jack_lambourne - portfolio

20
CLIENT PROJECT JOB NUMBER DATE SCALE DRAWN CHECKED STATUS FOR REVIEW DRAWING CHECKER CAD FILE CAD REF BLOCK DRAWING NUMBER ZONE REVISION NOTE ALL DIMENSIONS TO BE CHECKED ON SITE NO DIMENSIONS TO BE SCALED FROM THIS DRAWING THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS REV DATE DESCRIPTION CHKD DRN COPYRIGHT (C) Jack Lambourne 27/04/2015 21:09:21 27/04/2015 21:09:21 Final Presentation 05 Author 313 B2 - Market Place & Offices D.I.T Design N NOTES Exterior Wall Construction: 3mm Aluminium Rainscreen fixed via Steel Supports to Engineers Specs to 150mm PIR Insulation to NBS Spec. J21 with Breather Membrane fixed and taped to NBS Spec. M50 with Waterproofing Membrane taped and fixed to Warm Side of Insulation on 200mm Cast in situ Concrete Inner leaf shear wall Ground Floor Construction: 25mm Solid Stone finish to NBS Spec. M40 on 30mm Stone Mortar to NBS Spec. Z21 on 75mm Screed to NBS Spec. Q23 on 200mm PIR Insulation to NBS Spec. J21 on 200mm Cast In situ Concrete Slab to NBS Spec. E10 Upper Floor Construction: 700 x 640mm Cast In situ Concrete Beam to NBS Spec. E05 supporting 225mm Hollowcore Slab to NBS Spec. E60 with 75mm Screed Cast on top to NBS Spec. Q23 with 195mm Raised Access Pedestals with 20mm Raised Access Panel Finish to NBS Spec. M50 Balcony Floor Construction: 35mm Sandstone Ash Paving Slab (500 x 500mm) to NBS Spec. Q10 on 30mm Layer of Stone Mortar to NBS Spec. Z21 on 75mm Screed Layed to a fall of 1:100 to NBS Spec. Q23 on 150mm PIR Insulation (0.023) to NBS Spec. J21 on 225mm Casr in Situ Concrete Balcony slab to NBS Spec. E10 Aco Drainage System in Balcony which Drains into Wall Cavity Glazing System: Double Glazed Thermally Broken Glazing System fixed with Manufacturers Specs. on Aluminium Cover Flashing to NBS Spec. H71 on Vapour Control Layer Taped and sealed at Glazing Frame on 50mm PIR Insulation (0.023) to NBS Spec. J21 on 250 x 150mm Aerated Concrete Block to NBS Spec. E60 on Isokorb System preventing Cold Bridging Balcony View 1 Balcony View 2 Roof Terrace B2 - Market & Offices Building

Upload: jack-lambourne

Post on 16-Apr-2017

288 views

Category:

Documents


1 download

TRANSCRIPT

  • CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    REV DATE DESCRIPTION CHKD DRN

    COPYRIGHT (C)

    Jack Lambourne

    27/0

    4/2

    015 2

    1:0

    9:2

    1

    27/04/2015 21:09:21

    Final Presentation

    05

    Author

    313

    B2 - Market Place &Offices

    D.I.T

    Design

    N

    NOTES

    Exterior Wall Construction:

    3mm Aluminium Rainscreen fixed via Steel Supports to EngineersSpecsto 150mm PIR Insulation to NBS Spec. J21with Breather Membrane fixed and taped to NBS Spec. M50with Waterproofing Membrane taped and fixed to Warm Side ofInsulationon 200mm Cast in situ Concrete Inner leaf shear wall

    Ground Floor Construction:

    25mm Solid Stone finish to NBS Spec. M40on 30mm Stone Mortar to NBS Spec. Z21on 75mm Screed to NBS Spec. Q23on 200mm PIR Insulation to NBS Spec. J21on 200mm Cast In situ Concrete Slab to NBS Spec. E10

    Upper Floor Construction:

    700 x 640mm Cast In situ Concrete Beam to NBS Spec. E05supporting 225mm Hollowcore Slab to NBS Spec. E60with 75mm Screed Cast on top to NBS Spec. Q23with 195mm Raised Access Pedestalswith 20mm Raised Access Panel Finish to NBS Spec. M50

    Balcony Floor Construction:

    35mm Sandstone Ash Paving Slab (500 x 500mm) to NBS Spec.Q10on 30mm Layer of Stone Mortar to NBS Spec. Z21on 75mm Screed Layed to a fall of 1:100 to NBS Spec. Q23on 150mm PIR Insulation (0.023) to NBS Spec. J21on 225mm Casr in Situ Concrete Balcony slab to NBS Spec. E10Aco Drainage System in Balcony which Drains into Wall Cavity

    Glazing System:

    Double Glazed Thermally Broken Glazing System fixed withManufacturers Specs.on Aluminium Cover Flashing to NBS Spec. H71on Vapour Control Layer Taped and sealed at Glazing Frameon 50mm PIR Insulation (0.023) to NBS Spec. J21on 250 x 150mm Aerated Concrete Block to NBS Spec. E60on Isokorb System preventing Cold Bridging

    Balcony View 1 Balcony View 2 Roof Terrace

    B2 - Market & Offices Building

  • Wall Construction

    102.5mm Outer Leaf Brick Rainscreen with100mm Cavity with Stainless Steel Cavity tray to aid with both structureand drainage with50mm PIR Rigid Insulation in cavity fixed to OSB withStainless steel wall ties every 600 c/c fixed to12mm OSB with Breather membrane fixed to100mm of Quilted Insulation (Rockwool) which has aVapour Control Layer keeping out moisture which is fixed behind20mm Gypsum Plasterboard.

    200

    410

    325

    120

    102

    50

    100

    43

    75

    50

    Roof Construction400mm Concrete Slates on Roof fixed every 325mm C/C onto50 x 35mm Timber Battens which are fixed onto35mm OSB for addtional structural support with aBreather membrane laid with appropriate tapes and seals to control roofmoisture installed with a timber tilting fillet fixed onto50 x 50mm Timber Battens which are fixed onto a 200mm C16 TimberRafter.

    50

    100 x 50mm Timber Battensfixed to underside of 200mmC16Timber Rafter

    150mm EPS Rigid Insulation installed below C16 Timberrafter to maintain thermal continuity

    Insulated Cavity Closer fixed above Brickwork and cavity insulation

    200mm C16 Timber Rafter

    100mm EPS Insulation installed inbetweentimber rafters withadditional 50mm EPS Insulation installedabove rafter

    16mm SW Soffit Board fixed to18mm SW Fascia Board which is then fixed toa timber tilting fillet

    100 x 50mm Timber Battens every 600 c/c

    120mm PVC Gutter Piece fixed to18mm SW Fascia Board withaluminium flashing laid into Gutter withEaves ventilater fixed onto the top of the fascia pieceAllowing ventilation under the slates

    Jack Lambourne

    C12700655

    Building Performance Assignment

    Detail C

    03 1 : 5Detail C

    Key Section

  • Wall ConstructionVentilated Facade System with 18mm Cedar RotatingPanels fixed toa continuous breather membrane/wind barrier to maintain airtightness which is fixed to12mm OSB on the outer leaf with100mm EPS Rigid Insulation (0.023) with an additional70mm EPS Rigid Insulation supported by 70 x 35mm TimberBattens every 400 c/c fixed to18mm OSB fixed to a vapour control layer which maintainsairtightness. This is fixed to a25mm Service Cavity with 25 x 25mm Timber Battens with a20mm Gypsum Plasterboard Finish

    25

    208

    Roof Construction400mm Concrete Slates on Roof fixedevery 325mm C/C onto50 x 35mm Timber Battens which are fixedonto35mm OSB for addtional structural supportwith aBreather membrane laid with appropriatetapes and seals to control roof moistureinstalled on200mm EPS Rigid Insulation supported by200mm x 50mm Timber Engineered Joistsfixed ontoA Vapour Control membrane whichmaintains air tightness stuck to two Layersof 12.5mm Gypsum Plaster

    Flat Roof ConstructionBitumen Roofing Felt torched on as a finish and lapped up 150mm over upstand piece onBreather Membrane which is laid and sealed with appropriate agents on150mm PIR Rigid insulation which combines with wall insulation to keep thermal envelope which is laid ontoA vapour control layered membrane wrapped around onto the wall onto20mm OSB fixed onto175 x 45mm C16 Timber battens on20mm Gypsum Plasterboard

    200mm x 22.5mm RSJ sized to engineers specs.supporting load of ventilated facade and timber flat rooffixed to 100 x 35mm Timber Batten all supported on a200 x 200mm Steel Column to engineers specs.

    1517

    520

    149

    10569

    206

    The bottom connection of the ventilated facade allows airflow through facade

    Jack Lambourne

    C12700655

    Building Performance Assignment

    Detail E

    05 1 : 5Detail E

    Key Section

  • 6 7

    Interior Exterior

    700 x 640mm Cast In situ ConcreteBeam to NBS Spec. E05supporting 225mm Hollowcore Slabto NBS Spec. E60with 75mm Screed Cast on top toNBS Spec. Q23with 195mm Raised AccessPedestalswith 20mm Raised Access PanelFinish to NBS Spec. M50

    35mm Sandstone Ash Paving Slab (500 x 500mm) to NBSSpec. Q10on 30mm Layer of Stone Mortar to NBS Spec. Z21on 75mm Screed Layed to a fall of 1:100 to NBS Spec. Q23on 150mm PIR Insulation (0.023) to NBS Spec. J21on 225mm Casr in Situ Concrete Balcony slab to NBS Spec.E10Aco Drainage System in Balcony which Drains into WallCavityU-Value: 0.124 W/m2K

    Double Glazed Thermally Broken Glazing System fixed withManufacturers Specs. (U-Value: 1.35 W/m2K)on Aluminium Cover Flashing to NBS Spec. H71on Vapour Control Layer Taped and sealed at Glazing Frameon 50mm PIR Insulation (0.023) to NBS Spec. J21on 250 x 150mm Aerated Concrete Block to NBS Spec. E60on Isokorb System preventing Cold Bridging

    Double Glazed Thermally Broken Glazing System fixedwith Manufacturers Specs.(U-Value: 1.35 W/m2K)on Vapour Control Layer taped and wrapped to NBSSpec. J40on Two Thermal Blocks to NBS Spec. E60on Cast concrete to NBS Spec. E10with 100mm PIR Insulation (0.023) screwed through toconcrete, refer to engineers specswith Breather membrane layer to NBS Spec. J40with Rigid Cement Materialwith Glass Spandrel Panel Finish to ManufacturersSpecs.U-Value: 0.177 W/m2K

