j05 267 140r march2007v15 sdt - transport scotland...location of boreholes project: drawing: client:...
TRANSCRIPT
-
Mouchel Fairhurst JV Raith M74 Junction 5
March 2007 J05/267/140R
Figures
-
0m 1000m500m
Junction 5 – M74
Reproduced from Road Map 3 1:250 000 scale by permission of Ordnance Survey ® on
behalf of The Controller of Her Majesty’s Stationery Office. © Crown Copyright 2001. All
rights reserved. Licence number 100046014
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Mouchel Fairhurst JV
August 2006
Figure 1.1(J05/267/223D)
Site location
JGG DJF
Not To Scale
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Mouchel Fairhurst JV
August 2006
Figure 2.1(J05/267/264D)
Site location and surrounding area
JGG
Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.
Pond No. 5
Location of Site
River Clyde
StrathclydeLoch
Proposed Location of Underpass
DJF
Pond No. 1 (in SSSI)
70 71 72 73
57
58
59
60
61
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Mouchel Fairhurst JV
August 2006
Figure 2.2(J05/267/225D)
Proposed route of underpass
JGG DJF
Proposed Route of Underpass
Not To Scale
Based on Mouchel Fairhurstdrawings referenceM8MFJV.ST3.G.1212revB,M8MFJV.ST3.G.1214revA andRAITHMFJV/ST3/S/1010
Ch.500.0
Ch.650.0
Ch.900.0
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 3.1J05/267/266D
Mouchel Fairhurst JV
November 2006
DJF
Metres OD
Idealised Conceptual Model
Not to Scale
30
25
20
15
10
5
0
SDT
M74
South North
Highest recordedPiezometric water levelin BH270A @ 25.92m OD
Approx. 600 m
Approx. 700m
Pond 1
RiverClyde
Pond No.5
Approx. 400 m
Lowest recordedPiezometric water levelin BH217 @ 18.56m OD
30
25
20
15
10
5
0
A725 A725BH217
BH 230
BH 270A
Idealised Conceptual model
Level of rock headunknown at this location
Ground conditions andgeology unknown
Made Ground
Glacial Till
Marine and Glaciolacustrine Silt/Clay
ROCK HEADUpper Coal Measures which includes horizons of Sandstone, Mudstone and Siltstone
Proposed underpass
Lower Sand and Gravel Alluvial and Glacial deposits consisting of horizons of Sands, Gravels, Silts, Clay, and Glacial Till
Upper Sand and Gravel Alluvial and Glacial deposits consisting of Silt and Clay with horizons of sand and gravel
Pond 3
Metres OD
-
Location of Boreholes
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 4.1(J05/267/276D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2084BH209
4BH207
4BH207A
4BH211
4BH215
4BH2164BH217
4BH221
4BH2244BH225
4BH218B
4BH226
4BH2274BH228
4BH2314BH233
4BH234
4BH238A
4BH238B
4BH239
4BH241
4BH242
4BH243
4BH247
4BH249
4BH252A
4BH214
4BH265
4BH266
4BH268
4BH269
4BH270A
4BH272
4BH274
4BH288
4BH290
4BH2534BH255
4BH275
110 m to NNE20 m to NE
270 m to SW4BH201
N
Pumping and Observation WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in RockResponse Zone in Clay
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
4BH210
Use of Well:
Response Zone Location:
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Junction 5 - M74Raith
Mouchel Fairhurst JV
March 2007
Figure 4.2 (J05/267/298D)
Contour plot of groundwater levels
LCP
N
18.0m OD
18.5m OD
19.0m OD
19.5m OD
20.0m OD
20.5m OD
21.0m OD
21.5m OD
22.0m OD
22.5m OD
23.0m OD
23.5m OD
24.0m OD
24.5m OD
25.0m OD
SDT
-
Project:
Client:
Drawing:
Description:Groundwater Specialists
OGIDate:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 5.1J05/267/230D
JGGDrawdown curve
August 2006
Mouchel Fairhurst JV
Pumping from 4BH217 - 8hr testDrawdown observed in 4BH216
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.200.00 100.00 200.00 300.00 400.00 500.00 600.00
Time in minutes since start of test
Dra
wdo
wn
in m
etre
s
SDT
-
Project:
Client:
Drawing:
Description:Groundwater Specialists
OGIDate:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 5.2J05/267/231D
JGGLogarithmic drawdown curve
August 2006
Mouchel Fairhurst JV
Pumping from 4BH217 - 8hr testDrawdown observed in 4BH216 (semi-log graph)
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.201.00 10.00 100.00 1000.00
Time in minutes since start of test
Dra
wdo
wn
in m
etre
s
SDT
-
Project:
Client:
Drawing:
Description:Groundwater Specialists
OGIDate:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 5.3J05/267/232D
JGGLogarithmic curve and best fit line
August 2006
Mouchel Fairhurst JV
Pumping from 4BH217 - 8hr testDrawdown observed in 4BH216 (semi-log graph)
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.201.00 10.00 100.00 1000.00
Time in minutes since start of test
Dra
wdo
wn
in m
etre
s
0.1500
0.0845
0.0655
SDT
Q = 94.2 m3/dayT = 263.2 m2/day
-
BH209 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.4(J05/267/278D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2084BH209
4BH207
4BH207A
4BH217
4BH214*
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH209 Pumping TestLocation of Pumping and Observation Wells
First Test Date: 02 Feb 06First Test Duration: 2.5 hours
Second Test Date: 06 Feb 06Second Test Duration: 8 hours
-
BH217 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.5(J05/267/279D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2084BH209
4BH2164BH217 4BH218B
4BH265
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH217 Pumping TestLocation of Pumping and Observation Wells
Test Date: 14 Feb 06Test Duration: 8 hours
-
BH217 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.6(J05/267/280D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2084BH209
4BH2164BH217
4BH225
4BH218B
4BH265
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH217 Pumping TestLocation of Pumping and Observation Wells
Test Date: 23 Feb 06 – 24 Feb 06Test Duration: 24 hours
-
BH265A Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.7(J05/267/300D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2084BH209
4BH2164BH217
4BH225
4BH218B
4BH265
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH265 Pumping TestLocation of Pumping and Observation Wells
Test Date: 28 Feb 06 – 01 Mar 06Test Duration: 24 hours
-
BH270A Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.8(J05/267/282D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH241*
4BH265*
4BH270A
4BH272
4BH274
4BH290
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH270A Pumping TestLocation of Pumping and Observation Wells
Test Date: 14 Apr 06Test Duration: 8 hours
-
BH228 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.9(J05/267/283D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2284BH288
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH228 Pumping TestLocation of Pumping and Observation Wells
Test Date: 04 May 06Test Duration: 8 hours
-
BH224 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.10(J05/267/284D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH224
4BH218B
4BH234
4BH265
4BH266
4BH268*
4BH288
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH224 Pumping TestLocation of Pumping and Observation Wells
Test Date: 08 May 06Test Duration: 8 hours
-
BH217 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.11(J05/267/285D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH2164BH217 4BH218B
4BH233*
4BH266
4BH269*
4BH270A*
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH217 Pumping TestLocation of Pumping and Observation Wells
Test Date: 13 May 06 – 19 May 06Test Duration: 6 days
-
