Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 1 of 13

JacksonConventionComplexRequestforQuotes(RFQ)

for

CarpetReplacementBallroom

RFQ#01-2017C

DateIssued: January18,2017

QuoteDueDate:4:00p.m.CST,February10,2017

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 2 of 13

TABLEOFCONTENTS

1. BACKGROUND 3

2. INTRODUCTION 4

2(A)RFQSCOPE 42(B)CRITICALDATES 42(C)QUOTEDUEDATEANDDELIVERY 52(D)SUBMISSIONFORMATANDSTYLE 52(E)MISCELLANEOUSINFORMATION 5

3. RFQEVALUATIONPROCESSANDCRITERIA 7

3(A)FORMOFAGREEMENTBETWEENJCCANDRESPONDENT 7

APPENDIXA–FLOORPLAN 8

APPENDIXB–QUOTATIONSHEET 9

APPENDIXC–SAMPLESERVICESAGREEMENT 10

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 3 of 13

1. BACKGROUNDJacksonConventionComplex:Openedin2009,theJacksonConventionComplex(“JCC”)features330,000squarefeetofflexibleexhibit,ballroomandmeetingspaceandislocatedintheheartofdowntownJackson…Mississippi’scapitalcityandtheheartofSouthernhospitality.Ithostsawiderangeofeventsincludingconventions,tradeshows,corporatemeetings,banquets,weddings,receptions,concerts,sportingevents,consumershows,politicalevents,communitygatheringsandreligiousservices.InFY2015,theComplexwashostto257eventdaysandover171,000eventattendees,generatingapproximately$32millionineconomicimpact.Inadditiontoofferingfirst-rateamenities,stateofthearttechnologies,resortqualityserviceandin-housecatering,theComplexisaLEED®CertifiedbuildingasestablishedbytheU.S.GreenBuildingCouncil(USGBC).TheJacksonConventionComplexisownedbytheCapitalCityConventionCenterCommissionandmanagedbySMG.Formoreinformation,visitwww.jacksonconventioncomplex.com.

CapitalCityConventionCenterCommission:TheCapitalCityConventionCenterCommission(“Commission”)wasformedin2005tooverseeallmattersrelatedtotheconstructionandoperationoftheJacksonConventionComplexandiscomprisedofanine-memberboardofcommissioners.TheCommissioncontractswithSMGforthemanagementoftheJCC.

SMG:In2008,theCommissioncontractedwithSMG(“Operator”)tomanagetheJacksonConventionComplex,includingtheauthoritytonegotiateandcontractforgoodsandservicesnecessaryforthesuccessfulmanagementandoperationofthefacility.In2013theCommissionextendedSMG’scontractthrough2016withrenewaloptionsthrough2022.Foundedin1977,SMGprovidesmanagementservicestomorethan230publicassemblyfacilitiesincludingconventionandexhibitioncenters,arenas,stadiums,theatres,performingartscenters,equestrianfacilities,sciencecentersandavarietyofothervenues.Withfacilitiesacrosstheglobe,SMGmanagesmorethan14.4millionsquarefeetofexhibitionspaceandover1.75millionsportsandentertainmentseats.Astherecognizedglobalindustryleader,SMGprovidesvenuemanagement,sales,marketing,eventbookingandprogramming,constructionanddesignconsulting,andpre-openingservicesforsuchlandmarkfacilitiesasMcCormickPlace&SoliderFieldinChicago,MosconeConventionCenterinSanFrancisco,Houston'sReliantPark,andLouisiana’sMercedes-BenzSuperdomeandSmoothieKingCenter.SMGalsooffersfoodandbeverageoperationsthroughitsconcessions,cateringandspecialeventsdivision,SAVOR,currentlyservicingmorethan100accountsworldwide.Formoreinformation,visitwww.smgworld.com.

EqualBusinessOpportunityProgram:SMG,inkeepingwiththeCityofJackson’sEqualBusinessOpportunityPlan,iscommittedtotheprincipleofnon-discriminationinpubliccontracting.ItisthepolicyofSMGtopromotefullandequalbusinessopportunityforallContractorsdoingbusinesswithSMGandtheJacksonConventionComplex.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 4 of 13

2. INTRODUCTION

2(A)RFQScopeSMG(“Operator”),asoperatoroftheJacksonConventionComplex(“JCC”)isseekingbidsfromqualifiedandexperiencedfirmswithdemonstratedabilityandexperienceincarpetreplacementservicestoreplacecarpetinthefacility’sballrooms.