    Double Glazed Thermally Broken GlazingSystem fixed with Manufacturers Specs.(U-Value: 1.35 W/m2K)on Aluminium Cover Flashing to NBS Spec.H71on Vapour Control Layer Taped and sealed atGlazing Frameon 50mm PIR Insulation (0.023) to NBS Spec.J21on 250 x 150mm Aerated Concrete Block toNBS Spec. E60on Isokorb System preventing Cold Bridging

    200mm Cast In situ Concrete ParapetPiece to NBS E10with Rubber Gasket Frame to NBSM50with 20mm Glass Parapet Finish toManufacturers Specsfixed via engineers specs

    35mm Precast Parapet Capping Piece toNBS Spec. F31with Specialised Gasket Piece fixed to thetop of the glass parapet.Finished with Aluminium Flashing PieceFixed via Engineers Specs

    700 x 640mm Cast In situ Concrete Beam to NBSSpec. E05supporting 225mm Hollowcore Slab to NBS Spec.E60with 75mm Screed Cast on top to NBS Spec. Q23with 195mm Raised Access Pedestalswith 20mm Raised Access Panel Finish to NBSSpec. M50

    3mm Aluminium Rainscreen fixed via Steel Supports toEngineers Specsto 100mm PIR Insulation to NBS Spec. J21with Breather Membrane fixed and taped to NBS Spec.M50with Waterproofing Membrane taped and fixed to WarmSide of InsulationU-Value: 0.19 W/m2K

    Aluminium Sill Profile fixed back to Castin Situ Parapet Piecewith Special Mastic to SeparateMaterials3mm Aluminium Rainscreen fixed viaSteel Supports to Engineers Specsto 150mm PIR Insulation to NBS Spec.J21with Breather Membrane fixed andtaped to NBS Spec. M50with Waterproofing Membrane tapedand fixed to Warm Side of InsulationU-Value: 0.129 W/m2K

    200mm Cast In situ ConcreteParapet Piece to NBS E10with Rubber Gasket Frame to NBSM50with 20mm Glass Parapet Finish toManufacturers Specsfixed via engineers specs

    400 x 400mm Cast In situ ConcreteColumn designedto Engineers Specs

    Aluminium Sill Profile fixed backto Cast in Situ Parapet Piecewith Special Mastic to SeparateMaterials3mm Aluminium Rainscreenfixed via Steel Supports toEngineers Specsto 150mm PIR Insulation to NBSSpec. J21with Breather Membrane fixedand taped to NBS Spec. M50with Waterproofing Membranetaped and fixed to Warm Side ofInsulationU-Value: 0.129 W/m2K

    First FFL

    9.365

    Second FFL

    13.325

    Third FFL

    17.285

    3960

    3960

    2745

    1215

    2745

    6513

    30003

    Double Glazed Thermally BrokenGlazing System fixed withManufacturers Specs.(U-Value: 1.35W/m2K)with Glass Spandrel Panel Finish toManufacturers Specs.

    First FFL

    9.365

    Second FFL

    13.325

    Third FFL

    17.285

    1000

    1000

    1000

    3

    6

    7

    400 X 400mm Cast InSitu Concrete Columnwrapped in Insulationto NBS Spec. J21to avoid ThermalBridge

    35mm Sandstone Ash Paving Slab (500 x 500mm) toNBS Spec. Q10on 30mm Layer of Stone Mortar to NBS Spec. Z21on 75mm Screed Layed to a fall of 1:100 to NBSSpec. Q23on 150mm PIR Insulation (0.023) to NBS Spec. J21on 225mm Casr in Situ Concrete Balcony slab toNBS Spec. E10Aco Drainage System in Balcony which Drains intoWall CavityU-Value: 0.124 W/m2K

    200mm Cast In situ Concrete Parapet Piece to NBS E10with Rubber Gasket Frame to NBS M50with 20mm Glass Parapet Finish to Manufacturers Specsfixed via engineers specs

    35mm Precast Parapet Capping Piece toNBS Spec. F31with Specialised Gasket Piece fixed to thetop of the glass parapet.Finished with Aluminium Flashing PieceFixed via Engineers Specs

    Exterior

    Interior

    500

    500

    3000

    50

    956 151

    400 X 400mm Cast InSitu Concrete Columnwrapped in Insulationto NBS Spec. J21to avoid ThermalBridge

    35mm Sandstone Ash Paving Slab (500 x 500mm) toNBS Spec. Q10on 30mm Layer of Stone Mortar to NBS Spec. Z21on 75mm Screed Layed to a fall of 1:100 to NBS Spec.Q23on 150mm PIR Insulation (0.023) to NBS Spec. J21on 225mm Casr in Situ Concrete Balcony slab to NBSSpec. E10Aco Drainage System in Balcony which Drains into WallCavityU-Value: 0.124 W/m2K

    200mm Cast In situConcrete Parapet Piece toNBS E10with Rubber Gasket Frameto NBS M50with 20mm Glass ParapetFinish to ManufacturersSpecsfixed via engineers specs

    35mm Precast Parapet Capping Piece toNBS Spec. F31with Specialised Gasket Piece fixed to thetop of the glass parapet.Finished with Aluminium Flashing PieceFixed via Engineers Specs

    Aluminium Sill Profile fixed backto Cast in Situ Parapet Piecewith Special Mastic to SeparateMaterials3mm Aluminium Rainscreenfixed via Steel Supports toEngineers Specsto 150mm PIR Insulation to NBSSpec. J21with Breather Membrane fixedand taped to NBS Spec. M50with Waterproofing Membranetaped and fixed to Warm Side ofInsulationU-Value: 0.129 W/m2K

    Double Glazed Thermally Broken Glazing System fixed withManufacturers Specs.(U-Value: 1.35 W/m2K)on Aluminium Cover Flashing to NBS Spec. H71on Vapour Control Layer Taped and sealed at Glazing Frameon 50mm PIR Insulation (0.023) to NBS Spec. J21on 250 x 150mm Aerated Concrete Block to NBS Spec. E60on Isokorb System preventing Cold Bridging

    CLI

    EN

    T

    PR

    OJE

    CT

    JOB

    NU

    MBE

    R

    DA

    TE

    SC

    ALE

    DR

    AWN

    CH

    ECK

    ED

    STA

    TUS

    FOR

    RE

    VIE

    W

    DR

    AWIN

    G

    CH

    ECK

    ER

    CA

    D F

    ILE

    CA

    D R

    EF

    BLO

    CK

    DR

    AW

    ING

    NU

    MBE

    RZO

    NE

    REV

    ISIO

    N

    NO

    TE

    ALL

    DIM

    EN

    SIO

    NS

    TO B

    E C

    HE

    CK

    ED O

    N S

    ITE

    NO

    DIM

    EN

    SIO

    NS

    TO B

    E S

    CAL

    ED

    FR

    OM

    TH

    IS D

    RA

    WIN

    GTH

    IS D

    RAW

    ING

    IS T

    O B

    E R

    EAD

    IN C

    ON

    JUN

    CTI

    ON

    WIT

    HR

    ELE

    VAN

    T C

    ON

    S ULT

    AN

    TS D

    RA

    WIN

    GS

    RE

    VD

    ATE

    DE

    SCR

    IPTI

    ON

    CH

    KDD

    RN

    CO

    PYR

    IGH

    T (C

    )

    Jack

    Lam

    bou r

    ne

    27/04/2015 23:35:37

    27/0

    4/20

    15 2

    3:35

    :37

    1 :

    20

    Sect

    ion

    CC/E

    lev a

    tion/

    Plan

    05

    Jack

    Lam

    bour

    ne

    334

    B2 -

    Mar

    ket P

    lace

    & O

    ffice

    s

    D.I.

    T

    Desi

    gn

    1 : 20Section CC

    1 : 20Part Elevation

    1 : 2002 First FFL Part Plan3D

    Key Plan NTSKey Section NTS

    N

  • 7

    200mm Cast In situ Concrete Parapet Piece to NBS E10with Rubber Gasket Frame to NBS M50with 20mm Glass Parapet Finish to Manufacturers Specsfixed via engineers specs

    35mm Precast Parapet Capping Piece to NBS Spec. F31with Specialised Gasket Piece fixed to the top of the glassparapet.Finished with Aluminium Flashing Piece Fixed via EngineersSpecs

    Aluminium Sill Profile fixed back to Cast in Situ ParapetPiecewith Special Mastic to Separate Materials3mm Aluminium Rainscreen fixed via Steel Supports toEngineers Specsto 150mm PIR Insulation to NBS Spec. J21with Breather Membrane fixed and taped to NBS Spec. M50with Waterproofing Membrane taped and fixed to WarmSide of InsulationU-Value: 0.129 W/m2K

    35mm Sandstone Ash Paving Slab (500 x 500mm) to NBS Spec.Q10on 30mm Layer of Stone Mortar to NBS Spec. Z21on 75mm Screed Layed to a fall of 1:100 to NBS Spec. Q23on 150mm PIR Insulation (0.023) to NBS Spec. J21on 225mm Casr in Situ Concrete Balcony slab to NBS Spec.E10Aco Drainage System in Balcony which Drains into Wall CavityU-Value: 0.124 W/m2K

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    REV DATE DESCRIPTION CHKD DRN

    COPYRIGHT (C)

    Jack Lambourne

    27/0

    4/2

    015 2

    1:1

    4:1

    3

    27/04/2015 21:14:13

    1 : 5

    ParapetDetail

    05

    Jack Lambourne

    336

    B2 - Market Place &Offices

    D.I.T

    Design

    Parapet 3D

    1 : 5

    Parapet Detail

    Parapet 3D Step 1 Parapet 3D Step 2

    Parapet 3D Step 3 Parapet 3D Step 4

    Parapet 3D Step 5 Parapet 3D Step 6

    Parapet Key 3D

    Step 1700 x 640mm Cast In situ Concrete Beam cast along with 225mm Cast in SituBalcony slab via steel rebarand thermal block placed on top of balcony slab.

    Step 2200mm ConcreteParapet Piece castinto balcony slab ontop of thermal block.150mm PIRInsulation installedon top of balconyslab and fixed.

    Step 375mm Screed poured to a fall of 1 100 with 30mmof stone mortar spread on top of screed. Leadflashing is then torched on the interior side of theparapet piece.150mm PIR Insulation is then fixed onto balconyslab and beam on the exterior.

    Step 435mm Stone paving is then layed on top ofstone mortar which is 500 x 500mm. AluminiumSteel supports are then fixed via self drillingscrews, see enginners specs.

    Step 53mm Aluminium Rainscreen installed onto steelsupports 500mm wide with 20mm gap for ventilation.Aluminium sill profile then installed via engineersspecs.