BH270A Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.12(J05/267/286D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH228*
4BH234
4BH238B
4BH239
4BH252A
4BH265*
4BH266
4BH268
4BH270A
4BH274
4BH290
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH270A Pumping TestLocation of Pumping and Observation Wells
Test Date: 22 May 06 – 06 Jun 06Test Duration: 14 days, 18 hours
-
BH234 Pump Test Well Locations
Drawing:Project:
Client: Description:
Drawn by:Date:
© OGI Groundwater Specialists Limited 2007
J5 M74 Raith
Mouchel-Fairhurst JV
March 2007
Figure 5.13(J05/267/287D)
JG DFChecked by:
Scale: Not To ScaleDrawing based on: Raeburn Fig No A2 (Contract No. 18622-04)
4BH225*
4BH2314BH233*
4BH234
4BH239*
4BH241*
4BH268*
4BH269
N
Pumping WellObservation Well
Response Zone in Lower GravelResponse Zone in Upper Gravel
Response Zone in Rock
Response Zone in Upper and Lower Gravel
Key
100 m(Approximate Scale)
Use of Well:
Response Zone Location:
* - Indicates that the data from this well was not analysed
BH234 Pumping TestLocation of Pumping and Observation Wells
Test Date: 10 Jun 06 – 11 Jun 06Test Duration: 24 hours
-
Project:
Client:
Drawing:
Description:Groundwater Specialists
OGIDate:
Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Pump Well 270AObservation 272
March 2007
SDT JGG
Figure 5.14(J05/267/288D)
0.000
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
2.0000.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00
Time in minutes since start of pump test
Dra
wdo
wn
in m
etre
s
Pumping Rate = 1135 cu.m/day Distance from Obs Well = 174m
Pumping Period
Recovery Period
Pumping from BH270A - 14 Apr 06 Drawdown in Observation Well 272
Junction 5 - M74Raith
Mouchel Fairhurst JV
-
Project:
Client:
Drawing:
Description:Groundwater Specialists
OGIDate:
Drawn by: Checked by:
© OGI Groundwater Specialists 2007Mouchel Fairhurst JV Pump Well 270A
Observation 272
March 2007
SDT JGG
Figure 5.15(J05/267/289D)
Pumping from BH270A - 14 Apr 06 Drawdown in Observation Well 272
Simulated by Groundwater Computer Model0.000
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
2.0000.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00
Time in minutes since start of pump test
Dra
wdo
wn
in m
etre
s
Pumping Rate = 1135 cu.m/day Distance from Obs Well = 174m
Pumping Period Recovery Period
Computer Simulation of Drawdown With Transmissivity T = 80sq.m/d Storage Coefficient, S = 0.0007
Junction 5 - M74Raith
-
Project:
Client:
Drawing:
Description:Groundwater Specialists
OGIDate:
Drawn by: Checked by:
© OGI Groundwater Specialists 2007
Junction 5 - M74Raith
Figure 5.16J05/267/290D
JGGLogarithmic curve and CVM fit line
March 2007
Mouchel Fairhurst JV SDT
T = 55 sq.m/day
S = 0.0006
Leakance = 0.00285 /day
-0.500
0.000
0.500
1.000
1.500
2.000
2.500
3.000
3.5001 10 100 1000 10000 100000
Time in Minutes Since Start of Pump Test
Dra
wdo
wn
in M
etre
s
Field Data
CVM Fit
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© OGI Groundwater Specialists 2007
Junction 5 - M74Raith
Mouchel Fairhurst JV
March 2007
Figure 6.1(Ref:J05/267/291D)
Drawing showing possible location of internal wells
SDT
Not To Scale
Based on Mouchel Fairhurstdrawings referenceM8MFJV.ST3.G.1212revB andRAITHMFJV/ST3/S/1010
Structural deck 1AWestern Roundabout
Structural deck 1BM74
Structural deck 1C Eastern Roundabout
JGG
Northeast Dewatering wells
Southwest Dewatering Wells
100 metres
Approximate Scale
Ch.500.0
Ch.650.0
Ch.900.0
-
Piezometric Levels (Chainage Section)
14
16
18
20
22
24
26
28
0 200 400 600 800 1000 1200 1400 1600
Distance along chainage (m)
Piez
omet
ric h
ead
(m)
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Junction 5 - M74Raith
