j05 267 140r march2007v15 sdt - transport scotland...location of boreholes project: drawing: client:...

40
Mouchel Fairhurst JV Raith M74 Junction 5 March 2007 J05/267/140R Figures

Upload: others

Post on 06-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Mouchel Fairhurst JV Raith M74 Junction 5

    March 2007 J05/267/140R

    Figures

  • 0m 1000m500m

    Junction 5 – M74

    Reproduced from Road Map 3 1:250 000 scale by permission of Ordnance Survey ® on

    behalf of The Controller of Her Majesty’s Stationery Office. © Crown Copyright 2001. All

    rights reserved. Licence number 100046014

    Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    August 2006

    Figure 1.1(J05/267/223D)

    Site location

    JGG DJF

    Not To Scale

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    August 2006

    Figure 2.1(J05/267/264D)

    Site location and surrounding area

    JGG

    Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.

    Pond No. 5

    Location of Site

    River Clyde

    StrathclydeLoch

    Proposed Location of Underpass

    DJF

    Pond No. 1 (in SSSI)

    70 71 72 73

    57

    58

    59

    60

    61

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    August 2006

    Figure 2.2(J05/267/225D)

    Proposed route of underpass

    JGG DJF

    Proposed Route of Underpass

    Not To Scale

    Based on Mouchel Fairhurstdrawings referenceM8MFJV.ST3.G.1212revB,M8MFJV.ST3.G.1214revA andRAITHMFJV/ST3/S/1010

    Ch.500.0

    Ch.650.0

    Ch.900.0

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 3.1J05/267/266D

    Mouchel Fairhurst JV

    November 2006

    DJF

    Metres OD

    Idealised Conceptual Model

    Not to Scale

    30

    25

    20

    15

    10

    5

    0

    SDT

    M74

    South North

    Highest recordedPiezometric water levelin BH270A @ 25.92m OD

    Approx. 600 m

    Approx. 700m

    Pond 1

    RiverClyde

    Pond No.5

    Approx. 400 m

    Lowest recordedPiezometric water levelin BH217 @ 18.56m OD

    30

    25

    20

    15

    10

    5

    0

    A725 A725BH217

    BH 230

    BH 270A

    Idealised Conceptual model

    Level of rock headunknown at this location

    Ground conditions andgeology unknown

    Made Ground

    Glacial Till

    Marine and Glaciolacustrine Silt/Clay

    ROCK HEADUpper Coal Measures which includes horizons of Sandstone, Mudstone and Siltstone

    Proposed underpass

    Lower Sand and Gravel Alluvial and Glacial deposits consisting of horizons of Sands, Gravels, Silts, Clay, and Glacial Till

    Upper Sand and Gravel Alluvial and Glacial deposits consisting of Silt and Clay with horizons of sand and gravel

    Pond 3

    Metres OD

  • Location of Boreholes

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 4.1(J05/267/276D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2084BH209

    4BH207

    4BH207A

    4BH211

    4BH215

    4BH2164BH217

    4BH221

    4BH2244BH225

    4BH218B

    4BH226

    4BH2274BH228

    4BH2314BH233

    4BH234

    4BH238A

    4BH238B

    4BH239

    4BH241

    4BH242

    4BH243

    4BH247

    4BH249

    4BH252A

    4BH214

    4BH265

    4BH266

    4BH268

    4BH269

    4BH270A

    4BH272

    4BH274

    4BH288

    4BH290

    4BH2534BH255

    4BH275

    110 m to NNE20 m to NE

    270 m to SW4BH201

    N

    Pumping and Observation WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in RockResponse Zone in Clay

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    4BH210

    Use of Well:

    Response Zone Location:

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    March 2007

    Figure 4.2 (J05/267/298D)

    Contour plot of groundwater levels

    LCP

    N

    18.0m OD

    18.5m OD

    19.0m OD

    19.5m OD

    20.0m OD

    20.5m OD

    21.0m OD

    21.5m OD

    22.0m OD

    22.5m OD

    23.0m OD

    23.5m OD

    24.0m OD

    24.5m OD

    25.0m OD

    SDT

  • Project:

