james f langer introduction.ppt - compatibility mode · microsoft powerpoint - james f langer...
TRANSCRIPT
James F. Langer, P.E.Founder / Owner / Consultant
Process Engineering Center of Excellence LLC
2
Opportunities
REGISTERED PROFESSIONAL ENGINEER, TEXAS & CALIFORNIA
B.S. ChE 1978 UCLA
MBA PEPPERDINE
39 years experience
SHELL PROCESS ENGINEERING / PROJECT MGMT 28 YEARS
Shell Global Solutions 15 Years – Upstream Development Engineering
HESS 8 YEARS
PETROSKILLS INSTRUCTOR 2012 – Process Safety / Troubleshooting / Front End Field Development
PRINICPAL TECHNICAL EXPERT AT SHELL - ONE OF 25 SURFACE ENGINEERS GLOBALLY
Optimization
Hands on debottlenecking / troubleshooting – Globally
Produce the Limit
EXPERIENCE:
ONSHORE GAS PROCESSING
HIGH H2S / HIGH PRESSURE – MISSISSIPPI, TEXAS
OFFSHORE EXPERIENCE – SHELF / DEEPWATER GULF OF MEXICO
COMMISSIONED JV HESS ENCHILADA PLATFORM
PROJECT MANAGER HUNTINGTON BEACH GAS PLANT
James F. Langer, P.E.
4
Where I started…
• Thomasville:– 1970’s Mississippi– 23,000psi– 410 deg F– 46% H2S– 1200 LT/day– Inhibitor Oil
injection through open annulus
– Sulfinol– 3 Stage Claus
• Eustace- 1980’s Texas- 800 LT/day- 60mmscfd plant- 5,000 bpd
condensate- Inlet Separation- Condensate
Stabilization- Cryogenic- MDEA Amine
Treating- 3 Stage Claus- Cascaded SCOT- Catalytic
Incinerator
Tar Sands – Getty Oil Diatomite Pilot Plants
6
Jobs I’ve had…
7
Jobs I’ve had…
Places I’ve worked..Onshore / Offshore / Shelf / Deepwater
• Norway• Denmark• Netherlands• Germany• UAE• Dubai• Qatar• Oman
8
• Italy• France• England• Russia• Equatorial Guinea• Australia• Thailand• China• Brazil• Mexico
• Venezuela• Canada• Brunei• Malaysia• Indonesia• GOM• California• Texas• Louisiana• Mississippi• North Dakota
9
Training
10
More training…
11
More Training
Onshore Safe Design Standard
Developments Engineering 13
HE
SS
CO
RP
OR
AT
ION
• THE CHALLENGE
• Are we getting the most from our Asset?
• What’s the Technical Limit?• Is there more we can do?• What and Where are the limitations?
• THE SOLUTION:
• Seven Day Produce the Max Workshops:• Okume (27,000 bopd 160 Million bbls Reserves)• Ceiba (2 million bbl/yr 100 Million bbls Reserves)• S Arne ( $40 million/yr 80 Million bbls Reserves)• JDA ($410 million/yr 50 BCF Reserves)• NMB ($80 million/yr• Baldpate (40,000 bopd 1.5 TCF & 600 Million Reserves)• Bakken Subsurface($90 Million/yr 460 Million Reserves)• Bakken Surface ($250 Million/yr)
• THE BENEFIT:• Better Understanding of the Asset• Better Understanding of Each other on the Team• Time to allowed for completed staff work.• Asset Owns and presents the results• Members develop individual action plans for implementation
Produce the Max Workshop
Principal Technical Experts
Qatar – Dukhan PTL – Results - $275,000,000/yr
Developments Engineering 15
HE
SS
CO
RP
OR
AT
ION
15
GOST- PATENT- Crude Oil H2S Stripping
Developments Engineering 16
HE
SS
CO
RP
OR
AT
ION
16
18
Physical Properties of Hydrocarbons
James F. Langer, P.E.
FIELD HANDLING & PLANT PROCESSING OF NATURAL GAS
19
PS4 Process SafetyPF49 Troubleshooting FacilitiesPF3 Concept Selection
Principal Technical Experts
Process OptimizationBenchmarking Against Physics
Online Field Data
Off line Field Data
Web Star TM
Process Optimization
Process Simulator
Hydrate Simulator
Engineering Tools
Principal Technical Experts
Operating Envelope Guidelines
Principal Technical Experts
Vessel Envelopes Online
Shows current operating point (X) versus Design limits.
Current Operating Point
Maximum Relief Valve Capacity
23
Dimensions of any Project
Challenging Threshold Normal Above Enabling
•What aspects of this project are challenging?
•What things can you change?
•What can’t you change?
24
TEMPA ROSSA DIMENSIONS Comment Result
Heavy Oil at 12,000 Ft API 22 to API 11 with 5 Wells
Prize 268 million barrels of Oil Recoverable
Geology / GeophysicsHIGHLY FRACTURED MATRIX. GOOD COMMUNICATION
ReservoirDrive Mechanism not confirmed20% API 22 80% API 11RAPID WELL DECLINE
Drilling 12,000 Ft Wells, $150MM/well=> Can’t afford to drill many wells
Wells Artificial Lift ESP – 1 MW – High Technical Risk
FacilitiesRemote Surface Location / Mountainous Terrain / Pipelines Difficult & Expensive / No Spares / PlateauLow API / H2S / CO2 /Batching Oil Sales
Operations Standard Processes / Remote Location
EconomicsTotal Capital $1.5 BRecover 268 MM BBLs => UTC $5.5/bblRecover 53 MM BBLS => UTC $28/bbl
HSSE H2S / LPG / Trucking
Project ManagementStakeholder Management / Complexity – Advanced ClassCommercial & National Park / Permits
Challenging Threshold Normal Above Enabling
Principal Technical Experts
Sakhalin OPF
Technical Integrity Assistance – London – 2 weeks
2000 Fluor Sugarland Texas
Principal Technical Experts
Spicy Gas - Sichuan
Dec 2003 243 killed
March 2006 15,000 Evacuated
10% H2S 15,000 PSI
Shell Team
STOP
Kill all 17 wells
Re-evaluate
21 days in China
Eliminated a Bhopal
Petro China
Recommendations
Fully Accepted
Offered Entry into Play
70 TCF
Principal Technical Experts
Principal Technical Experts
Surface FacilitiesChallenges & Solutions
(1) Development Setting(2) Boundary Conditions(3) Well site(4) Project Management(5) Drill Cuttings Disposition(6) Hydraulic Fracturing Source Water(7) Hydraulic Fracturing Return Water(8) Well Testing(9) Gas Processing Facilities(10)Environmental Concerns(11)Sustainable Development
Principal Technical Experts
Hydraulic FracturingChallenges & Solutions
(1) Hydraulic Fracturing
(1) 300,000 barrels of water
Minimize your Impact
(1) Blend in
Minimize your Impact
(1) Blend in
Bureau of Land Management Best Management Practices: http://www.blm.gov/wo/st/en/prog/energy/oil_and_gas/best_management_practices.html
Sustainable DevelopmentChallenges & Solutions
(1) Flaring(1) Thermal Oxidizer(2) Ground Flare
Sustainable DevelopmentChallenges & Solutions
(1) Flaring(1) Thermal Oxidizer(2) Ground Flare
A Different Way
Courtesy the Fluor Corporation
Go and make a difference.Go and make some great decisions.Make the World a better place.