jama k-12 experience

14
JAMA has extensive experience with public school construction and renovation. Our relationships with DSA, understanding of their processes and thorough knowledge of applicable building codes have enabled the firm to have long-standing relationships with numerous Districts and DSA, including their plan reviewers, district engineers, and inspectors. Working collaboratively with owners, designers, contractors, and building agencies allows us to complete well-executed projects on budget and on schedule. JAMA's educational portfolio includes more than 2,000 projects spanning new construction, modernizations, and seismic retrofits. JAMA K-12 EXPERIENCE San Marcos High School Marlborough High School LAUSD Linda Esperanza High School LAUSD Central Region Elementary School #15 CONTACT SHANE FITZGERALD, SE 4757 Principal-in-Charge (213) 785-3161- direct (213) 483-6490 - main [email protected] KENT KAEWWAEN, SE 6431 Project Manager (213) 785-3173- direct (213) 483-6490 - main [email protected]

Upload: others

Post on 09-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

JAMA has extensive experience with public school construction and renovation. Our relationships with DSA, understanding of their processes and thorough knowledge of applicable building codes have enabled the firm to have long-standing relationships with numerous Districts and DSA, including their plan reviewers, district engineers, and inspectors.

Working collaboratively with owners, designers, contractors, and building agencies allows us to complete well-executed projects on budget and on schedule. JAMA's educational portfolio includes more than 2,000 projects spanning new construction, modernizations, and seismic retrofi ts.

JAMA K-12 EXPERIENCE

San Marcos High School

Marlborough High SchoolLAUSD Linda Esperanza High School LAUSD Central Region Elementary School #15

CONTACT

SHANE FITZGERALD, SE 4757Principal-in-Charge (213) 785-3161- direct(213) 483-6490 - mainfi [email protected]

KENT KAEWWAEN, SE 6431Project Manager (213) 785-3173- direct(213) 483-6490 - [email protected]

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

FIRM PROFILE

HEADQUARTERED IN LOS ANGELES, JOHN A. MARTIN & ASSOCIATES, INC. (JAMA) WORKS TO SERVICE CLIENTS WITH THE LATEST DESIGN, COST AND MANAGEMENT TECHNIQUES.

With nearly 70 employees, John A. Martin & Associates (JAMA) works in collaboration with a network of offices throughout the United States to complete structural designs for an annual average of 12 million square feet of new construction worldwide. Originally founded in 1953 the firm has proven capabilities in structural design for all project types and sizes, completed in both the private and public sectors.

By continually embracing new and expanding design and analysis technologies, JAMA delivers faster and more efficiently to clients and regularly assists other team members to do the same. An in-house BIM Director and skilled Production staff allow the firm to balance cutting edge techniques with lessons learned from over 65 years of engineering application to address a range of renovations, new construction and rehabilitation projects.

Utilizing the latest design techniques, applications, and engineering concepts, and expediting the analysis and modifications early in the design process, JAMA is committed to communicating and collaborating utilizing the latest technology and tools. In addition to Revit, AutoCAD (up to version 2019), Dynamo, Digital Project, Rhino, TEKLA, 3DS Max, and Bentley systems software, the firm also utilizes BIM 360 (formerly Autodesk A360), BIM 360 Glue and Autodesk BIM360 Design (formerly C4R collaboration for Revit) for multi-discipline coordination. BIM 360 hubs are used for file sharing and coordination, and BIM360 Design as well as BIM 360 glue for ‘‘real time’’ model coordination with all disciplines. Revit 2019 serves as our primary BIM production software tool and facilitates 3D models that allows JAMA to visualize the project in 3D and explore every detail of the design by expediting the analysis and modifications early in the design process.

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

LEADERSHIP

Shane Fitzgerald, SE, DBIA - Principal

The recipient of a B.S. in Civil Engineering from California Polytechnic University, San Luis Obispo in 1995, Mr. Fitzgerald is a Licensed Structural Engineer in California.

A member of the John A. Martin & Associates, Inc. staff since 2002, with more than 23 years of experience in structural engineering design and project management which encompasses a diverse array of project types including educational facilities, civic structures, medical facilities, sport facilities, laboratory facilities, residential, aviation, theatres, parking structures, and office buildings; as well as renovations and seismic evaluations. He is also a DBIA certified design-build professional with over $750M of design-build experience in the past 5 years. He is an integrated partner and proven leader with experience in solving complex design issues in a team environment specifically for educational projects. Mr. Fitzgerald technical abilities coupled with his personal and professional project management skills will prove beneficial to the project team and his previous implementation of value engineering will ultimately ensure a successful project delivered on time and on budget.