Thisprojectincludesremovalandhauling/disposalofoldcarpetandinstallationofnewcarpetalreadypurchasedbythefacility.Contractorsshouldincludeallneededsupplies,laborandequipmentintheirsubmittedpricing.AdiagramisincludedinAppendixAforreferencedarea.

Thisprojectisscheduledaroundfacilityeventsandrequiresastrictdeadlineforinstallation(seeSection2(B)forrequiredinstallationtimeline).Failuretomeetthisdeadlinewillresultina15%penaltyofthefinalprojecttotal.

Contractorsarewelcomedtoinspecttheareatobecomefamiliarwiththespace,ifdesired.Seesection2(B)toscheduleawalkthroughwiththeDirectorofOperations.

ScopeofWork:

• Removeanddisposeapproximately2850Sqydofcurrentcarpetandpadding.• Floorprepasneeded• Installapproximately2850sqydofcarpet.Carpetandadhesiveprovidedbyfacility.SeeappendixAforgraphical

representation/diagram.o Approximately2029sqyd-1metertilesina4-tileprecisionsetpattern.o Approximately821sqyd–50centimeterbordertiles

• Installfloorthresholdsasneeded(blackincolor):o Qty12–CarpettoCarpeto Qty14–CarpettoConcrete/HardSurface

• Sitecleanup• Punchlist–asneededanddeterminedbyOperator.

2(B)CriticalDates

Date DescriptionWednesday, January 18, 2017 Project is Issued

Friday, February 10, 2017 Quote Due by 4pm CST

Monday, February 13, 2017 Review of QuotesFriday, February 17, 2017 Selection of FirmSaturday, March 11, 2017 Available Project Start Date

Saturday, March 18, 2017 Required Completion Date ***

Aformalshowingofreferencedareasforsiteinspections,measuringandprojectquestionansweringcanbearrangedindependentlybycontactingBrianSwindoll,DirectorofOperations,orWalterPlummer,ChiefEngineer,at601-960-2321oroperations@jacksonconventioncomplex.com.AllsitevisitsmustbecompletedbeforeFebruary3,2017.

**Note:Failuretomeetrequireddeadlinewillresultina15%penaltyoftotalpaymentamounttocontractor.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 5 of 13

2(C)QuoteDueDateandDeliveryProposalssubmittedinresponsetothisRFQmustbesealedandsubmittedtotheaddressbelowby4:00p.m.CentralStandardTimeonFriday,February10,2017.Responseswillimmediatelybedate/timestamped.Responsesreceivedafterduedateandtimewillbereturnedunopened.Therespondentshallassumefullresponsibilityfortimelydeliveryatthelocationdesignatedbelowforthereceiptofresponses.

Theofficialcontactperson(s)anddeliveryaddressforthepurposeofthisRFQis…

BrianSwindoll/DirectorofOperationsJacksonConventionComplex/SMG105EastPascagoulaStreetJackson,MS39201Telephone:601.960.2321Fax:601.960.2584Email:[email protected]

2(D)SubmissionFormatandStyleAllsubmittalsshouldincludeone(1)originalhardcopyandone(1)electronicPDF(viaUSB)copydeliveredinasealedenvelopereferencingRFQ#01-2017C(note-electronicPDFshouldmirrorhardcopyformat.)Thefollowingitemsshouldbeincludedinallsubmittals:

§ CompanyHistory/Qualifications–provideadetailedhistoryandastatementofqualificationsincludingadescriptionofcomparableservicesprovidedforcomparableprojects.

§ IfrespondentisaMinorityBusinessEnterpriseorWomanBusinessEnterprise(MBE/WBE)certifiedbytheStateofMississippi,theresponseshouldsoindicateviacopyofcertificateorotherofficialdocumentation.

§ CompletedBidSheet–SeeAppendixB.

§ Thenamesofthree(3)referencesthathavecontractedwiththerespondentforCarpetReplacement.Providethefollowingforeachreference:name,title,nameoforganization,addressandtelephonenumber,emailaddress,aswellasabriefdescriptionoftheprojectperformed.

2(E)MiscellaneousInformation• Quoteswillnotbeacceptedafterthedeadlineforanyreason.However,theOperatormayrequest

clarificationsoradditionalinformationfromtheproposerafterthedeadline.FirmsmaywithdrawtheirquotestotheOperator,eitherinwritingorinperson,ifsuchwithdrawalrequestisreceivedpriortothedeadlineforthereceiptofquotes.

