Page 1: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

IWEA Future Onshore & Offshore Pipeline ReportsAugust 2020

Contact: [email protected]

Page 2: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Part A: IWEA Future Onshore Wind Pipeline ReportAugust 2020

Contact: [email protected]

Page 3: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Confidential

The content of this report is confidential and intended for the recipient specified in first slide.

It is strictly forbidden to share any part of this report with any third party, without a written

consent of IWEA. If you received this report by mistake or from a source other than IWEA, then

please contact IWEA ([email protected]) and follow with its deletion, so that we can ensure

this does not occur in the future.

Disclaimer

IWEA assumes no responsibility for the currentness, correctness, completeness or

quality of the provided information. Liability claims against IWEA based on losses of a

tangible or intellectual nature caused by the use or the failure to use the provided information,

or the use of incorrect and incomplete information are categorically excluded, unless IWEA can be proven to have acted with intent or gross negligence. All content is non-binding

and subject to change without notice. IWEA expressly reserves the right to change,

supplement, or delete parts of this report or the entire content without notice, and temporarily

or permanently discontinue the publication.

Terms of Use

Page 4: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

•The data in this survey has been collected by:

• IWEA surveying the developers in its membership

• For non-members of IWEA, it has been supplied by MKO and MullanGrid

•If you would like to add your details to this survey or if you have any recommendations for future iterations, then please contact IWEA: [email protected].

Intro/Background

Page 5: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Creating Jobs ~8000 local construction jobs over 2 years

~400 local jobs for lifetime of the wind farm

Investment~€5 billion

More Community Benefit~€250,000 per turbine or

~€25 million/year or~€400 million over the lifetime

Funding Local AuthoritiesRates of €60 million per year or

€1.5 billion over the lifetime

Cleaner AirWill Reduce Carbon Emissions

by ~3 million tonnes per year or (~25% reduction for the electricity sector)

~90 million tonnes over the lifetime

The Climate Action Plan Proposes an Extra 4000MW of Onshore Wind by 2030

What does this look like for rural Ireland?

Page 6: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind:

4.2 GW Installed

9 GW Extra in Pipeline

4,400 MW

Feasibility

Stage

2,630 MW

Pre-

Planning

500 MW

In Planning

465 MW

With

Planning

185 MW

Planning &

Grid Offers

845 MW

Route to

Market

70 MW

Contracted

115 MW

Pending/

Unknown

105 MW

REFIT 2020

105 MW

REFIT

480 MW

RESS

260 MW

cPPA

0 MW

Merchant

25 MW

cPPA 2020

235 MW

cPPA

2020+

845 MW

Delivery

Status

Starting

Point for a

New Project

June 2020 Installed Capacity: 4215 MWWhere We

Are Now

In D

evelo

pm

ent

Where We

Need to Get ToTarget for 2030: 8200 MW

Projects Delivered

2020 Installed: 4215 MW

2030 Target: 8200 MW

50 MW

Contracted

but In

Planning

480 MW

RESS1

2021-2023

Page 7: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Corporate PPA Projects

Developer Corporate CountyTotal Capacity

(MW)Energisation

Year

Total

Page 8: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

RESS1 Projects

Wind Farm County Developer RESS1 Capacity (MW)

Total

Page 9: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind: Planning Status

0

500

1,000

1,500

2,000

2,500

With Planning In Planning 2020/2021 2022 2023 2024 2025 2026 2027

Going Into Planning

Planning Status (MW)

Page 10: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind

Planning Application Using SID: Yes/No

0

5

10

15

20

25

30

0

200

400

600

800

1000

1200

2020/2021 2022 2023 2024 2025 2026 2027

Going Into Planning

Usi

ng

SID

?

(Nu

mb

er

of

Pro

ject

s)

Usi

ng

SID

?

(Cap

aci

ty -

MW

)

SID Yes (MW) SID No (MW) SID Yes (#) SID No (#)

Page 11: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Using SID: Yes/No

By Capacity

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027

Going Into Planning

Usi

ng

SID

?