Kent Kaewwaen, SE - Project Manager

The recipient of a B.S. in Civil Engineering, from the University of Southern California (USC), in 2010 and a M.E. in Structural Design, from the University of Southern California (USC), in 2011, Mr. Kaewwaen, is a Licensed Structural Engineer in California.

With more than 8 years of experience as a structural engineer, he understands the unique requirements involved in the structural design of educational facilities and is well-versed in sustainably-sensitive projects. His experience on similar facilities is highly useful in preliminary project design stages to ensure the development of a cost-efficient structural solution that supports the desired architectural design. Kent is well versed in current codes and translating project goals, requirements, and work process into successful facilities.

K-12 Experience

Harvard Westlake Middle School

Standard Middle School Harvard Westlake Middle School

Lincoln Elementary Classroom Building

K-12 Experience

LAUSD Venice High School Renovation

LAUSD Linda Esperanza High School Lawndale High School

LAUSD William Clinton Middle School #4

K-12 Experience

Mesa Middle School Enclave

Independence High School LAUSD Elementary School #15

Burroughs High School Gym

Cos-ta

K-12 Experience

LAUSD Fremont High School

Lawndale High SchoolLAUSD Fremont High School

Montebello High School

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

San Marcos High School San Marcos, CA

New 403,000 square foot high school campus that meets design requirements for CHPS and potential LEED certification. Includes 4 primary tilt-up construction buildings (all of which are 4 stories in height) that house up to 3,200 students as well as a central plant, visitor stadium, and home stadium. Construction Cost: $127M

LAUSD Rancho Dominguez Preparatory School Long Beach, CA

193,000 square foot school that offers four different academies to students in grades 6-12. Shared facilities include a swimming pool, performing arts classrooms, a state-of-the-art library, a multipurpose room, central administration, 2 gyms, food service facilities, a lunch shelter, playfields, and underground parking. This project is CHPS certified. Construction Cost: $75M

LAUSD Central Region Elementary School #15 Los Angeles, CA

77,000 square foot project consisting of a 2-story classroom building designed over a subterranean parking garage. Also, separate structures include administrative offices, a cafeteria, and a single-story free standing entry canopy structure. Construction Cost: $70M

LAUSD Linda Esperanza Marquez High School Huntington Park, CA

14-acre high school site is split into an academic campus and athletic campus, joined byoutdoor gathering spaces and shared program such as the 2-story gymnasium andmultipurpose hall. Additional structures such as 1-story student dining building, 2-storyadministration / library, and 3-story classroom building (designed over subterraneanparking) serve a total student population of over 1,600 students.

LAUSD Venice High School Comprehensive Modernization Los Angeles, CA

Design-Build Modernization of existing structures and construction of multiple new venues and structures on campus, including two, two-story classroom buildings, a gymnasium with faculty offices, specialty classrooms and locker rooms, outdoor athletic fields, a new parking lot and four small support buildings.

General Shafter Elementary School Multi-Purpose Building Bakersfield, CA

New one-story, 9,985 square foot multi-purpose facility for a school serving more than 150 students. Construction Cost: $3.8M

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

LAUSD Fremont High School Multi-Building Campus Renovation (Design-Build) Los Angeles, CA

A $100M Design-Build school project that focused on creating connections both within the schools new learning communities as well as the outside neighborhood. Includes student plaza renovations, re-appointed building elevations, gymnasium seismic upgrades, 3-story concrete classroom building seismic upgrades and ADA improvements, and a new student-focused library and cafeteria. Designed to meet the LEED for Schools Silver certification and Collaborative for High Performance Schools (CHPS) verifications. Won a 2014 Leroy F. Green Design and Planning Award of Honor from the Coalition for Adequate School Housing (CASH)/American Institute of Architects (AIA). Construction Cost: $100M

LAUSD Grant High School Comprehensive Modernization Valley Glen, CA

Multi-phased effort that includes demolition of outdated structures and portables, renovation of five existing structures, and construction of four new buildings on this high school campus, originally constructed in 1959. The project is part of the District’s fast-track modernization of 11 schools that required urgent upgrades to meet teaching standards. New construction includes a new 2-3 story classroom building with general, specialty and science classrooms; a new administration building; a new library building; and a new maintenance and operations / utility building.