    Step 635mm Precast concrete parapetcapping piece fixed onto top of glassand parapet piece with masticinbetween. Aluminium flashing piecescrews onto capping piece.Parapet glass piece then installed withsteel frame and mastic. 20mm Glassfixed via bolts by engineers specs.

    Key Section

    Material

    Description

    Shape/Size

    Density

    Weight

    Strength

    UV

    Performance

    Fire Rating

    Thermal

    Conductivity

    R - Value

    Permeablilty

    Acoustic

    Performance

    Water Absorption

    PIR Insulation Stone Paving Stone Mortar Screed Balcony Slab Glazing Thermal Block Concrete Beam Lead Flashing PVC-u Pipe Vapour Barrier Aluminium Rainscreen Breather Membrane Aluminium Flashing Aluminium Supports Parapet Glazing

    Thermal Layer

    2400 x 1200mm

    30-60 kg/m3

    N/A

    Poor

    UV can damage material

    Class 1

    0.023 w/mk

    5.71

    High Vapour Resistance

    Low Moisture Absorption

    Good

    Finish Material

    500 x 500mm

    2,400Kg/m

    N/A

    Good

    UV cannot damagematerial

    Poor

    1.7 w/mk

    0.08

    Low Vapour Resistance

    High Moisture Absorption

    Poor

    Used as substrate

    30mm Thick

    1,620Kg/m

    2.162 gram per (cubic cm)

    Fair

    UV cannot damagematerial

    Poor

    1.73 w/mk

    0.20

    Low Vapour Resistance

    High Moisture Absorption

    Poor

    Used as substrate

    75mm Thick

    2,000Kg/m

    20 kg per m2

    Fair

    UV cannot damagematerial

    Poor

    1.2 w/mk

    0.06

    Low Vapour Resistance

    High Moisture Absorption

    Poor

    Used as substrate

    225mm Thick

    2,400Kg/m

    N/A

    Excellent

    Durable against UV

    Good

    0.5 w/mk

    0.33

    100 GNs/kg.m

    Medium MoistureAbsorption

    Good

    Used as support

    700 x 640mm

    2,400Kg/m

    N/A

    Excellent

    Durable against UV

    Good

    0.5 w/mk

    0.33

    100 GNs/kg.m

    Medium MoistureAbsorption

    Good

    Used as Rainscreen

    3mm Thick

    2,400Kg/m

    2.5kg/m2

    Good

    UV cannot damagematerial

    Poor

    1.9 w/mk

    0.61

    Low Vapour Resistance

    High Moisture Absorption

    Fair

    Used as Parapet Flashing

    3mm Thick

    2,400Kg/m

    2.5kg/m2

    Good

    UV cannot damagematerial

    Poor

    1.9 w/mk

    0.61

    Low Vapour Resistance

    High Moisture Absorption

    Fair

    Used as Supports forRainscreen

    3mm Thick

    2,400Kg/m

    2.5kg/m2

    Good

    UV cannot damagematerial

    Poor

    1.9 w/mk

    0.61

    Low Vapour Resistance

    High Moisture Absorption

    Fair

    Used as light source

    6mm Thick DoubleGlazed

    2,500 kg/m3

    10kg per m2

    Good

    Durable against UV

    Class 1

    0.8 w/mK

    2.38

    100 GNs/kg.m

    Low Moisture Absorption

    Good

    Used as finish

    20mm Thick Glass

    2,500 kg/m3

    10kg per m2

    Good

    Durable against UV

    Class 1

    0.8 w/mK

    2.38

    100 GNs/kg.m

    Low MoistureAbsorption

    Good

    Used as drainage Pipe

    50mm Diameter

    1.38 g/cm3

    N/A

    Good

    N/A

    Good

    0.16 w/mK

    1.05

    Medium VapourResistance

    Low Moisture Absorption

    Fair

    0.001

    Used as moistureprotection layer

    0.52mm thick x 2m Long

    Low Density

    N/A

    Fair

    N/A

    Poor

    0.16 w/mK

    1100 MNs/g

    0.03 mlv

    Poor

    0.001

    Used as thermal break

    250mm x 150mm

    500Kg/m

    N/A

    Excellent

    UV cannot damagematerial

    Good

    0.16 w/mK

    1100 MNs/g

    Good

    Medium MoistureAbsorption

    Used as weatherprotection

    1.32mm thick x 1.2m

    2,400Kg/m

    14.92kg per m2

    Poor

    Durable against UV

    Good

    35.3 w/mk

    0.5097

    Medium MoistureAbsorption

    Poor

    Medium VapourResistance

    0.47

    Used as air layer

    0.25mm thick x 2m Long

    Low Density

    1200g/m2

    Fair

    N/A

    Euroclass A2

    0.0278 w/mK

    1100 MNs/g

    0.05 mlv

    Poor

  • 5600

    Unit 1Unit 2

    Unit 3

    Site Notice

    Bus Depot

    Proposed Playground

    Site Notice

    External Stairs & Lift 1- Fire Protected

    External Stairs & Lift 2 - Fire Protected

    Proposed Park Landscape

    Proposed External Landscape forpedestrian use

    Ramp gradient 1 12 & StairsRamp gradient 1 12 to carpark

    Proposed Building (to be designed at alater Stage

    Proposed Building(to be designed at alater Stage

    AOV

    AOV AOV

    AOV

    Apartments/ConcreteCore 1

    Apartments/ConcreteCore 2

    AOV

    Fall

    Fall

    Fall Fall

    Flat Roof

    Flat Roof

    2141

    5

    20270

    19750

    184706617

    4552

    6734 9

    384

    ENTRANCE

    BroadstoneLuas

    King's Inn Park

    Existing Surrounding Buildings

    Existing Buildings

    The Royal Society ofthe King's Inn

    20315

    ESB

    1045

    3

    1481

    0

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    18/1

    1/20

    15 1

    7:07

    :43

    18/11/2015 17:07:43

    1 : 1000

    01 - Site Location Map

    T5

    Author

    0000

    Regulatory Processes

    Dublin City Council

    PLANNING

    1 : 1000Site Location Plan

    North

    Water mains

    Site boundary

    North

    O.S MAP NO. - 3263 - 904

    Surface Water

    Foul Water

    Electricity ESB

  • Stair Core

    Basement Carpark

    Glass Balcony

    Location of Concrete Core with one bedroom apartments

    Glass Balcony

    Retail/Cafe

    Proposed Zinc Roof with 10 degree slope

    3000

    2600

    2600

    2600

    Proposed Building, to be designed further

    Pedestrian Pathway

    Unit 2 Unit 1

    TESCO DEALZ

    Proposed Commercial Building

    Carpark EntranceFire Exit

    1 12 Gradient Ramp

    21406

    Unit 1Unit 2

    Private BalconiesAccess Balconies

    2597

    300

    2603

    2600

    1800

    1100

    1989

    9

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    18/1

    1/20

    15 1

    7:15

    :03

    18/11/2015 17:15:03

    1 : 200

    01 - North & WestElevations

    T5

    Author

    0018

    Regulatory Processes

    Dublin City Council

    PLANNING

    1 : 200North Elevation - Planning

    1 : 200West Elevation - Planning

  • EXIT

    BG

    s

    s

    Indicates structure/construction providing minimum60 minutes fire resistance to B.S 476 Part 8/20-22(National) or I.S. EN 13501-2: 2003 (European)

    Indicates structure/construction providing minimum 120minutes fire resistance to B.S 476 Part 8/20-22(National) or I.S. EN 13501-2: 2003 (European)

    Indicates structure/construction providing minimum 30minutes fire resistance to B.S 476 Part 8/20-22(National) or I.S. EN 13501-2: 2003 (European)

    Indicates doorset construction providing minimum 30minutes fire resistance (integrity) with smoke seal withreference to B.S 476 Part 8/20-22 (National) or I.S. EN13501-2: 2003 (European)

    Indicates doorset construction providing minimum 60minutes fire resistance (integrity) with smoke sealwith reference to B.S 476 Part 8/20-22 (National) orI.S. EN 13501-2: 2003 (European)

    Access/ Egress Doors/ Storey Doors/ Final Exits

    Smoke detector - Part of the commonfire detection and alarm system

    Back lit Exit sign/ Luminaries (3 hours non-maintained)

    Travel Distance

    1400 x 900mm Wheelchair Refuge Space

    Heat Detector - Part of the common firedetection and alarm system

    Break Glass Alarm Unit

    Fire Extinguishers (Co2 and Foam)

    LEGENDEmergency lighting, fire detection and alarminstallations to be provided as indicated insections 1.8.7.2 and 1.8.11 of fsc applicationreport.Locations of fire detection and alarmcomponents are provisional only. Final positionsof components shall comply with relevantsections of I.S 3219: 2009Fire Resistance of external walls:Only those parts of the external walls indicatedon drawing as being of fire resistingconstruction, in addition to those parts of theexternal walls provding support to elements ofstructure, e.g. compartment floors etc. and otherfire resisting elements, shall be constructed of 60minute fire resisting construction

    Floors on all escape routes shall have a non-slippy surfaceContents of Individual Service DuctsService Duct 1:Cold water supply (C.W.S), Hot water supply (H.W.S), RainwaterDrainage (R.W.D), Foul Wste (F.W), Soil Vent Pipe (SVP)

    Service Duct 2:Electricity supply (ESB), Telecom supply (T.S), Ventilation (V),Ventilation flue (V.F)

    Service Duct 3:Boiler flue (B.F), Heat supply(H.S)

    Generally all pipe work penetrating compartment floors shall be firestopped/sealed to satisfy the requirements of item 3.4.2 & 3.4.5 of TGD B(All uPVC pipes complying with B.S 4514: 1983 & B.S 5255 : 1989 withmax 160 diameter stack and penetrating compartment shall be fitted withproprietary fire seals or alternatively cased in vertically 30 minute casing,as noted in diagram 22 of TGD B.)

    TD 20

    TD 21

    TD 22

    TD 23

    3.5M

    4.4M

    8.0M

    8.7M

    TD 24

    9M

    9M

    9M

    9M

    18M

    18M

    18M

    18M

    9M 18M

    TravelDistance

    Actual Type

    One Way

    Two Way

    Starting Point

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    FD 60

    FD 30

    Duct

    Duc

    t

    Stairs A

    Stairs B

    s

    AOV

    BG

    BG

    FD 60

    sFD 60sFD 60 sFD 60 sFD 60 sFD 60 sFD 60

    sFD 60

    sFD 60

    sFD 60

    sFD 60

    sFD 30

    Glazing systemwith 60 minS FR

    Glazing systemwith 30 minS FR

    sFD 30 sFD 30 sFD 30 sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30

    sFD 30sFD 30

    sFD 30

    sFD 30

    sFD 30sFD 60

    sFD 30 sFD 30 sFD 30 sFD 30 sFD 30

    sFD 60

    sFD 60

    BG

    BG

    BG

    EXIT

    EXIT

    EXIT

    Note: Section 3 in BS5588 -1:2004states that flats travel distance from headof the stair to any point in any habitableroom does not exceed 9M.

