JAIPRAKASH JAYPEE BINA.THERMAL POWER PLANT POWER VENTURES LIMITED A DIVISION OF JAIPRAKASH POWER VENTURES LIMITED REF: JBTPP/EC Compl./2013-14/57-7 21.05.2014 The Chief Conservator of Forests. Ministry of Environment & Forests Regional office (WZ), Kendriya Paryavaran Bhawan E-5. Arera Colony. Link Road-3 Ravishankar Xagar BHOPAL-462^016 (M.P) Sub: Compliance status of various conditions of the Environmental Clearance granted by MoEF vide letter No. J-l3011/28/92-1AII(T) dated 23.04.1996 and additional conditions stipulated vide letter No. J-130 12/45/05-1A II (T) dated 05.08.2009 for coal based Jaypee Bina Thermal Power Plant (2x250 MW) at Village Sirchopi. Tehsil Bina. Dist. Sagar (M.P) Dear Sir, We are pleased to submit half yearly Compliance report to conditions laid down in Environmental Clearance with supporting documents/ annexures /photographs in respect of Jaypee Bina Thermal Power Plant for the period October 2013 -March 2014. Thanking you. Yours faithfully, For JAYPEE BLNA THERMAL POWER PLANT DR B J PRASAD Sr. G M (ENVIRONMENT & SAFETY) . Encl: As above Copy to: 1. The Additional Director & Zonal Officer Central Pollution Control Board, Shankar Bhawan, 3rd floor, North TT Nagar, BHQPAL-462003 2. The Chairman. MP Pollution Control Board, Paryavaran Parisar, E-5,Arera Colony BHOPAL-462016 3. The Regional Officer. M.P. Pollution Control Board. Deen Dayal Nagar. Housing Board Colony. SAGAR (M.P.) Corp. Office : Sector-128, Noida - 201 304, Uttar Pradesh (India) Ph. : +91 (120) 4609000, 2470800 Fax : +91 (120) 4609464/4609496 , ._ __ -I-.T-, Bina Office : Rajiv Nagar, Post Box No. 1, Sub P.O.-Agasod, Tehsil & P.O.-Bina - 470 113 /\ PR r Distt- Sagar 'M'R' Ph- : +91 (7S8°) 2771013 Fax ; +91 (7580) 277200 Regd. Office : JUIT Complex, Waknaghat, P.O. Oumehar Bani, Kandaghat-173215, Distt. Solan (H.P.) Ph. : +91 (1792) 257999, 245367 Fax : +91 (1792) 245362

Upload: others

Post on 04-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

JAIPRAKASHJAYPEE BINA.THERMAL POWER PLANT POWER VENTURES LIMITEDA DIVISION OF JAIPRAKASH POWER VENTURES LIMITED

REF: JBTPP/EC Compl./2013-14/57-7 21.05.2014

The Chief Conservator of Forests.Ministry of Environment & ForestsRegional office (WZ), Kendriya Paryavaran BhawanE-5. Arera Colony. Link Road-3Ravishankar XagarBHOPAL-462^016 (M.P)

Sub: Compliance status of various conditions of the Environmental Clearance granted by MoEF videletter No. J-l3011/28/92-1AII(T) dated 23.04.1996 and additional conditions stipulated videletter No. J-130 12/45/05-1A II (T) dated 05.08.2009 for coal based Jaypee Bina Thermal PowerPlant (2x250 MW) at Village Sirchopi. Tehsil Bina. Dist. Sagar (M.P)

Dear Sir,

We are pleased to submit half yearly Compliance report to conditions laid down in EnvironmentalClearance with supporting documents/ annexures /photographs in respect of Jaypee Bina Thermal PowerPlant for the period October 2013 -March 2014.

Thanking you.

Yours faithfully,For JAYPEE BLNA THERMAL POWER PLANT

DR B J PRASADSr. G M (ENVIRONMENT & SAFETY)

.