LAUSD Elizabeth Learning Center Comprehensive Modernization Cudahy CA

Structural observation and conditions review of thirteen structures on the existing Elizabeth Learning Center campus. Structures include smaller shelters and single-story structures such as a lunch shelter and administrative building as well as larger more complex structures such as the Physical Education building, Classroom facility, and Oral Arts and Music Building.

LAUSD Polytechnic High School Comprehensive Modernization Sun Valley, CA

Structural evaluation and early conceptual design for the rehabilitation of an aging high school, including potential for the addition of nine new structures to accommodate new teaching standards.

St. John’s Lutheran School Classroom Building Bakersfield, CA

New two-story classroom building that includes four classrooms for middle school students, as well as a science lab and library. Construction Cost: $2.3M

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

Marlborough High School Arden Project Los Angeles, CA

Renovation of a gymnasium and new construction of an aquatics building, parking lot, and guard shack. LEED Gold Certified. Construction Cost: $17M

Wasco Union High School Student Services Building Phase VI Wasco, CA

New one-story, 13,400 square foot student services building designed as a wood-framed structure. Programmed spaces include 7 counselor offices, principal and other administrative staff offices, a conference room, and support spaces.

LAUSD Asset Prioritization Study Los Angeles, CA

Seismic Risk Factor Assessment and Prioritization for LAUSD that included over 630 buildings. Existing buildings were evaluated and ranked according to seismic capacity using HAZUS and ASCE-31/41.

Montebello Applied Technology Center Montebello, CA

New campus center consisting of six, 1-story steel framed buildings each approximately 24 feet tall with CMU sound walls. Completion Date: 2011

Costa Mesa Middle School Enclave Costa Mesa, CA

Located at one end of an existing high school campus, the project consists of a 2-story, 43,600 square foot steel-framed building and clock tower. The new facility engages the original campus by orienting itself parallel to the existing classroom buildings. On the south façade, the building creates a new urban scale gateway to the campus, linking the new middle school quad to the high school, and its shared athletics facilities to the north.

Lincoln Elementary School New Classroom Building Montrose, CA

New 1-story braced frame steel building with 10,850 square feet serves as a classroom. Construction Cost: $1.7M

Glendale Unified School District College View School Glendale, CA

New 52,000 square foot special needs school for students ages 3 years to 22. The facility includes 9 classrooms with therapy spaces, a multi-purpose room, admin spaces and a teaching kitchen and laundry area. The campus was designed to meet High Performance Incentives (HPI) guidelines. Construction Cost: 19.8M

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

LAUSD Valley Region Middle School #3 Sun Valley, CA

This school consists of four separate buildings that contain 38 classrooms, administration offices, learning community schools, food service, multi-purpose gymnasiums and fields, and a parking garage. Construction Cost: $35M

Jefferson Middle School Administration Building & Multi-Purpose Building San Gabriel, CA

New 6,800 square foot administration building and renovation of an 8,000 square foot multi-purpose building and existing childcare center. Construction Cost: $15M

LAUSD William Jefferson Clinton Middle School Los Angeles, CA

New 151,000 square foot campus consisting of 5 buildings including a gymnasium and a parking structure, designed to meet CHPS certification. Completion Date: 2006 Construction Cost: $25M

Burbank High School New Construction / Renovation Burbank, CA

A two-phase project that updated 420,000 square feet of an aging and outdated campus but allowed the campus to remain fully operational throughout construction. An initial phase constructed a new multi-story building supporting administration, science and general classrooms, vocational arts, and a library/media center. A second phase demolished existing classroom buildings to make room for a new gym, a swimming pool, 320-car parking structure, and renovation of the existing 1,300-seat auditorium. Construction Cost: $61M

Lawndale High School Phase 2 Cafeteria/ Student Union Building Lawndale, CA

New 2-story, 40,000 square foot student union and classroom building that features a double-height cafeteria space with glass façade and free-floating classroom. Construction Cost: $18M

Independence High School Bakersfield, CA

Construction of 78 classrooms, administration building, library, gym, cafeteria, mechanical building, field house, and a 720-student performing arts theatre. Construction Cost: $81M

Fremont Elementary School Glendale, CA New 31,200 square foot, 2-story classroom building that includes 20 classrooms and associated support facilities. Construction Cost: $10.5M

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

Standard Middle School Modernization Bakersfield, CA

Multi-phase effort that included a new Type V 1-story, 11,250 square foot science classroom building and the remodel of an existing Library/Administration building. Construction Cost: $10 3M

LAUSD South Regional High School #13 Los Angeles, CA

New high school that accommodates 2,025 students within 75 classrooms and 192,278 square feet of building area. The project also includes a 70,000 square foot underground parking garage with 188 car stalls.

