/SOCCER FIELDDSA #04-051197
BUSINESS & SCIENCE BLDG
CENTRAL PLANT
BLDG OVERHANG
BUSINESS & SCIENCE BLDG
ACCESSIBLE RESTROOMS A# 04-109108
A1.10
2
TENNIS COURTSDSA #04-051197
TYP.
02.40
02.15
02.01
02.42
02.43
ACCESS ROAD
ACCESS ROAD
TYP.
02.53
TYP.
02.54
PARKING LOTDSA #04-051197
SLOPED WALK
02.48
TYP.
02.56
TYP.
02.21
RAMP
21
' -
7"
Legend:
AREA OF DEMOLITION
(E) BUILDINGS / STRUCTURES
1. REFER TO SHEET G0.11 FOR TYPICAL SYMBOLS AND ABBREVIATIONS
02.01
02.56
PARKING LOT
02.01
02.06
02.40
02.47
02.40
02.20
02.22
02.17
02.21
Notes:
BR
AD
LEE LASS
I
NO. A-32437
LI C
E NS ED A RCH I T
EC
T
REN . 02 - 28 - 21
ST
A
TE
O F CA L I F OR
NI A
CK
Y G
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
Please Recycle
5028009000
Keynotes:
Agency
Approval:
File No.: 37-C5
Facility:
ISSUE:
CONSTRUCTION DOCUMENTS
Project:
Sheet Title:
Date: Client Project No:
Sheet:
No. Issued Date No. Issued Date
T 909 989 9979 / www.hmcarchitects.com
3546 Concours Street / Ontario, CA 91764
CUYAMACA COLLEGE SCOREBOARD
SITE PLAN - DEMOLITION
10/29/2020 5028014100
A1.10
GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT
CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYEL CAJON, CA 92019
N:\Projects\5028 Grossmont-Cuyamaca CCD\013_Student Center Renovation\06 BIM CAD\03 REVIT
1" = 30'-0"
1SITE PLAN - DEMO
NO. Note - Detail
02.01 (E) CONCRETE PAVING
02.06 (E) LANDSCAPING TO REMAIN
02.15 (E) SHED
02.17 (E) DRINKING FOUNTAIN TO BE REMOVED
02.20 (E) LIGHT POST - PROTECT IN PLACE
02.21 (E) CONC. CURB TO REMAIN - PROTECT IN PLACE
02.22 (E) UTILITY PANEL ON PEDESTAL - PROTECT IN PLACE
02.40 (E) CONCRETE PAVING TO BE REMOVED
02.42 (E) CHAINLINK FENCE AND FOOTING TO BE REMOVED
02.43 (E) RETENTION BASIN TO BE REMOVED. SEE CIVIL DWG C3.01FOR ADDITIONAL INFO
02.47 (E) LANDSCAPE, ROCK, ETC TO BE REMOVED FOR (N)CONCRETE PAVING
02.48 REMOVE (E) TRUNCATED DOMES
02.53 (E) PARKING STRIPING TO REMAIN
02.54 (E) WHEEL STOP TO REMAIN
02.56 (E) CHAINLINK FENCE TO REMAIN
N
1/4" = 1'-0"
2ENLARGED SITE PLAN - SIDEWALK
N
11/4/2020
DSAD E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECT
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT
APP: INC:REVIEWED FOR
SS FLS ACS
DATE:
✔ ✔ ✔
04-119355
11/12/2020
CUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD
STORAGE CONTAINER NOTES
1. RELOCATE (E) 40-FT STORAGE CONTAINER AND
CONTENTS PRIOR TO START OF CONSTRUCTION
ACTIVITES TO ALTERNATE TEMPORARY LOCATION
ON CAMPUS.
2. TEMPORARY LOCATION OF STORAGE CONTAINER
TO BE COORDINATED WITH COLLEGE.
3. UPON COMPLETION OF CONSTRUCTION
ACTIVITES, (E) STORAGE CONTAINER AND
CONTENTS SHALL BE RETURNED TO ORIGINAL
LOCATION.
1 03/11/2021ADDENDUM 002
1
1. RELOCATE (E) 40-FT STORAGE CONTINER PRIOR
TO START OF CONSRUCTION ACTIVITIES TO
ALTERNATE TEMPORARY LOCATION ON CAMPUS.
CONTENTS TO BE REMOVED BY COLLEGE PRIOR TO
RELOCATION.
2. TEMPORARY LOCATION OF STORAGE CONTAINER
TO BE COORDINATED WITH COLLEGE.
3. UPON COMPLETION OF CONSTRUCTION
ACTIVITES, (E) STORAGE CONTAINER SHALL BE
RETURNED TO ORIGINAL LOCATION. CONTENTS OF
STORAGE CONTAINER, OFOI.
1
E
CO
TRENCH
CENTRAL PLANT
ACCESS ROAD
J
J
J
SEE E1
.1
FIRE ALARM
POWER
COMM.
(EX) DUCT WORK
(EX) MAIN DISTRIBUTION SWITCHBOARD 'MSB'
(EX) IDF CABINET
(EX) FIRE ALARM TERMINAL CABINET(1) 1-1/4''C. (FIRE ALARM)
(1) 1-1/4''C. (FUTURE FIRE ALARM)
(2) 1-1/4''C. (FUTURE COMM.)
(1) 1''C. (FUTURE SCOREBOARD COMM.)(1) 1-1/4''C. (FUTURE FIRE ALARM)
(2) 1-1/4''C. (FUTURE COMM.)
(1) 1''C. (FUTURE SCOREBOARD COMM.)
(1) 1-1/2''C. (XFMR 'TSB' POWER)
(1) 2''C. (FUTURE POWER)
(1) 1-1/4''C. (FUTURE FIRE ALARM)
(2) 1-1/4''C. (FUTURE COMM.)
(1) 1''C. (FUTURE SCOREBOARD COMM.)
(1) 1-1/2''C. (XFMR 'TSB' POWER)
(1) 2''C. (FUTURE POWER)
NOTE:
1. CORE DRILLING REQUIRED THROUGH
CONCRETE WALLS AT THIS BUILDING.