Encl: As above

Copy to: 1. The Additional Director & Zonal OfficerCentral Pollution Control Board, Shankar Bhawan, 3rd floor, North TT Nagar,BHQPAL-462003

2. The Chairman.MP Pollution Control Board, Paryavaran Parisar, E-5,Arera ColonyBHOPAL-462016

3. The Regional Officer.M.P. Pollution Control Board.Deen Dayal Nagar. Housing Board Colony.SAGAR (M.P.)

Corp. Office : S e c t o r - 1 2 8 , N o i d a - 201 3 0 4 , U t t a r P r a d e s h ( I n d i a )Ph. : +91 (120) 4609000, 2470800 Fax : +91 (120) 4609464/4609496

, ._ __ -I-.T-, Bina Office : Rajiv Nagar, Post Box No. 1, Sub P.O.-Agasod, Tehsil & P.O.-Bina - 470 113/\ PR r Distt- Sagar 'M'R' Ph- : +91 (7S8°) 277101-°3 Fax ; +91 (7580) 277200

Regd. Office : JUIT Complex, Waknaghat, P.O. Oumehar Bani, Kandaghat-173215, Distt. Solan (H.P.)Ph. : +91 (1792) 257999, 245367 Fax : +91 (1792) 245362

Page 2: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

1

S.N.

Status of Compliance of Environmental Clearance (EC) granted vide letter no.I-13011/Z8/92-1A II (T) dated 23.04.1996 to

laypee Bina Thermal Power Plant. Bina for the period from October. 2013 to March, 2014.

Compliance Conditions

1. All the conditions stipulated by the Madhya Pradesh Pollution Control

Board vide letter No 19980/TS/KZ/Sagar/MPPCB/95 dated 16lh

October, 1995 and No 4209 /TS/KZ/MPPCB dated 14.03.96 should bestrictly implemented.

2. Only washed coal with ash content not exceeding 30% should beused , Fly ash generated to the tune of 0.828 MT/day should beutili/cd in Fal-G-Cemcnt, brick making etc. Full utilixation should be

ensured by end of 9 year as proposed.'Use of coal should berestricted to 8100 tonnes /day.

Status

All the conditions stipulated by MPPCB have been complied.

Condition of use of washed coal was waived off vide MOKF letter noJ-13011/28/92-IA-II (T) dated 15.10.1997. Copy attached as Annexure-1.Following efforts have been made to abide by M o K F not i f icat ion

No.2804(F) dated 3rd November, 2009 for fly ash u t i l i /a t ion inphased manner and full utilization after 4 ycars:-

(ij A fly ash brick/ block manufactur ing u n i t has been installed,having capacity of 45Lac/pa bricks. The photograph of FlyAsh brick manufacturing unit is attached as Annexure - 2.

(ii) MOU's have been signed with following industries/enterprisesfor supply of Fly Ash:

(a) M/s. Heidelberg Cement India Limited (Diamond Cements) tosupply lOOOMT/per day fly ash for utili/ation in cement.

(b) M/s Shrec Traders, Mandidccp for supply of 300 MT per day Fly Ashfor trading to bricks manufacturer and cement plant.

(c) M/s Panna Lai Ahirwar, Khurai for supply of SO MT per month of MyAsh for manufacture of bricks.

(d) M/s Richhariya Industries, Sagar for supply of 100 MT per month ofFly Ash for manufacture of bricks.

(c) M/s Cenosphcre India PvtLtd, Kolkata.Following companies arc also taking fly ash for ut i l i /at ion incement manufacturing and MOU's are likely to be signedshortly for bulk supply of fly ash with these companies:

(f) Ultra Tech, Khor, Nccmach (M.P.)(g) Birla Corporation Ltd., Chittorgarh (Rajasthan)(h) ACC Ltd., Bundi, Lakhcri, (Rajasthan")

Page 3: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

4.

A closed cycle circulating water system with cooling towers should beincorporated in the project design and only make up water should bedrawn.A barrage proposed across Bctwa river from where a 4 km long pipe

I will be drawn be so designed as to restrict the pondage to 385 m andi within the river banks to avoid acquisition of additional land! Continuous stack monitoring equipment for SPM, S02 and NOX

should be provided and data collected should be regularly analy/.cd forascertaining the pollution levels within prescribed standards.

| Land requirement should be restricted to 850 Ha with followingi breakup;! a) Power plant - 330 ha ( 262 ha for plant plus 68 ha for green

belt]b) Ash disposal - 380 ha ( 306 ha ash pond plus 74 ha green

belt)| c) Township - 1.15 ha| d) Ra i l , road , pipeline etc - 25 ha

[i) ACC Ltd.,Kymorc (M.P.)Q) Wonder Cement ] , td. ,Chhit torgarh[M.P.)