Glendora High School Expansion and Renovation Glendora, CA

Renovation and expansion of large multi-purpose/gym, theater with stage, administration building, and additional classrooms as well as a new swimming pool and pool equipment building. Construction Cost: $12M

LAUSD Centennial High School Modernization Compton, CA

Completion Date: 2000 / Construction Cost: $4.1M

LAUSD Agreement/Contract No. 0220163 - Peer Review for Structural Engineering Drawings - Project No. 2001539 Los Angeles, CA

Washington Elementary School San Gabriel, CA

1-story, Type V library building with 3,170 square feet and a 1-story kindergarten building with 1,750 square feet. Construction Cost: $24.3M

Freedom Middle School Gymnasium Bakersfield, CA

New 1-story, 13,000 square foot gym constructed of CMU with steel beams, and metal deck, all on a conventional concrete foundation. Construction Cost: $3M

La Crescenta Elementary School Montrose, CA

New 2-story, 28,360 square foot classroom building. Construction Cost: $4M

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

Foothill High School Agriculture Science Building Modernization Bakersfield, CA

Renovation of an existing 20,000 square foot building that included a new opening in existing building shearwalls, increased gravity and lateral stability, wood stud wall furring and nonstructural framing assistance, new ramp /slabs, new evaporation coolers, checks on slab on grade for trenches and for new eye wash.

Dooley Elementary School Long Beach, CA

Construction Cost: $32M

Harvard Westlake Middle School Campus Los Angeles, CA

Middle school campus with a total footprint of 230,400 square feet. Construction Cost: $5M

Northwood High School - Irvine Unified School District Irvine, CA

A new 200,000 square foot high school complex consisting of 10 separate buildings including an administration structure, library media center, theater, gymnasium, shower and locker facility, shop building and classroom buildings.

El Segundo High School Modernization El Segundo, CA

This modernization affected 6 buildings on the school campus. Construction Cost: $10M

Stonecreek Junior High School Kern County, CA

Multi-building campus includes gymnasium and locker rooms.

Camino Nuevo Charter Academy Elementary School Los Angeles, CA

New elementary school developed as an adaptive reuse of a vacant office building. By reusing and renovating the former structure and parking lots, the low-slung building was transformed into an inviting 12-classroom elementary school around a courtyard. Main elements include a new freestanding extension which widens upstairs passageways for additional natural light, the sloping parking lot which is converted into a pleasant outdoor assembly / play area, and curved wooden lattices that shade most of the building.

Mt. Pleasant High School Phase III San Jose, CA Construction of a new theater building and new multi-purpose building totaling 20,169 square feet. Construction Cost: $8.48M

9 5 0 S . G R A N D A V E N U E | L O S A N G E L E S , C A 9 0 0 1 5 | 2 1 3 . 4 8 3 . 6 4 9 0 T | W W W . J O H N M A R T I N . C O M

K-12 EDUCATIONAL FACILITIES

Carlsbad High School Modernization Carlsbad, CA

Our structural scope of work is to providing services related to the partial demo of Building 500 to allow space for the new building. Also our service includes seismic strengthening of the entire existing structure. Construction Cost: $86M

Woodrow Wallace School Gymnasium Kernville, CA

A central component of the campus master plan that includes a new 13,204 square foot gymnasium and renovation/conversion of a multi-purpose modular classroom building. Construction Cost: $9.8 M

Oxnard High School Performing Arts Complex, Humanities Building, and Applied Arts Building Oxnard, CA

High school project that included three separate structures: a 20,000 square foot Performing Arts Complex, a 32,000 square foot Humanities Building, and a 21,000 square foot Applied Arts Building.

Standard Elementary School Bakersfield, CA

New 1-story, 58,400 square foot campus intended for 900 K-6 students plus a 30-child daycare facility. A planned portable classroom expansion, which will allow the site to accommodate an additional 180 students as well as a pre-K classroom, will bring total enrollment to 1,120 students. Construction Cost: $18M

Greenfield Elementary School #12 Kern County, CA

Six-building, multi-story campus constructed via Type V construction on standard spread footings. Construction Cost: $12.5M

Trabuco Hills High School Technology, Art, and Science Building Saddleback, CA

A 2-story Technology, Art, and Science Building and 1-story, 62,820 square foot Multi-Purpose Building. Construction Cost: $7M

Woodbridge High School Music Fitness Buildings Irvine, CA

1-story wood framed building with a tall relocatable building and lunch shelter with solarpanels.