jane addams memorial tollway corridor of the future

1
90 39 SOUTH BELOIT TOLL PLAZA ELGIN TOLL PLAZA BELVIDERE TOLL PLAZA DEVON TOLL PLAZA RIVER ROAD TOLL PLAZA 47 94 53 Irene Road Belvidere Oasis Park-and-Ride Facility Randall Road Park-and-Ride Facility Schaumburg/Hoffman Estates Area Elmhurst Road Illinois Route 47 Illinois Route 25 Park-and-Ride Facility WISCONSIN ILLINOIS BOONE MCHENRY OGLE DEKALB KANE LAKE COOK DUPAGE Improved Transit Access MARENGO-HAMPSHIRE McHenry County Area JANE ADDAMS MEMORIAL TOLLWAY (I-90) • Creating 21st century, state-of-the-art corridor linking Rockford to O’Hare Airport • Planning for new transit options • 62 miles of roadway improvements • Projected to handle more than 15,000 trucks carrying 375,000 tons of freight per day • Will save drivers $440 million annually due to reduced congestion and delays • Provides opportunity for local interchange improvements • Expected to create or sustain as many as 11,500 additional permanent jobs within the Chicago region • Interchange expansion being planned at multiple locations Possible Park-and-Ride Facility SOUTH BELOIT TOLL PLAZA Toll Plaza Location Possible Interchange Expansion Space for New Transit Options Add Fourth Lane Add Third Lane First Green Interchange R O C K F O R D O H A R E JANE ADDAMS MEMORIAL TOLLWAY INTERSTATE 90 Updated: 09/18/12 Corridor of the Future DRAFT - Subject to change

Upload: others

Post on 17-Nov-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JANE ADDAMS MEMORIAL TOLLWAY Corridor of the Future

90

39

SOUTH BELOIT TOLL PLAZA

ELGIN

TOLL

PLA

ZA

BELVID

ERE TOLL PLAZA

DEVON TOLL PLAZA

RIVER R

OAD TOLL PLAZA

47

94

53

Irene Road

Belvidere Oasis Park-and-Ride Facility

Randall Road Park-and-Ride Facility

Schaumburg/Ho�man Estates Area

Elmhurst Road

Illinois Route 47

Illinois Route 25 Park-and-Ride Facility

WISCONSIN

ILLINOIS

BOONE

MCHENRY

OGLE DEKALB

KANE

LAKE

COOK

DUPAGE

Improved Transit Access

MARENGO-H

AMPSHIR

E

McHenry County Area

JANE ADDAMS MEMORIAL TOLLWAY (I-90)• Creating 21st century, state-of-the-art corridor linking

Rockford to O’Hare Airport• Planning for new transit options • 62 miles of roadway improvements• Projected to handle more than 15,000 trucks carrying 375,000

tons of freight per day• Will save drivers $440 million annually due to reduced

congestion and delays• Provides opportunity for local interchange improvements• Expected to create or sustain as many as 11,500 additional

permanent jobs within the Chicago region• Interchange expansion being planned at multiple locations

Possible Park-and-Ride Facility

SOUTH BELOIT TOLL PLAZA

Toll Plaza Location

Possible Interchange Expansion

Space for New Transit Options

Add Fourth Lane

Add Third Lane

First Green Interchange

ROCKFORD

O’H

ARE

JANE ADDAMS MEMORIAL TOLLWAYI N T E R S TAT E

90Updated: 09/18/12

Corridor of the Future DRAFT - Subject to change