(iii) Besides the above, a 2MTPA Cement G r i n d i n g U n i t is plannedwithin the premises to u t i l ize the fly ash for which PublicHearing has been conducted on 30.10.2012 and final K1A-HMP report has been submitted to M O K F on 08, Apri l 2013for grant of environment clearance.

(iv) Fly ash has also been utilized in in ternal road construction,(v) Managing Director, MP Road Development Corporat ion Limited,

Bhopal has been requested vide letter 25.12.2013 for promotion ofutilixation of My Ash in Road Construct ion activities. Karlicr,Collector Sagar has also been requested for u t i l i za t ion of My Ash incivil works.

Consumption of coal is less than permissible l i m i t of 9000 MT/Day(revised by MOKF vide letter no J-13011/28/97-1A-11 (T) dated17.11.1997). Copy attached as Annexurc-3.Closed circuit Natural Draft Cooling towers have been provided and onlymakeup water is drawn. Photograph of cooling tower is attached asAnnexure-4.The barrage has been designed to restrict the pondage to 385.75m andpondage is limited within the river banks.

Four no's of Continuous Ambient Air Qua l i t y M o n i t o r i n g stations havebeen installed in consultation with SPCB. The AAQ data arc wi th in theprescribed limits. Dedicated network for s h a r i n g the data with MPPCB &CPCB arc under development. Photograph of AAQM is attached asAnnexure-5. Monitoring result of Ambient Air Quality is attached asAnncxure-6.Mol-F vide letter no.J.13011/28/92-IA.II. dated 4-12-1996 restricted theland requirement to 726 ha (Annexurc-7) with following break up :Power plant Area - 260 haAsh Pond Area - 326 haOther Area 1.15 haPipeline etc. 25 haTotal 726 ha

Page 4: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

! Guard pond with two sections each of 3960 M3 capacity should be

created for collection and treatment of effluents from various plant

activities before its discharge to Betwa river as per the standards laid

down by central pollution control board / Madhya Pradesh Pollution

Control Board.

8.

9.

10.

For Socio -- economic up-liftmcnt of local and affected person'sfacilities such as hospital, school etc. should be created at project site.Adequate employment facilities should be provided to affected peopleand if need be, training should be imparted to them in suitable fields.

Noise level should be maintained within 85 d b (A) by propermaintenance of equipments and isolation etc. for people working ingenerator hall, car plugs should be provided.

For easy access of the areas on northern side of plant, a corridorshould be maintained between plant and proposed ash disposal area.

An effluent treatment plant (ETP) along with guard pond has been provided

to treat the effluents and to recycle the treated effluent in the plant use

Annexure-8. The ETP consists of:

(a) Collection cum equalization sump : 1680M3

(b) Flash mixer cum flocculation tank : 22.5 M3

(c) Tube settler chambers(2Nos.): 316.88 M3 each(d) Guard pond(2Nos.) :600M3each

Effluents from various sections such as SSF back wash, recycled water from

ash pond, service water, neutralized effluent from DM plant, boiler blow

down are brought to the ETP. Arrangement for Acid / Alkali dosing is

provided for neutralizing the treated effluent before recycling for various

uses. The effluent is treated to conform to the prescribed norms of

CPCB/MPPCB.

A hospital with two doctors is already established for medical support tolocal people and employees.A Hindi medium school is also running for educat ion of children of localpeople and employees.

To the extent possible, local people have been employed for variousactivities in the plant. Necessary training is given to them beforeinducting them. To provide easy access for s k i l l enhancement of the localpeople, an ITI has been constructed and academic session will start inthe current year. A polytechnic school is also proposed under GSRactivities.The plant is participating in Sanjccvani Project, of the state governmentfor healthcare of malnourished children in the age group of 05 monthsto 05 years of 30 villages around the plant site in B ina Tchsil.All equipments have been designed and fitted wi th adequate noisecontrol measures so as to keep the noise level below 85 dB(A).Personal protective equipments like car plug/car muff arc provworkers who work in noisy area.Has been complied.

Page 5: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

11.

12.

13.

14.

15.