• TheOperatorreservestherighttochangeanyaspectof,terminate,ordelaythisRFQ,theRFQprocessand/ortheprogramwhichisoutlinedwithinthisRFQatanytime,andnoticeshallbegiveninatimelymannerthereafter.

• AllquotesandrelatedmaterialsshallbecomethepropertyoftheOperatorupondeliveryandshallbesubjecttopublicinspectionattheconclusionoftheselectionprocess.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 6 of 13

• Thisprojectisscheduledaroundfacilityeventsandrequiresastrictdeadlineforinstallation(seeSection2(B)forrequiredinstallationtimeline).After-hoursinstallationforthisprojectisanoption,andmaybecomenecessarybasedonthenatureofeventssurroundingtheaffectedinstallationarea(s).Failuretomeetthisdeadlinewillresultina15%penaltyofthefinalprojectpaymenttocontractor.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 7 of 13

3. RFQEVALUATIONPROCESSANDCRITERIAAttheconclusionofthequotingprocess,allresponsesshallbeunsealedandreviewedbyanevaluationteamcomposedoftheJCCexecutiveteamand/orotherpartiesattheOperator’sdiscretion.

IfanawardismadeasaresultofthisRFQ,itshallbeawardedtothefirmwhosequoteismostadvantageoustotheOperator.FirmselectionwillbedependentuponPricing/Value,RelevantExperienceandProfessionalReferences.Allrespondingcontractorswillreceivenotificationoftheawardviaemail.

SelectionScoreSheet

CRITERIONEVALUATION

POINTS

1.Pricing/Value 502.RelevantExperience 254.References 25 100

3(A)FormofAgreementbetweenJCCandRespondentItistheintentoftheOperatortoenterintoawrittencontractwiththeselectedfirmresultingfromthisRFQprocess.If,foranyreason,Operatorisunabletosuccessfullynegotiateandexecuteacontractwiththeselectedcontractor,negotiationswiththenextrunnerupwouldcommence,continuinguntilasuccessfulnegotiationiscompleted.Asampleoftheservicesagreementtobeusedisincludedinthisdocumentasreference.SeeAppendixC.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 8 of 13

APPENDIXA–FLOORPLAN

Note:Thisplandepictstheballroomsseparated.TheroomwillNOTbedividedduringthisinstall.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 9 of 13

APPENDIXB–QUOTATIONSHEET

PROJECT: Carpet:FacilityBallroomsLOCATION: JacksonConventionComplexDATEDUE: February10,2017by4:00P.M.(CST)

COMPANY: ADDRESS: CITY,STATE,ZIP

COMPANYREP: DATE: REPEMAIL: PHONE: INSTRUCTIONSANDCONDITIONS:Priceperitemincludesalllabor,materials,andequipmentperlistinSection1(A)toremoveoldcarpetandinstallnewmodularcarpet.Note:Newcarpetandadhesivealreadypurchasedbyfacility.Thisquoteisforlabortoremoveoldcarpetandinstallnewcarpet,andincidentalssuchasthresholds. Demolition–removeoldcarpetandpad $__________

Disposal–oldcarpetandpad $__________

PrepandInstallationofnewcarpet $__________

Thresholds–materialprice $__________

Thresholds–installationlabor $__________

Other(ifneeded):_________________________________________ $__________

TOTALPROJECTCOST(totalofabovelines): $__________

THEPRICESINDICATEDSHALLBETHEACTUALPRICETOTHEJCCANDSHALLREMAINCONSTANTANDSHALLNOTBEAFFECTEDBYOUTSIDEINFLUENCES.BYSUBMITTINGARESPONSE,VENDORAGREESTHATFAILURETOMEETPROJECTDEADLINEWILLRESULTINA15%PENALTYOFTOTALPROJECTCOST.

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 10 of 13

APPENDIXC–SAMPLESERVICESAGREEMENT

CONTRACTFORPROFESSIONALSERVICESTypeofServiceProvided

ThisContractismadeandenteredintoonthisthedayof,20,byandbetweentheJacksonConventionComplex/SMG,(“SMG”),andNameofCONTRACTOR,(hereinafterreferredtoasthe“CONTRACTOR”).