MIN. (3) LOCATIONS. ALL OPENINGS
SHALL BE PROPERLY SEALED.
CENTRAL PLANT
BUILDING
MOUNT J-BOX AS HIGH
AS POSSIBLE (TYP.)
SCOREBOARD
KEYNOTES:
1-1/2''C. (POWER TRANSFORMER 'TSB')
1-1/4''C. (POWER CONTROL STATION), 3 #2, 1 #8 GND.
(1) 1''C. (FIBER CONTROL STATION)
(1) 1''C. (SOUND CONTROL STATION)
(1) 1''C. (FUTURE SCOREBOARD COMMUNICATIONS)
(1) 1-1/4''C. (POWER), 3 #4, 1 #8 GND.
(1) 1''C. (FIBER CONTROL STATION)
(1) 1''C. (SOUND CONTROL STATION)
EXTEND POWER CONNECTION TO SCOREBOARD AS REQUIRED.
VIDEO BOARD A3,B3,C3,D3,E3,F3: 3/4''C., 3 #12, 1 #12 GND. ('SB'-2,4)
VIDEO BOARD F2,G2,G3,C2,D2,E2: 3/4''C., 2 #12 (HOT), 1 #10 (NEUTRAL), 1 #12 GND. ('SB'-6,8)
VIDEO BOARD A1,A2,B2,B1,C1,D1,E1,F1,G1: 3/4''C., 3 #12 (HOT), 1 #10 (NEUTRAL), 1 #12 ('SB'-10,12,14)
SCOREBOARD: 3/4''C., 2 #12, 1 #12 GND. ('SB'-16)
3/4"C. (SPARE)
VERIFY VIDEO BOARD AND SCOREBOARD POINT OF CONNECTIONS WITH SCOREBOARD VENDOR
PRIOR TO INSTALLING CONDUITS AND CONDUCTORS. EXTEND ALL POWER CONNECTIONS TO
SCOREBOARD AND VIDEO BOARD AS REQUIRED.
3/4''C., 4 #12 (HOT), 2 #10 (NEUTRAL), 1 #12 (GROUND)
('SB'-1,3 @ QUAD RECEPTACLE #1)
('SB'-5,7 @ QUAD RECEPTACLE #2)
(2) 1''C. (CAT-5E)
(1) 2''C. (SPEAKER CABLE)
EXTEND CAT-5E AND SPEAKER CABLE CONNECTION TO SCOREBOARD AS REQUIRED.
QUAD RECEPTACLE SHALL BE INSTALLED INSIDE THE ENCLOSURE.
PROVIDE 3/4"X10'-0" COPPER GROUND ROD AND GROUND THE SCOREBOARD AS REQUIRED. FIELD
VEIRFY EXACT LOCATION OF GROUND LUG AT THE SCOREBOARD AND EXTEND MIN. #4 SOLID COPPER
GROUNDING CONDUCTOR IN 3/4" GRC. TO GROUND ROD AS REQUIRED.
1
2
3
4
T
SEE E1.1
TRANSFORMER 'TSB'
TRANSFORMER PRIMARY
DISCONNECT SWITCH
SEE E1.1
PANEL 'SB'
1
3
2
CLIMATE CONTROLLED SCOREBOARD
OUTDOOR ENCLOSURE
3''C.
1-1/2''C.
1-1/2''C. (XFMR 'TSB' POWER)
1''C. (SCOREBOARD FUTURE COMM.)
(2) 1''C. (CONTROL)
'SB'-1,3,5,7
5
6
1
E1.6
6
7
7
8
4
HOUSEKEEPING PAD5
E1.5
8
(2) 1''C. (CONTROL)
1,35,7
1-1/4''C. (CONTROL STATION POWER),
3 #4, 1 #8 GND.
1-1/4''C. (CONTROL STATION POWER),
3 #2, 1 #8 GND.
9
9
9' -
3"
3' - 7"
1
1
1
1-1/4''C. (POWER), 3 #4, 1 #8 GND
(1) 1''C. (FIBER)
(1) 1''C. (SOUND)
SEE E1.1
4
E1.5
KEYNOTES:
FIELD VERIFY EXACT LOCATION PRIOR TO ROUGH-IN.
COORDINATE WITH ARCHITECT AND DISTRICT STAFF.
ALL CONDUITS SHALL STUB INTO PEDESTAL DESIGNATED
CONDUIT STUB UP AREA.
1
1
PEDESTAL
2
M F
2
9 11
1
SEE E1.1
4
E1.5
1-1/4''C. (POWER), 3 #2, 1 #8 GND.
(1) 1''C. (FIBER)
(1) 1''C. (SOUND)
KEYNOTES:
FIELD VERIFY EXACT LOCATION
PRIOR TO ROUGH-IN. COORDINATE
WITH ARCHITECT AND DISTRICT STAFF.
ALL CONDUITS SHALL STUB INTO
PEDESTAL DESIGNATED CONDUIT
STUB UP AREA.
1
1
PEDESTAL
MF15
13
2 2
21
1
E1.3
1
E1.4
S
M
NO.E 14781
Exp. 6-30-2021
R
E
TATE 0F CA LIF0RN
IA
LECT
EG
ISTER
ERPR0FESSI0NAL
ENG
INE
ER
0N
ICA
G0ESE -HANS
EN
#20012
LACIR
N
BR
AD
LEE LAS
SI
NO. A-32437
LIC
ENS E D A RCH
I T
EC
T
R
EN. 02 - 28 - 21
ST
A
TE
O F CA L I F OR
NIA
CK
Y G
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
Please Recycle
5028009000
Keynotes:
Agency
Approval:
File No.: 37-C5
Facility:
ISSUE:
CONSTRUCTION DOCUMENTS
Project:
Sheet Title:
Date: Client Project No:
Sheet:
No. Issued Date No. Issued Date
T 909 989 9979 / www.hmcarchitects.com
3546 Concours Street / Ontario, CA 91764
ENLARGED PLANS
09/18/2018 5028013000
E1.2
GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT
CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019
1/8" = 1'-0"1
CENTRAL PLANT BLDG. PLAN
1/4" = 1'-0"4
SCOREBOARD PLAN1/4" = 1'-0"
3SOCCER CONTROL PLAN
1/4" = 1'-0"2
TRACK AND FIELD CONTROL PLAN
GENERAL NOTES:
1. SEE ONE-LINE DIAGRAM FOR FEEDER SIZE
2. SEE SCOREBOARD/CONTROL WIRING DIAGRAM FOR
COMMUNICATIONS WIRING REQUIREMENTS.