Continuous monitoring of ground water should be undertaken in ! Ground water Monitoring is being done through MPPCB, Sagar. Theconsultation with central ground water board. Data collection should | bottom of ash pond has been provided with impervious HDPK liner amibe analyzed for ascertaining if leaching through ash pond is taking has been concreted to ensure that there is no leaching (Annexure-9).place affecting the water quality. Continuous monitoring of flue gases Continuous monitoring equipment has been ins ta l led for stack emission,should also be ensured. Photograph of continuous stack monitoring equipment of Hue gases is

attached as Annexure-10.

For controlling NOX emission, low NOX burners and steam injectionsystem should be provided.Project authorities must create sufficient in house capability[Environmental Cell) supported by full-fledged laboratory to monitorand implement environment related issues.

Adequate f inanc ia l provision, item wise and year wise, must be madefor implementation of above stipulated conditions. Detail on theseaspects should be submitted to the ministry by,31st May 1.996.

Full co-operation should be extended to Scientists/Officials fromRegional Office Of Ministry at Bhopal who would be monitoring thecompliance of environmental measures by providing environmentaldata, plans and related documents requested from time to time.

Secondary over fire air burner have been provided to reduce NOxemission level.Project has established a separate Environmenta l Management cell withqualified and experienced executives. A full-fledged laboratory has beenset-up to monitor the Environmental parameter. Organogram of theHnvironmcnt Management Cell is attached as Annexurc-11. List ofequipment provided in the laboratory is attached as Annexure-12.Rs.265.98 Crs have been provided for implementat ion of environmentalprotection measures such as ESP, HTP, dust separation and extractionsystem, ash effluent recycling system, on l ine stack moni tor ing andcontinuous AAQ monitoring equipments, plantation, etc as per detailsgiven below:Environment protection systemsESPOnline Stack Monitoring system for PM 2.5,PM10,S02,CO,NOX 35.00Ash handling system 37.00Hfflucnt & Sewage treatment 1.2.50Dust suppression in coal yard 0.23Ash Pond 80.00AAQ Monitoring Systems 0.25Green belt plantation 1.0Total 265.98Recurring expenditure towards environmental protection measures hasbeen included in the Operational & Maintenance budget of the plant.Full co-operation is extended to the visiting officials.

CostfRs Croresl100.00

Page 6: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

Status of Compliance of Additional conditions stipulated in Environmental Clearance (EC) vide Letter no J-13Q12/45/08-IAJL1 (T) dated05.08.2009 to laypee Bina Thermal Power Plant. Bina for the period from October. 2013 to March. 2014.

S.N. Compliance Conditions

1. I A sewage treatment plant shall be provided and the treated sewageshall be used for raising green belt / plantation

Adequate safety measures shall be provided in the plant area tochcck/minimi/c spontaneous fires in coal yard, especially duringsummer season.Storage facilities for auxiliary liquid fuel such as LDO and IIFO/LSHSshall be made in the plant area in consultation with the dcp't ofExplosive, Nagpur. Sulphur content in the liquid fuel shall not exceed0.5%. Disaster Management Plan shall be prepared to meet anyeventuality in case of an accident taking place due to storage of oil.

4 i Adequate funds shall be allocated for undertaking GSR activities.

Status

A sewage treatment plant (STP) of 1000KLD is in Operation. The STPcomprises of:-• Screen Bar,• Equalization tank,• Aeration tank,• Secondary clarificr and chlorination system.The treated sewage water is used for green belt development / plantationand sprinkling.The sludge of STP is used as manure in Grcenbelt Development.Adequate safety measures such as water sprinklers have been providedin coal yard to check / minimize spontaneous fires in coal.

Approval for storage of liquid fuel from Chief Controller of Explosive,Nagpur has already been obtained vide letter noP/IIQ/MP/15/2848(P271672) dtd 13.03.2012. Copy enclosed asAnnexure-13.The liquid fuel is sourccd from Govt. owned agencies likeIOCL/HPCL/BPCL etc. to ensure sulfur content within permissible limitsof 0.5%.Disaster Management plan has been prepared which has been approvedby Directorate, Industrial Health and Safety, MP, Indore vide letter no15/32/B-2/MIIC/VI/12/4201 dated 27.07.2012. Copy of the approval ofOn-Sitc Emergency Plan and Disaster Measure is attached asAnnexure-14. This plan will take care of any eventuality in case of anaccident.A Separate fund has already been allocated for undertaking CSR activities.Fund allocation for various CSR activities is as below:

(1} One time expenditure : Rs 35 Crorcs.[2] Recurring expenses is met from annua l budget as per

requirement.

