1 | Page JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED (CHIEF ENGINEER, CIVIL INVESTIGATION & DESIGN WING KASHMIR) LETTER OF INVITATION (LOI) FOR ENGAGEMENT OF CONSULTANT FOR REVIEW AND UPDATION OF DPR AND ASSISTING JKSPDC IN PROCUREMENT OF EPC CONTRACT FOR IMPLEMENTATION OF RMU works of existing 9 MW HEP MOHRA IN DISTRICT BARAMULLA JAMMU & KASHMIR STATE ON TURN-KEY BASIS

Upload: others

Post on 23-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

1 | P a g e

JAMMU & KASHMIR STATE POWER DEVELOPMENT

CORPORATION LIMITED

(CHIEF ENGINEER, CIVIL INVESTIGATION & DESIGN WING KASHMIR)

LETTER OF INVITATION (LOI)

FOR

ENGAGEMENT OF CONSULTANT

FOR REVIEW AND UPDATION OF DPR AND

ASSISTING JKSPDC

IN PROCUREMENT OF EPC CONTRACT

FOR

IMPLEMENTATION OF RMU works of existing 9 MW HEP

MOHRA IN DISTRICT BARAMULLA

JAMMU & KASHMIR STATE

ON TURN-KEY BASIS

Page 2: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

2 | P a g e

J & K STATE POWER DEVELOPMENT CORPORATION LIMITED

OFFICE OF THE CHIEF ENGINEER, CIVIL INVESTIGATION & DESIGN WING KASHMIR,

SRINAGAR-190018

Telephone: 0194-2493163. Fax: 0194-2491363 Email: [email protected]

LETTER OF INVITATION

No:

Date:

To

__________________________

__________________________

__________________________

__________________________

Subject: Engagement of Consultant for REVIEW AND UPDATION OF EXISTING DPR AND

ASSISTING JKSPDC IN BIDDING PROCESS FOR PROCUREMENT OF AN EPC

CONTRACT FOR IMPLEMENTATION OF RMU works of existing 9 MW MOHRA

HEP IN DISTRICT BARAMULLA

JAMMU & KASHMIR STATE ON TURN KEY BASIS

Dear Sir,

The J&K State Power Development Corporation Limited (JKSPDC) intends to Execute RMU works of exiting 9 MW Mohra HYDRO ELECTRIC PROJECT in District Baramulla, JAMMU & KASHMIR STATE ON TURN-KEY

BASIS. For the above purpose, the JKSPDC is intending to engage the services of reputed consultants/ consulting companies/ consulting organizations for:

1. Review /Update the DPR as per the detailed terms of reference/scope indicated in this document.

2. Preparation of pre-qualification (RFQ) bid documents conforming to CEA, CWC, MOP, GOI Guidelines/ Standard FIDIC documents (as per the requirement of the Owner) and evaluation thereof for selection of technically responsive bidders for the EPC Contract through an International competitive bidding process.

3. Preparation of “REQUEST FOR PROPOSALS (RFP)”- Bid Documents conforming to CEA,

MOP,GOI guidelines/Standard FIDIC documents (as per the requirement of the Owner) using

the Reviewed/updated DPR and evaluation thereof for selection of EPC Contractor.

Page 3: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

3 | P a g e

4. Assisting JKSPDC in bidding process at all stages including techno-commercial evaluation of bids

received for procurement of the EPC Contract.

5. The Consultant shall also be required to share and transfer all requisite information and knowledge

regarding the project execution and all technical features including design layout, design features,

construction schedule etc with JKSPDC and also the Project Management Supervision Consultant to

be separately engaged by JKSPDC.

ELIGIBILITY CRITERIA

The intending bidders would be required to meet and comply with following eligibility criteria.

A. ESSENTIAL TO MEET 1. The bidder should be an established well known reputed Consulting Company/

Organizationestablished under Indian Companies Act 1956 ( or equivalent registration for foreign companies ) for providing consultancy services in the field of hydro-electric projects.

2. The prospective bidders should have previous experience of providing consultancy services comprising of:

Minimum 5 Years experience in Review/Updating/Preparation of DPR‟s of Hydro Electric Power Projects with minimum capacity of 20 MW and above as on 31-08- 2012.

Framing bid documents i.e. RFQ & RFP for the hydro electric projects including assisting the Owner in conducting the National competitive bidding process for procurement of EPC contract or (having been associated with Design/Engineering & Construction) of Hydro Power Projects, for the implementation of at least one hydro power project having installed capacity of at least 20 MW or more.

3. The bidder must not have been blacklisted/ debarred from practicing as Consultant by Government

of India or any Department/ Undertaking thereof, any State Government or any Department/ Undertaking thereof.

4. Intending bidders would be required to produce certified copies of the audited accounts/statements for the last 3 financial years) and other documentary evidence in support of their submissions in response to requirements listed at serial no 1-2 as above and self declaration in respect requirement listed at S. No. 3. The bidder should have a minimum average annual turnover of Rs 100 lacs consecutively from the last three financial years.

BIDDERS FAILING TO MEET THE ESSENTIAL CRITERIA WOULD BE CONSIDERED NON

RESPONSIVE AND THEIR BIDS WOULD STAND REJECTED AT THE TECHNICAL EVALUATION

STAGE.

B. DESIRABLE

5. The bidders/ companies should preferably have on its regular roll, working for at least last one year, minimum 5 Senior level key Consultants in the fields of DPR preparation; Procurement of

Page 4: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

4 | P a g e

Contracts, Civil Engineering (with experience in construction of dam/ barrage and tunneling), Mechanical Engineering (with experience in hydro-mechanical engineering works related to construction of hydroelectric projects), Electrical Engineering (with experience in electro-mechanical engineering works related to construction of hydroelectric projects) & Engineering Geology who have working experience of more than 10 years (in respect of post graduate engineers/geologists) and 15 years (in case of graduate engineers/ geologists), assisted by other support staff with adequate experience in procurement of contracts, surveying, design and engineering in the field of hydro power.

6. Bidders, to support and strengthen their credentials in respect of previous experience, may submit along with applications for pre-qualification, performance certificates/ completion

certificates testifying successful completion and commissioning of hydro electric projects having

installed capacity equal to or more than 20 MW in aggregate for which the consultancy stood

provided by the bidder in last 5 years.

Proposals to provide the above stated services (referred to as “proposal” herein after) should be submitted in the manner stated herein after:

SECTION-I

Instructions to Bidders:

1.0 Bidders are required to furnish all information and documents as called for in this request for proposal (RFP) document in English. Any printed literature furnished by the bidder in a language other than English, should be accompanied with an English translation, in which case, for the purpose of interpretation of the document, the English version will be referred.

1.1 Proposal should be typed or filled in ink.

1.2 All additions, alterations and over-writings in the proposal or accompanying documents must be clearly initialed by the authorized signatory.

1.3 Bidder has to be a single entity, Joint Ventures or Consortiums. The proposal is non document transferable.

1.4 The proposal document shall be submitted in the following manner in three envelopes :

Envelope-1

1.4.1 The bid shall be accompanied with earnest money amounting to Rs. 30,000/-

(RupeesThirtythousand only) which shall be in the form of a crossed Demand Draft in favour

of Accounts officer with Chief engineer, CI&D Wing Kashmir, J&K State Power Development

Corporation Limited, payable at Srinagar and placed in a separate sealed envelope-1 marked as

„BID EARNEST MONEY‟ FOR CONSULTANCY SERVICES FOR RMU works of existing Mohra HEP

on the top of the envelope.

Envelope-2

1.4.2 All the other documents explained hereinafter, shall be furnished in three sets and placed in a separate sealed envelope-2 and marked as „TECHNICAL BID DOCUMENTS FOR CONSULTANCY

Page 5: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

5 | P a g e

SERVICES FOR RMU works of existing Mohra HYDRO ELECTRIC PROJECT‟ on the top of the envelope. The price bid should be quoted as explained hereinafter and should be placed in a separate sealed envelope clearly marked as „PRICE BID‟ FOR CONSULTANCY SERVICES FOR RMU works of existing Mohra HYDRO ELECTRIC PROJECT‟ on the top of the envelope.

Envelope-3

1.4.3 The price bid should be quoted as explained hereinafter and should be placed in a separate sealed envelope-3 clearly marked as „PRICE BID‟ FOR CONSULTANCY SERVICES FOR RMU works of existing Mohra HYDRO ELECTRIC PROJECT‟ on the top of the envelope.

1.4.4 All the above three sealed envelopes should be put inside one single cover, sealed and clearly

super scribed on top of the cover with the words „BID FOR CONSULTANCY SERVICES FOR RMU works of existing Mohra HYDRO ELECTRIC project. Name and address of the bidder should also be clearly written on the packet.

1.5 Proposal document shall be submitted at the following address on or before 24nd September 2012 upto 1400 hrs.

Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC), Bemina Srinagar. PHONE NO: 0194 2493163, 0194 2491363

E-mail: [email protected]

However it may be noted that the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir

(JKSPDC) may, at his discretion, extend the due date and time for submission of the proposals

which shall be duly notified.

1.6 Any proposal received after the closing of the due date and time shall not be considered. Chief

Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) shall retain all documents

submitted by the bidder.

1.7 Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) Bemina,Srinagar also takes

no responsibility for delay, loss or non receipt of documents sent by post / courier / or other means.

1.8 All proposals (in the sealed cover/ envelope referred at 1.4.4 above super scribed as „CONSULTANCY SERVICES FOR implementation of RMU works of existing 9 MW Mohra HYDRO ELECTRIC PROJECT submitted by the applicant/ bidders by the due date

and time at office of the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) shall be

opened first by opening of the sealed envelope-1 (referred at 1.4.1 above) marked as „BID

EARNEST MONEY‟ FOR CONSULTANCY SERVICES FOR RMU works of existing Mohra HYDRO

ELECTRIC PROJECT‟ on the same date at 1400 hrs or on any subsequent date which shall be

communicated to the bidders in advance in the same office in the presence of such applicants/

bidders or their authorized representative who would like to attend the Bid Opening.

Page 6: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

6 | P a g e

1.9 Envelope-2 containing „TECHNICAL BID DOCUMENTS FOR RMU works of exiting Mohra HYDRO ELECTRIC PROJECT‟ (refer 1.4.2) of only those bidders, who are found to have

submitted the Bid Earnest Money in the form and in accordance with the requirements laid herein,

shall be taken up for opening.

1.10 Bids not accompanied by Bid Earnest Money shall be rejected at very outset. 1.11 The technical bids shall be evaluated by the “Bid Evaluation Committee” to be constituted for

the purpose by the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC).

1.12 Price bids, submitted in Envelope-3 and super scribed as „PRICE BID‟ of only those bidders whose score is equal to or more than specified by the JKSPDC herein after shall be opened on a date which shall be separately communicated to each of the technically responsive bidders in the same office in the presence of such technically responsive bidders or their authorized representative who would like to attend the Price Bid Opening.

1.13 The bidder may properly check the proposal before submission to ensure that all information / documents required are included.

1.14 At any time prior to opening of proposals, the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) either at his own initiative or in response to clarifications requested by a prospective bidder(s) may modify the RFP document by issuing an amendment. In addition, such amendment(s) shall be sent by fax / mail to the bidders who have already submitted their bids.

1.15 The proposals as submitted shall indicate that proposal is FIRM and that the proposal shall remain valid for a period of not less than 180 days from the date of opening of proposal.

1.16. The Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) shall preliminarily

examine the proposal to determine whether the proposals are responsive to the requirements of the RFP document. Proposals shall be considered non-responsive and liable for summary rejection if any of the following primary requirements have not been met.

1.16.1 Proposal is not received by the due date and time.

1.16.2 Proposal is not accompanied with Bid Earnest Money.

1.16.3 Proposal is not accompanied with the required documents.

1.16.4 Proposal is not a FIRM proposal.

1.16.5 Proposal is not valid for the prescribed minimum period.

1.17 The Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) shall take up evaluation of only responsive bids. Negotiations may be initiated with one or more bidders at the discretion of the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC).

1.18 The Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) reserves right to reject any proposal, if at any point of time, it becomes known or is discovered that a material misrepresentation has been made by an applicant/ bidder in the process related to submission of the bid.