    Client:

    Drawing:

    Description:Groundwater Specialists

    OGIDate:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 5.1J05/267/230D

    JGGDrawdown curve

    August 2006

    Mouchel Fairhurst JV

    Pumping from 4BH217 - 8hr testDrawdown observed in 4BH216

    0.00

    0.02

    0.04

    0.06

    0.08

    0.10

    0.12

    0.14

    0.16

    0.18

    0.200.00 100.00 200.00 300.00 400.00 500.00 600.00

    Time in minutes since start of test

    Dra

    wdo

    wn

    in m

    etre

    s

    SDT

  • Project:

    Client:

    Drawing:

    Description:Groundwater Specialists

    OGIDate:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 5.2J05/267/231D

    JGGLogarithmic drawdown curve

    August 2006

    Mouchel Fairhurst JV

    Pumping from 4BH217 - 8hr testDrawdown observed in 4BH216 (semi-log graph)

    0.00

    0.02

    0.04

    0.06

    0.08

    0.10

    0.12

    0.14

    0.16

    0.18

    0.201.00 10.00 100.00 1000.00

    Time in minutes since start of test

    Dra

    wdo

    wn

    in m

    etre

    s

    SDT

  • Project:

    Client:

    Drawing:

    Description:Groundwater Specialists

    OGIDate:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 5.3J05/267/232D

    JGGLogarithmic curve and best fit line

    August 2006

    Mouchel Fairhurst JV

    Pumping from 4BH217 - 8hr testDrawdown observed in 4BH216 (semi-log graph)

    0.00

    0.02

    0.04

    0.06

    0.08

    0.10

    0.12

    0.14

    0.16

    0.18

    0.201.00 10.00 100.00 1000.00

    Time in minutes since start of test

    Dra

    wdo

    wn

    in m

    etre

    s

    0.1500

    0.0845

    0.0655

    SDT

    Q = 94.2 m3/dayT = 263.2 m2/day

  • BH209 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.4(J05/267/278D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2084BH209

    4BH207

    4BH207A

    4BH217

    4BH214*

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH209 Pumping TestLocation of Pumping and Observation Wells

    First Test Date: 02 Feb 06First Test Duration: 2.5 hours

    Second Test Date: 06 Feb 06Second Test Duration: 8 hours

  • BH217 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.5(J05/267/279D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2084BH209

    4BH2164BH217 4BH218B

    4BH265

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH217 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 14 Feb 06Test Duration: 8 hours

  • BH217 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.6(J05/267/280D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2084BH209

    4BH2164BH217

    4BH225

    4BH218B

    4BH265

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH217 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 23 Feb 06 – 24 Feb 06Test Duration: 24 hours

  • BH265A Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.7(J05/267/300D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2084BH209

    4BH2164BH217

    4BH225

    4BH218B

    4BH265

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH265 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 28 Feb 06 – 01 Mar 06Test Duration: 24 hours

  • BH270A Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.8(J05/267/282D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH241*

    4BH265*

    4BH270A

    4BH272

    4BH274

    4BH290

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH270A Pumping TestLocation of Pumping and Observation Wells

    Test Date: 14 Apr 06Test Duration: 8 hours

  • BH228 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.9(J05/267/283D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2284BH288

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH228 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 04 May 06Test Duration: 8 hours

  • BH224 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.10(J05/267/284D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH224

    4BH218B

    4BH234

    4BH265

    4BH266

    4BH268*

    4BH288

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH224 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 08 May 06Test Duration: 8 hours

  • BH217 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.11(J05/267/285D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH2164BH217 4BH218B

    4BH233*

    4BH266

    4BH269*

    4BH270A*

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH217 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 13 May 06 – 19 May 06Test Duration: 6 days

  • BH270A Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.12(J05/267/286D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH228*

    4BH234

    4BH238B

    4BH239

    4BH252A

    4BH265*

    4BH266

    4BH268

    4BH270A

    4BH274

    4BH290

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH270A Pumping TestLocation of Pumping and Observation Wells