3. SEE E1.5 FOR TYPICAL TRENCH DETAIL AND CONDUIT
INSTALLATION DETAIL.
1 03/11/2021ADDENDUM 002
ARD
1
CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD
1
600V FEEDER SCHEDULE LEGEND
T75 "T" INDICATES TYPICAL TRANSFORMER FEEDER
REFERENCE. THE NUMBER INDICATES
TRANSFORMER TYPE.
REFER TO SCHEDULE ON SHEET
FOR SIZE REQUIRED.
1. ALL CONDUCTOR SHALL BE PROVIDED WITH TYPE THWN-2 INSULATION.REFERENCE SPECIFICATION SECTION 26 05 19 (16120) FOR ADDITIONALREQUIREMENTS.
PROVIDE 60 DEGREE COPPER/ALUMINUM RATED TERMINATION FOR ALLFEEDERS SIZED WITH #2 OR SMALLER CONDUCTORS. PROVIDE 75 DEGREECOPPER/ALUMINUM RATED TERMINATIONS FOR ALL FEEDERS SIZED WITH #1OR LARGER CONDUCTORS.
CONTRACTOR SHALL BE RESPONSIBLE FOR ORDERING LUG CONFIGURATIONAN ALL EQUIPMENT, BREAKER OF DISCONNECTS TO MATCH FEEDERCONFIGURATIONS INDICATED.
WHERE MULTIPLE CONDUIT QUANTITIES ARE INDICATED, CONDUCTORQUANTITIES AND SIZES SHOWN IN SCHEDULE SHALL BE PROVIDED IN EACHCONDUIT.
2.
3.
4.
I.D.
2A
2B
3A
3B
4A
4B
5A
5B
6A
6B
7A
7B
8A
8B
9A
9B
10A
10B
12A
12B
15A
15B
17A
17B
20A
20B
22A
22B
25A
25B
30A
30B
35A
35B
40A
40B
45A
45B
50A
50B
60A
60B
70A
70B
80A
80B
100B
120B
160B
200B
250B
300B
350B
400B
600Volt Feeder ScheduleType
.
.
Ampacity
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
125
125
150
150
175
175
200
200
225
225
250
250
300
300
350
350
400
400
450
450
500
500
600
600
700
700
800
800
1000
1200
1600
2000
2500
3000
3500
4000
Copper
Conduit
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(3)
(3)
(3)
(3)
(4)
(4)
(5)
(6)
(7)
(8)
(12)
(12)
3/4"
3/4"
3/4"
3/4"
1"
1"
1"
1"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
2"
2"
2"
2"
2"
2"
3"
3"
3"
3"
3"
3"
3"
3"
2"
2"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
4"
4"
4"
4"
4"
4"
4"
Conductors
3 # 12, 1# 12 Gnd
4 # 12, 1# 12 Gnd
3 # 10, 1# 10 Gnd
4 # 10, 1# 10 Gnd
3 # 8, 1# 10 Gnd
4 # 8, 1# 10 Gnd
3 # 6, 1# 10 Gnd
4 # 6, 1# 10 Gnd
3 # 4, 1# 8 Gnd
4 # 4, 1# 8 Gnd
3 # 4, 1# 8 Gnd
4 # 4, 1# 8 Gnd
3 # 3, 1# 8 Gnd
4 # 3, 1# 8 Gnd
3 # 2, 1# 8 Gnd
4 # 2, 1# 8 Gnd
3 # 1, 1# 6 Gnd
4 # 1, 1# 6 Gnd
3 # 1, 1# 6 Gnd
4 # 1, 1# 6 Gnd
3 # 1/0, 1# 6 Gnd
4 # 1/0, 1# 6 Gnd
3 # 2/0, 1# 6 Gnd
4 # 2/0, 1# 6 Gnd
3 # 3/0, 1# 4 Gnd
4 # 3/0, 1# 4 Gnd
3 # 4/0, 1# 4 Gnd
4 # 4/0, 1# 4 Gnd
3 # 250, 1# 4 Gnd
4 # 250, 1# 4 Gnd
3 # 350, 1# 4 Gnd
4 # 350, 1# 4 Gnd
3 # 2/0, 1# 2 Gnd
4 # 2/0, 1# 2 Gnd
3 # 3/0, 1# 2 Gnd
4 # 3/0, 1# 2 Gnd
3 # 4/0, 1# 2 Gnd
4 # 4/0, 1# 2 Gnd
3 # 250, 1# 2 Gnd
4 # 250, 1# 2 Gnd
3 # 350, 1# 1 Gnd
4 # 350, 1# 1 Gnd
3 # 4/0, 1# 1/0 Gnd
4 # 4/0, 1# 1/0 Gnd
3 # 300, 1# 1/0 Gnd
4 # 300, 1# 1/0 Gnd
4 # 250, 1# 2/0 Gnd
4 # 350, 1# 3/0 Gnd
4 # 400, 1# 4/0 Gnd
4 # 500, 1# 250 Gnd
4 # 500, 1# 350 Gnd
4 # 500, 1# 350 Gnd
4 # 350, 1# 400 Gnd
4 # 400, 1# 400 Gnd
Aluminum
Conduit
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(3)
(3)
(3)
(3)
(4)
(4)
(5)
(6)
(7)
(8)
(12)
(12)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
2"
2"
2"
2"
2"
2"
3"
3"
3"
3"
3"
3"
3"
3"
2"
2"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
4"
4"
4"
4"
4"
4"
4"
Conductors
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
3 # 2/0, 1# 3 Gnd
4 # 2/0, 1# 3 Gnd
3 # 3/0, 1# 3 Gnd
4 # 3/0, 1# 3 Gnd
3 # 4/0, 1# 3 Gnd
4 # 4/0, 1# 3 Gnd
3 # 250, 1# 2 Gnd
4 # 250, 1# 2 Gnd
3 # 300, 1# 2 Gnd
4 # 300, 1# 2 Gnd
3 # 350, 1# 2 Gnd
4 # 350, 1# 2 Gnd
3 # 500, 1# 2 Gnd
4 # 500, 1# 2 Gnd
3 # 4/0, 1# 1 Gnd
4 # 4/0, 1# 1 Gnd
3 # 250, 1# 1/0 Gnd
4 # 250, 1# 1/0 Gnd
3 # 300, 1# 1/0 Gnd
4 # 300, 1# 1/0 Gnd
3 # 350, 1# 1/0 Gnd
4 # 350, 1# 1/0 Gnd
3 # 500, 1# 2/0 Gnd
4 # 500, 1# 2/0 Gnd
3 # 300, 1# 3/0 Gnd
4 # 300, 1# 3/0 Gnd
3 # 500, 1# 3/0 Gnd
4 # 500, 1# 3/0 Gnd
4 # 400, 1# 4/0 Gnd
4 # 500, 1# 250 Gnd
4 # 600, 1# 350 Gnd
4 # 600, 1# 400 Gnd
4 # 750, 1# 600 Gnd
4 # 750, 1# 600 Gnd
4 # 500, 1# 600 Gnd
4 # 600, 1# 750 Gnd
1.
