jan. 17. - 18., 2008 risk management eckhard hinrichsen, glo mexico

11
Jan. 17. - 1 8., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

Upload: francis-taylor

Post on 05-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

Jan. 17. - 18., 2008

Risk ManagementEckhard Hinrichsen, GLO Mexico

Page 2: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 2

Contents

1. Risk Management Services

2. Clients, References

Page 3: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 3

• Risk Analysis, Quantitative or Qualitative

• HAZOP (Facilitating or “Part of Team”)

• “What if”, FMECA Analyses, LOPA, SIL Studies

• Environmental Risk Analysis

• AIM / RBI / RCM / RBM

• Training Courses

Risk Management ServicesGLO Mexico

Page 4: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 4

Risk ManagementRequirements:SEMARNAT (Mexican Environmental Agency)

•Requires that all Industrial Installations perform a Risk Analysis, to be updated at least every 5 years.

•Issues a Guideline for how to perform the Risk Analysis and how to select the type (probabilistic, deterministic, ..), depending the size and type of the Installation.

CRE (e.g. LNG Terminals)

PEMEX, Multinationals

•Internal Procedures and Guidelines, NRF’s

International Codes and Standards

•API’s, IEC, OSHAS, NFPA, ..

Page 5: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 5

Risk ManagementTools:• “RISK”

In-house development, integrated tool for to facilitate Risk Analysis as per PEMEX requirements.

• Fault Tree Manager

• PHAST

Consequence Analysis, dispersion, fire, explosion modelling (DNV)

• Shell FRED

similar to PHAST

Page 6: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 6

Risk Group Staff:

• Permanent: 8

• Free Lance: 5 - 10

Page 7: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 7

Contents

1. Risk Management Services

2. Clients, References

Page 8: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 8

• PEMEX• PGPB, 120 Units in 4 Gas Complexes, 2006

• PEP, Offshore Platforms

• PEP Region Norte, Various Onshore Installations, ongoing

• PEP Region Sur, Vent Study of Nitrogene Removal Unit, Dynamic Process Simulation, Fully quantitative risk analysis

• DEMAR• Subsea Pipelines

• Upgrade Metering Platform Cayo Arcos, ongoing

• ICA Fluor• Risk Analysis, LNG Import Terminal Manzanillo, Dec./2007

Risk Management ServicesClients, References (1/2)

Page 9: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 9

• El Paso / TDF: LPG Transport System Burgos – Monterrey, • Participation in HAZOP

• Vent Study, Fire Fighting System analysis

• Availability Analysis

• Hydraulic Study, Waterhammer

April 2006, ongoing

• Termigas: Tuxpan LPG Terminal, Manoeuvrability Study, 2004• Ship Simulation in Hamburg

Risk Management ServicesClients, References (2/2)

Page 10: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 10

Conclusions

1. GLO Mexico offers a complete range of risk analysis services

2. More than 10 years experience

3. Emphasis on oil and gas, onshore and offshore

4. Environmental Risk analysis offered too

5. Experienced staff and latest tools available

Page 11: Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico

America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 11

Thank you for your attention!