WHEREAS,onbehalfoftheCapitalCityConventionCenterCommission(the“COMMISSION”),SMGservesasthemanager/operatoroftheJacksonConventionComplexlocatedat105PascagoulaStreetintheCityofJackson,Mississippi(the“COMPLEX”);and

WHEREAS,theCONTRACTORrepresentsthatitisatypeofservicesprovidedbyCONTRACTORmanagedbyPrincipal/ExecutiveofCONTRACTOR,locatedataddressofCONTRACTOR;and

WHEREAS,SMGandCONTRACTORdesiretoenterintoawrittencontractwherebyCONTRACTORshallprovideprofessionaltypeofservicesprovidedbyCONTRACTORservicestoSMGfortheCOMPLEXaccordingtothetermsofthisContract;

NOW,THEREFORE,forandinconsiderationofthemutualpromisesandbenefitsflowingbetweenthemthepartiesherebyagreeasfollows:

1. TERMOFAGREEMENT.ThetermofthisContractshallbeginonstartdateandshallcontinueinforcethroughandincludingterminationdateunlessterminatedearlierbySMG.SuchterminationmaybemadeatthesolediscretionofSMG(a)uponthirty(30)dayswrittennoticetoCONTRACTOR,or(b)atanysuchtimeastherearenoappropriatedorotherwiseunobligatedfundsavailabletoSMGtosatisfyitsobligationshereunder,

2. SCOPEOFWORK.SMGshallhiretheCONTRACTORtobetheprovideroftypeofservicesprovidedbyCONTRACTORservicesunderthefollowingtermsofthisservice:

§ TermA§ TermB§ TermC§ TermD§ TermE

3. FEEANDPAYMENTSCHEDULE.SMGshallcompensateCONTRACTORasfollowsfortypeofservicesprovidedbyCONTRACTORservices:§ CompensationTermA§ CompensationTermBThesumdueshallbeinvoicedbyCONTRACTORwithin10businessdaysafterservicesarerenderedandSMGshallmakepaymenttoCONTRACTORwithin30businessdaysfromitsreceiptoftheinvoice.Shouldtherebeanyrequestforservicesorequipmentnotsetforthherein,CONTRACTORshallreviewsuchrequestwiththeGeneralManagerforapprovalofanyadditionalcharges.

4. INDEMNITY.TheCONTRACTORagreesthatitwillindemnify,defend,andholdSMG,theCOMMISSIONandtheiragentsandemployeesharmlessfromsuits,causesofaction,orclaimsofdamagesarisingoutoforrelatedinanywaytotheworkunderthisContractwhichresultsininjurytoanypersonand/orproperty;providedhowever,thatthe

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 11 of 13

CONTRACTORshallnotberequiredtoindemnifySMGifSMGissolelynegligentwithrespecttothecauseofsuchsuit,causeofaction,orclaimeddamage.

5. INSURANCE.TheCONTRACTORwillprovide$1millionGeneralLiabilityInsuranceandWorkers’Compensationinsuranceforitspersonneltocover$500,000bodilyinjuryperperson,$500,000injuryperoccurrence,and$500,000propertydamage,withSMGandtheCapitalCityConventionCenterCommissionnamedasanadditionalinsuredandcertificateholder.

TheCONTRACTORagreestoprovideacertificateofinsuranceasspecifiedhereinpriortocommencingworkunderthisContract.

6. NOAGENCY.ItisagreedthattheCONTRACTORisanindependentcontractorandshallinnowaybeconstruedtobeanemployeeofSMG.NothingcontainedinthisContractshallbeconstruedtoconstitutethattheCONTRACTOR,itsemployees,servants,agents,orsubcontractorsareapartner,employee,servant,oragentofSMG,norshalleitherhavetheauthoritytobindtheotherinanyrespect.Accordingly,CONTRACTORshallberesponsibleforandshallfileanyapplicablereturnsorformsandpayanytaxdue,employmentorotherwise,withrespecttoitsworkunderthisContract.

7. AlthoughthisContractevidencesthetypeofworkthatistobeperformedbytheCONTRACTOR,SMGdoesnotcontrolthemannerandmeansofsuchwork.

8. TheCONTRACTORshallberesponsibleforsecuringallrequiredpermitsorlicensesrequiredbyanyregulatoryagencyortheCounty,State,orFederalgovernmentshavingjurisdictionovertheworkperformedbytheCONTRACTORhereunder.

9. SMGshallpayforutilitiesattheJacksonConventionComplex.Utilitiesinclude:waterandsewage,electricity,gas,andtrashpickup.

10. CONTRACTORshallnotmake,directlyorindirectly,anyrenovations,capitalimprovements,oralterationstotheJacksonConventionComplexwithoutfirstobtainingthewrittenconsentofSMG.CONTRACTORshallkeepSMG,theCOMPLEXandtheCOMMISSIONfreefromanyliensorencumbrancesarisingoutofanyworkperformed,materialfurnished,orobligationsincurredbyCONTRACTOR.