2.
GENERAL NOTES:
UNLESS WHERE OTHERWISE NOTED. ALL WORKINDICATED ON THESE DRAWINGS SHALL BECONSIDERED NEW WORK.
ALL ELECTRICAL GEAR AND EQUIPMENT SHOWN ON ONE-LINEDIAGRAM SHALL BE NEMA 1 UNLESS OTHERWISE NOTED.
NO
T A
PP
LIC
AB
LE
600V FEEDER SCHEDULE GENERAL NOTES:
M
(EX) 2500A, 277/480v, 3PH,4W, 'SQUARE D' SWITCHBOARD 'MSB', 65 kAIC,
PANEL
DISTRIBUTION SECTION
2500/3PMAIN
NEMA 3R
75 KVA, 480v-208/120v
TRANSFORMER 'TSB'
3P125A
T75
T75
(250 AMP)
'SB'
4
E1.3
200A/3P/3R
W/ 125A FUSES
KEY NOTES:
PROVIDE (1) 125A/3P BREAKER IN EXISTING SPACE.1
1
(EX)
(EX)
2
E1.3 4
E1.3
T75
(EX)
3
E1.3
10 kAIC
NEMA 4X
PRIMARY SUPPLY
XON
GROUNDING ELECTRODE SEE 250-30 (a) (3)
PROVIDE TYPE (1) OR (2) GROUNDING
ELECTRODE IF AVAILABLE WITHIN 20'-0", OR
PROVIDE A 3/4"x10'-0" COPPER GROUND ROD
CONNECTION TO ELECTRODE. CONNECT
GROUNDING ELECTRODE CONDUCTOR TO
GROUNDING ELECTRODE WITH LISTED
GROUND CLAMP. SEE 250-70.
BONDING JUMPER. SEE 250-92 (a) (2) AND
250-30 (a) (1).
GROUNDING ELECTRODE CONDUCTOR. SEE
250-62 FOR MATERIAL, 250-64 FOR
INSTALLATION, AND 250-66 FOR SIZE WHERE
250-30 (a) (3) ELECTRODE TYPE (1) OR (2) IS
USED, OR #4 CU. WHERE GROUND ROD IS
PROVIDED.
TRANSFORMER SEE ONE-LINE DIAGRAM FOR
SIZE AND TYPE.
PRIMARY FEEDER
GROUNDING CONDUCTOR
SEE ONE-LINE DIAGRAM FOR
SIZE
(D)
TYPICAL PLAN VIEW TRANSFORMER
(W)
ANCHOR BOLT
(TYP)
CONCRETE PAD PER
DETAIL
1/2" HILTI KB-TZ SS ANCHORS
W/ 3 5/8" MIN. EMBED IN EACH
CORNER OF TRANSFORMER.
TOTAL OF (4)
TRANSFORMER
NEOPRENE PAD.
LESS THAN 1/2" THICK.
T75 75 KVA (1) 2"C. 3 #1, 1 #6 GND (1) 3"C. 4 #250, 1 #4 GNDCOPPER
TRANSFORMER SIZING
75 32''KVA
WIDTH (W)
33''25''
HEIGHT
630 LBS.
WEIGTHDEPTH (D)
RATING CONDUCTOR PRIMARY SECONDARY
THREE PHASE TRANSFORMER FEEDER SCHEDULE
ID
5
E1.5
5" MIN. CONCRETE
EDGE DIST
1
GROUND BUS
SERVICE ENTRANCE DISCONNECTOR PANELBOARD
2" MIN
2" MIN
20'-0" MIN
GROUNDING CONDUCTOR SIZEEQUIPMENT AMPACITY
2001 - 4000 AMPS
1201 - 2000 AMPS
0 - 200 AMPS
201 - 400 AMPS
801 - 1200 AMPS
401 - 800 AMPS
#1/0 CU.
#4 CU.
#350 CU.
#250 CU.
#3/0 CU.
#2/0 CU.
GROUND SIZING SCHEDULE
MAIN AND EQUIPMENTBONDING JUMPER PERC.E.C. 250-80
SEE GROUNDING CONDUCTOR
SCHEDULE FOR SIZING
GROUNDING CONDUCTOR TO
TRANSFORMER.
GROUNDING CONDUCTOR
FROM MAIN SWITCH BOARD.
METAL UNDERGROUND WATER
PIPE C.E.C. 250-52(A)1
C.U. BOND TO METALLIC COLD
WATER PIPE, GAS PIPING,
STRUCTURAL STEEL AND FIRE
SPRINKLER SYSTEM PIPING PER
C.E.C. 250-104
#4 CONCRETE ENCASED COPPER
ELECTRODE PER C.E.C. 250-52(3).