Page 7: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

7 | P a g e

1.19 In the event of any bidder not responding to further clarifications as required for the finalization of the bid, the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) reserves the right to forfeit the bid earnest money furnished by such bidder and reject the bid.

1.20 Any deviation to any clause of this document must be properly spelt out in „Exceptions and Deviations‟ statement to be submitted along with the bid, giving details of page number and clause number and detailing the deviation. The Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) reserves the right to accept or reject any deviation or modify the relevant clause of the RFP document to the extent necessary. „Exceptions and Deviations‟ statement in the prescribed format as per Annex-7 must be attached with the proposal.

1.21 After opening of proposal and till final selection of successful bidder, no correspondence of any

type, unless called for and initiated by the Chief Engineer, Civil Investigation & Design Wing BeminaKashmir (JKSPDC), shall be entertained.

1.22 Applicant/ Bidder or authorized representative of the Applicant/ Bidder must sign each page of the proposal.

1.23 Bidders are informed that the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) is neither under any obligation to select any bidder, nor to give any reason for selecting any bidder; the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) is also under no obligation to proceed with the work or part thereof.

1.24 Successful Bidders shall have to enter into contract with JKSPDC, as per agreement format supplied herein as a part of the bid document within 7 days from the issuance of letter of intent/ letter of award of contract for consultancy services.

1.25 Successful bidder shall be required to provide a security deposit (contract performance guarantee) in the form of bank guarantee of amount not less than 5% (five per cent) of the total value of the contract and valid for the tenure of the contract plus twenty eight days in the prescribed format.

1.26 Date of start for providing of consultancy services shall be as specified in the contract agreement or notice to proceed to be issued under the contract agreement, whichever is later.

1.27 In the event of failure of successful Bidder to execute the contract agreement within 7 days from

the date of receipt of acceptance of the proposal/ letter of intent/ letter of act, full earnest money deposit shall stand forfeited and the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) may consider placing order on next competitive bidder at the risk and cost of the successful bidder.

1.28 The Standard Guidelines for Engagement of Consultants by the Chief Engineer, Civil Investigation

& Design Wing Bemina Kashmir (JKSPDC) and also containing contract for Engagement of Consultants specifying scope of work; deliverables etc. is enclosed as Annex-II.

1.29 No conditions / suggestions other than laid down in the NIT documents shall be entertained.

Page 8: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

8 | P a g e

SECTION-II

Information to be furnished by the Bidders

2.0 Team Leader and Members:-

2.1 The experience and qualifications of the team proposed to be assigned for the Task should be indicated as per Annex-III.

2.2 Price Bid

The bidders must quote consultancy charges in detail in one quote including travel, stay, office expenses

or any other sundry charges. This quote should include all tax liability under income tax, service tax,

professional tax, and any other tax existing ten days before the submission of price bid. The price bid

should be placed in separate sealed envelope-3 and should be clearly marked as price bid for

“CONSULTANCY SERVICES FOR RMU works of exiting 9 MW HYDRO ELECTRIC PROJECT”.

SECTION-III

Proposal Evaluation Criteria:

3.0 Technical CRITERIA

The following shall be the criteria for technical evaluation of proposals contained in the bi documents.

3.1Team Leader and Members:

Team:

Constitution of the assigned team in respect of number of members, their qualifications and experience

shall entitle the bidder to a maximum score of 1200 points.

The actual score for the team (including the team leader) of the team of 6 no senior level consultants

proposed by the bidder companies would be calculated by using following points:

1. Points for each member being on regular roll of the bidder for last 12 months @50/ each . 2. Points for post graduate degree with 10 years working experience:

Qualification: 75

Experience: 75

Points for graduate degree with 15 years working experience: Qualification: 60

Experience: 90

3.2 PREVIOUS EXPERIENCE IN THE PROFESSION/BUSINESS OF PROVIDING CONSULTANCY

SERVICES:

The time duration for which the Bidder Companies, established under Indian Companies Act, 1956 ( or

equivalent registration for foreign companies ) have been in the profession/ business of providing

consultancy in the field of hydropower would be taken as an indicator of their being active in the

business as well as resourcefulness of the bidders.

Page 9: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

9 | P a g e

All applicant bidders having an experience of five or more years as on 31-08-2012 in this regard would be

given 250 points. Bidders with lesser experience as per eligibility para-2 page no: 5 would be scaled

accordingly.

Team Leader:

In addition to above, the consultant/ expert, out of the 6 number senior level consultants/ experts,

nominated as the Team Leader for the present assignment would receive additional 250 points if the

expert has the comprehensive experience of having been responsible/ being associated with the

implementation of a hydro electric project having installed capacity equal to or more than 20 MW from the

stage of preparation of bid documents to testing and commissioning of the project. The expert must have

assisted the owner/ employer in bid evaluation, award of contract, design& engineering supervision &

monitoring of civil construction and erection of plant and equipment.

The Team Leader, having experience of maximum number of projects, in conformity with above, would

earn full 250 points and Team Leaders with lesser number of projects would be scaled accordingly.

Desirable:-

3.3 QUANTUM OF BUSINESS: Quantum of business handled by the bidder, supported by Income Tax Returns for last three years, would decide award of 250 Points. The bidder having the highest combined turn over at least above the minimum of average annual turnover of Rs.100 Lacs (para-4,page-5) for the last 3 years would be given full 250 points and bidders with lesser turn over would be scaled accordingly.

3.4 PREVIOUS EXPERIENCE OF PROVIDING CONSULTANCY SERVICE FOR HEP:

Previous experience of providing consultancy services involving framing/ review of bid documents, RFQ &

RFP, assisting the Employer in the bidding process for procurement of an EPC Contract, Design &

Engineering for the implementation of hydro power projects: 250 Points.

Bidder with maximum experience in terms of MW would be given full 250 points and bidders with lower

figures would be scaled accordingly.

3.5 PERFORMANCE CERTIFICATES:

Performance certificate testifying successful completion and commissioning of assignment of Design, EPC

at least one hydro electric project having capacity equal to or more than 20 MW for which the consultancy

stood provided: 500 points. The bidder furnishing the certificates in conformity with above for the largest

project would be given full 500 points and the other bidders would be rated accordingly as per the size of

the Project.

This clause shall be applicable for the experience of bidders within India or abroad.

Page 10: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

10 | P a g e

3.6 Qualifying Technical Score The minimum qualifying technical score, for being eligible for consideration in the next stage of

evaluation, against the maximum score of 2700, shall be 2025 POINTS (75%). The financial bids of only

those bidders, who score 2025 points or above in the technical evaluation, shall be opened and bidders

considered eligible for consideration for next stage of evaluation.

3.7 Financial Evaluation The proposal with the lowest financial bid shall be given a score of 100 and score of other bidders shall be

inversely proportional to their prices.

3.8 Technical Evaluation

The bidder with highest technical score shall be given a score of 100 and the actual scores of other

bidders shall be normalized directly in proportion to the technical score secured by them.

3.9 Overall Evaluation

The total score of each bidder shall be worked out by adding 60% weight age of technical score and 40%

of financial score.

SECTION-IV

4.0 Terms of Reference

Scope of Work

4.1 Review and Updating of existing DPR.

4.2 Preparation of pre-qualification (RFQ) bid documents in conformity with CEA,CWC, MOP, GOI, Guidelines / FIDIC documents (as per the requirement of Owner) and assisting the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) in invitation of RFQ bids and evaluation thereof for selection of technically responsive bidders through International competitive bidding process.

4.3 Preparation of “REQUEST FOR PROPOSALS”- Bid Documents conforming to CEA, CWC, MOP,

GOI guidelines/FIDIC documents (as per the requirement of Owner) using the

Reviewed/updated DPR.

4.4 Assisting the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) in

bidding process at all stages of the bidding process including techno-economic evaluation of bids received for the procurement of an EPC Contract.

4.5 The Consultant shall also be required to share and transfer all requisite information and knowledge regarding the project execution and all technical features including design layout, design features,

construction schedule, etc with the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) and also the Project Management Supervision Consultant to be separately

Page 11: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

11 | P a g e

engaged by the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC). A 5% of the total payment due to the consultant shall be retained up to the complete

transfer of knowledge to the Project Management Supervision Consultant.

SECTION-V

5.0 Responsibilities of the Consultant

1. Review and Updation of the existing DPR.

2. Preparation of Pre-Qualification Bid Documents for International competitive bidding

conforming to CEA, CWC, MOP, GOI guidelines/ FIDCIC documents (requirements of the Owner).

3. Evaluation of pre-Qualification Bids received in response to RFQ.

4. Preparation of Detailed RFP Bid Documents is conforming to CEA, CWC, MOP, GOI

guidelines/FIDIC documents (requirements of the Owner) using the data and other information

available from DPR for RMU works of existing 9 MW Mohra HYDRO ELECTRIC PROJECT

formulated by JKSPDC.

5. Assisting the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) at all

stages of the bidding process including participating in pre-bid conferences, drafting of replies to

bidders queries, carrying out necessary modifications to the bidding documents.

6. Techno-economic evaluation of bids received in response to RFP Bids and assisting theChief

Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) in selection of EPC

arrangement on turnkey basis.

7. Presentation before the Management committee/ Board of Directors of JKSPDC or its sub-

committees /Govt. of J&K and follow-up action as per feedback from the Chief Engineer, Civil

Investigation & Design Wing Bemina Kashmir (JKSPDC).

8. Assisting in all documentations like Contract Agreements, Construction Schedules, Interface

Schedules including signing of the various agreements.

9. Knowledge transfer and sharing.

10. Any other matter / issue related to above scope of services.

6.0 DETAILS OF DOCUMENTS TO ACCOMPANY THE BID

The following documents duly filled and signed by the applicant bidders shall be treated as part of

the bid document:

Annexure 1: LOI data

Annexure 2: Terms of reference, schedule for deliverables under the contract & schedule

for payments

Annexure 3: Format for submission of technical bids (FORMS 1-7)

Annexure 4: Format for submission of financial bid (FORM 8-9)

ANNEXURE 5: GUIDELINES FOR ENGAGEMENT OF CONSULTANTS

Annexure 6: PROPOSED CONTRACT WITH APPENDICES

ANNEXURE 7: PROFORMA FOR EXCEPTIONS AND DEVIATIONS

Page 12: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

12 | P a g e

ANNEXURE 8: CHECK LIST

Applicant/ Bidders are requested to keep their Proposal/ Bid valid for a period of One Hundred and Eighty

(180) days from the date of opening of the Technical Proposal, during which period they will maintain the

personnel proposed for the assignment and also the offered price.

Kindly acknowledge receipt of this Letter of Invitation through fax/e-mail per return.

Yours Sincerely,

Chief Engineer,

Civil Investigation & Design Wing Kashmir

(JKSPDC),Bemina, Srinagar.

Page 13: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

13 | P a g e

ANNEXURE-I

LETTER OF INTENT

BID DATA SHEET

LETTER OF INTENT

Page 14: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

14 | P a g e

BID DATA SHEET

SN0: ITEM DESCRIPTION

1.1 Name

of

Assign

ment

Selection/ Engagement of Consultants for Review/ Updation of DPR and assisting the Chief

Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) in procurement

of EPC Contract for the IMPLEMENTATION OF RMU works of existing 9 mw MOHRA HEP

in District Baramulla in J&K State on turnkey basis.

1.2 Name of Owner J&K STATE POWER DEVELOPMENT CORPORATION LTD.,REGISTERED OFFICE: SHAW INN ,BOULEVARD

SRINAGAR-190001J&KTEL:-0194 – 2500109,0194-2500165 , FAX:0194-2500145 JAMMU OFFICE:J&K STATE POWER DEVELOPMENT CORPORATION LTD. ASHOK NAGAR

SATWARIJAMMU-180003JAMMU & KASHMIR STATETEL:0191-2430548 FAX 0191-2435403

1.3 Description

and

objective of

assignment

The Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) desires to execute RMU works of existing 9 MW HEP Mohra for

which it has got the Detailed Project Report (DPR) framed by JKSPDC in the Year

2011

For the above purpose, the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) is intending to engage the services of

reputed consultants/ consulting organizations for:

Review and Up-dation of existing DPR. Preparation of pre-qualification (RFQ) bid documents in conformity with CEA, CWC, MOP, GOI guidelines/FIDIC documents (as per the requirement of Owner) and assisting the Chief Engineer, Civil Investigation & Design Wing Bemina Kashmir (JKSPDC) in invitation of RFQ bids and evaluation thereof for selection of technically responsive bidders through International competitive bidding process.