    Note : Each apartment features aprotected corridor which essentiallyis a fire compartment within thelayout. It significantly helps with thefire distances. None of the distancesexceed over nine metres.

    AOV above Stairwell onto roofAOV

    Block 2

    2

    3sFD 60

    TD 20: M

    TD 21: M

    TD 22: M

    TD 23: M

    TD 24: MTD 25: M

    TD 26: M

    TD 27: M

    TD 28: M

    TD 25

    TD 26

    TD 27

    TD 28

    2.9M

    5.4M

    8.7M

    6.5M9M

    9M

    18M

    18M

    18M

    18M

    45M

    45M

    TravelDistance

    Actual Type

    Note: In BS5588 -1:2004 states thatwhen smoke detecters are introducedthe travel distances are increased by15%.

    AOV

    Block 2

    sFD 60

    OneWay

    TwoWay

    OneWay

    TwoWay

    One Way

    One Way

    One Way

    One Way

    One Way

    One Way

    One Way

    Exterior Stair Core 1

    Ramp to Below Proposed Pedestrian Landscape

    External Lift 1

    Proposed Residential Green SpaceProposed Residential Pathway

    Constitution Hill

    Proposed Residential Green Space

    Proposed New Entrance to site

    Proposed Residential Pathway

    Constitution Hill

    10.1M +Smoke A.

    20270

    32 mSTAIRWELL A

    sFD 60

    20290

    32 mPRIVATE GARDEN

    21 mLIVING ROOM 12 m

    BED ROOM

    8 mKITCHEN

    11 mBED ROOM

    6 mBATHROOM

    9 mHALL

    21 mLIVING ROOM

    8 mKITCHEN

    12 mBED ROOM

    7 mBATHROOM

    11 mBED ROOM

    9 mHALL

    49 mPRIVATE GARDEN

    33 mPRIVATE GARDEN

    21 mLIVING ROOM

    12 mBED ROOM

    8 mKITCHEN

    11 mBED ROOM

    6 mBATHROOM

    9 mHALL

    33 mPRIVATE GARDEN

    21 mLIVING ROOM

    12 mBED ROOM

    8 mKITCHEN

    11 mBED ROOM

    6 mBATHROOM

    9 mHALL

    32 mPRIVATE GARDEN

    21 mLIVING ROOM

    8 mKITCHEN

    11 mBED ROOM

    6 mBATHROOM

    12 mBED ROOM

    9 mHALL 34 m

    Reception

    15 mStore

    26 mLaundrette

    53 mFIRE LOBBY

    19 mLIFT LOBBY

    8 mLOBBY

    24 mSTAIRWELL B

    9 mHALL

    10 mHALL

    18 mBED ROOM

    18 mLIVING ROOM

    8 mKITCHEN

    8 mBATHROOM

    25 mPrivate Balcony

    Entrance

    2

    2

    1

    1

    AOV Note : There is an A.O.V ineach Stair core on every floorlevel. This allows in the eventof a fire, all levels to be keptclear of smoke and the suctionis continuous throught theBuilding.

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    18/1

    1/20

    15 1

    7:23

    :08

    18/11/2015 17:23:08

    1 : 200

    02 - First Floor FFL -Unit 1

    T5

    Author

    007

    Regulatory Processes

    Dublin City Council

    PLANNING

    1 : 20001 - First FFL - Unit 1

    North

  • 41 mPlant Room

    19 mLift Lobby

    8 mLobby

    23 mStairwell B

    26 mLiving Room/ Kitchen

    8 mBathroom

    Duct

    10 mHall

    AOV

    Duct

    Exterior Stair Core 2

    External Lift 2

    Proposed Residential Green Space

    Proposed New Entrance to site

    53 mFire Lobby

    33 mLaundrette

    41 mPlant Room

    26 mLiving Room/Kitchen

    18 mBedroom

    23 mStairwell D

    8 mFire Lobby

    19 mLift Lobby

    7 mBathroom

    Constitution Hill

    300

    300

    300

    300

    300

    300 300300300

    300

    All one bed flats are equipped tofacilitate all ambulant or disabledpersons. All other apartmentshave the potential to becomewheelchair accessible

    all enterances has level access

    2960

    2800 1870

    1948

    1200

    4000

    2800

    1027

    158 mRetail space

    158 mRetail space

    158 mRetail space

    105 mRetail space

    Indicates Existing structure/construction.

    Indicates Proposed structure/construction.

    LEGEND

    Vehicle Entrance and Exit from site boundary

    Approach A From public Road/Site boundary

    Site Bondary

    1800mm Wheelchair Turning Circle

    Access control panel

    Proposed Level

    Emergency Call

    Wheelchair Refuge

    Circulation

    Level Landing

    Amulant Disabled WC

    Ambulant Stairs

    LEGEND

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    19/1

    1/20

    15 1

    3:27

    :57

    19/11/2015 13:27:57

    1 : 200

    Ground FFL Unit 2

    T5

    Author

    00007a

    Regulatory Processes

    Dublin City Council

    PLANNING

    1 : 200000- Ground FFL Unit 3

  • 7

    6

    5

    4

    3

    2

    1

    15141312111098

    22

    21

    20

    19

    18

    17

    16

    29 28 27 26 25 24 23

    19 mLIFT LOBBY

    2 mLIFT

    2 mLIFT

    8 mLOBBY

    24 mSTAIRWELL B

    10 mHALL 8 m

    BATHROOM

    8 mKITCHEN

    18 mLIVING ROOM

    Exterior Stair Core 1

    Ramp toBelow

    Proposed Pedestrian Green Landscape

    ExternalLift 2

    Proposed Residential Green Space

    Proposed

    NewEntrance to

    site

    Proposed ResidentialPathway

    Constitution Hill

    AOV

    DuctB2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    Block 3

    ExteriorStairCore 2

    External Ramp 1 12 Gradient

    External Steps

    19850

    5678

    11830

    Entrance

    32 mPrivate Garden

    48 mPrivate Garden

    32 mPrivate Garden

    32 mPrivate Garden

    31 mPrivate Garden

    51 mLaundrette/Cafe

    11 mW.C

    39 mLiving Room/Kitchen

    19 mBedroom

    26 mPrivate Balcony

    Proposed Pedestrian Paving

    Block2

    Proposed Residential GreenSpace

    1583

    3710

    34 mStairwell C

    48 mEntrance Lobby

    7 mHall

    6 mHall

    21 mStairwell D

    17 mBike Store

    Duct

    1

    2

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    2

    003

    12 mBedroom

    29 mLiving Room/Kitchen

    6 mWC

    10 mBedroom

    8 mHall

    11 mBedroom

    6 mW.C

    8 mHall

    10 mBedroom

    29 mLiving Room/Kitchen

    6 mW.C

    10 mBedroom

    8 mHall

    11 mBedroom

    29 mLiving Room/Kitchen

    8 mHall

    6 mW.C

    10 mBedroom

    11 mBedroom

    6 mW.C

    8 mHall

    10 mBedroom

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    18 mLift Lobby

    35 mStair Lobby

    Duc

    t

    D2

    21 mLift Lobby

    3 mLobby

    29 mLiving Room/Kitchen

    29 mLiving Room/Kitchen

    11 mBedroom

    2740

    1500

    4639

    4963

    1500

    1035

    1500

    7901 11850

    38641207

    3100

    2770

    3006

    3864

    2223

    1440

    3498

    3775

    425 1200 2492 910 630 1770 423

    910

    910

    3380

    910

    Duc

    t

    2774 800 1300 2988

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    9153

    4976

    6645

    2513

    4822

    425 1200 2617 910 505 1770 787 1010 2627 425 1200 2492 910 630 1770 433 416 1200 2492 910 630 1770 424 425 1200 2492 910 630 1770 433 475 1810 3379 7397 260

    5648

    4144

    690

    1810

    3438

    7141

    4428

    3731

    3579

    6093

    776

    900

    1094

    900

    510

    3051

    430 1010 705 1010

    1010

    1190

    1625

    4303

    7076

    5563

    2988

    1010

    1010

    2575

    910

    910

    3485

    5940

    1433 683 1220 1035 630 427 1810 890 1810 450 630 538

    481

    1220

    539

    1220

    565

    788 1770 1023

    1083

    1220

    3847

    3629

    6093

    803

    1770

    1261

    1770

    918

    1500

    1207

    3100

    2770

    3006

    2223

    3498

    3743

    5039

    910

    3505

    1450

    37431207

    3100

    2770

    3743

    2223

    3498

    3800

    910

    3505

    1500

    37501207

    3100

    2770

    3750

    2223

    3498

    3775

    5039

    910

    3505

    1500

    37751207

    3105

    2765

    3775

    2223

    3503

    3775

    5114

    910

    3505

    3788 3743

    20320

    19570

    18620

    7125

    8164

    F2

    1890

    FW.1 FW.2 FW.3 FW.4 FW.5 FW.6

    SW.1 SW.2 SW.3 SW.4 SW.5

    Fall Fall Fall Fall Fall

    Fall

    Fall

    Fall

    Fall

    Fall

    Schedule of Rooms

    Two Bedroom Apartment x 5

    One Bedroom Apartment x 1

    Laundrette/Cafe x 1

    Bike Store x 1

    01

    0101

    01

    02

    02

    02

    03

    03

    0303

    03

    04

    04

    04

    06

    0606 09

    0909

    11

    11

    11 12

    12

    12

    12

    13

    13

    17

    17

    17

    04

    04

    Two Bedroom Apartments

    Existing Stair Core

    Roof Gardens

    Private Balcony

    Laundrette/Cafe

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:07

    :12

    10/12/2015 14:07:12

    1 : 100

    First Floor

    T6

    Author

    005

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10001 - First FFL Unit 2

    First Floor 3D View

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.13 - External paving.Concrete paving slabs with a permablepaving finish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • B2 C2A2

    Wind flower planting sedumon 100mm soil layeron root barrier/drainage membraine toNBS Spec. Q37

    50mm slab pavingon 50mm sand cementto NBS Spec. Q25

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Structural steel column supporting balcony aboveto NBS Spec. G10

    Drainage channel draininbeded in concrete to NBSSpec. R10

    Curtain walling to NBS Spec. H11 fixed strictlyin accordance with manufacturersspecifications.