SEE FEEDER SCHEDULE FOR SIZING
S
M
NO.E 14781
Exp. 6-30-2021
R
E
TATE 0F CA LIF0RN
IA
LECT
EG
ISTER
ERPR0FESSI0NAL
ENG
INE
ER
0N
ICA
G0ESE -HANS
EN
#20012
LACIR
N
BR
AD
LEE LAS
SI
NO. A-32437
LIC
ENS E D A RCH
I T
EC
T
R
EN. 02 - 28 - 21
ST
A
TE
O F CA L I F OR
NIA
CK
Y G
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
Please Recycle
5028009000
Keynotes:
Agency
Approval:
File No.: 37-C5
Facility:
ISSUE:
CONSTRUCTION DOCUMENTS
Project:
Sheet Title:
Date: Client Project No:
Sheet:
No. Issued Date No. Issued Date
T 909 989 9979 / www.hmcarchitects.com
3546 Concours Street / Ontario, CA 91764
ONE-LINE DIAGRAM AND DETAILS
09/18/2018 5028013000
E1.3
GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT
CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019
NO SCALE E1.3
1ONE-LINE DIAGRAM
NO SCALE E1.3
2THREE PHASE TRANSFORMER GROUNDING
NO SCALE E1.3
4TRANSFORMER ANCHORAGE DETAIL
NO SCALE E1.3
3SERVICE ENTRANCE GROUNDING AND BONDING DETAIL
1 03/11/2021ADDENDUM 002
CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD
1
2 SETS OF: 1"C. WITH (2) CAT-5E CABLES
2"C. WITH (3) 10 Ga. 2 CONDUCTOR
SPEAKER CABLES
6 STRAND MM FIBER
OPTIC CABLE IN 1''C.
6 STRAND MM FIBER
OPTIC CABLE IN 1''C.
XLR CABLE
IN 1''C.
SCOREBOARD
GENERAL NOTES:
1. ALL FIBER, XLR CABLES, CAT-5E AND SPEAKER CABLES ARE
FURNISHED AND INSTALLED BY CONTRACTOR.
2. ALL CONDUITS ARE FURNISHED AND INSTALLED BY
CONTRACTOR.
3. COORDINATE ALL CABLE TERMINATION LOCATION AND
REQUIREMENT WITH SCOREBOARD VENDOR.
4. SEE SPECIFICATION 27 10 00 FOR FIBER, XLR, CAT-5E AND
SPEAKER CABLE INSTALLATION REQUIREMENTS.
KEY NOTES:
TERMINATE 6-STRAND MM FIBER OPTIC CABLE AT FIBER
OUTLETS AS REQUIRED. SEE SPECIFICATION 27 10 00 FOR
TERMINATION AND CONNECTOR TYPE.
TERMINATE XLR CABLE AT THE OUTLET AS REQUIRED.
FURNISHED AND INSTALLED BY CONTRACTOR.
PROVIDE 3/4" X 10'-0" COPPER GROUND ROD AND GROUND THE
SCOREBOARD AS REQUIRED.
TERMINATE (18) 2m WATERTIGHT ETHERNET CABLES AND (2) 4m
WATERTIGHT ETHERNET CABLES AT VIDEO MODULES ON BACK
OF THE SCOREBOARD AS REQUIRED. COORDINATE EXACT
TERMINATION LOCATIONS WITH SCOREBOARD VENDOR.
XLR CABLES AND FIBER OPTIC CABLES SHALL BE TERMINATED
AT THE DESIGNATED EQUIPMENT INSIDE THE REMOTE AMP RACK
AS REQUIRED.
TERMINATE ALL CAT-5E CABLES AND SPEAKER CABLES AT THE
SCOREBOARD VIDEO BOARD AND SOUND SYSTEM AS
REQUIRED. COORDINATE TERMINATION LOCATIONS WITH
SOOREBOARD VENDOR.
TERMINATE ALL CAT-5E CABLES AND SPEAKER CABLES AT AT
THE DESIGNATED EQUIPMENT INSIDE THE REMOTE AMP RACK AS
REQUIRED.
PROVIDE DUAL-GANG BOX AND FACEPLATE. SEE SPEC 27 10 00
FOR ADDITIONAL REQUIREMENTS.
1
2
3
CLIMATE CONTROLLED SCOREBOARD OUTDOOR
ENCLOSURE (BY SCOREBOARD VENDOR)
POWER RECEPTACLE
XLR OUTLETFIBER OUTLET
TRACK FIELD CONTROL STATION
PEDESTAL (NEMA 3R)
3
POWER RECEPTACLE
XLR OUTLET
SOCCER CONTROL STATION
PEDESTAL (NEMA 3R)
3
212
M P P M P P
8
E1.5
4
45
6
6
5
7
XLR CABLE
IN 1''C.
7
8
8
F
9
9FIBER OUTLET
1
F
9
1
1
1
1
1
1
1
OVERHEAD WHERE CONDUITS ENTER UNDERGROUND HANDHOLES, PROVIDE SIMILARTHIS DETAIL APPLIES TO ALL CONDUITS ENTERING BUILDINGS FROM UNDERGROUND OR
PROVIDE 'DYMO' LABEL ON CONDUITINDICATING CONDUIT ORIGINATION.
TOGETHER AND PROVIDE IDENTIFICATIONLABEL INDICATING TYPE OF SYSTEM AND
GROUP ALL COMMON CABLE TYPES
OTHER END LOCATION OF CABLE.
LABELING EXCEPT USE WATERPROOF LABELS.
HAND WRITTEN LABELS ARE2.
NOTE:
1.
NOT PERMITTED.
BLDG 'A'FROM
CONDUITS WHEN INSTALLINGCABLES BETWEEN BUILDINGS).
(PROVIDE (1) PULL ROPE INTO ALL
PROVIDE IDENTIFICATION LABELTO ALL PULL ROPES INDICATINGLOCATION OF OTHER END OF ROPE.SECURE LOOSE END TO CONDUIT.