Page 7: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

5.

6.

7.

First aid and sanitation arrangement shall be made for the driversand other contract workers during construction phase.

Provision shall be made for the housing of construction labour withinthe site with all necessary infrastructure and facilities such as fuel forcooking , mobile toilets, mobile STP, safe drinking water , medicalhealth care, creche etc. the housing may be in the form of temporarystructures to be removed after the completion of the project.

A copy of the compliance letter shall be sent by the proponent toconcerned Panchayat , Zila Parisad / Municipal Corporation, Urbanlocal Body and the Local NGO, If any from whom suggestions/representations, if any, were received while processing the proposal.The clearance letter shall also be put on the website of the companyby the proponent.The proponent shall upload the status of compliance of the stipulatedEC condition, including results of monitored data on their website andshall update the same periodically. It shall simultaneously be sent tothe Regional Office of MOHF, the respective Zonal Office of CPCB and

Following CSR activities have been implemented for the benefits ofsurrounding villagers:

(a) Senior secondary school and Hospital.(b) ITI(c) Renovation of 16 KM approach road.(d) Deepening of Kanera Canal(e) Various community welfare activities such as medical camps,

family planning camps, temple and school renovation etc.(f) Funds have been allocated for setting up Polytechnic, women/

adult education, Forty bedded Hospital, Sanitation, Communitycenter etc.

(gj The plant is participating in Sanjeevani Project of the stategovernment for healthcare of malnourished children in the agegroup of 05 months to 05 years of 30 villages around the plantsite in Bina Tchsil.

One full fledged Hospital with doctors & other paramedical facilities hasbeen set up for the employees including drivers & contract workers.Sanitation facilities for contract workers and drivers have been provided.Facilities for housing construction labours within the site with necessaryarrangements such as Annapurna (Community Mess), drinking waterconnection, toilets and power connection etc. have been provided.Further, medical facilities including doctor and paramedical staff havebeen provided for the workers.Since both the units of the plant have been commissioned, the number ofconstruction labour has been reduced substantially and only skeletonconstruction labours are working in the premises.Already Complied

The status of Compliance of stipulated F,C conditions inc luding result ofmonitor data is uploaded on company's website.The previous six monthly Compliance status of Environmental Clearance

was sent to the Regional Office of MoKF, Zonal Office CPCB at Bhopal and

Page 8: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

9.

10.

[ SPCB. The criteria pollutant levels namely; SPM, RSPM, S02 and NOX(ambient levels as well as stack emissions) shall be monitored anddisplayed at a convenient location near main gate of the company inthe publ ic domain.

The environmental statement for each financial year ending 31stMarch in Form-V as is mandated to be submitted by the projectproponent to the concerned State Pollution Control Board asprescribed under The Environment (Protection) Rules, 1986, asamended subsequently, shall also be put on the website of thecompany along with the status of compliance of KG conditions andshall also be sent to the respective Regional Offices of MOEF by c-mail.The project authorities shall inform the Regional Office as well asMinistry regarding the date of financial closure and final approval ofthe project by the concerned authorities and dates of start of landdevelopment work and commissioning of plant.

MPPCB vide18/11/2013.

letter no. JBTPP/KC Compl./2013-14/1886, dated.

The criteria pollutants (ambient levels as well as stack emissions) arcbeing monitored Arrangements have been made for display of AAQ datanear main gate in the public domain.

Environment Statement for the financial year April 2012 - March 2013has been submitted in Form-V on 25/09/201 3 to MPPCB, Bhopal.

It shall nc uploaded on website of the company along with EC compliancereport and shall also be sent to the Regional office of MoEF by e-mail.

The financial closure has already been achieved in November 2009.Consent to establish has been granted by MPPCB vide letter no64/TS/MPPCB/2011 dtd 3rd January 2011.Two units (2x250 MW) have been commissioned after obtaining Consentfor Operation by MPPCB, vide letter No.l818/TS/MPPCB/2013 dated04.03.2013 under Air Act, 1.981 and 1816/TS/MPPCB/2013 dated04.03.2013 under Water Act,1974.Application for renewal of Consent Water and Air Acts has beensubmitted to MPPCB on 04 01 2014. Consent is awaited

Page 9: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

,iirl^^il£28/92:

Telegram : PARYAVARAN,NEW DELHI

Telephone :^m (fiwrfto) •Telex : (bi-Jingual) ; W-66185 DOE IN

--FAX ; 4360678 -MRrT

GOVERNMENT OF INDIA

MINISTRY OF ENVIRONMENT & FORESTS

PARYAVARAN BHAWAN, CGO COMPLEX

?M ffe. f^ft - 110003LODHl ROAD, NEW DELHM 10003

Dated j 15*10,1997*

OFFICE MEMORANDUM

Subject: 2 x 289 MW Bina Thermal Power Project (Phase-!),Aiadhya Pradesh by M/s Bina Power Supply CompanyLtd e

Reference Is invited to this Ministry's OfficeMemorandum of even number dated 23rd, April , 1996 and 4thOsceraber? 1996 regarding the above mentioned - subject,

'2. In view of our Notification No . 560 (E) dated 19thSeptember, 1997 regarding use of beneficiated coal for powerprojects, ,there_j.s__no_ _need to use beneficiated coal in theproposed. Bina The^maTrPoweF>rgj¥cj~as it is onIyr~5BF~Ki]F~from the linked mine* As such, condition No, (ii) of our "CUM. dsted 23rd April, 1996 may be read as under i-

(ii) Fly ash generated to the tune of 0.828 MT /dayshould be utilised in Fal-G-Cement, brick makingetce Full utilisation should be ensured by theendv-of 9th year as proposed. Use of coal shouldbe restricted to 8100 tonnes/day.

3. Other conditions will remain unchanged.

Vaidyanathan, , • ^Joint Executive President,. (™ 2n-Bina Power Suoply Company Ltd.,£-7/726. Arexa Colony.,

al^ •; 462 01 6., (M_.P ..)_._

Copy to; —

I. The Secretary, Ministry of Power, Shram Shakti Bhawan sRafi Marg, New Delhi*

Page 10: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

ANNEXURE- 2.

FLY ASH BASED BRICK MANUFACTURING PLANT

Page 11: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

oL J(7i\)"1

a_r^

• « j\

;o n H . >Jf o ;>• ^- f 9?-• <T" ^ '" ? na S *' '? v ° r' nD - 3- 3' (J „

— ... DJ o-i n> v

- nO

"O^•<r*-u

H 0J">

i_o'!> •

?rn

^:^J N— M

<A

S ', t t>]J ?- fl> r

CD U

5' 2.£J 3

i?|Tj:? 'c< n> -I rt <' C '

v, '+ C

-«• m

' o n

o

P

"If£/ 4"x

P-

^-.00 'C"t.O

Oo

OO

o

o ">3 a

-^ aC)

ily —I'

a- .-.,-j i/,

« ?;

;;1 5'

itTT3 ^£a€ £|? 5AJ\/i

• 6 ?

1-^"3

Inbfc

a> o1 OJf.L '••

-i OB)

C

5o

-TH

2

anj.

'-~>

0

a

o'«V.

9-

1)71

zorS O

<*

'

*i>OJ

2ttlat

DOm

5:

g.o

g r

!/o

Page 12: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

ANNEXURE- 4

NATURAL DRAFT COOLING TOWER

Page 13: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

ANNEXURE-

AMBIENT AIR QUALITY MONITORING EQUIPMENT

—•'

-~

Page 14: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

I

faypee BinaThermal Power PlantCAAQMS-lfNear ATM)

Date - 28.02.2014

PM2.5 ug/m3 • PM10 ug/m3

Chart Title

S02 ug/m3 NOX ug/m3 N02 ug/h NO ug/m3

Time

CO mg/m3

Time

Page 15: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

Telegram : PARYAVARAN,NEW DELHI

4360478

Telex : (bi-Hngual) : W-66185 DOE INFAX : 4360678

GOVERNMENT OF INDIAMINISTRY OF ENVIRONMENT & FORESTS

PARYAVARAN BHAWAN, CGO COMPLEX^M%, f^t - 110003

LODH! ROAD, NEW DELHI-1 10003

Subject: BIna Thermal Power Project Stage-I (2 x 289 MW) byM/s Bintj Power Supply Company Limited/ M»P.

The undersigned is directed to refer to letterNo.BPSC/DO/RV/96 dated 29th October, 1996 from M/s Bina PowerSupply Company Limited regarding the above mentioned project.