Preparation of “REQUEST FOR PROPOSALS”- Bid Documents conforming to CEA, CWC, MOP, GOI guidelines/FIDIC documents (as per the requirement of Owner) using the DPR of RMU works of existing 9 MW Mohra HYDRO ELECTRIC PROJECT. Assisting the Chief Engineer, Civil Investigation & Design Wing

Bemina Kashmir (JKSPDC) in bidding process at all stages of the bidding

process including techno-economic evaluation of bids received for

procurement of an EPC contract for the construction and commissioning of

RMU works of existing 9 MW HEP Mohra ( HYDRO ELECTRIC PROJECT

IN DISTRICT Baramulla, JAMMU & KASHMIR STATE ON TURN KEY BASIS.

1.4

The Owner

will provide

the following

inputs:

Detailed Project Report formulated by JKSPDC can be seen by the consultants at

the office of Chief Engineer CI&D wing JKSPDC,Bemina Srinagar. Successful bidder

(Consultant) shall be provided a copy of the DPR on award of the Contract.

Page 15: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

15 | P a g e

1.5 The

documents

enclosed are:

1. LOI Data Sheet

2. Terms of Reference, Schedule of deliverables, Schedule of Payments under

the proposed contract.

3. Formats for the technical and financial proposals.

4. JKSPDC Standard Guidelines for engagement of Consultants.

5. Draft Contract for the Consultancy Services.

1.6 Consortium The bidder has to be a single entity or consortium of companies to participate in

the bidding process.

1.7 Address for

submission of

bids

Chief Engineer,

Civil Investigation & Design Wing Bemina Kashmir (JKSPDC), Bemina,

Srinagar.

E-mail: [email protected].

TEL: 0194-2493163 FAX :0194-2491363

1.8 Date & Time

for submission

of bids

24-09-2012 up to 1400 hours.

1.9 Date of

opening of bids

24-09-2012 at 1400 Hours or next working date. The date of opening of financial bids shall

be communicated to technically responsive bidders separately.

Page 16: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

16 | P a g e

ANNEXURE-II

TERMS OF REFERENCE

1. SCOPE OF WORK

2. TIME SCHEDULE FORDELIVERABLES UNDER THE CONTRACT

3. SCHEDULE OF PAYMENTS UNDER THE CONTRACT

1. SCOPE OF WORK AND RESPONSIBILITIES OF CONSULTANT Introduction

Page 17: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

17 | P a g e

The Mohra HEP is a heritage run-of the river scheme on River Jhelum and was the second

Hydel scheme constructed in South Asia way back in 1905 with an installed capacity of 4.00

MW. The project is located at a distance of 90 km from Srinagar on Srinagar-Uri national high

way and about 35 km ahead of Baramulla town. The intake works of the project are located

immediately just on the downstream of the Barrage of newly constructed Uri HEP. The project

was a multipurpose one catering to the needs of the villagers for irrigation purposes as well. The

project is located all along the National Highway leading to Pakistan. The 10 Km long water

conductor of the scheme is mostly made of Deodar wood having T & G joints. By the year 1950

the power house had out lived more than its useful life &, therefore, proposals for replacement

of the old electro-mechanical and Hydro- mechanical equipment by new sets of higher capacity

was felt imperative. This necessitated the redesigning/augmentation of the initial wooden flume

(water conductor) & its other connected civil structures. The capacity of the power house was

proposed to be raised from 4.0 Mw’s to 9.0 MW’s. However, when the argumentation proposals

were still at the implementation stage, the old power house got washed away due to

unprecedented floods of 1959. The site for the new power house building was decided to be

shifted to a safer place which resulted in head loss of 31 mtrs. from existing 128.00 mtr. to

97.00 mtr.

The new power house with an installed capacity of 9.00 MW having two units of 4.5 MW

each was commissioned in 1962 & it generated electricity till year 1992. In 1992, severe floods

again damaged the project seriously. The project came to complete grinding halt /stand still

after commissioning, of the Uri-Ist HEP, in year 1997 by the NHPC, due to diversion of water

from River Jhelum near intake works of Mohra HEP towards the HRT of Uri HEP Due to heavy

leakages in the ages old wooden water conductor, the generation dwindled with the passage of

time and damages to the wooden water conductor increased due to regular slides and

depositions of heavy debris inside and above the water conductor.. The problem would get

aggravated during wet weather due to heavy slides.The project is under outage since

commissioning of the Uri-Ist HEP in year 1997 as the requisite discharges were not made

available by the NHPC for this downstream project.

The JKSPDC intends to rehabilitate this prestigious project, mostly in view of its heritage value,

by utilizing the existing Infrastructure especially its wooden water conductor after

conducting requisite restoration/ repairs/ retrofication/ replacement & refurbishment works

for the project under RMU in order to make it operational once again.

Page 18: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

18 | P a g e

a) Under the modernization & rehabilitation proposal of the Mohra HEP, it is envisaged to

utilize the available fall of 114 mt for the 9.00 MW installed capacity. Besides the surplus flows

from the River Jehlum available during summer months, additional water shall be drawn from

the adjacent Boniyar Nallah, located near the existing intake of Mohra HEP.

Proposed RMU works.

The proposed RMU works are aimed to rehabilitate and restore the existing power project to

generate 9 MW or more power, by utilizing the existing infrastructure to their maximum utility

and maintaining the heritage value of this project by restoring/ utilizing most of the existing

wooden water conductor, which is located and visible all along its alignment parallel to National

Highway connecting Pakistan which has gained International importance due to restoration of

Muzafarabad- Kashmir ages old trade route. The proposed RMU works may include but not

limited to the following:

Modifications to existing intake works and intake channel of Mohra HEP on River

Jhelum.

Restoration /repairs to existing masonry/ concrete walls and floors of conductor including removal of debris etc.

Rehabilitation / renovation/ restoration/ strengthening of damaged portion of wooden flume with latest techniques and replacement of severely damaged wooden water conductor by RCC/ steel conduits.

Construction of Diversion structure on the Boniyar Nallah.

Construction of Boniyar link channel catering to the designed discharge from Boniyar Nallah.

Restoration, renovation/ reconstruction of damaged wooden chutes and other cross drainage works.

Modifications & restoration works for reactivation of existing desilting tank.

Re-Construction of damaged tailrace.

Restoration of damaged Breast walls / Retaining walls and approach roads.

Refurbishing / Restoration/ replacement & Modernization of all Hydraulic gates, valves & other control structures

Installation and commissioning of new electro- mechanical and Hydro- Mechanical & other auxiliary equipment.

b) Infrastructure.

Page 19: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

19 | P a g e

The consultant shall ensure maximum utilization of existing infrastructure and give details of new

infrastructure

c) PROJECT LAYOUT/ Proposals:

Examine various alternative layouts and proposals of Mohra HEP. The Consultant will rank the

alternatives, techno economically.

d) DPR REVIEW:

The Consultant shall review and update the DPR in accordance with the prevalent:

i. CEA / CWC norms,

ii. Applicable BIS standards,

iii. Latest editions of “Guidelines for Formulation of Project Reports for Power Projects”

published by CEA,

iv. “Guidelines for Preparation of Detailed Project Report of Irrigation and Multipurpose

Projects, Govt. of India, Ministry of Irrigation” published by CWC.

v. “Guidelines for Preparation of Estimates for River Valley Schemes” published by CWC.

vi. MOEF/ Forest/ PCB guidelines.

The references of such standards, practices shall be specified in the DPR, together with

appropriate appendices and drawings.

e) The DPR shall include design briefs, general project layout and layout of each major structure,

sufficient plans and cross-sections to establish the magnitude and characteristics of works and

their costs. The D.P.R shall include detailed design of each component and specific details and

specifications for all the restoration, retrofitting, refurbishing, and all new works.

f) Electromechanical Works:-

For E&M and Hydro Mechanical Works, the details in DPR shall include the Design Briefs,

calculations for preliminary dimensions, weights, ratings and settings, single line diagrams

indicating ratings of equipments, sizes, Plans and sections indicating their locations etc.

g) DESIGNS:-

The Consultant shall prepare in sufficient detail, designs of all structures required for the selected

alternative. The recommendation for proposed alternative shall be supported with cost details and

optimization studies. The Consultant shall establish conclusively, that the suggested Project

alternative and layout, is the techno economically the most feasible option, with maximum possible

utilization of existing infrastructure.

h) POWER POTENTIAL STUDIES: -

The consultant will carry out power potential optimization studies to review the Capacity and unit

configuration.

i) COST ESTIMATION: -

Page 20: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

20 | P a g e

The Consultant shall review cost estimates based on the available data as well as that to be

collected by way of additional survey/investigation at DPR stage. This shall include:-

I) The cost of R & R, EMP, etc.

II) The cost on account of project engineering and construction management

expenses, the owner‟s overhead expenses, and an adequate allowance for physical contingencies

(to be determined on the basis of risks involved in the construction of the different structures, as

per relevant guidelines).

III) Import duties, taxes and interest during construction shall be assessed and separately indicated the cost estimates shall be broken down into local and foreign currency components if required

on the basis of Indian/International practices. Prices for major civil works and for permanent equipment shall be estimated on the basis of Indian/International Practices, supported with Rate Analysis as per CWC Guidelines and/or documents showing current market trends.

J) Surveys / Investigations

The bidder shall have to review the documents, and available data required for Updation of DPR Any

additional DPR level Geological investigations as may be suggested by the consultant shall be carried out

by the owner. However all the additional topographical digitized survey for the project components like

Head works, water conductor, Intake works, X- drainage works, Desilting Basin, Forebay, Spill Channel,

Penstock, Power house Area, Tailrace etc. shall have to be carried out by the Consultant, for which rates

shall have to be quoted by the Consultant separately for taking L- section, X- sections, Site plan, Contour

plans etc. for about 3 sq. Km of the area. The details of Tentative B.O.Q for this survey work as under:

1. Preparation of L- section & X- section along Nallah / water Conductor, submergence area

etc using automatic electronic Digital total station by taking readings after intervals not

exceeding 100M and at all obligatory / profile charge points.( width of cross sections as per

site requirement but not less than 100M Width) for a total length of 15 Kms.

2. Preparation of site plans with Contours as per required contour interval along Nallah, water

conductor and other main project components using Automatic Electronic Digital total station

by taking readings after intervals not exceeding 100M and at all important profile changes,

Buildings, Bridges, and other permanent features for an area of 3 sq.km.

The quantum of survey works may increase or decrease as per actual site requirements and payments

shall be regulated as per the rates allotted to the consultant separately for this Survey work. The

consultant shall have to provide survey field data in three sets both in hard & soft copies for working out

the actual quantum of survey work conducted and regulating payments thereof for the survey work.

Any other tests, if any required shall have to be carried out by the bidder. All consistency and other

requisite tests and studies on the available Hydro-Metrological data shall form part of the scope of work

for the bidder.

Page 21: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

21 | P a g e

The EIA / EMP studies have not been conducted by owner as this is an existing project for which RMU is

being undertaken. Bidders shall have to collect all the DPR level baseline field data for developing R&R

plans and the DPR shall contain a separate chapter on EIA/ EMP issue as per norms / requirements of

MOEF/ Forest department / Pollution Control Board.

k) SENSITIVITY ANALYSIS:

Sensitivity analysis on tariff of energy generated at the Project shall be performed taking into

consideration the provisions of J&K Electricity Act, 2010 JKSERC/CERC guidelines, and specially covering

the material and labour costs, load growth, foreign exchange variation, capital outlay, as well as operating

costs including change in depreciation rates, interest rate, return on equity and O & M expenditure and

discount rates. A Risk Matrix shall be prepared and included in the DPR covering aspects like unplanned

delays in project implementation, R & R, etc, and also the environmental protection aspects of the

Project.

l) DATA REVIEW & VALIDATION:

The Consultant shall review and analyze the available hydro meteorological data, encompassing the

impact of upstream/downstream projects and perform the necessary work for up-gradation of the

hydrologic studies to establish the river flow series, the design floods, the sediment inflow and deposition

and other hydrologic parameters for design work. The Consultant shall formulate and deliver a suitable

software model in which future data updating can be made and used for forecasting daily/seasonal water

discharges.

m) CONSTRUCTION MATERIALS:

Consultant shall verify availability of various construction materials at locations indicated as well as

properties, characteristics and adequacy as indicated in the available documents and if necessary, suggest

suitable alternatives.

n) CONSTRUCTION SCHEDULE:-

A construction schedule using modern project management tools and analysis, showing schedules for

annual construction expenditures, covering the entire construction period, shall be prepared. The

construction and installation program for each package shall be developed on the basis of the detailed

study of all activities involved and of the construction techniques planned. These programs shall take into

consideration interface with other construction activities, access availability, anticipated Geological

conditions, normal construction efficiencies, meteorology and river regime, etc. The construction and

installation programs developed shall be made in Prima Vera/Microsoft Projects which shall incorporate all

contracting activities, supplies, civil works and equipment erection in such a way as to maintain

appropriate sequence. All these programs shall be computer based. Sufficient knowledge/hands on

training shall be provided to JKSPDC team of officials to use these programs.