    200mm polished concrete floorslab 35N20 concreteA142 mesh reinformentwith 100mm suspendedceiling to NBS Spec. K10

    Concrete box beam to engineersspec with 3mm plaster skim on12.5mm plasterboard toNBSspec. K10

    Zinc standing seam parapet cappinglaid to a 3 degree fall on 18mm WBP plyboardto NBS Spec. H74

    Curtain walling to NBS Spec. H11fixed strictly in accordance withmanufacturers specifications.

    New 200mm polished concretefloor slab 35N20 concrete A142mesh reinforcement with 50mmcover laid on 300mm XPSinsulation with radonbarrier at joints it is taped andlapped.foundation to engineers spec.

    Aspalt to NBS Spec. j21ON 3 LAYERS OF 100mmfoamglass flat roof insulationJoints lapping boards stageredon vapour/airtight membraineon 150mm concrete slab to NBSSpec. E60 with 100mm suspendedceiling to NBS Spec. K45with space for MVHR supply air ductworkand MVHR return extract ductwork

    Drainage channel draininbeded in concrete to NBSSpec. R10

    150mm concrete slab on60mm sand blinding on4 layers 150mm hardcore

    Parex EWI/ silicate render system orsimimlar. Silicate 2 coat render finishon reinforcement mesh on base coatall in accordence with suppliers detailspec.

    Parapet build up300mm EPS insulation boards with renderedfinish to NBS Spec M21 adhesive fixed to pasterparge coat substrate with 150mm pre-castconcrete upstand to NBS Spec. E60 with100mm EXP insulation yo NBS Spec. M21 withrendered finish.

    Air tight barrier at joints is tappedand lapped to NBS Spec. P10

    2671

    3035

    5015

    010

    0

    199

    301

    920

    0

    E2

    00 - Ground FFL

    16400

    01 - First FFL

    19750

    200mm Polished Concrete floor slab35N20 Concrete A142 meshReinforcement with 50mm cover laidon 300mm XPS insulation withRadon barrier at joints it is taped andlapped.

    10mm Plasterboard internal finsh on200mm concrete slab on two layers of150mm XPS insulation overlapped atjoints with 10mm plaster external finish

    100x100mm Stone paving ground levelfinish on 75mm Sand blinding on Threelayers of 150mm Hardcore

    200mm Polished Concrete floor slab 35N20Concrete A142 mesh Reinforcement with50mm cover laid with 100mm SuspendedCeiling

    100mm Suspended ceiling to NBS Spec.K45 with space for MVHR suppy airductwork and MVHR return extract ductworkwith 15mm 600x600mm Ceiling tile finish

    Aluminium Clad door frame to NBSspec L20 with Aluminium thresholdon 10mm steel angle fixed back to200mm structural Concrete

    Structural steel column to NBSSpec G10

    B2 C2

    05 - Fifth FFL

    31800

    815

    1262

    1712

    3789

    1287

    222

    564

    100mm suspended Ceiling to NBS specK45 with space for MBHR Supply airductwork and MHVR return extractductwork with 15mm 600x600mmCeiling finish

    200mm polished concrete floor slab 35N20concrete A142 mesh reinforcment with50mm cover with on 50mm acusticinsulation on 12.5mm OSB to NBS specK21 on a water membrain layer to be tapedand sealed at joints with air tight tape withan over lap of 100mm to NBS spec J40 on100mm Suspended ceiling

    Two Layers of 12.5mm PlasterboardInternal finish on 50x50mm Vertically fixedbattons on 200m Reinforced Concrete wallon Two layers of 150mm XPS insulationoverlapped at joints with 10mm Plasterexternal finish

    40mm Non-Permeable Timber boarding to NBSSpec H21 on Structural steel Universal I beamsfixed back to structural Steel columns Both to NBSspec G10 & Sized to Engineers Spec Fixed Backto structure

    Steel Framed balcony fixed back to structure withsteel angles to NBS spec G12 and sized toEngineers Spec with 10mm thermal break

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Non Permeable Timber Boarding slopedtowards Drain

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Roof Build up from External to Internal:Rheinzink angled standing seem covering sloped to an an angle on 1:3to NBS spec : H74. On 20mm structural OSB to NBS spec : k21. On50x50mm Horizontal battons at 600mm spacings to NBS spec H21. Ona water membrain layer to be taped and sealed at joints with air tighttape with an over lap of 100mm to NBS spec J40 . On 20mm structuralOSB to NBS spec : k21. On 100mm XPS insulation overlapped at joints.On 12.5mm OSB to NBS spec : k21 On Structural BCI 90 EngineeredC24 I beams at 400mm centers, to enginers specification with 300mmrockwool insulation is placed in between the beams. On a inteligentmembrain layer to be taped and sealed at joints with air tight tape withan over lap of 100mm to NBS spec J40. On 12.5mm OSB to NBS spec :k21. On 100mm suspended Ceiling to NBS spec K45 with space forMBHR Supply air ductwork and MHVR return extract ductwork with15mm 600x600mm Ceiling finish

    Wall Build up from External to Internal:15mm timber cladding to NBS spec K20. On 50X50mm vertical timberbattons to NBS spec H21. On a water membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm to NBSspec J40. On 12.5mm OSB to NBS spec : k21. On 100mm XPSinsulation overlapped at joints. On 12.5mm OSB to NBS spec : k21.On 200mm stimber stud wall filled with rockwool insulation is placed inbetween the studs. On a inteligent membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm to NBSspec J40. On 12.5mm OSB to NBS spec : k21. On 50X50mm verticaltimber battons to NBS spec H21. On Two Layers of 12.5mmPlasterboard.

    Insect mesh.

    E2

    05 - Fifth FFL

    31800

    F2

    Drainage channel draininbeded in concrete to NBSSpec. R10

    40mm Non-Permeable Timber boarding to NBS Spec H21 on Structural steel Universal I beams fixed back to structural Steel columns Both to NBS spec G10 & Sized to Engineers Spec 100mm structural concrete screed to NBS soec m10Fixed Back to structure

    Steel Framed balcony fixed back tostructure with steel angles to NBSspec G12 and sized to EngineersSpec with 10mm thermalbreak

    Structural steel column supportingbalcony above to NBS Spec. G10

    Roof Build up from External to Internal:Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H74. On 20mm structural OSB to NBS spec: k21. On 50x50mm Horizontal battons at600mm spacings to NBS spec H21. On awater membrain layer to be taped and sealed at joints with air tight tape with an over lapof 100mm to NBS spec J40 . On 20mmstructural OSB to NBS spec : k21. On 100mm XPS insulation overlapped at joints. On12.5mm OSB to NBS spec : k21 On StructuralBCI 90 Engineered C24 I beams at 400mmcenters, to enginers specification with 300mm rockwool insulation is placed in between the beams. On a inteligent membrain layer to be taped and sealed at joints with air tight tape with an over lap of 100mm to NBS spec J40. On 12.5mm OSB to NBS spec : k21. On 100mm suspended Ceiling to NBS spec K45 with space for MBHR Supply air ductwork and MHVR return extractductwork with 15mm 600x600mm Ceiling finish

    Insect mesh.311

    3789

    2080

    1709

    3796

    1156

    B2 C2

    04 - Fourth FFL

    28450

    100mm suspended Ceiling to NBS specK45 with space for MBHR Supply airductwork and MHVR return extractductwork with 15mm 600x600mmCeiling finish

    200mm polished concrete floor slab 35N20concrete A142 mesh reinforcment with50mm cover with 100mm Suspendedceiling

    Two Layers of 12.5mm Plasterboard Internalfinish on 50x50mm Vertically fixed battons on200m Reinforced Concrete wall on Two layersof 150mm XPS insulation overlapped at jointswith 10mm Plaster external finish

    40mm Non-Permeable Timber boarding to NBSSpec H21 on Structural steel Universal I beams fixedback to structural Steel columns Both to NBS specG10 & Sized to Engineers Spec Fixed Back tostructure

    Steel Framed balcony fixed back to structurewith steel angles to NBS spec G12 and sized toEngineers Spec with 10mm thermal break

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Non Permeable Timber Boarding slopedtowards Drain

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    CHECKER

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    NOTES

    10/1

    2/20

    15 1

    4:14

    :57

    10/12/2015 14:14:57

    As indicated

    1 20 SectionT6

    Group 4

    004

    General Arrangements

    Dublin City CouncilDESIGN 1 : 20Ground Floor Detail

    1 : 20Ground Floor Basement Junction

    1 : 20Fifth Floor Roof Detail

    1 : 20Fifth Floor Balcony and Roof Detail

    1 : 20Intermediate Balcony Connection Detail

    1 : 200Key section

    1 : 500Key plan

    Detail A Detail B

    Detail C

    Detail D

    Detail E

    Detail C - Intermediate balcony connection detail.Scale 1:20

    Detail D - Fifth Floor and roof detail.Scale 1:20

    Detail C - Fifth floor balcony and roofdetail.Scale 1:20

    Insulated Aluminium frame.

  • 8

    6

    5

    4

    1 2 34

    102

    8

    6

    5

    4

    1 2 34

    102

    7

    102

    1 Ground FFL

    0

    0 Top Found

    -900

    1 - First FFL - Power

    2722

    8 6 5 4

    2 - Attic Level - Power

    5382

    1 - False Ceiling

    2442

    7102

    2 - Attic Level - Power

    5382

    150x150

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    REV DATE DESCRIPTION CHKD DRN

    COPYRIGHT (C)

    Jack Lambourne

    22/0

    4/20

    15 1

    6:31

    :03

    22/04/2015 16:31:03

    As indicated

    Mechanical

    11

    Jack Lambourne

    102

    MEP Project

    Owner

    Design

    N

    1 : 100

    0 - Ground FFL - Mechanical1

    1 : 100

    1 - First FFL - Mechanical2

    Mechanical 3D3

    1 : 50

    Section - Mechanical4

    3D View 1 - Mechanical5

    3D View 2 - Mech6

    1 : 10

    Air Coil Unit Detail7

    3D View of Mech8

    You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

    http://www.novapdf.com

  • A - FFL - Ground

    0.115

    179

    302

    38

    43

    90

    41

    24

    25

    25

    9085

    76

    51

    VerticalStainless SteelBaluster 50mmDiameter

    Cast In situ Concrete Stairs

    25mm SolidStone TreadCast into20mm Mortarbed

    25mm SolidStone Riser

    Slip Resistant NosingFixed into stone throughconcrete. Acts as visualaids for visually impairedpersons