DATABLDG 'A'
BLDG 'A'
TOGETHER AND PROVIDE IDENTIFICATIONGROUP ALL COMMON CABLE TYPES
OTHER END LOCATION OF CABLE.LABEL INDICATING TYPE OF SYSTEM AND
BLD
G 'A
'
USE WATERPROOF LABELS
BELL GUARDSCONDUIT
DAT
A
DAT
A
BLD
G 'B
'
CABLES SHALL NOT BE PULLED UNTIL CONDUIT BELL GUARDS HAVE BEEN PLACED.
TIE OFF PULL ROPES IN
AROUND INSIDE OF HANDHOLEPROVIDE CABLE SUPPORT
NOT PERMITTED
LOCATION OF OTHER END OF ROPE.
(PROVIDE (1) PULL ROPE INTO ALLCONDUITS WHEN INSTALLINGCABLES BETWEEN BUILDINGS).
TO ALL PULL ROPES INDICATINGPROVIDE IDENTIFICATION LABEL
HAND WRITTEN LABELS ARE
SECURE LOOSE END TO CONDUIT.
2.
NOTE:
1.
BLD
G B
AS SPECIFIED.
HANDHOLE
CONDUITS (TYP)UNDERGROUND
FIBER OPTIC BACKBONE CABLE
LABEL TO SHOWN QUANTITY OF MULTIMODE AND
SINGLE MODE FIBERS IN THE CABLE.
ROOM # MDF - ROOM # 'IDF' - 012MMF/012SMF
LABEL BOTH ENDS OF BACKBONE CABLES AND IN EACH ROOM IN WHICH THECABLE ROUTES THROUGH.
ROOM DESIGNATIONS SHOWN IN DETAIL ARE AN EXAMPLE AND MAY NOTREFLECT ACTUAL ROOM INFORMATION.
1.
NOTES:
2.
MINIMUM 14-PORT FONT, BOLD/ ALL
CAPS LETTERING
SIDE VIEWFRONT VIEW
IDF - 1300A3 A4
DO NOT EXCEED BENDRADIUS IN CONDUIT OR
CABLE IN BOX.MORE THAN 6'' OFSURFACE BOX. NO
PERMANENT LABEL INSTALLED
IDF - 1300A1 A2
WINDOW.UNDER IDENTIFICATION
FACEPLATE
WALL
ADHERED TO CABLE
TO REAR OF MODULARBRING CABLE JACKET
PERMANENT LABEL
TERMINATIONWITHIN 1'' OF
JACK
CONDUIT
ALL LABELING FORMATS
MUST BE APPROVED BY THE
DISTRICT IT DEPARMENT IN
WRITING PRIOR TO
INSTALLATION OF LABELS.
PROVIDE COLORED OUTLETSIN FACEPLATE
PROVIDE CAT-6 INSERTS TO
MATCH THE TYPE OF CABLE
INSTALLED.
GR
EEN
OR
ANG
E
BLUE
BLAC
K
SLATE
BR
OW
N
WHIT
E
RED
RO
SE
AQ
UA
VIO
LET
YELLO
W
FIBER CABLE
TAG
I.D.
CABLE
SHRINK WRAP
AT END OF
FIBER CABLE.
EXTERIOR OR
INTERIOR FIBER
STRAIN RELIEF
ATTACHMENT.
PROVIDE RUBBER GROMMET OR OTHER
TYPE OF PROTECTION FOR CABLE
WHERE IT ENTERS CABINET.
PROVIDE 24'' OF SLACK
BETWEEN END OF CABLE
AND FAN KIT.
FAN OUT KIT FOR ALL
STRANDS OF FIBER.
ATTACH KEVLAR TO
STRAIN RELIEF
POST.
VELCRO TIE WRAP AT
LEAST 9'' OF INDIVIDUAL
STRANDS.
NEATLY WRAP 24'' OF
INDIVIDUAL FIBERS
AROUND ROUTING
GUIDES.
MULTIMODE AND
SINGLE MODE BINDERS
TO BE INDENTIFIED AND
COLOR CODED INSIDE
FIBER PATCH
PANEL-BLUE FOR
SINGLE MODE AND
AQUA FOR MULTIMODE
FIBER TAG TO BE
WITHIN 12" OF
PANEL
INDIVIDUAL STRAND COLOR
AND NUMBER SHALL BE
SHOWN ON PANEL FRONT
LABEL FOR ALL CABLES
LABEL SHALL BE
MINIMUM 18
POINT FONT,
BOLD, ALL CAPS
AND MIN.
3 1/2" W x 2"H
S
M
NO.E 14781
Exp. 6-30-2021
R
E
TATE 0F CA LIF0RN
IA
LECT
EG
ISTER
ERPR0FESSI0NAL
ENG
INE
ER
0N
ICA
G0ESE -HANS
EN
#20012
LACIR
N
BR
AD
LEE LAS
SI
NO. A-32437
LIC
ENS E D A RCH
I T
EC
T
R
EN. 02 - 28 - 21
ST
A
TE
O F CA L I F OR
NIA
CK
Y G
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
Please Recycle
5028009000
Keynotes:
Agency
Approval:
File No.: 37-C5
Facility:
ISSUE:
CONSTRUCTION DOCUMENTS
Project:
Sheet Title:
Date: Client Project No:
Sheet:
No. Issued Date No. Issued Date
T 909 989 9979 / www.hmcarchitects.com
3546 Concours Street / Ontario, CA 91764
SCOREBOARD/CONTROL STATION COMM./CONTROLWIRING DIAGRAM
09/18/2018 5028013000
E1.4
GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT
CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019
NO SCALE E1.4
1SCOREBOARD/CONTROL STATION COMM./CONTROL WIRING DIAGRAM
NO SCALE E1.4
2COMMUNICATION CABLE TYPICAL LABELING DETAIL
NO SCALE E1.4
3COMMUNICATION HANDHOLE LABELING DETAIL (TYP)
NO SCALE E1.4
4TYPICAL BACKBONE LABELING DETAILNO SCALE E1.4
5TYPICAL FACEPLATE LABELING DETAILNO SCALE E1.4
6TYPICAL FIBER TERMINATION DETAIL
1 03/11/2021ADDENDUM 002
CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD
1
17 1/
4'' (MIN)
12''(MIN.) SIDE KNOCK OUTS.