Figure 6.2(J05/267/292D)
Mouchel Fairhurst JV
March 2007
JGGPreconstruction
groundwater level SW - NE section
SDT
Measured Groundwater Levels in Boreholes
Modelled Initial Piezometric Level
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 6.3(J05/267/247D)
Mouchel Fairhurst JV
August 2006
SDT LCP
CLCut-off wall
Simulated groundwater flow to underpassexcavation with cut-off wall penetrating to 7m OD
Groundwater flow net with penetrating cut-off
wall to 7m OD
+14m OD
+22m ODGroundwater
Discharge
Underpass
-
Made Ground
Sand/Gravel
Rock
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 6.4(J05/267/248D)
Mouchel Fairhurst JV
August 2006
SDT LCP
CLCut-off wall
Simulated groundwater flow to underpassexcavation with cut-off wall penetrating to 7m OD
Water table with cut-off penetrating wall to 7m OD
+16m OD
Underpass
GroundwaterDischarge
+14m OD
Water Table
Note: Water Table immediately outside cut off wall is 16m OD
+22m OD
-
Piezometric Levels (Chainage Section)
14
16
18
20
22
24
26
28
0 200 400 600 800 1000 1200 1400 1600
Distance along chainage (m)
Piez
omet
ric h
ead
(m)
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Junction 5 - M74Raith
Figure 6.5(J05/267/293D)
Mouchel Fairhurst JV
March 2007
JGGDewatered
groundwater level SW - NE section
SDT
Measured Groundwater Levels in Boreholes
Modelled Initial Piezometric Level
Simulated Dewatering Piezometric Level
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Mouchel Fairhurst JV
August 2006
Figure 6.6(J05/267/250D)
Plan view of section along proposed unerpass
JGG
Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number 100046014.
DJF
70 71 72 73
57
58
59
60
61
Section Along Proposed Underpass
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Mouchel Fairhurst JV
August 2006
Simulated drawdown
JGG SDT
Figure 6.7(J05/267/251D)
1m
2m
1.5m
PredictedPiezometric Drawdown
Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.
Piezometric head at excavation at 16m OD.
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© OGI Groundwater Specialists 2007
Junction 5 - M74Raith
Mouchel Fairhurst JV
March 2007
Drawdown simulation for14m OD inside excavation
JGG SDT
Figure 6.8(J05/267/299D)
Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number 100046014.
3m
1m
2m
PredictedPiezometric Drawdown
-
Piezometric Levels (Chainage Section)
14
16
18
20
22
24
26
28
0 200 400 600 800 1000 1200 1400 1600
Distance along chainage (m)
Piez
omet
ric h
ead
(m)
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© OGI Groundwater Specialists 2007
Junction 5 - M74Raith
Figure 6.9(J05/267/294D)
Mouchel Fairhurst JV
March 2007
JGGArtesian pressure relief
SW-NE along underpass
SDT
Modelled Initial Piezometric Level
Reduction in Piezometric Head During FirstStage Dewatering/Pressure Relief
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Junction 5 - M74Raith
Mouchel Fairhurst JV
March 2007
Simulated reduction in artesian pressure head
JGG SDT
Figure 6.10(J05/267/295D)
1.0m
1.4m
1.2m
Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.
Simulated Reduction in Artesian Pressure Head Due to First Stage Dewatering and Artesian Pressure Relief
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© OGI Groundwater Specialists 2007
Junction 5 - M74Raith
Mouchel Fairhurst JV
March 2007
Simulated reduction in artesian pressure head
JGG SDT
Figure 6.11(J05/267/296D)
1.0m
1.4m
1.2m
Not To ScaleReproduced from Landranger(r) 1: 50 000 scale by permission of Ordnance Survey(r) on behalf of The Controller of Her Majesty's Stationery Office. (c)Crown copyright 2005. All rights reserved. Licence number WL9029.