    100mm MaxSpacing betweenSS verticals inaccordance withTGD Part M and K

    Bottom Rail

    Two 10mm Boltsused to secureBalustrading intostairs

    Stainless SteelGrips thatsecure metalsheeting, boltedthrough

    Metal Sheeting

    25mm Solid Stone Flooring

    Cast in situ Concrete Beam supporting stairs

    20

    30.83

    5

    A - FFL03 - Second Floor

    13.383

    A - GFFL - Ground Floor

    0.390

    A - FFL02 - First FFL

    9.430

    1340

    2340

    3022

    2843

    2828

    1611

    1635

    1589

    1453

    179 302

    400800

    1059

    559

    1078

    179

    1160

    FD60

    NoteAccording to PartM, if headroom isunder 2.1m, it is tobe guarded withadditional railings forsafety

    All flight to flight heights areunder 1.8m in accordancewith TGD Part M

    All handrails are extended byat least 300mm at the end ofeach flight in accordance withtgd Part M

    Imtermediate Landing

    Imtermediate Landing

    Imtermediate Landing100mm Non Structural Wall actingas ballustrades for for top floor

    5mm Carpet Finish

    Stainless SteelNosing

    Concrete Landing with6mm Carpet Tile Finish

    Change of Material ateach top and bottom ofstair for visually impaired

    Transition to 9mm Rubber Flooring on top landing

    FD60

    FD60

    All Guarding on SS SteelBallustrading and WallBallustrading is 1100mm Highabd all handrail heights are900mm

    ConcreteLanding with25mm SolidStone

    5mm Carpet FinishStainless Steel Ballustrading1100mm Vertical Ballusters in between 550mm SS sheetswith are fixed byStainless steel grips. Four Grips to a sheet. The verticalballustrades are fixed via bolts at the side of thestair. The handrail is also stainless steel (900mm high)

    Stainless Steel Handrail 900mm High Max (TGD Part K)

    300

    300

    300

    300

    300

    300

    300

    300

    5

    A

    320

    1

    320

    1

    A1

    307

    3

    307

    3

    8500

    900

    1400

    1010

    1010

    1545 2400

    300

    1500

    1500

    500

    3500

    300

    500

    200

    FD60

    FD60

    Wheelchair Refuge

    External Wall Build

    200mm Cast in Situ Concrete Core Wall

    Corduroy Hazard Warning Surface atTop and bottom of every flight forvisually inpaired

    300mm Treadscontinuing above

    40mm DiameterStainless SteelHandrail 50mm awayfrom wall face

    Landing inaccordance withTGD Part M

    300

    Extension of handrail(TGD Part M)

    123456789

    1716151413121110 18

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    REV DATE DESCRIPTION CHKD DRN

    COPYRIGHT (C)

    Jack Lambourne

    28/0

    4/20

    15 0

    0:18

    :14

    28/04/2015 00:18:14

    As indicated

    Stairs - GroundFloor Details

    05

    Author

    307

    B2 - Market Place &Offices

    D.I.T

    Design

    N

    1 : 5First Step - Detail

    Stairs - Ground Floor 3D 1 : 50Stairs - Section AA

    First Step - 3D

    Stairs - 3D Balustrade Detail

    Stairs - 3D Balustrade Detail 2

    Stairs - 3D ConnectionStairs - 3D Railing Grip

    1 : 50Stairs - Ground Floor Plan

    NOTEAll measurements and designs on all drawings are inaccordance with TGD Parts B (Fire Safety),M (Access and Disabilities) and K (Stairs).All floors and landings differ in finishes from Ground floor up toTop floor.

    Ground FloorFloor: 25mm Solid Stone - R Rating = 0.049Riser Material: 25mm Solid StoneTread Material: 25mm Solid Stone

    First FloorFloor (Landing): 6mm Carpet Tile - R Rating = 0.4Riser Material: 25mm Solid StoneTread Material: 25mm Solid Stone

    Top FloorFloor (Landing): 5mm Carpet - R Rating = 0.7Riser Material: 5mm CarpetTread Material: 5mm CarpetTop Floor Finish: 9mm Rubber Flooring - R Rating = 1.1

    Balustrade System UsedWall Side: Stainless Steel Handrail bolted into 200mm ConcreteCore (900mm High)

    Interior Side: Stainless steel vertical ballustrades with stainlesssteel sheeting fixed by steel grips and bolted to outer stairthrough concrete. (1100mm high)

    The top floor switches to a non structural 75mm In situ concretewall with 12.5mm Plaster either side

    Riser Size: 179mm (Min:150mm Max:180mm)Tread Size: 300mm (Min:300mm Max:450mm)

    -This stairs is designed for ambulant disabled persons to use

    1 : 1000Ground Floor Key Plan

    Vertical Ballistersattached via boltsinto stair

    Stainless Steel Nosing

    Metal Sheeting Fixed in betweenVertical Balustrading

    Stainless Steel guarding and handrail 1100mm and 900mmHigh Respectively

    Diameter of 40mm in accordance with Part M

    Stainless Steel Vertical Ballustrade

    Bolts are 10mm indiamter

    Car in situConcrete Staies with 25mm Solid Stone riser and tread.Stainless steel nosing installed to aid visually impaired persons

    1010mm FD60 FInalExit Door from Core

    25mm Solid Stone Finish

    Intermediate Landing

    200mm Cast In situ Concrete Floor slabwith 25mm Solid stone finish

    Balustrading InformationStainless steel verticalballustrades with stainless steelsheeting fixed by steel gripsand bolted to outer stair throughconcrete. (1100mm high)

    Slip resistant nosing installed onall steps for visually impairedpersonsand to avoid falling down the stairs

    Build up of External Wall

    Corduroy Hazardous Sign for visually Impaired perosnsPlaced 400mm from top trad of the stairsMust be the same width as the stairs and at least 800mmdeep

    40mm Diameter StainlessStteel Handrail, 900mmHigh in accordance withTGD Part M

    300mm Extension ofHandrail in accordance withboth TGD Parts K and MRequired for every hamdrail

    200mm Cast in situ Concrete core wall

    Riser : 25mm Solid Stone,179mm High (Max 180mm)Tread: 25mm Solid Stone,300mm Long (Min 300mm)

    Each stairway 1500mm Wide andlanding at least 1500mm wide inaccordancewith Parts B, M and K

    A spacing no more than100mm between verticalbalustrades in accordancewith Part K

  • 1

    B

    DUCT

    DUCT

    W.C No.2 W.C No.3 W.C No.4 W.C No.5

    W.C No.1

    W.H.B No.1 W.H.B No.2 W.H.B No.3

    2188

    820

    980

    610

    620

    1800

    880 900 900 850

    1513

    730

    Wheelchair Accessible Toilet

    NapkinDispenser

    Low Energy Handryer

    Soap Dispenser

    Napkin Dispenser Female WC

    3432

    6802

    HC

    C

    R.T.A

    R.T.A

    C C C

    C

    R.T.A

    R.T.A

    Electricity PanelC

    H

    100mm SVP Stack15mm Hot Waterfeed copper pipe

    15mm Cold Water feedPVC pipe

    32mm Sanitary DrainagePVC Pipe

    Handryers powered by Panel

    100mm SVP Stack

    15mm Cold Water feedPVC pipe

    100mm Sanitary DrainagePVC Pipe100mm Sanitary Pipe underneath Floor

    Hot Water Generated fromCylinder Located in Plant roomon roof

    Cold Water Feed taken fromCWSC in the plant room onthe roof

    Disabled Toilet Layout inaccordance with TGD Part M

    Cold Water Feed taken fromCWSC in the plant room onthe roof

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Cold Water feedPVC pipe (inaccordance with TGDPart H)

    Hot Water Generated fromCylinder Located in Plant roomon roof

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Cold Water Feed taken fromCWSC in the plant room onthe roof

    Disabled Toilet Layout inaccordance with TGD Part M

    1200mm 230V DownlightSmoke Detector

    Mechanical Ventilation System

    1

    Bathroom FFL

    9.169

    Towel Dispenser

    Mirror

    WC No.1

    WC No.2 WC No.3 WC No.4 WC No.5

    85

    0

    42

    7

    10

    22

    10

    67

    18

    05

    1200 1200 1200 1200 1200

    50

    0

    W.H.B No.3W.H.B No.2W.H.B No.1

    C H

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Hot Waterfeed copper pipe(in accordancewith TGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Hot Water Generated fromCylinder Located in Plant roomon roof

    C HC H

    100mm SVP Stack (inaccordance with TGDPart H)

    32mm Sanitary DrainagePVC Pipe

    1200mm 230V Downlight

    Smoke Detector

    Mechanical Ventilation System with 150 x 150mm Ductand 300 x 300mm Diffusers

    B

    Bathroom FFL

    9.169

    85

    010

    63

    20

    22

    40

    6

    76

    5

    50

    0

    600 6003432

    3000

    Duct DuctPaper TowelDispenser

    Vertical Grab Rail

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Hot Water Generated fromCylinder Located in Plant roomon roof

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Cold Water Feed taken fromCWSC in the plant room onthe roof

    Mirror

    Disabled Toilet Layout inaccordance with TGD Part M

    100mm Sanitary Pipe that runs at a fall into Soil Vent Pipe (SVP)

    Mechanical Ventilation System with 150 x 150mm Ductand 300 x 300mm Diffusers

    1

    BElectricity Panel

    Handryers powered by Panel

    1200mm 230V Downlight

    Smoke Detector

    1200mm 230V Downlights powered byelectricity panel located within duct

    Mechanical Ventilation System with150 x 150mm Ductand 300 x 300mm Diffusers

    150

    300 x 300mm Diffuser

    Flex Duct

    150 x 150mm Duct

    B

    Bathroom FFL

    9.169

    600 3432 600

    42

    7

    21

    47

    19

    55

    Low Energy Hand Dryer

    1200 1200

    Duct Duct

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Electricity Circuit Panel forHand Dryers

    One Way Light Switch

    100mm Sanitary Pipe that runs at a fall into Soil Vent Pipe (SVP)

    Bathroom Door

    100mm PVC Branch Pipe (in accordance with TGD Part H)

    1200mm 230V Downlight

    Mechanical Ventilation System with 150 x 150mm Ductand 300 x 300mm Diffusers

    1

    Bathroom FFL

    9.169

    1200 1200 1200 1200 1200

    19

    54

    19

    60

    42

    753

    0

    78

    7

    WC No.5 WC No.4 WC No.3 WC No.2 WC No.1

    Wheelchair Accessible Toilet

    Vertical Grab Bar

    50

    0

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Cold Water Feed taken fromCWSC in the plant room onthe roof

    Disabled Toilet Layout inaccordance with TGD Part M

    100mm Sanitary Pipe that runs at a fall into Soil Vent Pipe (SVP)

    1200mm 230V Downlight

    Smoke Detector

    Mechanical Ventilation System with 150 x 150mm Ductand 300 x 300mm Diffusers

    NOTES

    Foul Waste Water Drainage (TGD Part H)

    - Must prevent foul air from the drainage system entering the building- Must be ventilated- Must be accessible for clearing blockages- Must be protected from accidental damage

    Foul Wastewater Drainage - Pipework Overground:

    Wash Hand Basin (W.H.B) trap size = 32mm, seal size = 75mmWater Closet Pan (W.C) trap size = 100mm, seal size = 50mm

    Wash Hand Basin (W.H.B) branch pipe size = 100mm, gradient of 9mm min to max 90mmWater Closet Pan (W.C) branch pipe size = 50mm, gradient of 18mm min to max 45mm

    Discharge Stacks size = 100mm min diameter, 7.2 litres/secMaterial = PVC-uAirtightness : pipes, fittings and joints should be capable of withstanding air or smoke test for3 minutes.