NOTE:
DOWN ASSEMBLY.
(1) PIECE STEEL CHECKER PLATELID WITH STAINLESS STEEL BOLT
10 5/8'' (MIN)
LIGHTING
ANCHORED INTO CONCRETE.ETCHED POLYETHYLENE FACE
HIGH DENSITY REINFORCEDCONCRETE WITH END AND
PROVIDE DESCRIPTION LABEL
"POWER",
"LIGHTING", "SIGNAL" OR "FIRE ALARM"
TO
MATCH CABLING SYSTEM INSTALLED
AT
EACH LOCATION.
WHERE LOCATED IN DRIVEABLE ARES USE:
"CHRISTY" #B1017 SERIES
"BES CONCRETE # C1017 SERIES
ALL OTHER AREAS USE:
"CHRISTY" #N9 SERIES
"BES CONCRETE" # C9E SERIES
2' X 3' ONE PIECE BOLT DOWN STEEL
COVER (GALV.) (SEE NOTE #1)
6'' MIN.
LIFTING HANDLE
2 PLCS.
6" TOP INCLUDES FRAME
HEIGHT
IDENTIFICATION SPOT PROVIDE LABEL
"POWER", "LIGHTING", "SIGNAL" OR "FIRE
ALARM" TO MATCH CABLING SYSTEM
INSTALLED AT EACH LOCATION.
12'' RISER
2 TON SWIFTLIFTS
2 EA. SIDE WALL
4 TOTAL (TYPICAL)
4" X 10" KNOCKOUTS
1 EA. SIDE WALL
2 TOTAL
8" X 11" KNOCKOUTS
1 EA. SIDE WALL
2 TOTAL
3'-0"2'-0"
1'-6"
"OLDCASTLE" - 3313 SERIES.
"SAN DIEGO PRECAST" - 3313 SERIES
"JENSEN PRECAST" - 2436 SERIES
OR EQUAL
NOTE:
1'-6"
PROVIDE "HS 20-44 TRAFFIC RATED" COVER
WITH LABEL INDICATING TRAFFIC RATING
WHEN HANDHOLE 15 LOCATED IN
DRIVEABLE AREA ALL OTHER "AREA SHALL
BE PARKWAY RATED"1
TOP OF BOX TO BE FLUSH
WITH FINISHED GRADE
24"
6"
KEY NOTES:
WHERE CONDUITS SERVE INCOMING AND OUTGOING CIRCUITSKEEP RISERS SEPARATED INSIDE PULLBOX TO ALLOW FORSLACK CONDUCTORS.
TOPS OF CONDUITS MUST NOT EXTEND INTO PULLBOX MORETHAN 1/3 OF THE TOTAL AVAILABLE INSIDE BOX HEIGHT. INORDER TO ALLOW ADEQUATE SPACE FOR CABLE SLACK.
3/8"-3/4"
COMPACTED
GRAVEL
PROVIDE 6" DIA
PERFORATED
DRAIN
PIPE EXTEND 6'-0"
BEYOND BOX IN
TWO DIRECTIONS IN
TRENCH.
BOTTOM
OF
TRENCH
2
1
1
2
2''
18''X18"
16''
10 1/2''
5 3/4'' INSIDE DIMENSION
13''
TRIM
22 1/2'' ADA
6''
(2) GFI RECEPTACLES
20 AMP, 120v
(2) FIBER OUTLETS
(1) XLR OUTLET
SEE SITE
PLAN
COLE LIGHTING#TL410-WCS-PED/ADA-CCPOWER PEDESTALCOLOR TO BE SELECTED BY ARCHITECTAT TIME OF SUBMITTAL
3000 PSI CONCRETE
#4 (V) NARS EA CORNER
(TOTAL 4) W/ #3 TIES @ 8" O.C.
1/2'' DIA. HILTI KB-TZ SS ANCHORS
@EA. CORNER W/3-5/8'' EMBED PER
ICC ESR-1917
4'' MIN. CONCRETE
EDGE DIST (TYP.)
3'' CLR (TYP.)
2"
12"
TO BE LEVELTOP OF PAD GRADE
#4 REINFORCING BARS 12" 2"
TYPICAL SECTION ELEVATION
TYPICAL (TYP.) GENERAL NOTES
(TYP.)
1.
5.
6.
4.
3.
2.
EQ.
EQ.
ALL CONCRETE SHALL ATTAIN A MINIMUMCOMPRESSIVE STRENGTH OF 3000 PSI AT 28DAYS. AS PER 1905A METHOD 'A' AND TABLE19A-A-8. BATCH PLANT INSPECTIONS AND TESTSOF CEMENT AND REINFORCING BARS MAY BEWAIVED PER CBC TITLE 24 SECTION 1705A.3.3.1 &1705A.3.3.2
CONCRETE MIX DESIGNS SHALL COMPLY WITHTITLE 24 SECTION 1905A.2.
PORTLAND CEMENT SHALL CONFORM TO (ASTMC-150) TYPE I OR II
CONCRETE AGGREGATES SHALL CONFORM TOASTM C-33
CONCRETE PLACEMENT SHALL CONFORM TOTITLE 24 SECTION 1905A.7.
ALL REINFORCING BARS SHALL CONFORM TOTITLE 24 SECTION 1903A AND ASTM A-615 GRADE60.
6" M
IN. 6''
POWER CONDUITS ON BOTTOM
(EA. SIDE)
2'' SAND BASE
3'' MIN.
18''MIN.
12"
MIN.6''
UNDISTURBED EARTH
WARNING TAPE
MIN. 3'' DEEP (2) SACK CONCRETE SLURRY.
BACKFILL WITH SAND OR
(2) SACK CONCRETE SLURRY.