Page 22: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

22 | P a g e

o) FLOOD MODERATION: -

Perform flood moderation studies, which besides other details shall include assessment of the cost of

flood moderation. This should also encompass designing a flood forecasting and flood warning system to

give adequate time for taking up all the possible precautionary measures in case of occurrence of heavy

floods, during the construction, and post Construction period.

p) R&R ISSUES: -

A detailed assessment of submergence of property, villages, roads, cultivation etc. and a suitable

rehabilitation and resettlement plan along with costing, inconsonance with EIA/EMP Plans, shall be

provided in the DPR as per relevant guidelines.

r) FINANCING MIX:-

The DPR shall include detailed financial model indicating the best financing mix. The model shall have

both options of “with or without mega power status.”

A. DPR SUBMISSION AND APPROVAL :

a. Between the DPR submission and bidding process there may be a break. In this case the

Consultant will be granted time extension with cost remaining neutral. In case the break is for

more than three months for the reasons not attributable to the consultant or beyond his

control, escalation @5% per annum shall be granted for the cost related to the Bid Process.

The time schedule for various mile stones shall be as under:

S. No. Activity Time (in days)

1 Letter of Award/ letter of intent T0

2. Submission of work plan and methodology with approval of Owner (JKSPDC).

T0 + 14

3. Submission of the review report on DPR & on additional surveys, investigations, tests required if any by the owner and/ or by the consultant.

To +21

4. completion of topographical surveys To + 28

5. Submission of Hydrology, Power Potential studies. T0 + 35

6. Submission of Draft DPR

T0 + 70

7. Submission of final DPR and RFQ. To + 90

8. Finalization of pre-qualification of tenderers and issue of RFP. To + 135

9. Clearances from IWT/ Forest/PCB and other statutory bodies To + 150

10. Completion of bidding process for procurement of EPC

contract and financial closure.

T0 + 180

(note:- No change in submission of DPR will be accepted).

a. Consultant shall ensure that the DPR is “bankable” and complete in all respects. Cost

Page 23: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

23 | P a g e

Structuring i.e. with or without access road

b. The DPR in draft form shall be submitted to office of the Chief Engineer, Civil Investigation &

Design Wing Bemina (Kashmir) JKSPDC. The Chief Engineer, Civil Investigation & Design Wing

Bemina (Kashmir) JKSPDC will review the draft DPR and after incorporating JKSPDC‟s comments,

the Consultant shall submit 5 bound hard copies of the final DPR along with two copies in soft

form.

c. The DPR shall be submitted by JKSPDC to IWT for its Clearance and the Consultant shall

provide all assistance required to obtain required clearances/ approvals, including drafting of

replies to queries raised by GSI/CWC/CEA/Indus Commission/PCB/ Forest and other statutory

bodies which shall include doing and redoing any calculations/ revision in proposals/ Drawings/

Designs etc as per their directive and deputing experts during the discussions with GSI/CEA /

CWC/Indus Commission/ PCB/ Forest and other statutory bodies. The Consultant shall also submit

the final revised DPR after their observations.

B. BIDDING DOCUMENT & PROCESS:

The Consultant will also prepare the bidding documents comprising of Request for Qualification& Request

for Proposal leading to award of EPC contract. The consultant shall assist the Chief Engineer, Civil

Investigation & Design Wing Bemina (Kashmir) JKSPDC through the entire bidding process up to the

selection of the EPC contractor and award of contract. Drafting/Preparation of Agreements documents for

the purpose shall be the responsibility of the Consultants. The consultant may draft the RFQ/RFP as a

concurrent activity with DPR preparation.

C. KNOWLEDGE SHARING & TRANSFER:

The Consultant shall also be required to share and transfer all requisite information and knowledge

regarding the project execution and all technical features including design layout, design features,

construction schedule, etc with the Chief Engineer, Civil Investigation & Design Wing Bemina (Kashmir)

JKSPDC and also the Project Management Supervision Consultant to be separately engaged by JKSPDC.A

5% of the total payment due to the consultant shall be retained up to the complete transfer of

knowledge to the Project Management Supervision Consultant.

2. COST OFFER:

The cost quoted should be all inclusive including taxes & duties, out of pocket expenses, boarding and lodging etc. Service tax may be indicated separately. The cost offer should separately indicate the cost for DPR review /Updation, topographical surveys and Bidding Process for EPC Contract in the following manner

S.No Module Basic

cost

Service

tax

Total

1. Review & Updation of DPR

Page 24: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

24 | P a g e

2. Conducting additional topographical survey/investigations

rates to be quoted as per given BOQ

3. Bidding Process including drafting of RFQ, RFP, and

assisting the Chief Engineer, Civil Investigation & Design

Wing (Kashmir) JKSPDC in procuring EPC contract

Total*

The total cost is all total inclusive of taxes, duties, out of pocket expenses, travelling, boarding, lodging,

visits to site, conducting meetings and making presentations with the owner and other concerned

authorities as may be required, etc. Nothing extra over this cost shall be paid by the owner.

Responsibilities of the Consultant:

1. Review/Updation of DPR

2. Preparation of Pre-Qualification Bid Documents for International competitive bidding conforming to CEA, MOP, GOI guidelines/ FIDIC documents (requirements of the Owner).

3. Evaluation of Pre-Qualification Bids received in response to RFQ.

4. Preparation of Detailed RFP Bid Documents conforming to CEA,CWC, MOP, GOI guidelines/ FIDIC documents(requirements of the Owner) using the data and other information available from DPR of RMU works of existing 9 MW MOHRA HYDRO ELECTRIC PROJECT formulated by JKSPDC.

5. Assisting the owner at all stages of the bidding process ,drafting of replies to bidders queries, carrying out necessary modifications to the bidding documents.

6. Techno-economic evaluation of bids received in response to RFP Bids and assisting the Chief

Engineer, Civil Investigation & Design Wing Bemina (Kashmir) in selection of EPC arrangement on turnkey basis. Presentation before the management committee/ Board of Directors of JKSPDC /Govt. of J&K/ other statutory bodies & authorities and follow-up action as per feedback from the owner.

7. Assisting in all documentations like Contract Agreements, Construction Schedules, Interface Schedules including signing of the various agreements.

8. Knowledge sharing & transfer.

9. Any other matter / issue related to above scope of services.

Signature of Bidder

2. SCHEDULE OF PAYMENTS UNDER THE CONTRACT Module I: Review & Updation of DPR S. No. Milestone % of fee (excluding cost on

account of topographical

surveys)

1 Commissioning advance against bank guarantee after issue of

Letter of Award.

10%

Page 25: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

25 | P a g e

2. Submission of work plan and methodology with approval of Owner (JKSPDC).

5%

3. Submission of the review report on DPR & on additional

surveys, investigations, tests required if any by the owner and/ or by the consultant.

10%

4. Completion of topographical surveys and sub-mission of survey

data.

As per BOQ for survey work.

5. Submission of Hydrology, Power Potential studies, Geological

surface mappings and layouts

15%

6. Submission of Draft DPR 20%

7. Submission of final DPR and RFQ. 20%

8. Clearances from IWT/ Forest/PCB and other statutory bodies 15%

9. Retention money for knowledge sharing and transfer 5%

Total ( Including taxes) 100%

Module II: Bid process for selection of an EPC contractor

S No Milestone % of Fee

1 Commissioning Advance against submission of Bank Guarantee 10%

2 Submission of RFQ documents conforming to current CWC/CEA guidelines based

on data of reviewed/available DPR and approval of owner. 10%

3 Evaluation of RFQ and acceptance by the Owner. 10 %

4 Submission of RFP documents conforming to current CWC/CEA guidelines based

on data of reviewed DPR and approval of owner. 10%

4 Techno-Economic Evaluation of bids received and assistance in selection through

EPC arrangement on turnkey basis 20%

5 Preparation of draft agreement and presentation before the management

committee/BOD of JKSPDC and incorporating feedback from the owner.. 15%

6 Execution of EPC Contract with the selected bidder for development of project on

approval of owner. 20%

7 Knowledge Sharing & transfer 5 %

Total (incl. taxes) 100%

Payment of 5% retained shall be released after sharing & transfer of knowledge to the owner & / or to

PMC if appointed by owner separately.

Signature of Bidder

Page 26: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

26 | P a g e

ANNEXURE III

FORMAT

FOR TECHNICAL BID

(Bid Data sheets)

FORM NO: 1-7 ___

Page 27: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

27 | P a g e

FORM NO: 1

FROM TO _________________________ CHIEF ENGINEER

_________________________ CIVIL INVEST. & DESIGN WING,Bemina ,

SRINAGAR KASHMIR

_________________________ PDC COMPLEX BEMINA.

Subject: Engagement of Consultant for review and Updation of D.P.R including assisting the Chief

Engineer, Civil Investigation & Design Wing (Kashmir) JKSPDC in competitive bidding at all stages to

procure EPC Contract for implementation of RMU works of existing 9 MW Mohra HEP in District Baramulla

J&K State.

Dear Sir,

I, on behalf of ___________________________________, a Consultancy Company

herewith enclose Technical Proposal for engagement of my/our Company as a Consultant for

review and updation of D.P.R including assisting the Chief Engineer, Civil Investigation & Design Wing

(Kashmir) JKSPDC in International competitive bidding at all stages to procure EPC Contract for

implementation of RMU works of existing 9 MW Mohra HEP in District Baramulla J&K State.

Yours faithfully,

1. Signature of the authorized signatory:________________________________

2. Name of the authorized signatory:____________________________________

3. Name of the company:

4. Seal of the company:______________________________________________

Page 28: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

28 | P a g e

FORM NO:-F-2

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, ________ [NAME] _____________certify that I am the _____ [DESIGNATION] of [NAME OF

THE COMPANY] established under the Companies Act 1956 who has signed the above tender/ bid is

authorized to sign bid on behalf of the Company by the authority of its governing body.

1. Signature of the authorized signatory:__________________________________

2. Name of the authorized signatory:______________________________________

3. Name of the company:_______________________________________________

4. Seal of the company:_________________________________________________

Page 29: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

29 | P a g e

FORM NO:-F-3

1. Brief description of the registered company

2. Assignments of similar nature successfully completed:

3. The Bidder Consultancy Company/ Organization should also give details of the ongoing similar assignments in the above format.

1. Signature of the authorize d signatory:_____________________________________

2. Name of the authorized signatory:_________________________________________

3. Name of the company:_________________________________________________

4. Seal of the company:___________________________________________________

Note: The applicant/bidder companies must attach documentary evidence in support of their

submissions above.