11. MISCELLANEOUSPROVISIONS.

(A) Allcovenants,conditions,agreementsandundertakingscontainedinthisContractshallextendtoandbebindingontherespectiveheirs,successorsandassignsoftherespectivepartiesheretothesameasiftheywereineverycasenamedandexpressed.

(B) Itisunderstoodandagreedthat,if,duetothebreachordefaultbyeitherpartyofanyoftheirobligationshereunder,itshallbecomenecessaryfortheotherpartytoemployand/orconsultwithanattorneytogiveadvice,ortoenforceordemandanyofeitherparty’srightsorremedieshereunder,then,andinanysuchevent,thedefaultingorbreachingpartyshallpayallattorneyfees,courtcostsandotherexpensesoccasionedbysuchdefaultsorbreaches.

(C) AllnoticesfromCONTRACTORtoSMGshallbeservedonorsenttoSMGatthefollowingaddresses:

Attn:J.BrianSwindoll,DirectorofOperationsJacksonConventionComplex/SMG105PascagoulaStreetJackson,MS39201Telephone:(601)960-2321/Fax:(601)960-2584Email: [email protected]

AllnoticesfromSMGtoCONTRACTORshallbeservedonorsenttoCONTRACTORatthefollowingaddress:

Attn:ContactPersonCompanyNameCompanyAddress

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 12 of 13

CompanyAddressTelephone: CompanyPhone#Email: EmailAddress

Tobeeffective,allnoticestobegivenunderthisContractshallbeinwritingandshallbeservedpersonallyorsentbyUnitedStatescertifiedorregisteredmail.Theeffectivedateofnoticeshallbethepostmarkeddateorthedateofpersonalacknowledgementifhand-delivered.

(D) ThisContractcontainsalloftheagreements,termsandconditionsmadebetweenthepartieshereto,constitutestheentireagreementandunderstandingbetweenthem,andsupersedesandrevokesanyprioragreementorunderstandingrelatingtothesubjectmatterofthisContract.Nochange,amendment,terminationorattemptedwaiverofanyoftheprovisionshereofshallbebindingupontheotherpartyunlessreducedtowritingandsignedbybothpartieshereto,orbytheirrespectivesuccessorsininterest.

(E) Ifanysection,paragraph,sentenceorportionofthisAgreementortheapplicationthereoftoanypartyorcircumstanceshall,toanyextent,beorbecomeinvalidorillegal,suchprovisionisandshallbenullandvoid;however,totheextentthatsaidnullandvoidprovision[s]donotmateriallychangetheoverallagreementandintentofthisentireagreement,theremainderofthisContractshallnotbeaffectedtherebyandeachremainingprovisionofthisContractshallbevalidandenforceabletothefullestextentprovidedbylaw.

(F) ThisAgreementshallbegovernedbyandconstruedinaccordancewiththelawsoftheStateofMississippi,andvenuefortheresolutionofanydisputeshallbeJackson,HindsCounty,Mississippi.

(G) Neithertheexercisenorfailuretoexerciseanyright,optionorprivilegeunderthisContractbySMGshallexcludeSMGfromexercisinganyandallotherrights,optionsorprivilegesunderthisContract,norshallsuchexerciseornon-exerciserelieveCONTRACTORfromCONTRACTOR’sobligationtoperformeachandeverycovenantandconditiontobeperformedbyCONTRACTORunderthisContract,orfordamagesorotherremedyforfailuretoperformormeettheobligationsofthisContract.

(H) ForceMajeure.Neitherpartyheretoshallbeliabletotheotherpartyforanynonperformance,inwholeorinpart,ofitsobligationsunderthisContractcausedbytheoccurrenceofanycontingenciesbeyondthecontroloftheparties,includingbutnotlimitedtotheweather(includingbutnotlimitedtotornadoes,hurricanes,andfloods),earthquakes,declaredorundeclaredwar,sabotage,actsofterrorism,insurrection,riot,orotheractsofcivildisobedience,actsofapublicenemy,actsofgovernmentsoragenciesdirectlyaffectingthetermsofthisContract,strikes,labordisputes,actsofthirdpartiesnotwithinthecontrolofthepartywhoseperformanceisaffected,extraordinaryshortagesoffuel,failuresofpower,accidents,fires,explosions,orotherpreviouslyunmentionedactsofGod.Intheeventthatanysuchunexpectedeventsorcatastrophesoccur,thepartywhoseperformanceisaffectedshallhaveareasonabletimeinwhichtoresumeperformanceandsuchparty'snonperformanceshallnotconstituteadefaultorbreachhereunder.Notwithstandingtheforegoing,ifthenon-performingpartyisunabletoresumefullperformancedespitereasonableattemptstodoso,theotherpartyshallhavetherighttoterminatethisContract.