PROVIDE MIN. 6''
SEPARATION BETWEEN
POWER AND ALL
OTHER CONDUITS AT
ALL HORIZONTAL AND
CROSSING LOCATIONS
COMMUNICATION
AND CONTROL
CONDUITS ON TOP
OR ON SIDE OF
POWER CONDUITS
PROVIDE "CARLON" SNAP-LOC DUCT
SPACER SYSTEM (OR EQUAL), FOR
VERTICAL AND HORIZONTAL CONDUIT
SPACING. PROVIDE AT MAXIMUM 10'-0" ON
CENTER.
ELECTRICAL CONDUITS SEE SITE
PLAN FOR QUANTITY.
SELECTED BACKFILL FREE OF LARGE
DEBRIS AND COMPACTED TO 90%
RELATIVE DENSITY
NEW ASPHALT OR CONCRETE PAVING
MATCH EXISTING. (WHERE
APPLICABLE.)
PAVING BASE (WHERE APPLICABLE.)
BACKFILL TO MATCH
EXISTING GRADE AT
LANDSCAPED AREAS.
24"
MIN.
IN
VEHICULAR
AREA
1
BOTTOM PLATE
FINISH FLOOR
PVC
PVC
PVC
PV
C
PV
C
PV
C
12'' M
IN.
PR
GS
PULL ROPE
MAX.18''
LC
EM
T
PVC = SCHEDULE 40 P.V.C. CONDUIT
PRGS = PVC COATED RIGID STEEL CONDUIT
EMT = ELECTRICAL METALLIC CONDUIT
PVC OR FLEXIBLE METAL CONDUIT MAY
NOT BE SUBSTITUTED FOR EMT, FROM
AN UNDERGROUND FEEDER TO THE
FIRST WIRING DEVICE WHERE THAT
DEVICE EXCEEDS +18'' A.F.F.
ALL EXTERIOR
EXPOSED
LOCATIONS.FINISHED
GRADE
BRANCH CIRCUIT
OR COMMUNICATION
CONDUIT
CONC. BLDG.
SLAB OR
FOOTING
FEEDER OR SITE
CONDUITS
PROVIDE METAL
SUPPORT TO KEEP
CONDUITS
VERTICAL UNTIL
FRAMING IS
COMPLETE.
ALL SPARE CONDUITS TO BE
PROVIDED WITH PVC CAP.
PROVIDE EYE BOLT SECURED
THRU TOP OF CAP TO TIE OFF
PULL ROPE.
CONDUIT I.D. PER
SPECIFICATIONS
DEV
ICE
BO
X
DEV
ICE
BO
X
DEV
ICE
BO
X
PROVIDE ''CPI # 10622-010'' GROUND BAR ASSEMBLY OR EQUAL.
GROUNDING LUG ORTERMINAL CONNECTION
3/8" LOCK WASHER
3/8" NC x 3/4" HHCS
COPPER BAR
4''
10''
TO ADDITIONAL
CABINET OR
RACKS AS
EQUIPMENT
# 6 GROUND
FRAME.
PROVIDE PLASTIC SURFACE MOUNTBOX ''HUBBELL'' # WT-DEEP SERIES OR EQUALSINGLE OR DOUBLE GANG TO MATCHOUTLET. MOUNT OVER EXISTING
REMOVE SIDE KNOCKOUT FORFOR GROUNDING CONDUCTOR ACCESS.
NOTE:
INSULATOR
SUPPORTBRACKET
RECESSED OUTLET BOX.
1/4"
CONNECT TO EXISTING GROUNDINGCONDUCTOR AT RECESSED BOX
RECEPTACLESRECONNECT TO EXISTINGCIRCUIT AS REQUIRED.
''HUBBELL'' FACEPLATE (OR EQUAL).PROVIDE NEW MATCHING
LOCAL POWER
# 8 GROUNDINGCONDUCTOR
AS REQUIRED.
ALL EQUIPMENT AND LABOR SHOWN TO BE
FURNISHED AND INSTALLED BY SCOREBOARD
VENDOR COORDINATE WITH PROJECT
ELECTRICAL CONTRACTOR AS REQUIRED.
REQUIRED.
NOTE: MOUNT GROUND BUS BAR TO PLYWOOD BACKBOARD
WITH (4) 1'' X 1/4'' WOOD SCREWS AT MOUNTING HOLES IN
SUPPORT BRACKETS.
1
1
1
S
M
NO.E 14781
Exp. 6-30-2021
R
E
TATE 0F CA LIF0RN
IA
LECT
EG
ISTER
ERPR0FESSI0NAL
ENG
INE
ER
0N
ICA
G0ESE -HANS
EN
#20012
LACIR
N
BR
AD
LEE LAS
SI
NO. A-32437
LIC
ENS E D A RCH
I T
EC
T
R
EN. 02 - 28 - 21
ST
A
TE
O F CA L I F OR
NIA
CK
Y G
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
Please Recycle
5028009000
Keynotes:
Agency
Approval:
File No.: 37-C5
Facility:
ISSUE:
CONSTRUCTION DOCUMENTS
Project:
Sheet Title:
Date: Client Project No:
Sheet:
No. Issued Date No. Issued Date
T 909 989 9979 / www.hmcarchitects.com
3546 Concours Street / Ontario, CA 91764
ELECTRICAL DETAILS
09/18/2018 5028013000
E1.5
GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT
CUYAMACA COLLEGE900 RANCHO SAN DIEGO PKWYELCAJON, CA 92019
NO SCALE E1.5
1UNDERGROUND PULLBOX STYLE 'A'NO SCALE E1.5
2UNDERGROUND PULLBOX STYLE 'B'NO SCALE E1.5
3UNDERGROUND PULLBOX STYLE 'A' OR 'B' TYP. INSTALLATION
NO SCALE E1.5
4POWER PEDESTALNO SCALE E1.5
5TYPICAL HOUSEKEEPING PAD DETAILNO SCALE E1.5
6TYPICAL TRENCH DETAIL
NO SCALE E1.5
7TYPICAL CONDUIT DETAILNO SCALE E1.5
8CABINET GROUNDING DETAIL
1 03/11/2021ADDENDUM 002
CUYAMACA COLLEGE SCOREBOARDCUYAMACA COLLEGE TRACK AND FIELDIMPROVEMENTS PH.II - SCOREBOARD
1