Study name Management Plan /home/website/convert/temp/convert_html/5aaa0ba77f8b9a86188d9aff/document.doc Prepared by Name Title Job title Branch/District Branch/District Division/Region Division/Region Location Floor, street, city Version no. 1.0 Revision date 06 July 2022 Status Draft/ Final Review/Sign Off (Delete 2 of) DMS ref. no. DMS reference number Action statement Date Name Position Action required (Review/Endorse/Approve) Due date On-Q Template version date 8.07.02

Upload: trinhxuyen

Post on 15-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Study name

Management Plan

/tt/file_convert/5aaa0ba77f8b9a86188d9aff/document.doc

Prepared by NameTitle Job titleBranch/District Branch/District Division/Region Division/RegionLocation Floor, street, cityVersion no. 1.0 Revision date 06 May 2023Status Draft/ Final Review/Sign Off (Delete 2 of)DMS ref. no. DMS reference numberFile/doc.no File number/document number

Action statement

Date Name Position Action required(Review/Endorse/Approve)

Due date

On-Q Template version date 8.07.02

Page 2: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Study Name Study Plan

Document control sheet

Contact for enquiries and proposed changesIf you have any questions regarding this document or if you have a suggestion for improvements, please contact:

Study Manager Insert Study Manager's name here

Phone Insert phone number here

Version history

Version no. Date Changed by Nature of amendment

02/07/2002 Initial draft.

.

Name

Position

Signature Date

Queensland Transport Version 1.0 6/05/2023 Page 2 of 14

Page 3: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Study Name Study Plan

Contents

1 Broad strategy.............................................................................................................4

2 Study control...............................................................................................................4

2.1 Integration....................................................................................................................4

2.2 Scope management.......................................................................................................4

2.3 Time management........................................................................................................4

2.4 Cost management..........................................................................................................4

2.5 Quality management.....................................................................................................4

2.6 Human Resources management....................................................................................5

2.7 Communication management.......................................................................................5

2.7.1 Internal communication................................................................................................5

2.7.2 External communication...............................................................................................5

2.8 Risk and issues..............................................................................................................52.8.1 Risk...........................................................................................................................................52.8.2 Issues.........................................................................................................................................5

2.9 Procurement management............................................................................................6

Appendix A – Study scope........................................................................................................7

2.1 In scope.........................................................................................................................7

2.2 Out of scope..................................................................................................................7

2.3 Related Studys..............................................................................................................7

2.4 Constraints....................................................................................................................7

2.5 Urgency.........................................................................................................................7

2.6 Assumptions.................................................................................................................7

Appendix B – Study schedule..................................................................................................8

Appendix C – Study budget.....................................................................................................9

Appendix D – Risk management plan...................................................................................10

Appendix E – Internal communication management plan.................................................12

Appendix F – External communications..............................................................................13

Appendix G – Responsibility assignment matrix.....................................................................14

Queensland Transport Version 6/05/2023 Page 3 of 14

Page 4: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Study Name Study Plan

1 Broad strategyDiscuss the broad strategy to deliver the . To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2 Study control

2.1 IntegrationIntegration of the following eight elements will be achieved by development of this management plan, managing the in accordance with it and updating the plan and its attachments as the progresses and circumstances change. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.2 Scope managementDescribe how changes to scope will be managed (including software tools to be used). Refer to a detailed attachment showing scope in detail (could be drawings for physical Studys or Business Process Analysis for business change Studys). Describe how variations to scope will be identified, approved and funded.. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.3 Time managementDescribe how changes to time and resources will be managed (including any software tools to be used). Refer to an attached Study Schedule breaking the Study into activities (work breakdown structures) displaying start, finish, internal resources, external resources and major milestones. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.4 Cost managementDescribe how changes to costs will be managed (including software tools to be used). Refer to an attached budget estimate breaking the Study into activities (work breakdown structures) displaying the estimated costs for internal resources and external resources.To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.5 Quality managementThe quality assurance process used in completing the study will be the process outlined in the ITPF.To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

Queensland Transport Version 6/05/2023 Page 4 of 14

Page 5: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Study Name Study Plan

2.6 Human Resources managementDescribe the approach to be taken with the deployment of internal and external resources. Provide a Study team organisation structure and describe roles and responsibilities.Provide details of any Study specific training required. Refer to a responsibility matrix (if required). To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.7 Communication managementDescribe the approach to be taken with the deployment of internal and external resources. Provide a Study team organisation structure and describe roles and responsibilities. Provide details of any Study specific training required. Refer to a responsibility matrix (if required). To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.7.1 Internal communicationDetail the Study reports to be produced. Identify who will produce them, who will receive them and what action is required from the receiver. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.7.2 External communicationDescribe the communication processes for all internal parties including Executive Management, Advisory Group Members, Stakeholders, Sponsor, Director, team members, and users. Refer to a detailed Communication Plan (if required). To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.8 Risk and issues

2.8.1 RiskDescribe how the will manage risk in Section 10 of the proposal document. Ensure the attached risk table covers all these items.Refer to an attached risk plan showing identified risks, severity, likelihood and mitigation actions (Actions should be included in the Study schedule). To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.8.2 IssuesDescribe how the Study will manage issues (including software tools to be used). Refer to an attached listing of issues. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

Queensland Transport Version 6/05/2023 Page 5 of 14

Page 6: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Study Name Study Plan

2.9 Procurement managementDescribe how external goods and services will be procured. This includes contract/subcontract management, land acquisition, material procurement, contract administration. Refer to an attached procurement plan (if required). To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

Queensland Transport Version 6/05/2023 Page 6 of 14

Page 7: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix A – Study scope

7.1 In scopeThis defines the Study boundaries to facilitate effective management of deliverables on time and to agreed/approved cost. The scope outlined in any previous document should be confirmed here or updated as necessary. List all items that are included in the scope of this Study. To delete this guidance text box, double click mouse in the left margin then press delete.