(Cap

aci

ty -

MW

)

SID Yes (MW) SID No (MW)

Page 12: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Using SID: Yes/No

By Number of Projects

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027

Going Into Planning

Usi

ng

SID

?

(Nu

mb

er

of

Pro

ject

s)

SID Yes (#) SID No (#)

Page 13: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind: Location & Planning StatusExcludes REFIT Projects. Includes existing CPPAs and all other Future CPPAs/RESS Projects.

County With Planning In PlanningIn Advanced Pre-

PlanningFeasibility Stage Grand Total

Page 14: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind: Year of Planning Applications

Excludes REFIT Projects. Includes existing CPPAs and all other Future CPPAs/RESS Projects.

County

Sum of Capacity (Net MWs)

With Planning In PlanningGoing Into Planning

2020/2021 2022 2023 2024 2025 2026 2027 Grand Total

Page 15: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind

Future Tip Heights (% Capacity)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027

With

Planning

In Planning Going Into Planning Grand Total

<100 m 100-150 m 150-200 m Not Available

Page 16: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind

Future Turbine Capacity (% Capacity)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027 Grand Total

With

Planning

In Planning Going Into Planning

2-4 MW 4-6 MW Not Available

Page 17: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind

Planning Duration (% Capacity)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027

With

Planning

In Planning Going Into Planning Grand Total

25 Years 30 Years >30 Years Not Available

Page 18: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind

Type of Grid Connection: DSO/TSO

0

5

10

15

20

25

30

0

200

400

600

800

1000

1200

1400

1600

1800

2020/2021 2022 2023 2024 2025 2026 2027

With

Planning

In Planning Going Into

Planning

0 0 0 0 0 0

Nu

mb

er

of

Gri

d C

on

nect

ion

s

Typ

e o

f G

rid

Co

nn

ect

ion

(M

W)

Transmission (MW) Distribution (MW) Transmission (#) Distribution (#)

Page 19: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore: Type of Grid Connection

DSO/TSO: By Capacity

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027

With Planning In Planning Going Into

Planning

0 0 0 0 0 0

Typ

e o

f G

rid

Co

nn

ect

ion

(M

W)

Transmission (MW) Distribution (MW)

Page 20: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore: Type of Grid Connection

DSO/TSO: By Number of Projects

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2020/2021 2022 2023 2024 2025 2026 2027

With Planning In Planning Going Into

Planning

0 0 0 0 0 0

Nu

mb

er

of

Gri

d C

on

nect

ion

s

Transmission (#) Distribution (#)

Page 21: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Onshore Wind

Number of Projects by Grid Connection

Excludes REFIT Projects. Includes existing CPPAs and all other Future CPPAs/RESS Projects.

Going Into PlanningGrand Total

2020/2021 2022 2023 2024 2025 2026 2027

Transmission (MW)

Distribution (MW)

Total (MW)

Transmission (#)

Distribution (#)

Total (#)

Page 22: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Part B: IWEA Future Offshore Pipeline ReportAugust 2020

Contact: [email protected]

Page 23: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Confidential

The content of this report is confidential andintended for the recipient specified in the first slide.It is strictly forbidden to share any part of this reportwith any third party, without the written consent ofIWEA. If you received this report by mistake or from asource other than IWEA, then please contact IWEA([email protected]) and follow with its deletion, sothat we can ensure this does not occur in the future.

Disclaimer

IWEA assumes no responsibility for the currentness,correctness, completeness or quality of the providedinformation. Liability claims against IWEA based onlosses of a tangible or intellectual nature caused bythe use or the failure to use the provided information,or the use of incorrect and incomplete informationare categorically excluded, unless IWEA can be provento have acted with intent or gross negligence. Allcontent is non-binding and subject to change withoutnotice. IWEA expressly reserves the right to change,supplement, or delete parts of this report or theentire content without notice, and temporarily orpermanently discontinue the publication.

