Jakarta Floods
Hongjoo HahmWorld Bank
JanJaap BrinkmanDeltares - Delft Hydraulics
The World Bank
Jakarta flood management
• Part 1: The basics - Spatial Planning• Part 2: The flood of February 2007• Part 3: No-regret measures• Part 4: Tide and High tide floods• Part 5: Water specialist center, short-term actions• Part 6: Actions and financing structure
The World Bank
Part 1
The basics: Spatial planning
“We live in a changing world”
The World Bank
Total urban area % (java-bali spatial plan)2000 - 2025
Total urban area % (java-bali spatial plan)
2000 - 2025
It is really happeningIt is really happeningLanduse, JabodetabekLanduse, Jabodetabek19921992
20022002
Perubahan Penutup/Penggunaan Lahan di Daerah Puncak dan sekitarnyaMenggunakan Data Inderaja Landsat-TM
30-07-1992 17-09-2001U
G. Pangrango G. Pangrango
It is really happeningUrban area, G. Pangrango
1992 - 2001
The World Bank
tugu
0
2
4
6
8
10
12
14
16
18
time (hours)
rainfall
(mm)
Land-use & Rainfall runoff
(Katulampa)
0
400
0
0.9
m3/s
m3/s
Fast runoffUrban
Slow runoffNon-Urban
The World Bank
Part 2
Flood February 2007
Hydrology
The World Bank
Daily rainfall Feb 2
Feb 1; 07:00 –
Feb 2; 07:00
The World Bank
Daily rainfall Feb 4
Feb 3; 07:00 –
Feb 4; 07:00
The World Bank
Inflow Ciliwung Febr 2007Katu Lampa - Manggarai
Banjir 31/01 - 06/02, 2007
0
100
200
300
400
500
600
700
800
1 12 23 34 45 56 67 78 89 100 111 122 133 144
m3
/s
Inflow 17
Inflow 16
Inflow 15
Inflow 14
Inflow 13
Inflow 12
Inflow 11
Inflow 10
Inflow 9
Inflow 8
Inflow 7
Inflow 6
Inflow 5
Inflow 4
Inflow 3
Inflow 2
Katu Lampa
1
23
5
67
8 9
10
1312
14 15
11
16
4
17
6
Katu Lampa
The World Bank
Flood February 2007
Hydraulics & Flood extent
Unique
• “Complete upstream-downstream flood modelling framework now available for all major drainage including all 13 rivers”
The World Bank
The World Bank
The World Bank
The World Bank
The World Bank
West Banjir canal
Part 3
No-regret ST Measures
Rehabilitation“Restore original-available
design capacity”-Dredging
-Dike improvement
The World Bank
1 August 2007
C: River Embankment Rehabilitation
1. Confirmation of Scope of Works
West Banjir Canal – Longitudinal Section
The World Bank
1 August 2007
C: River Embankment Rehabilitation
1. Confirmation of Scope of Works
Cengkareng Floodway – Longitudinal Section
The World Bank
A: Urgent Maintenance Dredging
1. Scope of Works
National Importance
West banjir canaldesign
No-regret ST Measures
“East-Banjir Canal”
The World Bank
• Stepwise approach:
A. Cipinang-Sunter-Buaran-Cakung(With increased Cipinang-Sunter capacity)
B. Finish EBC-NE stretchC. Optimize Manggarai gateD. Connect with Ciliwung
WBC EBC
Cakung
Sunter
Cipinang
Manggarai
Ciliwung
Increase capacity
Increase capacity
No-regret ST Measures
EBC-CAK-CIL-Manggarai Simulation 2007
The World Bank
Existing – flood 2007
EBC-CAK-CIL-Manggarai
Part 4
Tidal analysisHigh Tide floods
The World Bank
Animation of tide in South China Sea
Animation of tide in western Java Sea
Spring tide analysis
• Prediction based on analysed tidal constituents Tanjung Priok
• Only spring tides are plotted
• Upper plot: 18.6 year cycle caused by eliptical orbit moon
• Lower plot: semi-annual cycle presumably caused by interaction diurnal and semi-diurnal spring-neap cycle
Astronomic tide
Sea level anomaly
Flood event June 2007
• Increase in water level due to MSLA
• Spring tide (at semi-annual high)
flooding reported at June 14, ~10.00 pmFebruary 2007, not exceptional
The World Bank
Future high spring tides
Next semi-annual high spring tide: October 29, November 26, December 24 -2007, January 21
Following semi-annual high spring tide: June 4, 2008
Month with the highest average MSLA!
The World Bank
November 26, 2007
Subsidence
The World Bank
1980
2003
Land-use change
The World Bank
Pluit 1989, 2007, 2025(Positive view)
240 cm
Pasar Ikan cm
Nov 1989 Nov 2007 Nov 2025
Nov 26, 2007
190 cm Oct 29, 2007
140 cm
215220
225
subsidence
40-60 cm
40-60 cm
Climate changeSea level rise
subsidence
Critical level 2007
The World Bank
240 cm
Pasar Ikan cm
Nov 1989 Nov 2007 Nov 2025
Nov 26, 2007
190 cm Oct 29, 2007
140 cm
215220
225
subsidence
40-60 cm
40-60 cm
Climate changeSea level rise
subsidence
2025:
80-100 cm increase
18.6 year cycle
Pluit 1989, 2007, 2025(Positive view)
Critical level 2007
Sea level Nov 26
The World Bank
High tide floods 2007: “Signs of a sinking Jakarta”
Pluit 1989-2007 2007-2025 TotalSea level rise 4-6 cm 4-6 cm 8-12 cmSubsidence 40-60 cm 40-60 cm 80-120 cm
The World Bank
Jadebotabek Water Resources
Management Study (JWRMS,1994)
The World Bank
Part 5
“Strong knowledge base”
“Short-term action”
The World Bank
Flood HazardMapping
• Still a lot of confusion!! – Who is right? – Who is going to solve this?– Who dares to make decision?
• One storey from specialists required!
• “Water knowledge center” for DKI - Jabodetabek
The World Bank
Part 5
Actions and Financing mechanism
The World Bank
ACTION PLAN
• Short Term:
– Dredging / East Banjir Canal / Manggarai Gate
– Stop Ground Water Extraction (industrial)– Early Warning System– Strict Building Codes
The World Bank
ACTION PLAN
• Medium Term:
– Bulk Water Supply– Stop Ground Water Extraction (household)– Solid Waste Management– Low Income Housing / Slum Improvement
The World Bank
ACTION PLAN
• Long Term:
– Water Quality– Water Retention Basin / Catchment Area /
Sea Defense– Land Use and Spatial Planning
The World Bank
Jakarta Floods
Hongjoo HahmWorld Bank
JanJaap BrinkmanDeltares – Delft Hdraulics
Thank you!
The World Bank