jacobs technology summer 2009 exit presentation

11
ESCG Contract Sensitive Trey Cox July 29, 2009

Upload: treycox

Post on 21-May-2015

181 views

Category:

Documents


2 download

DESCRIPTION

This is my co-op exit presentation from my co-op with Jacobs Technology during the Summer of 2009

TRANSCRIPT

Page 1: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract Sensitive

Trey Cox

July 29, 2009

Page 2: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 2 of 17

Safety Moment

Hazards of Pumping Gas– Explosions– Fuel spills

Some Precautions to take while pumping gas– Turn off your vehicle's engine when refueling– Don't smoke, light matches or use lighters while

refueling– Avoid getting in and out of vehicle

Page 3: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 3 of 17

Introduction

Currently a Sophomore Embry-Riddle Aeronautical University.

This is my 2nd Co-op tour.Pi Kappa Alpha Fraternity

Page 4: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 4 of 17

Projects I’ve Worked On

Regenerative ECLSS Fluid HoseLow Impact Docking SystemPotable Water DispenserPortable Life Support System

Page 5: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 5 of 17

REFH

Flow Characterization of Hygiene Water Dispenser – Measured Flow Rates to determine flow velocity

Page 6: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 6 of 17

LIDS

EDU-54 Load Ring– Static Load Testing– Compared static load sensing capabilites

Page 7: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 7 of 17

PWD

Calibration of Sensor and GagesSet-up of Tests

Page 8: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 8 of 17

PLSS

Vapor Lock Testing– Ran pumps at reduced pressures

Page 9: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 9 of 17

Other Events

July 4th in Austin Houston Astros Game Trip to Daytona Beach Golf

Page 10: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 10 of 17

What I’ve Learned

Solidified knowledge of process to start and run a test

Being in a professional environment

Page 11: Jacobs Technology Summer 2009 Exit Presentation

ESCG Contract SensitiveFebruary 26, 2007 - 11 of 17

Future Plans

To return for a 3rd Co-op tour in Summer 2011.Plan on graduating in May 2012, with a degree in