Terms of Use

Page 24: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Caveat regarding the information contained in this report

This report was compiled using information submitted to IWEA by its members, based on their mostaccurate estimations of when their projects will apply for planning consent, and the make up of saidprojects in terms of capacity, turbine size etc. This information is subject to change and all the projectsincluded in this report may not be progressed.

The rate of development of this pipeline is also highly dependent on the policy framework that is put inplace by Government to facilitate offshore wind in this country over the coming months and years, withno route to commissioning a project currently in place.

There is also the possibility that some of the intended project sites in this pipeline will overlap andtherefore all projects would not be able to progress as planned.

Finally, there is the possibility that other organisations that are not members with IWEA have projectsplanned that are not captured in this pipeline report.

Page 25: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

4 projects planned for the Atlantic Ocean

6 projects planned for the Celtic Sea

13 projects planned for the Irish Sea

Over 10 different developers involved

in projects

An expected average project capacity of

over 700 MWOver 16 GW

Ireland’s Offshore Wind Pipeline Overview – August 2020

23 Projects in the Irish offshore wind

pipeline

Page 26: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Projects and Approximate Capacity Excepted to Apply for Planning Consent

Number of Projects Capacity (MW)

Low High Low High

2021

2022

2023

2024

2025

0

2000

4000

6000

8000

10000

12000

2021 2022 2023 2024 2025

2 - 4 1 - 3 10 - 14 2 - 4 1 - 2

Cap

acit

y (M

W)

Capacity (Low) Capacity (High)

Year Expected to Apply :

Number of Projects:

Page 27: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

0

200

400

600

800

1000

1200

2021 2022 2023 2024 2025 Pipeline Average

Cap

acit

y (M

W)

Year Expected to Apply for Planning

Average Expected Capacity of Project Applying for Planning Each Year

Page 28: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

Expected Project Location

East Coast/Irish Sea South Coast/Celtic Sea West Coast/Atlantic Ocean

Number of projects Approximate Capacity (MW) Number of Projects Approximate Capacity (MW) Number of Projects Approximate Capacity (MW)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2021 2022 2023 2024 2025 Total

Per

cen

tage

of

Pro

ject

s

Year Expected to Apply for Plannning

Page 29: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2021 2022 2023 2024 2025 Total

Per

cetn

age

of

Pro

ject

s

Year Expected to Apply for Planning

Expected Project Foundation Type

West Coast/Atlantic Ocean South Coast/Celtic Sea East Coast/Irish Sea Total

Fixed

Floating

Undecided

Total

Page 30: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2021 2022 2023 2024 2025 Total

Per

cen

tage

of

Pro

ject

s

Year Expected to Apply for Planning

Expected Average Water Depth of Projects

West Coast/Atlantic Ocean South Coast/Celtic Sea East Coast/Irish Sea Total

20-40m

40-60m

60-80m

> 100m

Not Available

Total

Page 31: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

2

14 Projects

7 Projects

0-10 km 10-20 km 20-40 km

Expected Distance from Shore to Project

Project Distance from shore and location Distance from Shore Atlantic Ocean Celtic Sea Irish Sea Total

0-10 km

10-20 km

20-40 km

Total

Page 32: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

2

1

9 Projects

8 Projects

3

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2021 2022 2023 2024 2025 Total

Per

cen

tage

of

Pro

ject

s

Year Expected to Apply for Planning

Expected Future Tip Heights

Page 33: IWEA Future Onshore & Offshore Pipeline Reports August 2020...Ireland’s Offshore Wind Pipeline Overview –August 2020 23 Projects in the Irish offshore wind pipeline Projects and

1

11 Projects9 Projects

2

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2021 2022 2023 2024 2025 Total

Per

cen

tage

of

Pro

ject

s

Year Expected to Apply for Planning

Expected Future Turbine Capacity