iv b.tech i sem, mechanical department, automation and robotics & (9a03702), date of exam...
TRANSCRIPT
-
8/11/2019 IV b.tech i Sem, Mechanical Department, Automation and Robotics & (9a03702), Date of Exam 23-09-2014, Facult
1/3
MOTHER THERESA INSTITUTE OF ENGINEERING & TECHNOLOGY, PALAMANER - 517408
BRANCH: MECH IV B.Tech I SEM I MID EXAMINATIONS SEP 2014 EXAM DATE: 23-09-2014
SUBJECT & Code: Automation and Robotics & (9A03702) Type: DESCRIPTIVE
Regd. No: Max. Marks: 20
Answer any Three Question
All Questions carry equal marks
1. (a) What is automation? Explain various types of automation
(b) What are the advantages and disadvantages of Automation?
2.
Explain the analysis of two stage transfer lines with storage buffers.
3.
Explain the following terms related to line balancing:
(a) Station time
(b) Cycle time
(c) Line efficiency
(d) Balance delay
4.
(a) Explain the concept of Assembly process.
(b) Define line balancing problem and explain the terminology involved.
5. Explain about any two assembly line balancing methods.
NAME OF THE FACULTY: K.NAGI REDDY DEPT: MEC
-
8/11/2019 IV b.tech i Sem, Mechanical Department, Automation and Robotics & (9a03702), Date of Exam 23-09-2014, Facult
2/3
MOTHER THERESA INSTITUTE OF ENGINEERING & TECHNOLOGY, PALAMANER - 517408
BRANCH:MECH IV B.TECH I SEM I MID EXAMINATIONS SEP 2014 EXAM DATE: 24-9-2014
SUBJECT & Code: Automation and Robotics & (9A03702) Type: OBJECTIVE
Regd. No: Max. Marks: 10
1 The Economic realities of the modern world are [ ]A Globalization B International
outsourcingC Local outsourcing D All of the above
2 The number of product variety that can be produced in programmable automation
are[ ]
A More B Medium C low D none
3 Reasons for Automation are [ ]
A To increase labor
productivity
B To reduce labor
cost
C To improve
worker safety
D all
4 USA principle means [ ]
A Understand the
existing processB Simplify the
processC Automate the
processD All of the above
5 The Manufacturing Industries which fall under Primary sectors are [ ]
A Agriculture B Forestry C A&B D none
6 In job shop production the type of layout engaged is [ ]
A Fixed positionlayout B Process layout C Cellular layout
D All of the above
7 In Batch production the quantity of production produced is [ ]
A High B Medium C Low D none
8 Basic elements of automation are [ ]
A Power B Program of
InstructionsC Control systems D All of the above
9 The power form used for casting process are [ ]
A Thermal B Mechanical C electrical D none
10 Advanced automation functions are [ ]
A Safety monitoring B Maintenance and
repair diagnosticsC Error detection
and recoveryD All of the above
11 The conditions fulfilling the requirement of Automated Production lines are [ ]
A High demand B Stable product
designC long product life
and multiple
operations
D All of the above
-
8/11/2019 IV b.tech i Sem, Mechanical Department, Automation and Robotics & (9a03702), Date of Exam 23-09-2014, Facult
3/3
12 The Storage buffers are used on automated production lines to [ ]
A Reduce the
impact of station
breakdown
B To provide a bank
of parts to supply
the line
C To provide a
place to put the
output of the line
D All of the above
13 Reasons for productivity of Manual assembly lines are [ ]
A Specialization oflabor B Interchangeableparts C Work flowprinciple and line
pacing
D all
14 Which is the best method that can solve the line balancing problem [ ]
A Largest candidate
ruleB Kilbridge and
wester methodC RPW D none
15 Which type of assembly lines involves in mass production [ ]
A Single model
assembly linesB Batch model
assembly lineC Flexible model
assembly lineD none
16 Which type of assembly lines involves in Batch production [ ]
A Single model
assembly linesB Batch model
assembly lineC Flexible model
assembly lineD none
17 Which type of assembly lines involves in Job Production [ ]
A Single model
assembly linesB Batch model
assembly lineC Flexible model
assembly lineD none
18 How many levels of automation? [ ]
A 4 B 5 C 6 D 7
19 Define balance delay? [ ]
A To measure
station efficiencyB To measure cycle
efficiencyC To measure line
efficiencyD None of the above
20 Which is the example of assembly process? [ ]
A Assembly
systemsB Assembly
methodsC Joining methods D none