S. No. Name

Assignment

(Brief Scope)

Name of

project

Owner/

Sponsor

Cost of

assignment

Date of

commencement

Date of

completion

Was

assignment

satisfactorily

completed

1 2 3 4 5 6 7 8

Page 30: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

30 | P a g e

FORM NO:- F-4

WORK PLAN & TIME SCHEDULE

Consultant may furnish the work plan, time schedule of the key staff for the various activities and

methodology/approach involved in the assignment. The complete process is scheduled to be completed in

180 DAYS from the date of start under the contract.

1. Signature of the authorized signatory:_______________________________

2. Name of the authorized signatory:___________________________________

3. Name of the company:____________________________________________

4. Seal of the company:______________________________________________

Page 31: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

31 | P a g e

FORM NO: F-5 Composition of the team personnel and the task which would be assigned to each team member for the proposed assignment: (TECHNICAL / FINANCIAL/ LEGAL/ OTHER KEY MEMBERS OF THE TEAM FOR CARRYING OUT THE

ASSIGNMENT)

S. No

POSITION

NAME

QUALIFICA

TION

RELEVANT

EXPERIENCE

DURATION

OF PROPOSED

DEPLOYMENT

(DAYS)

AMOUNT

REMARKS

1

TEAM LEADER

(with Min. 25 Years

experience as Hydraulic

Engineer with a Min. of 10

Years experience in similar

assignments in Hydro Power

Sector)

2

CIVIL ENGINEERING EXPERT

(with Min. 20 Years experience

as Hydraulic Engineer with a

Min. of 7 years experience in

similar assignments in Hydro

Power Sector)

3

MECHANICAL ENGINEERING

EXPERT

(with Min. 20 years experience

as Mechanical Engineer & 7

years experience in hydro-

mechanical works in Hydro

Power Sector)

4

ELECTRICAL ENGINEERING

EXPERT

(with Min. 20 years experience

as electrical Engineer & 7

years experience in electro-

mechanical works in Hydro

Power Sector)

5 GEOLOGIST ENGINEERING

(with Minimum 25 years

experience as Engineering

Geologist and 7 years as

Engineering Geologist in Hydro

Power Sector)

6

PROCUREMENT EXPERT

(with Min. 15 Years

experience in similar

assignments in Hydro Power

Sector)

7

ANY OTHER EXPERT

PROPOSED BY THE

CONSULATANT

1. Signature of the authorized signatory:________________________ 2. Name of the authorized signatory:______________________________ 3. Name of the company: 4. Seal of the company:_____________________________________________

Page 32: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

32 | P a g e

Form F-6

SUGGESTED FORMAT OF CURRICULUM VITAE FOR MEMBERS OF

CONSULTANTS TEAM

1. Name: _________________________________________

2. Profession/ Present Designation:____________________

3. Length of service with the Company: _________________

4. Internationality: __________________________________

5. Academic Qualification:: ___________________________

(Under this heading, summarize College/ University and other specialized education of the

proposed team member, giving names of schools, colleges, professional institutions attended

with dates on which attended and degrees/ diplomas obtained. Use up to quarter page.)

6. Proposed Position on the Team for Transaction Advisor : ________________

7. Key Qualifications:_________________________________________________

(Under this heading give outline of proposed Team Members experience and training most

pertinent to assigned work on proposed team. Describe degree of responsibility held by staff

member on relevant previous assignments and give dates and locations. Use up to half-a-page)

8. Experience: ___________________________________________________________

(Under this heading, give the list of positions held by the proposed Team Member since

graduation, giving dates, names of employing organization, title of positions held and location

of assignments. For experience in last ten years also give types of activities performed and

Owner references, where appropriate. Use up to three quarters of a page) .

9. Language: ________________________________________________________(Indicate

proficiency in speaking, reading and writing of each language by „excellent‟, 'good' or 'poor').

1. Signature of the authorized signatory:__________________________

2. Name of the authorized signatory:______________________________

3. Name of the company:________________________________________

4. Seal of the company:_______________________________________________

Page 33: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

33 | P a g e

FORM NO. F-7

COMMENTS/SUGGESTIONS OF CONSULTANT

(On the terms of reference):

1. ________________________________________________________________

2. ________________________________________________________________

3. ________________________________________________________________

4. ________________________________________________________________

5. ________________________________________________________________

1. Signature of the authorized signatory:_______________________________

2. Name of the authorized signatory:___________________________________

3. Name of the company:____________________________________________

4. Seal of the company:______________________________________________

Page 34: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

34 | P a g e

Annexure IV

Format for

Financial proposal

(Bid Data forms)

Forms 8-9

Page 35: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

35 | P a g e

FORM NO: 8

FINANCIAL PROPOSAL

(To be submitted with Financial Offer in Second Envelope) FROM:

TO: ________________________________

_________________________ _ THE CHIEF ENGINEER

_________________________ CIVIL INVEST. & DESIGN WING,BEMINA

SRINAGAR KASHMIR

_________________________ _ PDC COMPLEX BEMINA.

Subject: Engagement of Consultant for revising and updation of D.P.R including assisting the Chief Engineer, Civil

Investigation & Design wing Bemina ( Kashmir) JKSPDC in International Competitive Bidding at all

stages to procure EPC Contract for implementation of RMU works of existing 9 MW Mohra HEP in

District Baramulla J&K State.

Sir,

I, on behalf of ___________________________________, a Consultancy Company herewith enclose

Financial Proposal for selection of my/our Company as a Consultant for Engagement of Consultant for

assisting the Chief Engineer, Civil Investigation & Design wing Bemina ( Kashmir) JKSPDC in International

Competitive Bidding at all stages to procure EPC Contract for implementation of RMU works of

existing 9 MW Mohra HEP in District Baramulla J&K State.

Yours faithfully,

1. Signature of the authorized signatory:________________________________

2. Name of the authorized signatory:____________________________________

3. Name of the company:_____________________________________________

4. Seal of the company:______________________________________________

Page 36: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

36 | P a g e

FORM NO. F-9

SCHEDULE OF PRICE BID

Note: 1. T

h

e

c

o

s

t

i

s

a

l

l inclusive including taxes & duties and Out of Pocket expenses

2. The prices shall remain FIRM till completion of the Assignment.

1. Signature of the authorized signatory:__________________________

2. Name of the authorized signatory:______________________________

3. Name of the company:_______________________________________

4. Seal of the company:_______________________________________

S.No Module Basic

cost

Service

tax

Total

1. Review & Updation of DPR

2. Conducting additional topographical

survey/investigations rates to be quoted as per

given BOQ

3. Bidding Process including drafting of RFQ, RFP,

and assisting the Chief Engineer, Civil

Investigation & Design Wing (Kashmir) JKSPDC in

procuring EPC contract

Total*

The total cost is all total inclusive of taxes, duties, out of pocket expenses,

travelling, boarding, lodging, visits to site, conducting meetings and

making presentations with the owner and other concerned authorities as

may be required, etc. Nothing extra over this cost shall be paid by the

owner.

Page 37: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

37 | P a g e

ANNEXURE-V

JKSPDC STANDARD GUIDELINES FOR

ENGAGEMENT OF CONSULTANTS

Page 38: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

38 | P a g e

Jammu & Kashmir State

Power Development Corporation Ltd.

Standard Guidelines for Engagement of Consultants by JKSPDC

1.0 Short Title and Commencement These Guidelines shall be called „The J&K State Power Development Corporation Limited

(JKSPDC) Engagement of Consultants Guidelines‟,

2.0 Definitions In these Guidelines, unless the context otherwise requires;

2.a Words or expressions used in these guidelines shall have the meaning respectively assigned to

them in the Jammu and Kashmir Electricity Act, Samvat 1997 or the Jammu and Kashmir

Electricity Duty Act, 1963 or the Jammu and Kashmir State Electricity Regulatory Commission Act,

2000;

2. b Commission‟ means the Jammu & Kashmir State Electricity Regulatory Commission constituted

under the J&K State Electricity Regulatory Commission Act, 2000;

2. c „Management Committee‟ means a Committee designated as Management Committee appointed

by the Board of Directors of JKSPDC;

2. d „Consultant‟ includes any individual, firm, company, body or association of persons, not in the

employment of the JKSPDC, who or which possesses or has access to any specialized knowledge,

experience or skill relevant for the work and functions of the Commission;

2. e „Material breach of Contract‟ shall include but not be limited to the instances enumerated

hereinafter in these guidelines and shall also include all such violations of the terms of the

Contract which cannot be described in ordinary parlance as trivia

2. f „Officer‟ means an officer of the JKSPDC.

3.0 Engagement of Consultants

3.a Could be engaged only for executing specialized tasks for which requisite skills are either not available within the staff of the JKSPDC or where the nature of job is specific and time bound.

3.b Consultant will not normally be engaged for routine day-to-day work of the JKSPDC, for which staff is available.

3.c The „Terms of Reference‟ (TOR) for the „Engagement of Consultants‟ for specific tasks will be

approved by the Management Committee of JKSPDC.

3.d The Management Committee of JKSPDC may decide either to invite combined technical and financial proposals, or separate technical and financial proposals.

Page 39: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

39 | P a g e

3.e The Management Committee of JKSPDC shall in each case stipulate the minimum qualifying marks for the technical bid.

3.f After approval of the TOR by the Management Committee of JKSPDC, the Managing Director will

cause the request for Proposals to be issued inviting proposals, and ensuring that appropriate publicity is given in each case, which shall normally be through advertisement, in at least two International newspapers.

3.g In addition, „Request For Proposal‟ may also be issued to a panel of Consultants of standing,

as approved by the JKSPDC or by the Central Electricity Authority (CEA) or by the Central Water Commission (CENTRAL WATER COMMISSION, GOI) or by the Central Electricity Regulatory Commission (CERC) or by the Ministry of Power, Government of India depending upon the context, from time to time.

4.0 Request for Proposals (RFP)

The request for proposal shall include the following:

4.a A letter of invitation stating the intention of the JKSPDC to enter into a contract for provision of a consulting services, the source of funds, the details of the plan and the date, time and address for submission of proposals. 4.b Information to consultants shall contain all necessary information that will help consultants

prepare responsive proposals by providing information on the evaluation process and by indicating the evaluation criteria and factors and their respective weights and the minimum pre-qualification score.

4.c Terms of reference (TOR) shall be prepared to define clearly the objectives, goals and scope

of the assignment and provide background information including a list of existing relevant studies and basic data to facilitate the consultant‟s preparation of their proposals. If transfer of knowledge, training is an objective, the TOR will detail the number of staff to be trained. TOR shall list the services and surveys necessary to carry out the assignment and the expected outputs (for example reports, data, surveys etc.) linked to each task in the TOR.

5.0 Receipt of Proposals

5.1 Enough time shall be allowed for the consultant to prepare and submit their proposals. While the time allowed shall depend on the assignment, it will normally not be less than two weeks, during which period firms may seek clarifications about the information provided in the TOR.

5.b The Board of Directors of JKSPDC/ Chief Engineer CI & D Wing Bemina Kashmir may decide to extend the deadline for submission of proposals, as deemed appropriate by it.

5.c No amendments to the technical or financial proposals shall be accepted after the deadline except before a Management Committee appointed by the Board of Directors of JKSPDC / Chief Engineer CI&D Wing Bemina Kashmir. The proposal shall be submitted in sealed cover. Where the Chief Engineer, CI & D Wing Bemina Kashmir prescribes the separate technical and financial proposals to be submitted, they shall be submitted in separate sealed envelopes.

Page 40: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

40 | P a g e

6.0 Single Source Selection

Single source selection shall be exercised only in exceptional cases where it is appropriate and represents

a clear advantage because the tasks represent a natural continuation of previous work carried out by the

Consultant or where a rapid selection is essential or for very small assignments where the fee payable

does not exceed Rs.1.00 lac in each case or where only one firm is qualified or has experience for the

assignment. For each single source selection, prior approval of the Board of Directors of JKSPDC/Chief

Engineer CI & D Wing Bemina Kashmir is required.

7.0 Selection of Individual Consultant

7.a Individual Consultant shall be employed for assignments for which team of personnel is not required, no additional outside (home office) professional support is required, and where the experience and qualifications of the individual are the paramount requirement.

7.b Individual Consultants shall be selected on the basis of their qualifications for the assignment. They may be selected on the basis of references, or through comparison of qualifications among those expressing interest in the assignment, or those who are approached directly by the Chief Engineer, CI & D Wing Bemina Kashmir JKSPDC. Evaluation shall be on the basis of academic background, relevant experience and appropriate technical knowledge, knowledge of local conditions, administrative systems and concerned organizations. For individual consultants the fee payable shall not exceed Rs. fifty thousands in each case.

8.0 Scope of Work

8.a The „Terms of Reference‟(TOR) would specify the exact nature of the tasks to be undertaken by the Consultant, the time allowed for completion of each task, the services and surveys necessary to carry out the assignment and the specific Outputs and deliverables that are to be provided by the Consultant in relation to each task.