    Test Date: 22 May 06 – 06 Jun 06Test Duration: 14 days, 18 hours

  • BH234 Pump Test Well Locations

    Drawing:Project:

    Client: Description:

    Drawn by:Date:

    © OGI Groundwater Specialists Limited 2007

    J5 M74 Raith

    Mouchel-Fairhurst JV

    March 2007

    Figure 5.13(J05/267/287D)

    JG DFChecked by:

    Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)

    4BH225*

    4BH2314BH233*

    4BH234

    4BH239*

    4BH241*

    4BH268*

    4BH269

    N

    Pumping WellObservation Well

    Response Zone in Lower GravelResponse Zone in Upper Gravel

    Response Zone in Rock

    Response Zone in Upper and Lower Gravel

    Key

    100 m(Approximate Scale)

    Use of Well:

    Response Zone Location:

    * - Indicates that the data from this well was not analysed

    BH234 Pumping TestLocation of Pumping and Observation Wells

    Test Date: 10 Jun 06 – 11 Jun 06Test Duration: 24 hours

  • Project:

    Client:

    Drawing:

    Description:Groundwater Specialists

    OGIDate:

    Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Pump Well 270AObservation 272

    March 2007

    SDT JGG

    Figure 5.14(J05/267/288D)

    0.000

    0.200

    0.400

    0.600

    0.800

    1.000

    1.200

    1.400

    1.600

    1.800

    2.0000.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00

    Time in minutes since start of pump test

    Dra

    wdo

    wn

    in m

    etre

    s

    Pumping Rate = 1135 cu.m/day Distance from Obs Well = 174m

    Pumping Period

    Recovery Period

    Pumping from BH270A - 14 Apr 06 Drawdown in Observation Well 272

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

  • Project:

    Client:

    Drawing:

    Description:Groundwater Specialists

    OGIDate:

    Drawn by: Checked by:

    © OGI Groundwater Specialists 2007Mouchel Fairhurst JV Pump Well 270A

    Observation 272

    March 2007

    SDT JGG

    Figure 5.15(J05/267/289D)

    Pumping from BH270A - 14 Apr 06 Drawdown in Observation Well 272

    Simulated by Groundwater Computer Model0.000

    0.200

    0.400

    0.600

    0.800

    1.000

    1.200

    1.400

    1.600

    1.800

    2.0000.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00

    Time in minutes since start of pump test

    Dra

    wdo

    wn

    in m

    etre

    s

    Pumping Rate = 1135 cu.m/day Distance from Obs Well = 174m

    Pumping Period Recovery Period

    Computer Simulation of Drawdown With Transmissivity T = 80sq.m/d Storage Coefficient, S = 0.0007

    Junction 5 - M74Raith

  • Project:

    Client:

    Drawing:

    Description:Groundwater Specialists

    OGIDate:

    Drawn by: Checked by:

    © OGI Groundwater Specialists 2007

    Junction 5 - M74Raith

    Figure 5.16J05/267/290D

    JGGLogarithmic curve and CVM fit line

    March 2007

    Mouchel Fairhurst JV SDT

    T = 55 sq.m/day

    S = 0.0006

    Leakance = 0.00285 /day

    -0.500

    0.000

    0.500

    1.000

    1.500

    2.000

    2.500

    3.000

    3.5001 10 100 1000 10000 100000

    Time in Minutes Since Start of Pump Test

    Dra

    wdo

    wn

    in M

    etre

    s

    Field Data

    CVM Fit

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © OGI Groundwater Specialists 2007

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    March 2007

    Figure 6.1(Ref:J05/267/291D)

    Drawing showing possible location of internal wells

    SDT

    Not To Scale

    Based on Mouchel Fairhurstdrawings referenceM8MFJV.ST3.G.1212revB andRAITHMFJV/ST3/S/1010

    Structural deck 1AWestern Roundabout

    Structural deck 1BM74

    Structural deck 1C Eastern Roundabout

    JGG

    Northeast Dewatering wells

    Southwest Dewatering Wells

    100 metres

    Approximate Scale

    Ch.500.0

    Ch.650.0

    Ch.900.0

  • Piezometric Levels (Chainage Section)