2.10 Out of scopeList identified items that will not be delivered as part of this Study. This is most important as it specifies items which will not be undertaken as part of this Study. This assists in managing/avoiding scope creep. The importance of individual out of scope items should be mentioned. Such items may pose significant risks to the Study if they are not done at all by others. This may create risks for the Study which need to be recognised and managed. To delete this guidance text box, double click mouse in the left margin then press delete.

2.11 Related StudysList any related Studys or proposals affecting this Study (whether past, current or planned) and their relationship to this Study. The impact of these on your Study should be described. Such Studys may pose significant risks to the Study if they are not done at all by others or not completed in time. This may create risks for the Study which need to be recognised and managed. To delete this guidance text box, double click mouse in the left margin then press delete.

2.12 ConstraintsRestrictions which will limit the way the objective is to be achieved (describe anything that might impact on the successful development and/or implementation of the Study). This may include restrictions on budget / funding, political issues, limited resources to work on the Study, timing constraints or constraints on the implementation of the outcomes of the Study. To delete this guidance text box, double click mouse in the left margin then press delete.

2.13 UrgencyIdentify the urgency of the Study stating reasons. To delete this guidance text box, double click mouse in the left margin then press delete.

2.14 AssumptionsList all assumptions made in producing this document. To delete this guidance text box, double click mouse in the left margin then press delete.

Queensland Transport Version 1.0 6/05/2023 Page 7 of 14

Page 8: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix B – Study schedule

ID WBS ID Task name Resources Duration Depend. Start Finish

1

2

3

4

5

6

7

8

9

10

11

12

Queensland Transport Version 1.0 6/05/2023 Page 8 of 14

Page 9: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix C – Study budget

ID WBS ID

Task name Resources Duration Depend. Start Finish Internal labour cost

Contract labour cost

External services and material costs

Other costs

Total costs

1

2

3

4

5

6

7

8

9

10

11

12

Queensland Transport Version 1.0 22 September 2005 Page 9 of 14

Page 10: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix D – Risk management plan

Broad strategy for risk managementType here

A summary of significant risk factorsType here

Overall assessment of Study riskType here

Queensland Transport Version 1.0 22 September 2005 Page 10 of 14

Page 11: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix D – Risk management table

No. Risk factor

Like

lihoo

d

Impa

ct

Ris

k ra

ting Proposed response/mitigation

(what)Action (how) Related

activity number

1

2

3

4

5

Queensland Transport Version 1.0 22 September 2005 Page 11 of 14

Page 12: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix E – Internal communication management plan

References Study Plan dated …..

IntroductionType here

Standard Study reportingType here

Monthly reportsType here

Exception reportsType here

Conduct of meetingsType here

Management of information systemsType here

Study office proceduresType here

Control mechanismsType here

Addendum 1 - Communications management matrix

No. Identified staff Function / skill Role description

1

2

3

4

Queensland Transport Version 1.0 22 September 2005 Page 12 of 14

Page 13: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix F – External communications Communication Goal

(Outline here what the communication is to achieve – in say 25 words or less)

Communication Objectives(The objectives should be clear and measurable, dot points only. Breakdown the elements of how the goal will be achieved. These should state what the communication is to achieve and must be realistic. They should contain the elements – inform, persuade, motivate).

Communication Strategy(The strategy should indicate how to go from what is, to what should or could be).

Key messages(There should only be one to three key messages in dot point format. These key messages should be what needs to be said to get the target audiences to walk away thinking/doing as desired).

Target audiences(Who is to be influenced? These should be broken down into primary and secondary audiences. In some cases the objectives and strategies for each audience need to be separated).

Tactics(What will actually be done? This is where the communication activities are listed, at a broad level, against the target audiences. A matrix helps in this instance to clearly show the activity, audience, purpose and timeframe).

Budget(How much will it cost? Has funding been provided? – from another source?).

Resourcing

Timelines

Activities to be undertaken.

Communication tools to be used such as:

Frequently asked questions and responses Project website Freecall 1800 telephone enquiry line Fact sheets/information kit Display material Project contact cards

Communications management

Project team Schedule Cost/budget Risk identification and risk response protocols Communication approval process Role of consultants Communication and consultation reporting

Evaluation

Queensland Transport Version 1.0 22 September 2005 Page 13 of 14

Page 14: ITPF_study_management_plan - Department of …/media/busind/OnQ Project Management... · Web viewIntegrated Transport Planning Framework (ITPF) study management plan template Author

Error: Reference source not found

Appendix G – Responsibility assignment matrix

Legend

PM Study Manager SG Stakeholder group PG Program Manager

PC Study Manager – concept phase CR Customer representative EM Executive management

PO Study officer UR User representative

AG Advisory group SP Sponsor

A Assist C Consult O Coordinate P Primary responsibility R Review S Sign off

Role

WBS ID Task PM PC PO AG SG CR UR SP PG EM

Queensland Transport Version 1.0 22 September 2005 Page 14 of 14