8.b If transfer of knowledge, or training to staff is a task envisaged, then the TOR will list the details of staff to be trained.

8.c Detailed terms of engagement will be drawn up in each case and agreed to between the Consultant and the Chief Engineer CI & D Wing Bemina Kashmir. prior to award of Contract for consultancy. Contract shall incorporate on said details of engagement as far as possible as per „Model Contract at Schedule- I of these Guidelines.

9.0 Fees and Other Charges

9.a The Chief Engineer CI & D Wing Bemina Kashmir shall determine, based on the bids, the fees and other charges separately for each case, commensurate with the quantum of work involved and the level of professional expertise made available based on the bids.

9.b The amount determined shall be inclusive of all of the Consultant‟s costs and profits as well as any tax obligations (Income Tax, Service Tax and any other) of the Consultant.

Page 41: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

41 | P a g e

9.c Fees will be paid, subject to Chief Engineer CI & D Wing Bemina Kashmir‟s certificate of satisfaction, and statutory Tax Deduction at Source under relevant laws including the Income Tax Act 1961.

10.0 Conflict of Interest

10.a Consultant shall not be hired for any assignment that would be in conflict with their prior or current obligations to other Owners that may place them in a position of not being able to carry out the assignments objectively and impartially.

10.b The Consultant, or any entity affiliated with the Consultant, engaged by the Chief Engineer CI & D Wing Bemina Kashmir shall in no case represent or give opinion or advice to other

stakeholders in any matter which is adverse to the interest of the Chief Engineer CI & D Wing Bemina Kashmir. This would constitute a „Material Breach of Contract‟.

11. Obligations and Liability

11.a The Consultant‟s obligation shall be to provide the Services and Deliverables (agreed to and specified in the Contract at Schedules A, C and D respectively) to the Chief Engineer CI & D

Wing Bemina Kashmir within the time period provided in the Contract, except in the case of any „Force Majeure Events‟. Slippage in the Consultants‟ submission of Deliverables beyond a period of THIRTY days past the due date, shall constitute a „Material Breach of Contract‟.

11.b The Consultant‟s obligation shall be to provide the services (Schedule-C of the Contract) through the team of personnel stipulated therein (Schedule-B of the Contract) because the experience, qualification and Curriculum Vitae (CV) of the said personnel is fundamental to the technical evaluation of the bid, which is the basis for award of Contract. Change in team composition, task assignment, or person-day efforts contracted without written approval of the Chief Engineer CI & D Wing Bemina Kashmir shall constitute a Material Breach of Contract and no payment shall be made for any such breach of Contract for the concerned activity.

11.b The Chief Engineer CI & D Wing Bemina Kashmir may, in his discretion, terminate the Contract or a part thereof in the event of the Consultant failing to meet the aforesaid obligations. In case of such defaults the Chief Engineer CI & D Wing Bemina Kashmir shall be at liberty to get the work completed from any other agency at the „risk and cost‟ of the Consultant. Given that any such mid-term termination could entail higher costs than contracted, any enhanced costs would be covered by the „risk and cost‟ liability.

11.c „Force Majeure Events‟ shall include, without limitation, the following events to the extent that such events or their consequences qualify as per the standard set out above: i. any event beyond the reasonable control of the Consultant: natural disasters or other acts

of God; including earthquake, cyclone, flood, storm, war, terrorist attack, civil commotion or other similar occurrence

ii. any change in law including any legislation, sub-ordinate or delegated legislation, rules, regulation, directive, order, notification, exemption or any interpretation thereof duly issued/promulgated in exercise of lawful authority, after the date hereof adversely affecting the performance by the Consultants of its obligations hereunder, or

iii. Any event or circumstance of a nature analogous to any of the foregoing.

Page 42: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

42 | P a g e

12.0 Confidentiality

The Consultant, or any entity affiliated with the Consultant, shall not disclose to any unauthorized

person any information and/or data that may be supplied to him/her by the Chief Engineer CI &

D Wing Bemina Kashmir or by any other organization, under the directions of the JKSPDC/

Chief Engineer CI & D Wing Bemina Kashmir. All such documents shall be the property of

the JKSPDC/ Chief Engineer CI & D Wing Bemina Kashmir or any information that may

have come to his/her knowledge directly or indirectly by virtue of the assignment.

13.0 Intellectual Property Rights

13.a Where the Contract requires the Consultant to deliver reports or other materials (Deliverables) to the Chief Engineer CI & D Wing Bemina Kashmir the copyright in such Deliverables belong to the Chief Engineer CI & D Wing Bemina Kashmir.

13.b Without the express written consent of the Chief Engineer CI & D Wing Bemina Kashmir, a Consultant engaged by the Chief Engineer CI & D Wing Bemina Kashmir shall not utilize, publish, disclose, or part with any information collected for the Chief Engineer CI & D Wing Bemina Kashmir and shall be duty bound to hand over the entire record of the assignment to the Chief Engineer CI & D Wing Bemina Kashmir before the expiry of the Contract.

14.0 Duty of Care and Performance Standards

14.a The Consultant shall perform the services contracted with the highest standards of professional and ethical competence and integrity and shall furnish its independent professional opinion.

14.b The Consultant shall promptly replace without any cost to the Chief Engineer CI & D Wing Bemina Kashmir, any employee assigned under a contract awarded under these Guidelines that the Chief Engineer CI & D Wing Bemina Kashmir considers unsatisfactory. Any such replacement shall be with express approval of the Chief Engineer CI & D Wing Bemina Kashmir, and shall be by personnel of comparable qualifications and experience.

15.0 Termination of Contract

15.a The Chief Engineer CI & D Wing Bemina Kashmir may terminate a Contract to which these Guidelines apply if; 1. the Consultant commits any material or persistent breach of Contract (which, in the

case of a breach capable of remedy, is not remedied within the period specified in the notice after receipt of notice of material breach of contract by consultant) ; or

2. the Consultant becomes insolvent; or 3. The Chief Engineer CI & D Wing Bemina Kashmir exercises its discretion to terminate

services under Article-11 of these guidelines.

15.b Termination shall be effected by written notice served on the Consultant and will take effect on any date as far as possible, not less than seven days from the date of delivery of such notice.

Page 43: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

43 | P a g e

15.c The termination will be, without prejudice to either party‟s rights accrued before termination as per the Contract, but subject to Chief Engineer CI & D Wing Bemina Kashmir‟s certificate of satisfaction with Deliverables submitted before termination.

16.0 Dispute Resolution

In case of any differences or disputes between the parties arising out of contracted agreement, it

shall be referred for arbitration to a person nominated by the Chief Engineer CI & D Wing

Bemina Kashmir. The proceedings shall be subject to the Jammu & Kashmir Arbitration and

Conciliation Act, as amended from time to time. Jurisdiction of J&K Courts will apply.

17.0 Power to Remove Difficulties

If any difficulty arises in giving effect to any of the provisions of these Guidelines, the Chief

Engineer CI & D Wing Bemina Kashmir may, by general or special order, do anything, not

being inconsistent with the provisions of the relevant Jammu & Kashmir Government regulations

which appears to it to be necessary or expedient for the purpose of removing the difficulties.

Jurisdiction of J&K courts shall apply.

18.0 Saving of Inherent Power of JKSPDC

Nothing in these provisions shall bar the Chief Engineer CI & D Wing Bemina Kashmir from

adopting a procedure which is at variance with any of the provisions of these Guidelines, if the

Chief Engineer CI & D Wing Bemina Kashmir, in view of the special circumstances of the

matter or class of matters, and for reasons to be recorded in writing, deems it necessary or

expedient to depart from the procedure stipulated in these Guidelines.

19.0 General Power to Amend

The Chief Engineer CI & D Wing Bemina Kashmir may, at any time and on such terms as it

may deem fit, amend any of these Guidelines for the purpose of meeting the objectives with which

these Guidelines have been framed.

Page 44: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

44 | P a g e

ANNEXURE-VI

PROPOSED CONTRACT

FOR

PROVIDING OF CONSULTANCY SERVICE

Page 45: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

45 | P a g e

ANNEXURE-VI PROPOSED CONTRACT FOR CONSULTANCY SERVICES

This CONTRACT (hereinafter, together with all Appendices attached hereto and forming an integral part hereof, called the "Contract") is made the---------. day of the ---------month of, 2011, between, on the

one hand Chief Engineer CI & D Wing Bemina Kashmir. (JKSPDC)(Hereinafter called the

"Owner") and, on the other hand,................. (Here in after called the “Consultant").

WHEREAS:-

Chief Engineer CI & D Wing Bemina Kashmir, in order to augment and improve the hydro

power generation in the state and to reduce the demand-supply gap of the state, desires the implementation of RMU works of existing 9 MW Mohra HEP in District Baramulla J&K State.

For the above purpose, the Chief Engineer CI & D Wing Bemina Kashmir is intending to

engage the services of reputed consultants/ consulting organizations for:

a. Review and updation of D.P.R b. Preparation of pre-qualification (RFQ) bid documents conforming to CEA, CWC, MOP,

GOI guidelines/ Standard FIDIC documents (as per the requirement of Owner) and evaluation thereof for selection of technically responsive bidders for the EPC Contract through an International competitive bidding process.

c. Preparation of “REQUEST FOR PRPOSALS (RFP)”- Bid Documents conforming to CEA,

CWC, MOP, GOI guidelines/Standard FIDIC documents (as per the requirement of Owner) using the DPR for RMU works of existing 9 MW Mohra HYDRO ELECTRIC PROJECT IN

DISTRICT Baramulla, JAMMU & KASHMIR STATE .

d. Assisting Chief Engineer CI & D Wing Bemina Kashmir in bidding process at all

stages including techno-economic evaluation of bids received for procurement of the EPC Contract for implementation of RMU works of existing 9 MW Mohra HEP in District Baramulla J&K State. And WHEREAS:

The Consultant, have represented to Chief Engineer CI & D Wing Bemina Kashmir,

the Owner that they have the required professional skills, expert personnel backed up with the technical and financial resources required to provide the Services on the terms and conditions set forth in this Contract; And

Chief Engineer CI & D Wing Bemina Kashmir, the Owner, based on the offer of the

Consultant, to the effect that the Consultants have the required professional skills, expert personnel and technical and financial resources to provide the above cited Services required for the successful completion of the assignment as defined hereinafter (hereinafter called the "Services");

Page 46: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

46 | P a g e

NOW THEREFORE the parties hereto hereby agree as follows:

1. GENERAL PROVISIONS 1.1. Definitions

Unless the context otherwise requires, the following terms whenever used in this Contract have the following meanings:

(a) "Applicable Law" means the laws and any other instruments having the force of law in the State of J&K, as they may be issued and in force from time to time; (b) "Contract" means this Contract together with all Appendices/Attachments and including

all modifications made, in accordance with the provisions of Clauses 2.6 hereof between the owner and the Consultants.

(c) "Effective Date" means the date on which this Contract comes into force and effect pursuant to Clause 2.1 hereof; (d) "Personnel" means persons hired by the Consultants or by any Sub- consultant

as employees and assigned to the performance of the Services or any part hired had their domicile outside the Government's country; and "Local

Personnel" means such persons who at the time of being so hired had their domicile inside the Government's country;

(e) “Party” means the Owner or the Consultants as the case may be: (f) “Project” means providing of Consultancy Services as a Consultant for review/updation of

existing Detailed Project Report (DPR), framing of Bid Documents for International

Competitive Bidding and assisting Chief Engineer CI & D Wing Bemina Kashmir (JKSPDC) at all stages of the Bidding Process to procure an EPC Contract

for implementation of RMU works of existing 9 MW Mohra HEP in District Baramulla J&K State.

(g) "Services" means the work to be performed by the Consultants pursuant to this Contract for the purposes of the Project, as described in Appendix A hereto;

(h) “Starting Date” means the date referred to in Clause 2.3 hereto. (i) "Sub consultant" means any entity to which the Consultants subcontract any part of the

Services in accordance with the provisions of Clause 3.5 hereinafter; and

(j) "Third Party" means any person or entity other than the Chief Engineer CI & D Wing Bemina Kashmir, the Owner and the Consultants or a Consultant.

1.2. Relation between the parties

Nothing contained herein shall be construed as establishing a relation of master and servant or of

agent and principal as between Chief Engineer CI & D Wing Bemina Kashmir, the

Owner and the Consultants. The Consultant/s, subject to this Contract, have complete charge of personnel performing the Services and shall be fully responsible for the Services performed by them or on their behalf hereunder.

