(iwmp-xii)watershed.cg.gov.in/success story/success story pmksy-wdc... · 2019. 8. 22. · s.no....
TRANSCRIPT
(IWMP-XII)
(IWMP-XII)
% %
mbgl
mbgl
<7.0 lps
IWMP
PRA
FGD
Picture No.1 : Check Dam no. 01
Picture No.2 : Check Dam no. 02
Picture No. 3 Grassland Development near Check Dam
Picture No.4: Plantation of Horticulture plants
Picture No.5: Plantation of Horticulture plants
S.No. Critical Inputs Cost (In Lakh) Convergence
1
Fencing with RCC Pole and barbed
wire 2
IWMP (5.28 lakhs) Ring Well 3
Pitcher System 0.18
Fertilizers & Pesticide 0.1
2
Mango Plants (300) 0.09
KVK-Bastar (0.62 lakh)
Litchi Plants (55) 0.03
Citrus Plants (150) 0.04
Coconut Plants (70) 0.04
Banana (50) 0.02
Pump Diesel/Electric (Shakambari) 0.16
Sprinkler System (NHM) 0.1
3 Crop Production & Vegetables 0.15
Total 5.9
Table No. 01 Details of Convergence between IWMP programme and KVK Jagdalpur
S.No. Crop Area Yield(qt./1000sq.m) Cost of
Cultivation
Gross
Income
(in Rs.)
Net
Income
(in Rs.) (sq.m)
1 Brinjal 1000 12 5500 12000 6500
2 Tomato 1000 14 5400 11200 5800
3 Onion 1000 10 4500 12000 7500
4 Chilli 1000 15 5600 12000 6400
5 Okra 1000 8 3000 6400 3400
Table No. 02 Details of Vegetable production in the Watershed Area
Graph No. 01 Graph showing Vegetable Production in the Watershed area
0
2000
4000
6000
8000
10000
12000
14000
Brinjal Tomato Onion Chilli Okra
Area
(in Sq.m)
Cost of Cultivation
Gross Income (in Rs.)
Net Income (in Rs.)
Picture No.6: Sprinkler Irrigation
Picture No.7: Sprinkler Irrigation
roho, katla, mringal, silver-carp
Picture No.8: Fishery done by User Group
Picture No.9. PIA gone for monitoring at Oyster Mushroom Production Centre by
Rama Female SHG (12 members)
Picture No. 10 Rama Female SHG (12 members)
IWMP
Picture No. 11 Vermi-Compost Shed
Picture No. 12 SHG making Vermi-compost