    Surface Water Drainage (TGD Part H)

    Drainage area of flat roof = Plan area of relevant portion = 1358 m2

    Gutters should be laid with any fall towards the nearest outletTable 17 in TGD Part H refers to outlet sizes, for this project:

    Gutter size = 150mm minOutlet size = 89mm min, 100mm chosenFlow Capacity = 2.16 litres/sec

    Rainwater Pipes (RWP):

    - Should be discharged into a drain or gully- Size of RWP should be at least the size of the outlet from the gutter- Drains should be at least 75mm Diameter- 75mm and 100mm Rainwater Drains should be laid not less than 1:100

    - There must be a pressure relief valve and a service valve on each cold and hot waterpiping system

    Hot Water Generated fromCylinder Located in Plantroom on roof

    100mm SVP Stack(in accordance with TGD Part H)

    15mm Cold Water feed PVCpipe (in accordance withTGD Part H)

    Cold Water Feed taken from CWSC inthe plant room on the roof

    100mm Sanitary Pipe that runs at a fall into Soil Vent Pipe (SVP)

    32mm Sanitary DrainagePVC Pipe

    Napkin Dispenser

    Mirror

    Napkin Dispenser

    15mm Cold Water feed PVC pipe(in accordance with TGD Part H)

    Cold Water Feed taken fromCWSC in the plant room onthe roof

    Toilet Layout in accordancewith TGD Part M

    100mm Sanitary Pipe that runs at a fall into Soil Vent Pipe (SVP)

    Toilet Roll Holder

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE

    CAD REF

    BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    REV DATE DESCRIPTION CHKD DRN

    COPYRIGHT (C)

    Jack Lambourne

    23/0

    4/2

    015 2

    0:4

    3:0

    2

    23/04/2015 20:43:02

    As indicated

    Toilet Layout

    05

    Jack Lambourne

    309

    B2 - Market Place &Offices

    D.I.T

    Design

    N

    1 : 50

    Bathroom Floor Plan

    Bathroom 3D

    1 : 50

    Bathroom Section 1

    1 : 50

    Bathroom Section 2

    1 : 50

    Bathroom Ceiling Plan

    1 : 50

    Bathroom Section 3

    1 : 50

    Bathroom Section 4

    1 : 1000

    Bathroom Key Plan

    Bathroom View 1

    Bathroom View 2

    1 : 50

    MEP Legend

    Legend

    Bathroom 3D - Sinks

    Bathroom 3D - WC's

    15mm Hot Water Feed (Copper Pipe)

    15mm Cold Water Feed (PVC Pipe)

    Foul Waste Pipes (PVC Pipes)

    Electrical Feed

    Smoke Detector

    Mechanical Vent System

    Rise to AboveR.T.A

  • UP

    UP

    60 Minutes Fire Protection

    30 Minutes Fire Protection

    90 Minutes Fire Protection

    0.15 w/m2k

    0.8 w/m2k

    1 2 3 4

    A

    B

    C

    1580

    3

    19828

    4FD60

    5FD60

    6FD60

    2FD60

    9FD60

    8FD60

    11FD60

    12FD60

    3FD60

    1 2 3 4

    A

    B

    C

    1580

    3

    19828

    Internal Timber FramedDoor with Glazing Panel

    External Double TimberFramed Door with GlazingPanel

    Triple Glazed Window Unitwith timber frame

    810 1600

    2110

    2110

    2810

    500

    Project Name

    Name

    Student Number

    Date 03/12/2014 12:00:39

    Schedules and Parameters

    C12700655

    Jack Lambourne

    Legend

    1 : 1002 Ground FFL Fire Protection1

    1 : 1002 Ground FFL U-Values2

    1 Panel Exploded Ground Floor Fire Protection3

    1 Panel Exploded Ground Floor U-Values4

    Door Schedule

    DoorNo.

    FireRating Level

    DoorWidth Finish

    2 FD60 2 Ground FFL 810 Oak3 FD60 2 Ground FFL 810 Oak4 FD60 2 Ground FFL 810 Oak5 FD60 2 Ground FFL 810 Oak6 FD60 2 Ground FFL 810 Oak8 FD60 2 Ground FFL 1600 Oak9 FD60 2 Ground FFL 1600 Oak11 FD60 2 Ground FFL 1600 Oak12 FD60 2 Ground FFL 1600 Oak

    13 FD30 3 First FFL 1600 Oak14 FD30 3 First FFL 1600 Oak15 FD30 3 First FFL 1600 Oak16 FD30 3 First FFL 1600 Oak17 FD60 3 First FFL 810 Oak18 FD60 3 First FFL 810 Oak19 FD60 3 First FFL 810 Oak

    20 FD30 4 Second FFL 1600 Oak21 FD30 4 Second FFL 1600 Oak22 FD30 4 Second FFL 1600 Oak23 FD30 4 Second FFL 1600 Oak24 FD30 4 Second FFL 1600 Oak25 FD60 4 Second FFL 810 Oak26 FD60 4 Second FFL 810 Oak27 FD60 4 Second FFL 810 Oak28 FD30 4 Second FFL 810 Oak

    29 FD30 5 Third FFL 1600 Oak30 FD30 5 Third FFL 1600 Oak31 FD30 5 Third FFL 1600 Oak32 FD60 5 Third FFL 810 Oak33 FD60 5 Third FFL 810 Oak34 FD60 5 Third FFL 810 Oak

    Total Number of Doors: 31

    Room Schedule

    Number Name Level Area

    1 Balcony 2 Ground FFL 9 m2 Apartment 2 Ground FFL 128 m3 Maisonette 2 Ground FFL 49 m4 Balcony 2 Ground FFL 8 m5 Hallway 2 Ground FFL 16 m6 Storage 2 Ground FFL 11 m7 Bicycle

    Parking2 Ground FFL 42 m

    8 Maisonette 3 First FFL 58 m9 Apartment 3 First FFL 102 m10 Balcony 3 First FFL 7 m11 Balcony 3 First FFL 9 m12 Apartment 3 First FFL 71 m13 Hallway 3 First FFL 16 m

    16 Balcony 4 Second FFL 7 m17 Balcony 4 Second FFL 8 m18 Balcony 4 Second FFL 6 m19 Maisonette 4 Second FFL 51 m20 Apartment 4 Second FFL 71 m21 Hallway 4 Second FFL 15 m25 Apartment 4 Second FFL 101 m

    26 Hallway 5 Third FFL 16 m27 Maisonette 5 Third FFL 51 m28 Apartment 5 Third FFL 128 m29 Balcony 5 Third FFL 9 m30 Balcony 5 Third FFL 7 m31 Apartment 5 Third FFL 46 mTotal Number of Rooms: 26

    1 : 50Door/Window Legend

    Door Tag Shared Parameter File

    U-Values Shared Parameter File

    Door Tag

  • Constitution Hill Middle Floor Maisonette

    Bedroom

    Living Space

    Bedroom

    Existing Stairs

    Living Room

    First Floor Plan

    Balcony

  • Proposed Energy Analysis Typical Two bed Apartment

    Summary

    Proposed BER of 127 kwh/m2 B3 Rating

    Huge Improvement on the heat loss through the walls

    Windows upgraded to triple glazing

    Huge reduction on heat loss during the winter months

    DEAP Software was used for this analysis

    Heat pump and CHP Unit for electricity

    BER Rating B3

    Walls: 0.12 W/m2K Floor: 0.11 W/m2KRoof: 0.09 W/m2K

    127

    Living Room

    Bedroom

    Bathroom

    Balcony

    Access Deck

    Kitchen

  • 22 mStorage

    2586 mBasement Carpark

    32 mPrivate Garden

    48 mPrivate Garden

    32 mPrivate Garden

    32 mPrivate Garden

    31 mPrivate Garden

    51 mLaundrette/Cafe

    26 mPrivate Balcony

    48 mEntrance Lobby

    17 mBike Store

    12 mPrivate Balcony

    53 mAccess Deck

    9 mPrivate Balcony

    12 mPrivate Balcony

    9 mPrivate Balcony

    9 mPrivate Balcony

    24 mPrivate Balcony

    20 mPrivate Balcony

    Ground Floor Plan 1:400

    First Floor Plan 1:400

    Typial Upper Floor Plan 1:400

    55 mAccess Balcony

    Not EnclosedPrivate Balcony Not Enclosed

    Private BalconyNot Enclosed

    Private BalconyNot Enclosed

    Private BalconyNot Enclosed

    Private Balcony

    24 mPrivate Balcony

    20 mPrivate Balcony

    Fifth Floor Plan 1:400

    Roof Plan 1:400

    Roof mounted solar PV panels

    660mm Rheinzink angled standing seem roof.

    Overhead shading canopy

    480mm timber cladding external wall.

    Parex EWI/ silicate render system or simimlar. Silicate 2 coatrender finish on reinforcement mesh on base coat

    Powder coated aluminumBrise soleil with 1 metre overhang

    Glass balcony panels with stainless steel balcony railing

    40mm Non-Permeable Timber boarding onStructural steel Universal I beams fixed back to structural Steel columns

    Support columns to external access deck

    Granite paving and streets cape improvements

    Infill for services

    Triple glazed, aluclad timber patio doors/ windows

    815

    1262

    1287

    Wall Build up from External to Internal:15mm timber cladding. On 50X50mm vertical timberbattons. On a water membrain layer to be taped andsealed at joints with air tight tape with an over lap of100mm. On 12.5mm OSB. On 100mm XPS insulationoverlapped at joints. On 12.5mm OSB. On 200mmstimber stud wall filled with rockwool insulation is placedin between the studs. On a inteligent membrain layer tobe taped and sealed at joints with air tight tape with anover lap of 100mm. On 12.5mm OSB. On 50X50mmvertical timber battons to. On Two Layers of 12.5mmPlasterboard.