(I) LimitationsonSMGObligations.BecausetheCOMPLEXispubliclyowned,theCOMMISSIONretainstheright,underthelawsoftheCityofJacksontodeclinetoprovidefundingfortheoperationoftheCOMPLEXinthesolediscretionoftheCOMMISSION.Ifsuchnon-fundingrendersperformanceofthisContractdifficult,impractical,orimpossible,thenitshallnotbeconsideredadefaultunderorbreachofthetermsofthisContractandSMGandCOMMISSIONwillnotbeliableforsuchfailuretoperform,exceptthereshallbeanequitablereductionintheconsiderationwhichwouldotherwisebepayableorduebySMGtoCONRACTORunderthetermsofthisContract.

(J) ConfidentialInformation.CONTRACTORrecognizestheinterestofSMGinmaintainingtheconfidentialnatureofitsproprietaryandotherbusinessandcommercialinformation.CONTRACTORwillhold,inafiduciarycapacity,forthebenefitofSMG,allsecretorconfidentialinformationincludingbutnotlimitedto,clientandcustomerlists,marketingplans,productsorservices,developmentplans,publications,products,devices,structures,processes,procedures,methods,formulas,techniquesorfinances,includingbutnotlimitedtoinformationrelatingtoresearch,development,purchasing,accounting,sales,andknowledgeordatarelatingtoSMGoranyofitsaffiliatedentities,andtheirrespectivebusinesses,whichshallhavebeenobtainedbytheCONTRACTORand

Request for Quotes Ballroom Carpet Replacement

Carpet Replacement Ballroom RFQ #01-2017C As of 1.17.2017 Page 13 of 13

whichshallnotbeorbecomepublicknowledge(otherthanbyactsbyCONTRACTORorrepresentativesofCONTRACTORinviolationofthisContract).AfterterminationofthisContracttheCONTRACTORwillnot,withoutthepriorwrittenconsentofSMG,orasmayotherwiseberequiredbylaworlegalprocess,communicateordivulgeanysuchinformation,knowledgeordatatoanyoneotherthanSMGandthosedesignatedbyitorusetheconfidentialinformationforitsownpurpose.Allrecords,files,data,documentsandthelikerelatingtoSMGoritsaffiliatesshallbeandremainthesolepropertyofSMGandsuchaffiliates.UponterminationofthisContract,CONTRACTORwillnotremovefromtheCOMPLEX'spremisesorretainanyofSMG'smaterials,andallsuchmaterialsinCONTRACTOR'spossessionwillbereturnedpromptlytoSMG.CONTRACTORshalltreatallCOMPLEXdataandinformationtowhichithasaccessbyitsperformanceunderthisContractasconfidentialtotheextentthatconfidentialtreatmentofsameisrequiredunderfederaland/orstatelawandshallnotdisclosesuchdataorinformationtoathirdpartywithoutspecificwrittenconsentofSMG.IntheeventthatCONTRACTORreceivesnoticethatathirdpartyrequestsdivulgenceofconfidentialorotherwiseprotectedinformationand/orhasserveduponitasubpoenaorothervalidlyissuedadministrativeorjudicialprocessorderingdivulgenceofsuchinformation,CONTRACTORshallpromptlyinformSMGandthereafterrespondinconformitywithsuchsubpoenatotheextentmandatedbystateorfederallaw.ThisprovisionshallsurvivetheterminationorcompletionofthisContract.

SMGandtheCONTRACTORheretohavereadtheforegoingcontractandfullyunderstandandagreewiththecontentshereof.

INWITNESSWHEREOF,SMGandtheCONTRACTORhaveexecutedthisContracteffectiveDate.

CONTRACTOR:NameofCONTRACTOR

BY:Principal/ExecutiveofCONTRACTOR TITLE: Title

SIGNATURE: _________________________________DATE: _________________________________SMG:JACKSONCONVENTIONCOMPLEX/SMG

BY:KelvinD.Moore,CMP TITLE:GeneralManager