    14

    16

    18

    20

    22

    24

    26

    28

    0 200 400 600 800 1000 1200 1400 1600

    Distance along chainage (m)

    Piez

    omet

    ric h

    ead

    (m)

    OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Junction 5 - M74Raith

    Figure 6.2(J05/267/292D)

    Mouchel Fairhurst JV

    March 2007

    JGGPreconstruction

    groundwater level SW - NE section

    SDT

    Measured Groundwater Levels in Boreholes

    Modelled Initial Piezometric Level

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 6.3(J05/267/247D)

    Mouchel Fairhurst JV

    August 2006

    SDT LCP

    CLCut-off wall

    Simulated groundwater flow to underpassexcavation with cut-off wall penetrating to 7m OD

    Groundwater flow net with penetrating cut-off

    wall to 7m OD

    +14m OD

    +22m ODGroundwater

    Discharge

    Underpass

  • Made Ground

    Sand/Gravel

    Rock

    OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 6.4(J05/267/248D)

    Mouchel Fairhurst JV

    August 2006

    SDT LCP

    CLCut-off wall

    Simulated groundwater flow to underpassexcavation with cut-off wall penetrating to 7m OD

    Water table with cut-off penetrating wall to 7m OD

    +16m OD

    Underpass

    GroundwaterDischarge

    +14m OD

    Water Table

    Note: Water Table immediately outside cut off wall is 16m OD

    +22m OD

  • Piezometric Levels (Chainage Section)

    14

    16

    18

    20

    22

    24

    26

    28

    0 200 400 600 800 1000 1200 1400 1600

    Distance along chainage (m)

    Piez

    omet

    ric h

    ead

    (m)

    OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Junction 5 - M74Raith

    Figure 6.5(J05/267/293D)

    Mouchel Fairhurst JV

    March 2007

    JGGDewatered

    groundwater level SW - NE section

    SDT

    Measured Groundwater Levels in Boreholes

    Modelled Initial Piezometric Level

    Simulated Dewatering Piezometric Level

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    August 2006

    Figure 6.6(J05/267/250D)

    Plan view of section along proposed unerpass

    JGG

    Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number 100046014.

    DJF

    70 71 72 73

    57

    58

    59

    60

    61

    Section Along Proposed Underpass

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    August 2006

    Simulated drawdown

    JGG SDT

    Figure 6.7(J05/267/251D)

    1m

    2m

    1.5m

    PredictedPiezometric Drawdown

    Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.

    Piezometric head at excavation at 16m OD.

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © OGI Groundwater Specialists 2007

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    March 2007

    Drawdown simulation for14m OD inside excavation

    JGG SDT

    Figure 6.8(J05/267/299D)

    Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number 100046014.

    3m

    1m

    2m

    PredictedPiezometric Drawdown

  • Piezometric Levels (Chainage Section)

    14

    16

    18

    20

    22

    24

    26

    28

    0 200 400 600 800 1000 1200 1400 1600

    Distance along chainage (m)

    Piez

    omet

    ric h

    ead

    (m)

    OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © OGI Groundwater Specialists 2007

    Junction 5 - M74Raith

    Figure 6.9(J05/267/294D)

    Mouchel Fairhurst JV

    March 2007

    JGGArtesian pressure relief

    SW-NE along underpass

    SDT

    Modelled Initial Piezometric Level

    Reduction in Piezometric Head During FirstStage Dewatering/Pressure Relief

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    March 2007

    Simulated reduction in artesian pressure head

    JGG SDT

    Figure 6.10(J05/267/295D)

    1.0m

    1.4m

    1.2m

    Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.

    Simulated Reduction in Artesian Pressure Head Due to First Stage Dewatering and Artesian Pressure Relief

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © OGI Groundwater Specialists 2007

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    March 2007

    Simulated reduction in artesian pressure head

    JGG SDT

    Figure 6.11(J05/267/296D)

    1.0m

    1.4m

    1.2m

    Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.