2. The request for environmental clearance for the enhancedcapacity of 2 x 239 MW as against the approved proposal of 2 x250 MW has been examined and considering that the pollutionload due to the enhanced capacity will be within thepermissible limits, we have no objection to the installation oftwo units of 289 MW capacity each s'ubject to the followingconditions :-

i) All the conditions stipulated vide our letter of evennumber dated 23rd April, -1996 should be strictlyimplemented.

ii) The land requirement should be restricted to 726 hawith the following breakup.

.

Power Plant Area 260 ha

Ash Pond Area 326 ha

Other Area 115 ha

Pipeline etc. 25 ha

726 ha

I

Page 16: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

<-o ___

•••'"' iii) Water consumption should be reduced from 4030M3/hr to 3000 ra3/hr. The pondage/ thereforeacross Betwa river should also be reduced.

-,/i v) Project activities should restrictconsumption to 7824 tonnes/day.

coal

3, It should be ensured that there is no further "change'in the project profile/design for Stage-I.

(Nalini Bhat)Additional Director

Shri R. Vaidyanathan/Joint Executive President/Bina Power Supply Company Ltd./UCO Bank Building/Parliament Street,New Delhi-110001.

copy to :

1. Secretary/ Ministry of Power/ Shram Shakti Bhsvan/Rafi Marg/ New Delhi,

2. Chairman/ Madhya Pradesh Pollution Control Board/Paryavaran Parisar/ E-5, Arera Colony/ Bhopal.

3. Chairman/ Central Electricity Authority/ Sewa Bhawan/R.K. Puram/ New Delhi.

4. CCP(Central)/ Regional Office, Bhopal.

5. Guard file.

(Nalini Bhat)Additio-nal Director

Page 17: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

ANNEXURE-

EFFLUENT TREATMENT PLANT

Page 18: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

ANNEXURE-J

HOPE LINING AND CONCRETING OF ASH POND

Page 19: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

ANNEXURE- iO

ONLINE STACK MONITORING EQUIPMENT

Page 20: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

Annexure - f|

Jaypee Bina Thermal Power Plant(A Unit of Jaiprakash Power Ventures Limited)

Village - Sirchopi Tehsil - Bina, District - Sagar (MP) -470113

'

Organogram of the Environment Management Cell

Sr. G.M.(Environment)

Horticulture Officer(Plantation)

Assistant. G.M.(Chemistry Lab & Env.Lab.)

Engineer(Instrumentation)

1. Continuous Ambient Air Quality Monitoring Equipments (CAAQM)2. Online Flue Gas Analyzer Equipments3. Meteorological Instruments.

Sr. Manager(Env. Lab)

Chemist

Ash Utilisation Cell

Water, Waste Water, Manual Ambient Air QualityMonitoring and Stack Emission Monitoring

Page 21: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

Annexure

faypee Bina Thermal Power Plant(A Unit of Jaiprakash Power Venture Limited)

Village - Sirchopi Tehsil - BinaDistrict Sagar fM.P.l

List of Environmental Instruments:

1. pH Meter

2. Conductivity Meter

3. Turbidity Meter

4. Flame photo Meter

5. COD Digester

6. BOD Incubator

7. High Volume Sampler (APM-430)

8. Respirable Dust Sampler (APM-460 BL)

9. Stack Sampler (APM-610).

10. Barometer

11. Maximum-Minimum Thermometer

12. Electronic Balance»

Page 22: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

Government of Indiafio^r 3?k 3??flsT : JH

Ministry of Commerce &. Industry

Petroleum & Explosives Safety Organisation (PF.SO)^ iim- f FFTTd' Y feSTTJT

F-onneily I jcpai mi em of Explosivestrai <TfT. tr-cflTSfT, ft.sTr.a-lY. ffrc^F5 111 Floor, A-Block, CGO Complex,. Seminary Hills,

i (Nagpui (M.S.)) - '140006

m'ifAir ( No. ). I ' / l IQ/IViP/ 1 :i/?.848(P27 1 672)

31 "ft (T'O, _ ___ -—

_.,.-•- -~"lWs. lini.i Power Supply Compiiny r.iniii-.'dBina l.iieriual Power Station, Village Sirc.hopi, Sub Post OHice Agasod,I'.U I'ima - 470 I 13, Tehsil Bina, District • SAGAR , PIN - 4701 13State Madhya Pradesh