Simulated Reduction in Artesian Pressure Head Due to First Stage Dewatering and Artesian Pressure Relief
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Junction 5 - M74Raith
Figure 6.12 J05/267/275D
Mouchel Fairhurst JV SDTConceptual modelat Pond No.5
Not to Scale
JGG
Conceptual model of the groundwater and surface water flow recharging at Pond No. 5
Likely small Contribution of Artesian water
recharging the pond
Surface wa
ter recharg
e
Pond No. 5
Alluvial / Glacial deposits consisting of Sand, Gravel,
Silt and Clay
Direction of groundwater flow
ROCK - depth to rock head uncertainbut assumed to be approximately 15m bgl
Direction of groundwater flow
February 2007
DirectRainfall
Near Surfa
ce
Groundwa
ter Flow
Alluvial / Glacial deposits consisting of Sand, Gravel,
Silt and Clay
Surface wate
r
recharge
Near Surfa
ce
Groundwa
ter Flow
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© OGI Groundwater Specialists Limited 2007
Junction 5 - M74Raith
Figure 7.1(J05/267/297D)
Mouchel Fairhurst JV
March 2007
SDT DJFPiezometric head during dewatering
Pre-Construction & during Dewatering Piezometric Head
-10
-5
0
5
10
15
20
25
16 17 18 19 20 21 22 23 24 25 26
Piezometric Head (mOD)
Elev
atio
n (m
OD
)Initial pre-Dewatering Piezometric Head Distribution
Dewatering to 18mOD
3m Head reduction to ground levelFurther 4m Head reduction to 18mOD head
Ground Level 22mOD
Reduced Piezometrichead to 18m OD
Initial Artesian Head
Dewatering to 22mOD
Rock
Initial seepagedue to upward
hydraulic gradient
General downward flow torock from natural surface recharge
Rock
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 7.2(J05/267/258D)
Mouchel Fairhurst JV SDTConceptual model of existing conditions
at north of site
Not to Scale
DJF
Conceptual model of the upward flow of groundwater under existing conditions
Artesian water recharging upper strata
Direction of groundwater flow
in upper Sand & Gravel
ROCK - depth to rock head uncertainbut assumed to be at approximately 0mOD
Direction of groundwater flow
in Rock
August 2006
Existing Piezometric
surface in rock to n
ear ground surface
Clay aquitard
Existing water table
in upper aquifer
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 7.3(J05/267/259D)
Mouchel Fairhurst JV SDTConceptual modelat north of site
Not to Scale
DJF
Conceptual model of the upward flow of groundwater under dewatering conditions
Reduced Artesian water recharging upper strata
Direction of groundwater flow
in upper Sand & Gravel
ROCK - depth to rock head uncertainbut assumed to be at approximately 0mOD
Direction of groundwater flow
in Rock
August 2006
Depressed Piezome
tric surface in rock t
o near ground surfa
ce
Clay aquitard
Lowering of water t
able in upper aquife
r
-
OGIProject:
Client:
Drawing:
Description:Groundwater Specialists
Date:
Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Figure 7.4(J05/267/260D)
Mouchel Fairhurst JV
August 2006
LCPSchematic of recharge system
SDT
Not to Scale
Q outQ in Q out Q inExcavation
-
Groundwater Specialists
Drawing:
OGIProject:
Client: Description:
Date: Drawn by: Checked by:
© Oxford Geotechnica International (UK) Ltd 2006
Junction 5 - M74Raith
Mouchel Fairhurst JV
August 2006
Figure 7.5(Ref:J05/267/261D)
Possible location of dewatering and external recharge wells
SDT
Not To Scale
Based on Mouchel Fairhurstdrawings referenceM8MFJV.ST3.G.1212revB andRAITHMFJV/ST3/S/1010
JGG
Preliminary Drawing
100 metres
Approximate Scale
Internal Dewatering Wells
External Recharge Wells
Ch.500.0
Ch.650.0
Ch.500.0