    Simulated Reduction in Artesian Pressure Head Due to First Stage Dewatering and Artesian Pressure Relief

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Junction 5 - M74Raith

    Figure 6.12 J05/267/275D

    Mouchel Fairhurst JV SDTConceptual modelat Pond No.5

    Not to Scale

    JGG

    Conceptual model of the groundwater and surface water flow recharging at Pond No. 5

    Likely small Contribution of Artesian water

    recharging the pond

    Surface wa

    ter recharg

    e

    Pond No. 5

    Alluvial / Glacial deposits consisting of Sand, Gravel,

    Silt and Clay

    Direction of groundwater flow

    ROCK - depth to rock head uncertainbut assumed to be approximately 15m bgl

    Direction of groundwater flow

    February 2007

    DirectRainfall

    Near Surfa

    ce

    Groundwa

    ter Flow

    Alluvial / Glacial deposits consisting of Sand, Gravel,

    Silt and Clay

    Surface wate

    r

    recharge

    Near Surfa

    ce

    Groundwa

    ter Flow

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © OGI Groundwater Specialists Limited 2007

    Junction 5 - M74Raith

    Figure 7.1(J05/267/297D)

    Mouchel Fairhurst JV

    March 2007

    SDT DJFPiezometric head during dewatering

    Pre-Construction & during Dewatering Piezometric Head

    -10

    -5

    0

    5

    10

    15

    20

    25

    16 17 18 19 20 21 22 23 24 25 26

    Piezometric Head (mOD)

    Elev

    atio

    n (m

    OD

    )Initial pre-Dewatering Piezometric Head Distribution

    Dewatering to 18mOD

    3m Head reduction to ground levelFurther 4m Head reduction to 18mOD head

    Ground Level 22mOD

    Reduced Piezometrichead to 18m OD

    Initial Artesian Head

    Dewatering to 22mOD

    Rock

    Initial seepagedue to upward

    hydraulic gradient

    General downward flow torock from natural surface recharge

    Rock

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 7.2(J05/267/258D)

    Mouchel Fairhurst JV SDTConceptual model of existing conditions

    at north of site

    Not to Scale

    DJF

    Conceptual model of the upward flow of groundwater under existing conditions

    Artesian water recharging upper strata

    Direction of groundwater flow

    in upper Sand & Gravel

    ROCK - depth to rock head uncertainbut assumed to be at approximately 0mOD

    Direction of groundwater flow

    in Rock

    August 2006

    Existing Piezometric

    surface in rock to n

    ear ground surface

    Clay aquitard

    Existing water table

    in upper aquifer

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 7.3(J05/267/259D)

    Mouchel Fairhurst JV SDTConceptual modelat north of site

    Not to Scale

    DJF

    Conceptual model of the upward flow of groundwater under dewatering conditions

    Reduced Artesian water recharging upper strata

    Direction of groundwater flow

    in upper Sand & Gravel

    ROCK - depth to rock head uncertainbut assumed to be at approximately 0mOD

    Direction of groundwater flow

    in Rock

    August 2006

    Depressed Piezome

    tric surface in rock t

    o near ground surfa

    ce

    Clay aquitard

    Lowering of water t

    able in upper aquife

    r

  • OGIProject:

    Client:

    Drawing:

    Description:Groundwater Specialists

    Date:

    Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Figure 7.4(J05/267/260D)

    Mouchel Fairhurst JV

    August 2006

    LCPSchematic of recharge system

    SDT

    Not to Scale

    Q outQ in Q out Q inExcavation

  • Groundwater Specialists

    Drawing:

    OGIProject:

    Client: Description:

    Date: Drawn by: Checked by:

    © Oxford Geotechnica International (UK) Ltd 2006

    Junction 5 - M74Raith

    Mouchel Fairhurst JV

    August 2006

    Figure 7.5(Ref:J05/267/261D)

    Possible location of dewatering and external recharge wells

    SDT

    Not To Scale

    Based on Mouchel Fairhurstdrawings referenceM8MFJV.ST3.G.1212revB andRAITHMFJV/ST3/S/1010

    JGG

    Preliminary Drawing

    100 metres

    Approximate Scale

    Internal Dewatering Wells

    External Recharge Wells

    Ch.500.0

    Ch.650.0

    Ch.500.0