— 13

(E-mail): [email protected](Phone/Fax): 25I02<IS/25I0577

(Dale): 13/3/20 12

Diria Tliermal Power Slalion, Village Sirchopi, Sub Posl Office Agasod.Tehsil Binn f TFfl SAGAR -IT3TJ Madhya Pradesh

"0"

Sntyeci Peiruleuin Class "C" Installalion at Bina Thermal Power Station, Village Sirr.hopi, Sub Post Office A.gasod, Tehsil Bina , Dislricl : SAGAR ,Stale : Madhya Pradesh

ptRi 12/3/2012^1I'lease icier to your leiter No BPSCL/CCOE/2012 daicil 12/1/2012

2002 31/12/2013

l.urcnce No. I'/l IQ/MP/15/7S4,S(IJ271672) dated 13/3/2012 grained in Form XV under the Peiroleum Rules, 2002 and valid [ill 31/12/7.1113 for the sloiage of the followingkind and quantities of Petroleum al the subject installation ii forwarded herewith.

(Description of Pelrolenin)

(Petroleum Class A in bnlk)

gat BF ffq^r q^HpTzwr 'ft fSurr(Peiroleum Class A. otherwise than in bulk)

(Peiroleum Class B in hulk)

TJt T3(Peliolenm Class B, otheiwise than m bulk)

(Petiolenni Class C in bulk)

g^t n TO? 45lf?nnT ?T R)T?"flt, Petroleum Class C, otherwise than in bulk)

•FtT Snrrar (Totiil Capacity)

(Quanlily licenced in K.L )

(Nil)

(Nil)

(-Nil)

2800

(Nil)

2800 (KL)

*'-iii; ' ir?iii« 'mvn. 2002 ^ aitnvr sww JTI; RI PT 1-19 at ft JT£ flft i grt 5 1 -fl ctra'1 ii nrf fr ^ "W: ^cfi^Tor ^H -fliTf-H 2,'Ffii 'aT *T ji;-r;(fta

eft atirir •fluiv-H pW .HaiVr-i i 1 /1 2/20 13 q'4 fi"^ flii^RT 3-reJj ft^tftefn 1?F4'«T fl«ira~?r 3ipm ifn^pui fi 5m\ £*\o

I'ti^isi,- till !tuv the procedure strictly as laid down in rule 149 of llie t'etroleinn liules, 2002 and submit complete docuaients for further renewal of the licence, to The .It. ChiefCunirollei of Explosives, Central I Circle office .Agra so us lo roach on or before I he dale on which licence expires i.e 3 1/12/201 "i

(Youi-'s taithfuUy-K

L.

JT5ZV

tr.3fR'.tTfJTff ( T R Thomas )

( ClnefController o lHxp los ives )

qifl^liq St>tc1 (C'opy lorwaided lo)

I District Magisirale, Sagar (Madhya Pradesh I 5fl% 3RTqf??r CTTor-T^ 616-C/Anu.Lee/l 1 fe^ri^P 20/9/2011 &District Magistrate, Sagar (Madhya Pradesh ) with reference lo his N O C No. 616-C/Ann Lee/1 1 dated 20/9/201 I•HWrl JU«J i TtfilE^ frftnW, WCZTrafr.WRT. .3W7ff6fT fl VlfrT "fTff^T ?The .11 CTlicf Controller of Explosives. Central Circle office ,Agra A copy of the Licence is enclosed

'1'he Uy C'bief Conli oiler of Explosives. Bhopal Sufi Circle Office .Bhopal . A copy of the Licence is enclosed

http://peso.gov.in(For more informalion regtuding status,fees and other details please visil oui website http://peso.gov in)

Page 23: JAIPRAKASH - JP PowerVenturesjppowerventures.com/wp-content/uploads/2014/06/... · (a) M/s. Heidelberg Cement India Limited (Diamond Cements) to supply lOOOMT/per day fly ash for

O R O UKS BSEAM TSG BiO

14

E Jt fffcl If^g^gfeASURES

NOTIFY ";-:;.t AND UPDATfeDSuBJEC'r ro STifv^TiONMEIITIOHED.

(A Division of Jaiprakash Power Ventures

t-r*ffii

Post Office- Bina3

'istrlcf-'Sagar (IV1P) 470 113

iliii «.

OfM,P, INDOftE

8; 25.06.2012\e

(Occupier)