1.3. Law Governing Contract

This Contract, its meaning and interpretation, and the relation between the parties shall be governed by the Applicable Law prevailing in the J&K State.

Page 47: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

47 | P a g e

1.4. Language

This Contract has been executed in the English language, which shall be the binding and controlling language for all matters relating to the meaning or interpretation of this Contract.

1.5. Headings

The headings shall not limit, alter or affect the meaning of this Contract. 1.6. Notices 1.6.1 Any notice, request or consent required or permitted to be given or made pursuant to this

Contract shall be in writing. Any such notice, request or consent shall be deemed to have been given or made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram or facsimile to such Party at the following address:

For the Owner: ________________

________________ Attention: Post: Telegram: Fax: Email:

For the Consultants: _________________

_______________ Attention: Post: Telegram: Fax: Email:

1.6.2 Notice will be deemed to be effective as follows:

a. India Postage Service Mail or by Courier: On delivery b. India Postage Telegram: Seventy Two (72) hours following confirmed Transmission C. Fax: Seventy Two hours. d. Email: Seventy Two hours.

1.6.3 A Party may change its address for notice hereunder by giving the other Party notice of such

change pursuant to this Clause.

1.7 Location

The Services shall be performed in J&K State or at any other location desired by the Chief Engineer CI & D Wing Bemina Kashmir, the owner and, where the location of a particular

task is not so specified, at such locations, as the JKSPDC, the Owner may approve.

Page 48: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

48 | P a g e

1.8 Authority of Member in Charge

The Consultant may authorize any individual to act as the Team Leader on their behalf in exercising the entire Consultants' rights and obligations towards the Owner under this Contract, including without limitation the receiving of instructions and payments from the Owner.

1.9 Authorized Representative Any action required or permitted to be taken, and any document required or permitted to be executed under this Contract, may be taken or executed:

(a) on behalf of the Owner by____________________ or his designated representative;

(b) on behalf of the Consultants by________________or his designated representative.

1.20 Taxes and Duties

The consultants and the personnel shall pay the taxes, duties; fees, levies and other impositions levied under the existing, amended or enacted laws during life of this contract and the Owner shall perform such duties in regard to the deduction of such tax as may be lawfully imposed.

2. COMMENCEMENT, COMPLETION, MODIFICATION AND TERMINATION OF CONTRACT Effectiveness of Contract:

This Contract shall come into force and effect on the date (the "Effective Date") of the Owner's notice to the Consultants confirming that the following conditions have been met:

(a) This Contract has been approved by the Chief Engineer CI & D Wing Bemina Kashmir, the Owner.

(b) Requisite Contract Performance Bank Guarantee in the prescribed format has been submitted by the Consultant.

2.1 Termination of Contract for failure to become Effective:

If this Contract has not become effective within fourteen (14) days of the date hereof, either Party may, by not less than THREE (3) weeks' written notice to the other Party, declare this Contract to be null and void, and in the event of such a declaration by either Party, neither Party shall have any claim against the other Party with respect hereto.

2.2 Commencement of Services:

The Consultants shall begin carrying out the Services immediately viz. from the date of issue of

LOI/ Letter of Award OR such date as communicated by the Chief Engineer CI & D Wing Bemina Kashmir, the Owner in the notice to proceed whichever is later.

Page 49: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

49 | P a g e

2.3 Expiration of Contract:

Unless terminated earlier pursuant to Clause 2.9 hereof, this Contract shall terminate' when, pursuant to the provisions hereof, the Services have been completed and the payments on account of remuneration and reimbursable expenditures have been mad

2.4 Entire Agreement:

This Contract contains all covenants, stipulations and provisions agreed by the Parties. No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.

2.5 Modification:

Modification of the terms and conditions of this Contract, including any modification of the scope of the Services, may only be made by written agreement between the Parties and shall not be effective until the consent of the parties has been obtained. Pursuant to Clause 7.2 hereof, however, each Party shall give due consideration to any proposals for modification made by the other Party.

2.6 Force Majeure: 2.7 Definition

(a) For the purposes of this Contract, "Force Majeure" means an event which is beyond the reasonable control of a Party, and which makes a Party's performance of its obligations hereunder impossible or so impractical as reasonably to be considered impossible in the circumstances, and includes, war, riots, civil disorder, earthquake, fire, explosion, storm, flood or other adverse weather conditions, strikes, lockouts or other industrial action (except where such strikes, lockouts or other industrial action are within the power of the Party invoking Force Majeure to prevent), confiscation or any other action by government agencies.

(b) Force Majeure shall not include

Any event which is caused by the negligence or intentional action of a Party or such Party's Sub-consultants or agents or employees nor any event which a diligent Party could reasonably have been expected to both (i) take into account at the time of the conclusion of this Contract, and (ii) avoid or overcome in the carrying out of its obligations hereunder.

2.7.1 No Breach of Contract:

The failure of a Party to fulfill any of its obligations hereunder shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event has taken all reasonable precautions, due care and reasonable alternative measures, all with the objective of carrying out the terms and conditions of this Contract.

Page 50: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

50 | P a g e

2.7.2 Measures to be taken:

(a) A Party affected by an event of Force Majeure shall take all reasonable measures to remove such Party's inability to fulfill its obligations hereunder with a minimum of delay.

(b) A Party affected by an event of Force Majeure shall notify the other Party of such event as

soon as possible, and in any event not later than fourteen (14) days following the occurrence of such event, providing evidence of the nature and cause of such event, and shall similarly give notice of the restoration of normal conditions as soon as possible.

(C ) The Parties shall take all reasonable measures to minimize the consequences of any event

of Force Majeure.

2.7.3 Extension of Time:

Any period within which a Party shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure

2.7.4 Consultation:

Not later than thirty (30) days after the Consultants, as the result of an event of Force Majeure, have become unable to perform a material portion of the Services, the Parties shall consult with each other with a view to agreeing on appropriate measures to be taken in the circumstances.

2.8. Suspension:

The Owner may, by written notice of suspension to the Consultants, suspend all payments to the `Consultants hereunder if the Consultants fail to perform any of their obligations under this Contract, including the carrying out of the Services, provided that such notice of suspension:- (i) shall specify the nature of the failure, and (ii) shall request the Consultants to remedy such failure within a period not exceeding three

weeks after receipt by the Consultants of such notice of suspension and shall invoke contract performance guarantee.

2.9 Termination:

2.9.1. By the Owner: The Owner may, by not less than three (03) weeks' written notice of termination to the Consultants (except in the event listed in paragraph (f) below, for which there shall be a written notice of not less than fifteen (15) days), such notice to be given after the occurrence of any of the events specified in paragraphs (a)- through (f) of this Clause 2.9.1, terminate this Contract:

(a) If the Consultants fails to remedy a failure in the performance of their obligations hereunder, as specified in a notice of suspension pursuant to Clause 2.8 herein above, within three (03) week‟s of receipt of such notice of suspension or within such further period as the Owner may have subsequently approved in writing;

Page 51: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

51 | P a g e

(b) If the Consultants become insolvent or bankrupt or enter into any agreements with their creditors for relief of debit or take advantage of any law for the benefit of debtors or

go into liquidation or receivership whether compulsory or voluntary;

( C) If the Consultants fail to comply with any final decision reached as a result of arbitration proceedings pursuant to Clause 8 hereof;

(d) If the Consultants submit to the owner a statement which has a material effect on the rights, obligations or interests of the Owner and which the Consultants know to be false;

(e) If, as the result of Force Majeure, the Consultants are unable to perform a material portion of the Services for a period of not less than fifteen days (15) days; or

(f) If the Owner, in its sole discretion and for any reason whatsoever, decides to terminate this Contract.

2.9.2. Cessation of Rights and Obligations:

Upon termination of this Contract pursuant to Clauses 2.2 or 2.9 hereof, or upon expiration of this Contract pursuant to Clause 2.4 hereof, all rights and obligations of the Parties hereunder shall cease, except

(a) Such rights and obligations as may have accrued on the date of termination or expiration,

(b) The obligation of confidentiality set forth in clause 3.2 hereof,

© Any right which a Party may have under the applicable law

2.9.3 Cessation of Services:

Upon termination of this Contract by notice to pursuant to Clauses 2.9 hereof, the Consultants shall, immediately upon dispatch or receipt of such notice, take all necessary steps to bring the Services to a close in a prompt and orderly manner and shall make every reasonable effort to keep expenditures for this purpose to a minimum.

2.9.4. Payment upon Termination:

Upon termination of this Contract pursuant to Clauses 2.9 hereof, the 'Owner shall make the following payments to the Consultants:

(a) Remuneration pursuant to Clause 6 hereof for Services satisfactorily performed prior to the effective date of termination:

(b) Reimbursable expenditures pursuant to Clause 6 hereof for expenditures actually incurred prior to the effective date of termination; and

(c) Except in the case of termination pursuant to paragraphs (a) through (d) of Clause 2.9 hereof, reimbursement of any reasonable cost incident to the prompt and orderly termination of the Contract including the cost of the return travel of the Consultants' personnel and their eligible dependents

Page 52: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

52 | P a g e

3.0 OBLIGATIONS OF THE CONSULTANTS

3.1 General 3.1.1 Standard of Performance

The Consultants shall perform the Services and carry out their obligations hereunder with all due diligence, efficiency and economy, in accordance with generally accepted techniques and practices used with professional engineering and consulting standards recognized by professional bodies, and shall observe sound management, and technical and engineering practices, and employ appropriate advanced technology and safe and effective equipment, machinery, materials and methods. The Consultants shall always act, in respect of any matter relating to this Contract or to the Services, as faithful advisers to the Owner, and shall at all times support and safeguard the Owner's legitimate interests .

3.1.2 Law Governing Services

The Consultants shall perform the Services in accordance with the Applicable Law prevailing in the State of J&K and shall take all practicable steps to ensure that any Sub-consultants, as well as the Personnel and agents of the Consultants and any Sub consultants, comply with the Applicable Law prevailing in the State of J&K.

3.1.3 Conflict of Interest

The consultant shall hold the Owner's interest paramount, without any consideration for future work, and strictly avoid conflict with other assignments or their corporate interests.

3.2 Consultants not to benefit from Commission, Discounts etc.

The payment of the Consultant shall constitute the Consultant's only payment in connection with this Contract or the Services, and the Consultant shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Consultant shall use their best efforts to ensure that the Personnel, any Sub-Consultants, and agents of either of them similarly shall not receive any such additional payment.

3.2.1 Consultants and Affiliates not to be otherwise interested in Project

The Consultant agrees that, during the term of this Contract and after its termination, the Consultant and any entity affiliated with the Consultant, as well as any Sub-Consultants and any entity affiliated with such Sub- Consultants, shall be disqualified from providing goods, works or services (other than consulting services) resulting from or directly related to the Consultant's Services for the preparation or implementation of the project.

3.2.2 Prohibition of Conflicting Activities: The Consultant shall not engage, and shall cause their Personnel as well as their Sub Consultants and their Personnel not to engage, either directly or indirectly, in any business or professional activities which would conflict with the activities assigned to them under this Contract.

Page 53: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

53 | P a g e

3.2.3 Confidentiality:

The Consultants, their Sub-consultants and the Personnel of either of them shall not, either during the term or within two (2) years after the expiration of this Contract, disclose any proprietary or confidential information relating to the Project, the Services, this Contract or the Owner's business or operations without the prior written consent of the Owner. 3.3 Insurance to be taken out by the Consultant:

The Consultant (a) shall take out and maintain, and shall cause any Sub-Consultants to take out and maintain, at their (or the Sub-Consultants', as the case may be) own cost but on terms and conditions approved by the Owner, insurance against the risks, and for the coverage, as shall be specified in the SC; and (b) at the Owner's request, shall provide evidence to the Owner showing that such insurance has been taken out and maintained and that the current premiums have been paid.