    Roof Build up from External to Internal:Rheinzink angled standing seem coveringsloped to an an angle on 1:3. On 20mm structuralOSB. On 50x50mm Horizontal battons at600mm spacings. On a water membrain layer tobe taped and sealed at joints with air tight tapewith an over lap of 100mm. On 20mm structural OSB.On 100mm XPS insulation overlapped at joints. On12.5mm OSB On Structural BCI 90 Engineered C24I beams at 400mm centers, to enginers specificationwith 300mm rockwool insulation is placed in betweenthe beams. On a inteligent membrain layer to be taped andsealed at joints with air tight tape with an over lap of100mm. On 12.5mm OSB. On 100mm suspendedCeiling with space for MBHR Supply air ductworkand MHVR return extract ductwork with 15mm 600x600mmCeiling finish

    100mm suspended Ceiling to NBS spec K45 with spacefor MBHR Supply air ductwork and MHVR return extractductwork with 15mm 600x600mm Ceiling finish

    200mm polished concrete floor slab 35N20 concreteA142 mesh reinforcment with 50mm cover with100mm Suspended ceiling

    Two Layers of 12.5mm Plasterboard Internal finishon 50x50mm Vertically fixed battons on 200mReinforced Concrete wall on Two layers of150mm XPS insulation overlapped at joints with10mm Plaster external finish

    40mm Non-Permeable Timber boarding to NBS SpecH21 on Structural steel Universal I beams fixed backto structural Steel columns Both to NBS spec G10 &Sized to Engineers Spec Fixed Back to structure

    Steel Framed balcony fixed back to structure with steelangles to NBS spec G12 and sized to Engineers Specwith 10mm thermal break

    Structural steel column supporting balcony above

    Drainage channel drain inbeded in concrete

    Curtain walling to NBS Spec. H11 fixed strictly inaccordance with manufacturers specifications.

    200mm polished concrete floor slab 35N20 concreteA142 mesh reinforment with 100mm suspended ceiling

    New 200mm polished concrete floor slab 35N20concrete A142mesh reinforcement with 50mm cover laidon 300mm XPS insulation with radon barrier at joints it istaped and lapped.foundation to engineers spec.

    50mm slab pavingon 50mm sand cementAspalt ON 3 LAYERS OF 100mm foamglass flat roofinsulation Joints lapping boards stagered onvapour/airtight membraine on 150mm concrete slab with100mm suspended ceiling with space for MVHR supply airductworkand MVHR return extract ductwork

    Wind flower planting sedumon 100mm soil layeron root barrier/drainage membraine to

    Concrete box beam toengineers spec with 3mmplaster skim on 12.5mmplasterboard

    Zinc standing seam parapet capping laid to a 3degree fall on 18mm WBP plyboard

    Drainage channel draininbeded in concrete

    Parex EWI/ silicate render system or simimlar.Silicate 2 coat render finish on reinforcement meshon base coat all in accordence with suppliers detailspec.

    Parapet build up300mm EPS insulation boards with rendered finishadhesive fixed to paster parge coat substrate with150mm pre-cast concrete upstand to with 100mmEXP insulation withrendered finish.

    Air tight barrier atjoints is tappedand lapped

    32 mPrivate Garden

    48 mPrivate Garden

    32 mPrivate Garden

    32 mPrivate Garden

    31 mPrivate Garden

    51 mLaundrette/Cafe

    26 mPrivate Balcony

    48 mEntrance Lobby

    17 mBike Store

    Throughout the design process of the Constitution hill retro fit, there were many influencing factors to be taken into consideration. One of which being the new Luas line that is to be put in place in late 2017. We took into consideration very carefully that there will be huge increase to the amount of people coming through the site on a daily basis, from this we have designed a retail space on ground level which can be accessed by the main road. We also changed the layout of the apartments by allowing the balconies to face the communal garden allowing privacy for the occu-pants and the access decks to face the main road instead of the original layout.

    The existing building is not com-plaint with space standards in any room within the apartments. From this we came up with a suitable design to allow each apartment to be not only com-pliant with Dublin city council space standards but also com-pliant with the current Technical guidance documents.

    Architect:

    Daniel Coyle

    Group:

    Jack Lambourne Jamie Fitzgerald Patrick Dunne Aoife Ryan Craig Quinn

    Kitchen

    Living Space

    Private Balcony

    Bathroom

    Hall

    PASSIVHAUS STANDARDS

    Optimised Fabric U-Values:0.12 W/m2k

    Windows & Doors:0.85 2/m2k

    Air Tightness:1 ac/hr @ 50 Pa

    MHVR: 75% Efficient

    Balconies provide summer shading

    PASSIVE HOUSE ENERGY RETROFITSThe retrofit strategy proposes Design and Certification of retrofitting to Passivhaus EnerPhit standards. This will involve optimised super low energy fabric insualtion levels, near elimination of thermal bridges, air tightness to minimise heat loss, maximim use of solar gains, a high level of indoor air quality and an efficent mechanical ventilation system with heat recovery.

    EXISTING BUILDINGS - ENERGY ANALYSISThe energy performance was examined using DEAP soft-ware, U Value calculation software and linear thermal bridge modelling. The DEAP analysis clearly indicated a major improvement of energy standards as every result was an G BER rating. The biggest loss was through the buildings fabric. The openings and walls were the main cause of heat loss.

    LOW ENERGY RETROFIT PROJECTThe project proposes a sustainable design strategy for the energy retrofitting, refurshment and renewal of an existing Dublin City Council multi storey flat top residential apart-ment blocks located in the heart of Dublin Citys Centre. A number of issues were addressed including sustainable urban living and energy conservation.

    Ground Floor of Existing building with heat loss

    Typical Proposed One Bed Apartment

    Typical Proposed Two Bed Apartment

    Mechanical Heat Recovery MEP Model

    Existing Buildng - Aerial view from South-East Additions - Infill between blocks, roof-top units with ground floor extended shop fronts to street. Proposed - New external panel walls & external balconies/ access decks

    First Floor Plan

    Site Elevation

    1

    2

    Cross Section

    3D Section

    Exploded Floor Plans

    1:20 Details

    Proposed Floor Plans

    RoofMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12Zinc 0.003 116 3E05StructuralOSB 0.022 0.13 0.169StructuralOSB 0.022 0.13 0.169XPSInsulation 0.1 0.0341 2.933OSB 0.02 0.13 0.154RockwoolInsulation 0.3 0.044 6.818OSB 0.02 0.13 0.154ExternalSurface 0.06

    Uvalue 0.09

    Roof/BalconyfloorMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12StructuralScreed 0.07 0.12 0.583SandBinding 0.05 0.25 0.200RockwoolInsulation 0.3 0.044 6.818ConcreteSlab 0.1 1.6 0.063ExternalSurface 0.06

    Uvalue 0.13

    WallMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12StructuralOSB 0.002 0.13 0.015XPSInsulation 0.1 0.0341 2.933OSB 0.02 0.13 0.154RockwoolInsulation 0.2 0.038 5.263OSB 0.02 0.13 0.154Plasterboard 0.00125 0.17 0.007Plasterboard 0.00125 0.17 0.007ExternalSurface 0.06

    Uvalue 0.12

    FloorMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12ConcreteFloor 0.2 1.6 0.125XPSInsulation 0.3 0.0341 8.798ConcreteSlab 0.2 1.6 0.125ExternalSurface 0.06

    Uvalue 0.11

    RoofMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12Zinc 0.003 116 3E05StructuralOSB 0.022 0.13 0.169StructuralOSB 0.022 0.13 0.169XPSInsulation 0.1 0.0341 2.933OSB 0.02 0.13 0.154RockwoolInsulation 0.3 0.044 6.818OSB 0.02 0.13 0.154ExternalSurface 0.06

    Uvalue 0.09

    Roof/BalconyfloorMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12StructuralScreed 0.07 0.12 0.583SandBinding 0.05 0.25 0.200RockwoolInsulation 0.3 0.044 6.818ConcreteSlab 0.1 1.6 0.063ExternalSurface 0.06

    Uvalue 0.13

    WallMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12StructuralOSB 0.002 0.13 0.015XPSInsulation 0.1 0.0341 2.933OSB 0.02 0.13 0.154RockwoolInsulation 0.2 0.038 5.263OSB 0.02 0.13 0.154Plasterboard 0.00125 0.17 0.007Plasterboard 0.00125 0.17 0.007ExternalSurface 0.06

    Uvalue 0.12

    FloorMaterial Thickness ThermalConductivity Resistance

    InternalSurface 0.12ConcreteFloor 0.2 1.6 0.125XPSInsulation 0.3 0.0341 8.798ConcreteSlab 0.2 1.6 0.125ExternalSurface 0.06

    Uvalue 0.11

    PerBlockExisting1Bed 102Bed 163Bed 34Bed 1Total 30

    Overall 90

    PerBlockAppartments Size Required

    1Bed 13 84sqm 55sqm2Bed 20 93sqm 80sqm3Bed 0 N/A N/A4Bed 4 126sqm 100sqmTotal 37

    Overall 111

    1 - Renders2 - 3D Details Assignment3 - 2D Details Assignment4 - 3rd Year Balcony Details Project5 - Planning Drawings - Constitution Hill0000 - 01 - Site Location MapSheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    -0000 - 01 - Site Plan - First FloorSheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0001 - 01 - Site PlanSheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    00002 - 03 - Proposed site layout planSheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0002 - 01 - Basement Carpark - Unit 1Sheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0004 - 01 - Basement Carpark - Unit 3Sheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0005 - 01 - Ground FFL - Unit 1Sheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0006 - 01 - Ground FFL - Unit 2Sheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0007 - 01 - Ground FFL - Unit 3Sheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002 - 03 - Proposed site layout plan0003 - 01 - Basement Carpark - Unit 200003 - 03 - Basement Site0004 - 01 - Basement Carpark - Unit 300004 - 03 - Basement Unit 10005 - 01 - Ground FFL - Unit 10006 - 01 - Ground FFL - Unit 20007 - 01 - Ground FFL - Unit 30008 - 01 - First FFL - Unit 10009 - 01 - First FFL - Unit 20010 - 01 - First FFL - Unit 30011 - 01 - Typical Upper Floor FFL - Unit 10012 - 01 - Typical Upper Floor FFL - Unit 20013 - 01 - Typical Upper Floor FFL - Unit 30014 - 01 - Fifth FFL - Unit 10015 - 01 - Fifth FFL - Unit 20016 - 01 - Fifth FFL - Unit 30017 - 01 - South & East Elevation0018 - 01 - North & West Elevations0019 - 01 - Site Sections0020 - 01 - Sections

    0008 - 01 - First FFL - Unit 1Sheets-0000 - 01 - Site Plan - First Floor0000 - 01 - Site Location Map0001 - 01 - Site Plan0002 - 01 - Basement Carpark - Unit 100002