3.4 Liability of the Consultants

The Consultants shall be liable to the Owner for the performance of the Services in accordance with the provisions of this Contract. If the Consultants consist of more than one entity, then the Consultants and each of their members shall be jointly and severally liable to the Owner for the performance of the Services and for any loss suffered by the Owner as a result of a fault of the Consultants in such performance, subject to the following limitations: a. The Consultants shall not be liable for any damage or injury caused by or arising out of the

act, neglect, fault or omission of any persons other than the Consultants, its Sub-consultants or the personnel of either of them; and

b. The Consultants shall not be liable for any loss or damage caused by or arising out of circumstances over which the Consultants had no control. c. In the event that the Consultant is in default of his duties in performance of the services as

envisaged in the Contract Agreement, the Consultant shall redo, rectify all deficits, inadequacies, insufficiencies pointed out by Owner and authorities before whom the report(s) is submitted within a period of 15 days from the date on which such defects, deficits etc have been communicated to the consultant verbally or in writing as the case may be.

3.5 Indemnification of the Owner by the Consultants

The Consultants shall keep the Owner, both during and after the term of this Contract, fully and effectively indemnified against all losses, damage, injuries, deaths, expenses, actions, proceedings, demands, costs and claims, including, but not limited to, legal fees and expenses, suffered by the Owner or any Third Party, where such loss, damage, injury or death is the result of a wrongful action, negligence or breach of Contract of the Consultants or their Sub-consultants; or the Personnel or agents of either of them, including the use or violation of any copyright work or literary property or patented invention, article or appliance.

3.6 Consultants Actions Requiring Owner‟s Prior Approval:

The Consultants shall obtain the Owner's prior approval in writing before taking any of the following actions: (a) Appointing Personnel to carry out any part of the Services, including the terms and conditions

of such appointment; (b) Entering into a subcontract for the performance of any part of the Services, it being

understood:

Page 54: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

54 | P a g e

1. That the selection of the Sub-consultant and the terms and conditions of the

subcontract shall have been approved in writing by the Owner prior to the execution of the subcontract, and

2. That the Consultants shall remain fully liable for the performance of the Services by the Sub-consultant and its Personnel pursuant to this Contract;

3.7 Reporting Obligations: The Consultants shall submit to the Owner the reports and documents specified in Appendix B hereto, in the form, in the numbers and within the time periods set forth in the said Appendix, including any supporting data required by the Owner 3.8 Documents Prepared by the Consultants to Be the Property of the Owner

All plans, drawings, specifications, designs, reports and other documents prepared by the Consultants in performing the Services shall become and remain the property of the Owner, and the Consultants shall, not later than upon termination or expiration of this Contract, deliver all such documents to the Owner, together with a detailed inventory thereof. The Consultants may retain a copy of such documents but shall not use them for purposes unrelated to this Contract without the prior written approval of the Owner.

4.0 CONSULTANTS' PERSONNEL

4.1 General

The Consultants shall employ and provide such qualified and experienced Personnel as are required to carry out the Services

4.2 Description of Personnel

(a) The titles, agreed job descriptions, minimum qualifications and estimated periods of engagement in the carrying out of the Services of each of the Consultants' Personnel are described in Appendix C.

(b) If required to comply with the provisions of Clause 3.1.1 of this Contract, adjustments with respect to the estimated periods of engagement of Personnel set forth in Appendix C may be made by the Consultants by written notice to the Owner, provided:

1. That such adjustments shall not alter the originally estimated period of engagement of

any individual by more than 10% or one week, whichever is lesser, and 2. That the aggregate of such adjustments shall not cause payments under this Contract to

exceed the ceilings set forth in Clause 6.2 of this Contract. Any other such adjustments shall only be made with the Owner's written approval.

(c) If additional work is required beyond the scope of the Services specified in Appendix A, the estimated periods of engagement of personnel set forth in Appendix C may be increased by agreement in writing between the Owner and the Consultants, provided that any such increase shall not, except as otherwise agreed, cause payments under this Contract to exceed the ceilings set forth in Clause 6 of this Contract.

Page 55: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

55 | P a g e

4.3 Agreed Personnel

The Consultant hereby agrees to engage the personnel and sub-consultants listed by title as well as by name in Appendix C in order to fulfill his contractual obligations under this contract.

4.4 Removal and/or Replacement of Personnel

(a) Except as the Owner may otherwise agree, no changes shall be made in the Personnel. If, for any reason beyond the reasonable control of the Consultants, it becomes necessary to replace any of the personnel, the Consultants shall forthwith provide as a replacement a person of equivalent or better qualifications.

(b) If the Owner

(1) Finds that any of the Personnel has committed serious misconduct or has been charged with having committed a criminal action, or

(2) Has reasonable cause to be dissatisfied with the performance of any of the personnel, then the Consultants shall, at the Owner's written request specifying the grounds there for, forthwith provide as a replacement a person with qualifications and experience acceptable to the Owner.

(c) Any of the Personnel provided as a replacement under Clauses (a) and (b) above, the rate of remuneration applicable to such person as well as any reimbursable expenditures (including expenditures due to the number of eligible dependents) the Consultants may wish to claim as a result of such replacement, shall be subject to the prior written approval by the Owner. Except as the Owner may otherwise agree,

(1) The Consultants shall bear all additional travel and other costs arising out of or

incidental to any removal and/or replacement, and (2) The remuneration to be paid for any of the Personnel provided as a replacement

shall not exceed the remuneration which would have been payable to the personnel replaced.

5.0 Obligations of the Owner: 5.1 Payment

In consideration of the Services performed by the Consultants under this Contract, the Owner shall make to the Consultants such payments and in such manner as is provided by Clause 6 of this contract.

5.2 Services and Facilities The Owner shall make available free of charge to the Consultant the Services and Facilities listed under Appendix D. 6.0 SCHEDULES FOR DELIVERY OF SERVICES & Payment to the Consultants:

Page 56: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

56 | P a g e

6.1 SCHEDULES FOR DELIVERY OF SERVICES: The time schedule and the time duration during which the Consultant shall be obliged to deliver the services shall be here under:

S.

No.

Activity Time (in

days)

1 Letter of Award/ letter of intent T 0

2. Submission of work plan and methodology with approval of Owner (JKSPDC). T 0 + 14

3. Submission of the review report on DPR & on additional surveys, investigations, tests required if any by the owner and/ or by the consultant.

T0 +21

4. completion of topographical surveys T 0 + 28

5. Submission of Hydrology, Power Potential studies. T 0 + 35

6. Submission of Draft DPR

T 0 + 70

7. Submission of final DPR and RFQ. T0 + 90

8. Finalization of pre-qualification of tenderers and issue of RFP. T0 + 135

9. Clearances from IWT/ Forest/PCB and other statutory bodies T0 + 150

10. Completion of bidding process for procurement of EPC contract and financial

closure.

T 0 + 180

6.2 SCHEDULE & Mode of Payment;

Module I: Review & Updation of DPR S.

No.

Milestone % of fee (excluding cost on

account of topographical

surveys)

1 Commissioning advance against bank guarantee after issue of Letter

of Award.

10%

2. Submission of work plan and methodology with approval of Owner

(JKSPDC).

5%

3. Submission of the review report on DPR & on additional surveys, investigations, tests required if any by the owner and/ or by the

consultant.

10%

4. Completion of topographical surveys and sub-mission of survey data. As per BOQ for survey work.

5. Submission of Hydrology, Power Potential studies, Geological surface

mappings and layouts

15%

6. Submission of Draft DPR 20%

7. Submission of final DPR and RFQ. 20%

8. Clearances from IWT/ Forest/PCB and other statutory bodies 15%

9. Retention money for knowledge sharing and transfer 5%

Total ( Including taxes) 100%

Module II: Bid process for selection of an EPC contractor

Page 57: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

57 | P a g e

S No Milestone % of Fee

1 Commissioning Advance against submission of Bank Guarantee 10%

2 Submission of RFQ documents conforming to current CWC/CEA

guidelines based on data of reviewed/available DPR and approval

of owner.

10%

3 Evaluation of RFQ and acceptance by the Owner. 10 %

4 Submission of RfP documents conforming to current CWC/CEA

guidelines based on data of reviewed DPR and approval of owner. 10%

4 Techno-Economic evaluation of bids received and assistance in

selection through EPC arrangement on turnkey basis 20%

5 Preparation of draft agreement and Presentation before the

management committee/BOD of JKSPDC and incorporating

feedback from the owner..

15%

6 Execution of EPC Contract with the selected bidder for

development of project on approval of owner. 20%

7 Knowledge Sharing & transfer 5 %

Total (incl. taxes) 100%

Payment of 5% retained shall be released after sharing & transfer of knowledge to the owner & / or to PMC if

appointed by owner separately.

6.3 The Consultant shall submit the bills in triplicate to the Owner on Consultants‟ printed bill forms

indicating the work done by him during the period for which payment is sought. 6.4 The Owner shall cause the payment of the Consultants as per above given in schedule of payment

above within forty five (45) days after the receipt of bills by the Owner with supporting documents. But if the progress is not satisfactory and according to agreed work program/schedule the payment may be withheld.

6.5 The final payment under this Clause shall be made only after satisfactory completion of the

activities mentioned in the TOR. 6.6 All payments under this Contract shall be made to the account of the Consultants with: [NAME OF BANK] 7.0 Fairness and Good Faith: 7.1 Good Faith:

The Parties undertake to act in good faith with respect to each other's rights under this Contract and to adopt all reasonable measures to ensure the realization of the objectives of this Contract.

Page 58: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

58 | P a g e

7.2 Operation of the Contract: The parties recognize that it is impractical in this Contract to provide for every contingency which may arise during the life of the Contract, and the Parties hereby agree that it is their intention that this Contract shall operate fairly as between them, and without detriment to the interest of either of them, and that, if during the term of this Contract either party believes that this Contract is operating unfairly, the Parties will use their best efforts to agree on such action as may be necessary to remove the cause or causes of such unfairness, but no failure to agree on any action pursuant to this Clause shall give rise to a dispute subject to arbitration in accordance with Clause 8 hereof.

8.0 SETTLEMENT OF DISPUTES 8.1 Amicable Settlement The parties shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or the interpretation thereof. Any dispute between the parties as to matters arising pursuant to this Contract which cannot be settled amicably shall be resolved as per the J&K Arbitration & Conciliation Act, 1997 as amended from time to time. Jurisdiction of J&K Courts will apply.

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.

For and on behalf of (Owner) Witness: By_____________________ 1. Authorised Representative 2. For and On Behalf of (Consultants) Witness: By_____________________ 1. Authorised Representative 2.

LIST OF APPENDICES TO FORM PART OF THE CONTRACT

Description of the Services Detailed descriptions of the Services to be provided; dates for completion of various tasks; place of performance for different tasks; specific tasks to be approved by Owner; etc.

Reporting requirements Format, frequency and contents of reports; persons to receive them; dates of submission; etc.

Consultants' Personnel Titles and names (if already available), detailed job descriptions and minimum qualifications of Personnel to be assigned to work and man-months for each.

Duties of the Owner Service, facilities and properties to be made available to the consultants by the owner.

Cost of Services

Page 59: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

59 | P a g e

ANNEXURE VII

LIST OF DEVIATIONS

PROFORMA FOR EXCEPTIONS AND DEVIATIONS

The bidder is required to stipulate the list of Exceptions and Deviations of RFP document, if any, in the

Performa given below:

S. No. Description Reference Exception / Deviation desired

Signature of Bidder

Page 60: JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED › tender_files › 2012 › Karnah › Tender... · The J&K State Power Development Corporation Limited RMU works of

60 | P a g e

ANNEXURE VIII

CHECK LIST

Bidder shall complete this checklist and submit the same along with proposal document. Checklist only

covers certain important items required for evaluation of proposal. It has been enclosed to ensure that

applicant has submitted all the necessary data / information as called for in the RFP document.

Please write Yes or No for ensuring compliance.

1. Mode of participation

As single bidder

1. Whether the proposal document is in English language? 2. Whether requisite earnest money in appropriate form has been enclosed? 3. Has the proposal document been submitted in three sets? 4. Whether following documents have been submitted?

Exceptions and deviations sheet (Annex-I).

Experience of team (Annex-III)

5. Whether price bid has been placed in separate sealed envelope? 6. Whether three sealed envelopes of Bid have been placed in a sealed packet? 7. Whether a list of documents, data, brochures etc. submitted in support of the claims mentioned in the

proposal document has been enclosed? 8. Whether each page of the proposal document has been signed by the authorized signatory?

Signature of Bidder